Beruflich Dokumente
Kultur Dokumente
terrace:
Crt.
Thickness Technical
heavy
No.
Layer name
d(m)
(kN/m3)
1. Interior mortar plaster
0,02
19
M50
2.
RC plate
0,15
25
3.
6.
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
0.38
n
1,35
3.75
1,35
5.0625
0.513
Equalization layer
0,015
21
0.32
1,35
0.38
0.02
0.18
1.35
0.22
0.15
40
0.06
1.35
0.76
Equalization concrete
layerM100
Hidroinsulation3c+4b
0.03
21
0.62
1.35
0.76
0.03
1.35
0.08
Protection layer(sand
0.03
gravel)
Total
22
1.35
0.79
0.06
0.66
5.48
7.87
Crt.
Thickness Technical
heavy
d(m)
No.
Layer name
(kN/m3)
1. Interior mortar plaster
0,01
19
M50
2.
RC plate
0,13
25
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g 0.38
d
n
1,35
3.75
1,35
5.0625
0.513
3.
Layer of sand
0,015
16
0.48
1,35
0.648
4.
P.F.L. hard
0.015
0.18
1.35
0.243
5.
Foliated parquet
0,02
0.176
1,35
0.238
6.
Total
4.966
6.704
Crt.
Thickness Technical
heavy
d(m)
No.
Layer name
(kN/m3)
1. Interior mortar plaster
0,01
19
M50
2.
RC plate
0,13
25
3.
4.
Equalisation plaster
M100
Mosaic
5.
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g 0.38
d
n
1.35
3.75
1,35
5.0625
0.513
0,02
18
0.54
1,35
0.729
0,02
21
0.42
1,35
0.567
Total
5.09
6.872
Thickness Technical
heavy
d(m)
No.
Layer name
(kN/m3)
1. Interior mortar plaster
0,02
19
M50
2.
BCA
0,20
6
3.
polystyren
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g0.285
d
n
1.35
1.5
1,35
2.025
0.385
0.10
0.8
0.08
1,35
0.010
19
0.27
1,35
0.3645
2.075
2.801
Layer name
Thickness Technical
heavy
d(m)
(kN/m3)
0,01
19
1.
2.
BCA
0,20
3.
0,01
5.
Total
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g0.285
d
n
1.35
0.60
1,35
0.891
19
0.285
1,35
0.385
1.17
0.385
1.58
Layer name
Thickness Technical
heavy
d(m)
(kN/m3)
0,01
19
1.
2.
BCA
0,10
3.
0,01
5.
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g0.285
d
n
1.35
1.5
1,35
2.025
19
0.285
1,35
0.385
Total
2.07
0.385
2.795
Stairs:
Crt.
No.
Thickness Technical
heavy
d(m)
(kN/m3)
0,015
19
Layer name
24
3.6
1,35
4.86
0,13
25
3.75
1,35
5.063
0,02
21
0.42
1,35
0.385
2.
RC step
0,08
3.
RC ramp
5.
Design
load
(kN/m2)
g 0.27
d
mosaic
Load
coefficient
n
1.35
1.
4. I
Normed
Load
( kN/m2)
Total
7.825
0.350
10.564
Balcony:
Crt.
Thickness Technical
heavy
d(m)
No.
Layer name
(kN/m3)
1. Exterior mortar plaster
0,015
18
2. M100 RC Plate
0,15
25
3.
Equalisation plaster
4. Mosaic M100
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
g 0.27
d
n
1.35
3.75
1,35
5.0625
0.3645
0,03
0.18
0.54
1,35
0.729
0,01
21
0.42
1,35
0.567
5.
Total
4.98
6.723
elevator
Thickness
Layer name
1. Exterior mortar plaster
2. M100 RC Plate
3.
5.
d(m)
Tecnical
heavy
0,01
(kN/m3)
18
0,30
Equalisation plaster
0,01
M100
Total
Normed
Load
( kN/m2)
Design
load
(kN/m2)
g 0.27
d
n
1.35
25
3.75
1,35
5.0625
0.18
0.54
1,35
0.729
4.98
b)Variable loads
Live loads:
Crt.
Load
coefficient
No.
Layer name
Normed
Load
( kN/m2)
Load
coefficient
Design
load
(kN/m2)
1.
Superior slab
0.75
n
1.5
2.
Current floor
1.5
4.5
3.
Stairs
1.5
1.125
0.3645
5.309
p1 0.75[kN / m 2 ]
n
p1 3.00 [kN / m 2 ]
[kN / m 2 ]
=2
p c n p n 1.4 2 2.8 kN / m 2
n = 1.4
p c n p n 1.4 2 2.8 kN / m 2
Snows action:
s k i ce c t s0,k
2
0.8 1 1 2 1.6 [kN / m ]
n=1.5;
s0,k=2
[kN / m 2 ]
Winds load:
w( z ) q ref C e ( z ) c p
w(z) wind pressure at z height over terrain on rigid surfaces
z
C e ( z ) 0.65
10
c p 0.7
aerodynamic pressure coefficient
C) Exceptional loads
i) Seismic action evaluation according to P100 2006:
In the modal computation, the seismic action si evaluated using the response
the sum of the effective modal masses for the considered modes of vibration is at
least 90% from the total mass of the structure;
all modes of vibration with an effective modal mass greater than 5% of the total
mass have been considered.
The shear force applied at the base of the building on the direction of the
seismic action:
Fb i Sd (T) m
where:
i = 1.20 the building is classified as an importance class III;
Sd(T) the ordinate of the design response spectrum corresponding to the
fundamental period T;
T the fundamental period of vibration in the plane of the horizontal
direction considered;
m the total mass of the building;
= 0.85 the correction factor which takes into account the contribution of
the fundamental mode of vibration through the effective modal mass associated
(chose for T1<Tc and for buildings having more than two levels);
Sd (T) a g
T
q
5 u
1
u
1.35;
1
The mass on each level is computed using the software Robot Millennium.
EE E2E,k
where:
neglected;
For each level, the centers of mass and the centre of stiffness are
different, and they may or may not be on the same vertical line;
In the centre of mass of each floor, three DDOFs are considered: two
translations, ux and uy and a rotation about the vertical axis, u.