Status of Remaining Activities as on 05-01-2015

in Preparation for Energization of Safaniyah SVC Project.


S.NO

Description of Activities

Completed up to
Previous Week

Completed this Week

Total

Remaining

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

100.00%
100.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

0.00%

0.00%

0.00%

100.00%

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

100.00%
100.00%

0.00%

0.00%

0.00%

100.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

0.00%
0.00%
0.00%

100.00%
100.00%
100.00%

0.00%
0.00%

0.00%
0.00%

0.00%
0.00%

100.00%
100.00%

0.00%
0.00%
10.00%
0.00%

0.00%
0.00%
5.00%
0.00%

0.00%
0.00%
15.00%
0.00%

100.00%
100.00%
85.00%
100.00%

75.00%

0.00%

75.00%

25.00%

Civil Works, Erection and Testing


A Civil Works
1 Control Building
a Control Room.
1 2nd coat of paint on walls and floor
2 False ceiling
b AC/DC room
1 2nd coat of walls and floor
b Switchgear Room
1 2nd coat of walls and floor
c Battery Room
1 Eye wash
d Communication Room
1 2nd coat of paint on walls and floor
2 False ceiling
e Valve Rooms
1 Internal Fence
f Office
1 False ceiling
2 Epoxy on floor
3 2nd coat of paint on walls and floor
g Store
1 Epoxy on floor
2 2nd coat of paint on walls and floor
h Toilet
1 Fixing of Urinal,WC,water heater
2 2nd coat of paint on walls and floor
3 Septic Tank
4 False ceiling
i Other works in Control Building
1 Roofing works on roof & canopies

60.00%
0.00%
0.00%
0.00%
5.00%
0.00%

5.00%
0.00%
0.00%
0.00%
5.00%
0.00%

65.00%
0.00%
0.00%
0.00%
10.00%
0.00%

35.00%
100.00%
100.00%
100.00%
90.00%
100.00%

0.00%
70.00%
0.00%

0.00%
10.00%
0.00%

0.00%
80.00%
0.00%

100.00%
20.00%
100.00%

20.00%
0.00%
55.00%
0%

35.00%
0.00%
5.00%
0%

55.00%
0.00%
60.00%
0%

45.00%
100.00%
40.00%
100%

85%

0%

85%

15%

b Installation & testing of grounding grid &


grounding of equipment

90%

0%

90%

10%

c Readiness of Communication System

92%

1%

93%

7%

40%

0%

40%

60%

2
3
4
5
6
7
j
1
2
3
k
1
l
m
n

Loading Plateform(2 nos)


Side Walk
False ceiling in corridor
Access ladder & Drainage works
Paint on all doors
Staircase Epoxy & paint on railings
Cable Trenches
Precast Covers
Water proofing membrane external
Termination of w/p membrane
Lighting and lightning pole
Pedestals
Internal Fence.
Backfilling
Asphalting

B Electrical Works
a Erection of Filter Area

d Stability and
Transformers

sensitivity

test

of

Power

e AMR metering system

f Completion of PDS
g Testing and commissioning activities

77%
90%

3%
2.0%

80%
92.0%

20%
8.0%

h Glanding peeling, dressing and termination of


AC/DC lighting Panels

100%

0%

100.0%

0%

i Completion of Remote end 230kV New Saudi


Aramco S/S.

85%

3%

88%

12%

69%

1%

70%

30%

b Plumbing System

31%

1%

32%

68%

c Fire Detection & Alarm system

65%

2%

67%

33%

C Mechanical Works
a HVAC System

d FM 200 fire protection system

60%

0%

60%

40%

e Fire Fighting (Fire Extinguishers)

80%

0%

80%

20%

f Fire Hydrant System

0%

0%

0%

100%

Material & Manpower


A Electrical
a CTs for remote ends
b AMR metering System
c 13.8kV switchgear configuration with SAS.

1st lot has been delivered at site. FAT for 2nd batch is scheduled on 15-11-2013.
Not yet delivered at site despite of several site instruction notes, discussion during meetings and emails
Signals has been configured in the SAS system. These signals will be marked in red on the approved signal list and will

B Communication
a Accessories for communication duct banks, HH Partial delivery of material at site causing delay in close out activities related to communication HH, MH and duct banks
and MH.
b Media convertor Panels
C Mechanical
a Submersible Pumps
b HVAC balance duct material and accessories
c Mimic panels & balance fire detection &
protection system materials.
D Punch List
a
Punch List issued by DAR, CSD and after
walkthrough inspection needs to be rectified.

6 No. for safaaniyah 380kV BSP and 4 Nos. in loose form media convertor panels have been delivered at site and have b
Maadan S/S are yet to be delivered due to payment issue.
Delivered at site on 5/10/2013. (Closed)
Agreed delivery date 30-10-2013. Siemens confirmed in the Progress Review Meeting that delay in delivery of material
Agreed delivery date for Mimic panel and for remaining material date is 27-10-2013.

Siemens has been advised in progress review meetings & vide letter DAR-30933106/KA/059 to arrage dedicated manpo
and mechanical works. Siemens confirmed in the progress review meeting that punch list "A" catagory points will be rec
needs to increase manpower to meet the target.

ining Activities as on 05-01-2015


ergization of Safaniyah SVC Project.
Remarks

Preparation of Signal list for SCADA in progress.


Testing upto station level internal testing & under
CSD witnessing in progress One (1) SAS Engineer
is available at site. Remaining are BB Protection SetI & Set-II, TP-20 & 13.8kV.

Final Testing of Substation grounding grid is yet to


be done.
DVM local test has been completed and internal
testing of PSE panels is pending at Ma'aden S/S.
Activities at New Saudi Aramco S/S are in progress.
End to End test completed for 2 Nos of DVM facing
Manifa.
On hold.

Not yet delivered at site despite of several site


instruction notes, discussion during meetings and
emails. Matter needs to be resolved
Splicing of 24 core FOC in progress.
Testing of REB500 relay for 230KV completed.
Stability test of 380kV BB completed. Stability test
of 230kV BB is in progress. Stability & sensitivity
test of Power transformers is on hold 40%
completed. End to end and LSP testing are
remaining.

Completed (Closed). Inetrnal testing is in completed.


Internal scheme check in progress
Testing with CSD witness of Line protection scheme
in progress. Annunicator & SOE are remaining.
Delivery and hence installation and testing of Media
Converter panel is pending.

Termination of control cable in progress. Duct work


for 380kV & 230kV GIS buildings in progress.
Balance outdoor duct yet to be delivered.Revised
completion date is 16-11-2013
Slow progress. Submersible pumps delivered to site.
Preparation for pump installation going on. Revised
completion date is 30-10-2013
To expedite the progress SIEMENS / Firefreeze
advised to increase the man power and arrange the
balance materials immediately.

On hold, SIEMENS has to start the installation


activities immediately as the Partial IFC drawing for
FM 200 system of control building & 380kV GIS
building is received.
Installation fire extinguishers at power & auxiliary
transformer area, pump house, guard house and
labeling in all areas balance.
Civil work in progress. Waiting for civil work to
complete.

for 2nd batch is scheduled on 15-11-2013.


eral site instruction notes, discussion during meetings and emails
S system. These signals will be marked in red on the approved signal list and will be submitted to SEC for approval.

ing delay in close out activities related to communication HH, MH and duct banks.

4 Nos. in loose form media convertor panels have been delivered at site and have been installed. For New Saudi Aramco and
e to payment issue.

d)
mens confirmed in the Progress Review Meeting that delay in delivery of material will not affect the commissiong schedule.

and for remaining material date is 27-10-2013.

review meetings & vide letter DAR-30933106/KA/059 to arrage dedicated manpower for civil, electrical, communication
med in the progress review meeting that punch list "A" catagory points will be rectified by 10-11-2013. However Siemens
e target.