1 & Portion2)

S.No
1
1.1
1.2
2
3

Documents
Post Tender Meeting
Finalisation of Vendors
Engineering and Design Serivces
Drawing Numbers for (I&II)
Title Bolck Numbers for (I&II)

4 HSE Document
4.1 Loss and Prevention Program
5 Base Design Submission
5.1 Conductor
A TD for ACSR conductors(I&II) [GTP]
a.Data Schedule (10-TMSS-01 [rev.01])
b.Compliance Statement (01-TMSS-01[rev.02],10-TMSS-01
[rev.01])
c.Type Test Report
d.Manufactures responsibility Statement
e.Any other Qualifying Documents (Certification)
B

ITP of Conductor

5.2 OPGW
A TD of OPGW-I [GTP]
Data Schedule for OPGW 48 Cores.
Compliance Statement ( 01-TMSS-01, 10-TMSS-04 Rev.01 )
Type test report.
Manufactures responsibility Statement

Any other Qualifying documents.


Drum drawing.
B TD of OPGW-II [GTP]
Data Schedule for OPGW 48 Cores.
Compliance Statement ( 01-TMSS-01, 10-TMSS-04 Rev.01 )
Type test report.
Manufactures responsibility Statement
Any other Qualifying documents.
Drum drawing.
ITP of OPGW

5.3 Towers
A TD of Tower - I
Data Schedule for S1N, TA1N, TA2N, TA3N & DE towers.
Compliance Statement (20-TMSS-01 Rev.01 & 01-TMSS-01
Rev.02)
Type test report.
Manufactures responsibility Statement.
Any other Qualifying documents
B TD of Tower - II
Data Schedule for S1N, TA1N, TA2N, TA3N & DE towers.
Compliance Statement (20-TMSS-01 Rev.01 & 01-TMSS-01
Rev.02)
Type test report.
Manufactures responsibility Statement.
Any other Qualifying documents
C Shop & Erection Drawings of S1N (0-2 )tower -I
D Shop & Erection Drawings of S1N (0-2) tower -II
E Shop & Erection Drawings of TA1N (2-10) tower -I
F
G
H
I
J
K
L

Shop & Erection Drawings of TA1N (2-10) tower -II


Shop & Erection Drawings of TA2N (10-35) tower -I
Shop & Erection Drawings of TA2N (10-35) tower -II
Shop & Erection Drawings of TA3N (35-90) tower -I
Shop & Erection Drawings of TA3N (35-90) tower -II
Shop & Erection Drawings of DE (0-30) tower -I
Shop & Erection Drawings of DE (0-30) tower -II

5.4 Hardware Fittings


A TD of documents of Conductor & OPGW Hardware-I
Data Schedule for line hardware.
Compliance Statement ( 12-TMSS-01 Rev.02, 01-TMSS-01
Rev.02, 12-TMSS-02 Rev.01)
Type test report.
Manufactures responsibility Statement
Any other Qualifying documents
B TD of documents of Conductor & OPGW Hardware-II

Data Schedule for line hardware.


Compliance Statement ( 12-TMSS-01 Rev.02, 01-TMSS-01
Rev.02, 12-TMSS-02 Rev.01)
Type test report.
Manufactures responsibility Statement
Any other Qualifying documents
C Structure Identification & warnings-I
Structure Identification & warnings-II
D ACD,SB,Anti Theft bolts,Planut-I
ACD,SB,Anti Theft bolts,Planut-II
E ITP of Insul.Hardware & Conductor Fittings

5.5 Spacer Damper


A TD of Spacer Damper-I
B TD of Spacer Damper-II
C Type Test plan for Spacer Damper
D ITP of Spacer Damper

5.6 Insulator
A

TD for Insulators(I &II)


Data Schedule for Insulator.(160 kN & 330kN Porcelain Long
Rod Insulators)
Compliance Statement ( 15-TMSS-04 Rev.01, 01-TMSS-01
Rev.01)
Type test report
Manufactures responsibility Statement
Any other Qualifying documents.

B ITP of Insulator

5.7

OFMR, UGNMFOC, JOINT BOX (OPGW-OPGW,


OPGW-FOC)
Data Schedule for OFMR, FOC, Joint box .
Compliance Statement ( 48-TMSS-02 Rev.02, 01-TMSS-01
Rev.02)
Type test report.
Manufactures responsibility Statement
Any other Qualifying documents

5.8 Grounding

A TD for Grounding-I& II

6 Route Alignment Drawing


7 Sag and Tension Calculation
Conductor
OPGW

8 Mid Sapn Calculation


9 Plan and Profile( Portion-I)
Route map with spotted structure
Structure List
Profile
Sag Template Curve in transparent Sheet

10 Plan and Profile( Portion-II)


Route map with spotted structure
Structure List
Profile
Sag Template Curve in transparent Sheet

11 Soil Investigation
Boring at site
Report Submission
12 Access road & Structure

13 Foundation Design
Design Calculation
Foundation Drawings

14 QA/QC Doc.for (I&II)


A Third Party Inspector-Tower (SGS)
B Third Party Inspector- Insulator
C Third Party Inspector- OPGW

15 Purchase and Order


14.1
14.2
14.3
14.4
14.5

PO of Insulators (I&II)
PO of Conductors (I&II)
PO of OPGW (I&II)
PO of Towers (I&II)
PO of Hardware fittings (I&II)

Source of Document

Approved
Vendor/contractor
/Company

SUBMISSION to client
with Date

A-accepted
A

DAR ENGG

Coordination -HSE Mumbai.

1/26/2016

1/26/2016

4/17/2016

Coordination -HSE Mumbai.

MIDAL Cables

2/28/2016

Proj.Coordinator-Mumbai

Proj.Coordinator-Mumbai

4/7/2016
LS Cables

Proj.Coordinator-Mumbai

Proj.Coordinator-Mumbai

4/7/2016
KPTL
Design.Dept Mumbai

3/14/2016

Design.Dept Mumbai

3/14/2016

Design.Dept Mumbai
Design.Dept Mumbai

3/9/2016
3/9/2016

Design.Dept Mumbai

3/13/2016

Design.Dept Mumbai
Design.Dept Mumbai
Design.Dept Mumbai
Design.Dept Mumbai
Design.Dept Mumbai
Design.Dept Mumbai
Design.Dept Mumbai

3/13/2016
3/16/2016
3/16/2016
4/10/2016
4/10/2016
4/10/2016
4/10/2016

MOSODORFER-AUSTRIA
Proj.Coordinator-Mumbai

Proj.Coordinator-Mumbai

DAR ENGG
DAR ENGG

4/13/2016
4/17/2016

Proj.Coordinator-Mumbai

4/13/2016

Proj.Coordinator-Mumbai

4/13/2016

Proj.Coordinator-Mumbai

4/7/2016

DAMP-ITALY
Proj.Coordinator-Mumbai
Proj.Coordinator-Mumbai
Proj.Coordinator-Mumbai
Proj.Coordinator-Mumbai
NGK-Insulators
3/2/2016

Proj.Coordinator-Mumbai

Proj.Coordinator-Mumbai

4/5/2016

Proj.Coordinator-Mumbai

AL HARITH-KSA

A
A
A

A
A
A

Approval of Client
B-accepted as with
note

Remarks
C-Resubmit

Not submitted under hold

Can Proceed only after ITP Approval

Submitted wiating for SEC reply

Submitted wiating for SEC reply

Submitted wiating for SEC reply


Submitted wiating for SEC reply

Rev.01 under Preparation of HO

Rev.01 under Preparation of HO

B
B
B

Submitted wiating for SEC reply


Submitted wiating for SEC reply

B
B
B

Submitted wiating for SEC reply


Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply

Submitted wiating for SEC reply

Submitted wiating for SEC reply

Submitted wiating for SEC reply

Submitted wiating for SEC reply


Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply

C
C

Submitted wiating for SEC reply


Submitted wiating for SEC reply
Submitted wiating for SEC reply
Submitted wiating for SEC reply

Can Proceed only after ITP and Type Test


Approval

Submitted wiating for SEC reply

Submitted wiating for SEC reply

3rd party Inspector Appred for


Tower,Conductor,OPGW

KALPATARU IBN OMAIRAH COMPANY LTD,KSA


WO:302(Portion 1 & Portion 2)
CONTRACT NO: 4400007152
All Documents Status
ITEMS

Vendor

Conductor
OPGW

Midal Cables
LS cables

Insulators

NGK insulators

Tower/S1N
Tower/TA1N
Tower/TA2N
Tower/TA3N
Tower/DE
Hardware Fittings
Spacer Damper
NFOC
Joint Box
Grounding

Technical Documents
Submited(28.04.16)
Accepted

ITP
Accepted
Submited(07.04.16)

Type Test

Final Accpetance based upon


Type Test report Acceptance Reply from HO awaited Rejected(20.04.16)
by PE dep.SEC

KPTL
KPTL
KPTL
KPTL
KPTL
Mosdorfer
Damp

Shop & Erection


Drawing(SED)

Accepted

Accepted
Accepted

Submitted on (20.04.16)
Accepted

Submitted (02.05.16)
Submitted (02.05.16)
Submitted (02.05.16)
Accepted

Submited(28.04.16)

Submited(07.04.16)
Submited(11.04.16)

Submited(21.04.16)
Submited(11.04.16)

3rd Party Inspection


Agency
SGS/Breau Vertias
SGS

Placed
Placed

Intertek

Placed

SGS
SGS
SGS
SGS
SGS
Not Yet Decided
Not Yet Decided

Prysmian
KSA

Accepted

Not Yet Decided

P.O

Not Placed
Not Placed
Not Placed
Not Placed
Not Placed
Not Placed
Not Placed
Not Placed
Not Placed
Not Placed

Remarks
SEC reply awaited

KALPATARU IBN OMAIRAH COMPANY LTD,KSA


WO:302(Portion 1 & Portion 2)
CONTRACT NO: 4400007152
Document Approval Flow Chart
Post Tender Meeting
1.Finalisation of Vendors
2.Engineering and Design Serivces-DAR Engineering
Drawing Numbers for (I&II)
By wrting letter to SEC by Project Manger (PM) and we recived(Drawing Control Sheet)
Title Bolck Numbers for (I&II)
By wrting letter to SEC by Project Manger (PM) and we recived
HSE Document
Loss and Prevention Program(submitted in the HSE Department of SEC Quassim)
Purchase Order
Purchase Order Can't be placed Until the Materials Technical Documents are Approved by SEC (E&DD)
For Conformation of Material Following Document to Be Submit and Get it Approved
A.Technical Document
QA/QC for Material
Each and every materials are to be witnesed by SEC/3rd Party Inspector during test before Shippment
The required 3rd Party Inspectors should approved by SEC and for Approval CV's of 3rd Party Inspectors Should be Submittied
Route Alignment Drawing
Get it approved by Submission of Route Aligment Drawings with Covering &DTS Sign and Seal by Project Manger
Plan and Profile
Step-1
Obtain this Diagram from DAR ENGG E&DD
Print Out Paper Size of Diagram Should be Maintained as per Diagram Control Sheet by SEC
Document Submitted to the E&DD department SEC
Check List for Submission
*Covering Letter & DTS Signed and Seal by Project Manager
*Route map with spotted structure
*Structure List
*Plan & Profile
*Sag Template Curve in transparent Sheet

Step-2:
Reciving Reply from SEC for Plan Profiles
Submission Comments based on the following Status we have to proceed
A: Acceptable - Approved of Plan and Profile
B: Acceptable as Noted- Requset for Some missing Digram Number ,plant number,Size mentioned and once it submited then it will become A status.
C: Not Acceptable (Resubmit) -Changed of Documents Required
See Attached Sheet-Comments on the Documents to Rectify.
Step-3:
All Documents Should get A status until that the Submission will Continue with Revisions.
Each Revision the Step-1 Check lit should be followed and with the corrected and updated documents will be submitted
Along with that the Previous Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance Statement

Procedure for Documents / Drawings Submit to SEC


1.Write a Letter to SEC in the KIOCL letter Head Metion the DTS no,Material,Document Type,Revision Number(With Sign & Seal by Project Manager)
2. InReply of these Letter we will recive the Transmittal Letter from Project Department Quassim,Metioning which Department to Submit the Document
3.Arrangement of Document Following order
Transmittal-2 Copies
KIOCL letter(with Seal & Sign By Project Manger)
Submittal Form (with Seal & Sign By Project Manger)
Documents Fully with Seal and Sign by Vendors/DAR ENGG
Drawings (with Seal and Sign by Project Manger)
Copy CD wiritten all the Document which are Submitted
4.During Submission -1 Transmityal copy will be taken by us with Acknowledgement of Recived
5.During Submission 2 set we will make ,1 set to SEC-Riyadh,1 set to Project Department Quassim.

Base Design Submission


Tower

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Project Cordin
Shuold be submit and get approval from ( SEC-E&DD)
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get Signed from
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs only from the
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO certifcation ec
Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status we
A: Acceptable - Approved and P.O can be place
B: Acceptable as Noted- Requset for Some mis
C: Not Acceptable (Resubmit) -Changed of Doc
See Attached Sheet-Comments on the Docu
Step-3:

All Documents Should get A status until that the Submis


Each Revision the Step-1 Check lit should be followed an
Along with that the Previous Comment Sheet also should
Inspection and Test Plan Submission (FAT-Factory Acceptance test)
Step-1:
Obtain the Document from HO

Submit it to the Prequalification and Support Division Dep


Checklist for Submission
*Covering Letter and DTS seal & Sign by Projec
*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status we
A: Acceptable - Approved for the FAT report su
B: Acceptable as Noted- Requset for Some mis
C: Not Acceptable (Resubmit) -Changed of Doc
See Attached Sheet-Comments on the Docu
Step-3:

All Documents Should get A status until that the Submis


Each Revision the Step-1 Check lit should be followed an
Along with that the Previous Comment Sheet also should

Note: Each and every submission to Prequalification and Support Department

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division Dep
Checklist for Submission
*Covering Letter and DTS seal & Sign by Projec
*Type Test report (Should not be more than Fiv
Note: If the Type test report is more than Five Year past then test should cond
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status we
A: Acceptable - Approved for the Type Test Sub

B: Acceptable as Noted- Requset for Some mis


C: Not Acceptable (Resubmit) -Changed of Doc
See Attached Sheet-Comments on the Docu
Step-3:

All Documents Should get A status until that the Submis


Each Revision the Step-1 Check lit should be followed an
Along with that the Previous Comment Sheet also should

Note: Each and every submission to Prequalification and Support Department


Shop And Erection Drawings Submission
Step-1

Obtain this Diagram from Mumbai HO, E&DD


Print Out Paper Size of Diagram Should be Maintained as per Di
Document Submitted to the E&DD department SEC
Check List for Submission
*Covering Letter & DTS Signed and Seal by Project M
*Shop and Erection drawings
*Stub Stettings
*Template Settings
*Stub Cleat Settings

Step-2:

Reciving Reply from SEC for Shop and Erection Drawings


Submission Comments based on the following Status we have to
A: Acceptable - Approved of Plan and Profile
B: Acceptable as Noted- Requset for Some missing D
C: Not Acceptable (Resubmit) -Changed of Documen
See Attached Sheet-Comments on the Documents
Step-3:

All Documents Should get A status until that the Submission will
Each Revision the Step-1 Check lit should be followed and with t

Along with that the Previous Comment Sheet also should be atta

Mumbai HO Project Cordinator


m ( SEC-E&DD)

& DTS and get Signed from Project Manager

valid for 5 yrs only from the Date material tested)


ity Statement
uments(ISO certifcation ect..)

ical Documents
he following Status we have to proceed
ed and P.O can be placed
- Requset for Some missing Documents and once it submited then it will become
ubmit) -Changed of Documents Required
Comments on the Documents to Rectify.

s until that the Submission will Continue with Revisions.


t should be followed and with the corrected and updated documents will be submitted
ment Sheet also should be attached and Actions taken shoulbe be mentioned in Complia

ry Acceptance test)

nd Support Division Department of SEC

TS seal & Sign by Project Manger

he following Status we have to proceed


ed for the FAT report submitted
- Requset for Some missing Documents and once it submited then it will become
ubmit) -Changed of Documents Required
Comments on the Documents to Rectify.

s until that the Submission will Continue with Revisions.


t should be followed and with the corrected and updated documents will be submitted
ment Sheet also should be attached and Actions taken shoulbe be mentioned in Complia

n and Support Department of SEC normally takes 3 weeks for reply.

nd Support Division Department of SEC

TS seal & Sign by Project Manger


ld not be more than Five Year Report)
past then test should conducted newly and submit

he following Status we have to proceed


ed for the Type Test Submitted

- Requset for Some missing Documents and once it submited then it will become
ubmit) -Changed of Documents Required
Comments on the Documents to Rectify.

s until that the Submission will Continue with Revisions.


t should be followed and with the corrected and updated documents will be submitted
ment Sheet also should be attached and Actions taken shoulbe be mentioned in Complia

n and Support Department of SEC normally takes 3 weeks for reply.

d be Maintained as per Diagram Control Sheet by SEC


artment SEC

gned and Seal by Project Manager

d Erection Drawings
ollowing Status we have to proceed
of Plan and Profile
equset for Some missing Digram Number ,plant number,Size mentioned and once it submited then i
mit) -Changed of Documents Required
ments on the Documents to Rectify.

il that the Submission will Continue with Revisions.


ould be followed and with the corrected and updated documents will be submitted

Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance Statement

hen it will become A status.

ments will be submitted


be mentioned in Compliance Statement

hen it will become A status.

ments will be submitted


be mentioned in Compliance Statement

hen it will become A status.

ments will be submitted


be mentioned in Compliance Statement

and once it submited then it will become A status.

submitted

d in Compliance Statement

Base Design Submission


Conductor

Technical Document Submission


Step-1:
Obtain the Technicial docume
Shuold be submit and get ap
Check List for Technical Docu
*Prepare Coverin
*Data Schedule
*Compliace State
*Type Test report
*Manufactures Re
*Any Other Quali
*Drum diagram
Step-2:

Reciving Reply from SEC f


Submission Comments ba
A
B
C
See Attached
Step-3:

All Documents Should get


Each Revision the
Along with that the Previo

Inspection and Test Plan Submission (


Step-1:

Obtain the Document from


Submit it to the Prequalifi

Checklist for Submission


*Covering Lette
*ITP report

Step-2:

Reciving Reply from SEC f


Submission Comments ba
A
B
C
See Attached
Step-3:

All Documents Should get


Each Revision the
Along with that the Previo

Note: Each and every submission to Preq

Type Test Plan Document Submission


Step-1:

Obtain the Document from


Submit it to the Prequalifi
Checklist for Submission
*Covering Lette
*Type Test repo
*Any Special Te
Note: If the Type test report is more than
Step-2:

Reciving Reply from SEC f


Submission Comments ba
A

B
C
See Attached
Step-3:

All Documents Should get


Each Revision the
Along with that the Previo

Note: Each and every submission to Preq

Sag and Tension Calculation Chart


Conductor(should submit along with Profi

Submission

ument Submission

tain the Technicial document from Mumbai HO Project Cordinator


uold be submit and get approval from ( SEC-E&DD)
eck List for Technical Document Submission
*Prepare Covering Letter & DTS and get Signed from Project Manager
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs only from the Date material tested)
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO certifcation ect..)
*Drum diagram

civing Reply from SEC for Technical Documents


bmission Comments based on the following Status we have to proceed
A: Acceptable - Approved and P.O can be placed
B: Acceptable as Noted- Requset for Some missing Documents and once it subm
C: Not Acceptable (Resubmit) -Changed of Documents Required
See Attached Sheet-Comments on the Documents to Rectify.

Documents Should get A status until that the Submission will Continue with Revisions.
ch Revision the Step-1 Check lit should be followed and with the corrected and updated
ong with that the Previous Comment Sheet also should be attached and Actions taken sh

d Test Plan Submission (FAT-Factory Acceptance test)

tain the Document from HO


bmit it to the Prequalification and Support Division Department of SEC

ecklist for Submission


*Covering Letter and DTS seal & Sign by Project Manger
*ITP report

civing Reply from SEC for ITP


bmission Comments based on the following Status we have to proceed
A: Acceptable - Approved for the FAT report submitted
B: Acceptable as Noted- Requset for Some missing Documents and once it subm
C: Not Acceptable (Resubmit) -Changed of Documents Required
See Attached Sheet-Comments on the Documents to Rectify.

Documents Should get A status until that the Submission will Continue with Revisions.
ch Revision the Step-1 Check lit should be followed and with the corrected and updated
ong with that the Previous Comment Sheet also should be attached and Actions taken sh

d every submission to Prequalification and Support Department of SEC normally takes 3 weeks for r

n Document Submission

tain the Document from HO


bmit it to the Prequalification and Support Division Department of SEC
ecklist for Submission
*Covering Letter and DTS seal & Sign by Project Manger
*Type Test report (Should not be more than Five Year Report)
*Any Special Test required that also should be submitted
e test report is more than Five Year past then test should conducted newly and submit

civing Reply from SEC for ITP


bmission Comments based on the following Status we have to proceed
A: Acceptable - Approved for the Type Test Submitted

B: Acceptable as Noted- Requset for Some missing Documents and once it subm
C: Not Acceptable (Resubmit) -Changed of Documents Required
See Attached Sheet-Comments on the Documents to Rectify.

Documents Should get A status until that the Submission will Continue with Revisions.
ch Revision the Step-1 Check lit should be followed and with the corrected and updated
ong with that the Previous Comment Sheet also should be attached and Actions taken sh

d every submission to Prequalification and Support Department of SEC normally takes 3 weeks for r

on Calculation Chart
uld submit along with Profiles)

rial tested)

ments and once it submited then it will become A status.

ontinue with Revisions.


corrected and updated documents will be submitted
ed and Actions taken shoulbe be mentioned in Compliance Statement

ments and once it submited then it will become A status.

ontinue with Revisions.


corrected and updated documents will be submitted
ed and Actions taken shoulbe be mentioned in Compliance Statement

rmally takes 3 weeks for reply.

y and submit

ments and once it submited then it will become A status.

ontinue with Revisions.


corrected and updated documents will be submitted
ed and Actions taken shoulbe be mentioned in Compliance Statement

rmally takes 3 weeks for reply.

Base Design Submission


OPGW

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Pro
Shuold be submit and get approval from ( SEC-E&DD
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs o
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO ce
*Drum diagram
Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status
A: Acceptable - Approved and P.O can be
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:
Obtain the Document from HO
Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by

*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the FAT repo
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by
*Type Test report (Should not be more tha
*Any Special Test required that also shoul
Note: If the Type test report is more than Five Year past then test
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the Type Tes
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D

Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support


Sag and Tension Calculation Chart
OPGW(Shoud submit along with Profiles)

ment from Mumbai HO Project Cordinator


pproval from ( SEC-E&DD)
cument Submission
ing Letter & DTS and get Signed from Project Manager

rts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

or Technical Documents
ed on the following Status we have to proceed
Approved and P.O can be placed
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S
(FAT-Factory Acceptance test)

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger

ed on the following Status we have to proceed


Approved for the FAT report submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger


rt (Should not be more than Five Year Report)
st required that also should be submitted
n Five Year past then test should conducted newly and submit

ed on the following Status we have to proceed


Approved for the Type Test Submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

Base Design Submission


Insulator

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Pro
Shuold be submit and get approval from ( SEC-E&DD
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs o
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO ce

Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status
A: Acceptable - Approved and P.O can be
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:
Obtain the Document from HO
Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by

*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the FAT repo
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by
*Type Test report (Should not be more tha
*Any Special Test required that also shoul
Note: If the Type test report is more than Five Year past then test
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the Type Tes
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D

Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

ment from Mumbai HO Project Cordinator


pproval from ( SEC-E&DD)
cument Submission
ing Letter & DTS and get Signed from Project Manager

rts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

or Technical Documents
ed on the following Status we have to proceed
Approved and P.O can be placed
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S
(FAT-Factory Acceptance test)

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger

ed on the following Status we have to proceed


Approved for the FAT report submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger


rt (Should not be more than Five Year Report)
st required that also should be submitted
n Five Year past then test should conducted newly and submit

ed on the following Status we have to proceed


Approved for the Type Test Submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

Base Design Submission


Spacer Damper

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Pro
Shuold be submit and get approval from ( SEC-E&DD
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs o
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO ce

Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status
A: Acceptable - Approved and P.O can be
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:
Obtain the Document from HO
Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by

*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the FAT repo
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by
*Type Test report (Should not be more tha
*Any Special Test required that also shoul
Note: If the Type test report is more than Five Year past then test
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the Type Tes
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D

Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

ment from Mumbai HO Project Cordinator


pproval from ( SEC-E&DD)
cument Submission
ing Letter & DTS and get Signed from Project Manager

rts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

or Technical Documents
ed on the following Status we have to proceed
Approved and P.O can be placed
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S
(FAT-Factory Acceptance test)

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger

ed on the following Status we have to proceed


Approved for the FAT report submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger


rt (Should not be more than Five Year Report)
st required that also should be submitted
n Five Year past then test should conducted newly and submit

ed on the following Status we have to proceed


Approved for the Type Test Submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

Base Design Submission


Hardware Fittings

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Proje
Shuold be submit and get approval from ( SEC-E&DD)
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs on
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO cer

Step-2:

Reciving Reply from SEC for Technical Documen


Submission Comments based on the following S
A: Acceptable - Approved and P.O can
B: Acceptable as Noted- Requset for S
C: Not Acceptable (Resubmit) -Chang
See Attached Sheet
Step-3:

All Documents Should get A status until that th


Each Revision the Step-1 Check lit should be fo
Along with that the Previous Comment Sheet als

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Div
Checklist for Submission

*Covering Letter and DTS seal & Sign


*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following S
A: Acceptable - Approved for the FAT
B: Acceptable as Noted- Requset for S
C: Not Acceptable (Resubmit) -Chang
See Attached Sheet
Step-3:

All Documents Should get A status until that th


Each Revision the Step-1 Check lit should be fo
Along with that the Previous Comment Sheet als
Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Div
Checklist for Submission
*Covering Letter and DTS seal & Sign
*Type Test report (Should not be more
*Any Special Test required that also s
Note: If the Type test report is more than Five Year past then test s
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following S
A: Acceptable - Approved for the Type
B: Acceptable as Noted- Requset for S

C: Not Acceptable (Resubmit) -Chang


See Attached Sheet
Step-3:

All Documents Should get A status until that th


Each Revision the Step-1 Check lit should be fo
Along with that the Previous Comment Sheet als
Note: Each and every submission to Prequalification and Support

ment from Mumbai HO Project Cordinator


approval from ( SEC-E&DD)
ocument Submission
ring Letter & DTS and get Signed from Project Manager

orts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

C for Technical Documents


based on the following Status we have to proceed
e - Approved and P.O can be placed
e as Noted- Requset for Some missing Documents and once it submited then it will beco
table (Resubmit) -Changed of Documents Required
ed Sheet-Comments on the Documents to Rectify.

get A status until that the Submission will Continue with Revisions.
-1 Check lit should be followed and with the corrected and updated documents will be s
vious Comment Sheet also should be attached and Actions taken shoulbe be mentioned

n (FAT-Factory Acceptance test)

ification and Support Division Department of SEC

tter and DTS seal & Sign by Project Manger

C for ITP
based on the following Status we have to proceed
e - Approved for the FAT report submitted
e as Noted- Requset for Some missing Documents and once it submited then it will beco
table (Resubmit) -Changed of Documents Required
ed Sheet-Comments on the Documents to Rectify.

get A status until that the Submission will Continue with Revisions.
-1 Check lit should be followed and with the corrected and updated documents will be s
vious Comment Sheet also should be attached and Actions taken shoulbe be mentioned

requalification and Support Department of SEC normally takes 3 weeks for reply.

ification and Support Division Department of SEC

tter and DTS seal & Sign by Project Manger


port (Should not be more than Five Year Report)
Test required that also should be submitted
an Five Year past then test should conducted newly and submit

C for ITP
based on the following Status we have to proceed
e - Approved for the Type Test Submitted
e as Noted- Requset for Some missing Documents and once it submited then it will beco

table (Resubmit) -Changed of Documents Required


ed Sheet-Comments on the Documents to Rectify.

get A status until that the Submission will Continue with Revisions.
-1 Check lit should be followed and with the corrected and updated documents will be s
vious Comment Sheet also should be attached and Actions taken shoulbe be mentioned

requalification and Support Department of SEC normally takes 3 weeks for reply.

ubmited then it will become A status.

ated documents will be submitted


n shoulbe be mentioned in Compliance Statement

ubmited then it will become A status.

ated documents will be submitted


n shoulbe be mentioned in Compliance Statement

ubmited then it will become A status.

ated documents will be submitted


n shoulbe be mentioned in Compliance Statement

Base Design Submission


NFOC,JB

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Pro
Shuold be submit and get approval from ( SEC-E&DD
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs o
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO ce

Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status
A: Acceptable - Approved and P.O can be
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:
Obtain the Document from HO
Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by

*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the FAT repo
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by
*Type Test report (Should not be more tha
*Any Special Test required that also shoul
Note: If the Type test report is more than Five Year past then test
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the Type Tes
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D

Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

ment from Mumbai HO Project Cordinator


pproval from ( SEC-E&DD)
cument Submission
ing Letter & DTS and get Signed from Project Manager

rts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

or Technical Documents
ed on the following Status we have to proceed
Approved and P.O can be placed
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S
(FAT-Factory Acceptance test)

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger

ed on the following Status we have to proceed


Approved for the FAT report submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger


rt (Should not be more than Five Year Report)
st required that also should be submitted
n Five Year past then test should conducted newly and submit

ed on the following Status we have to proceed


Approved for the Type Test Submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

Base Design Submission


Grounding

Technical Document Submission


Step-1:
Obtain the Technicial document from Mumbai HO Pro
Shuold be submit and get approval from ( SEC-E&DD
Check List for Technical Document Submission
*Prepare Covering Letter & DTS and get S
*Data Schedule
*Compliace Statement
*Type Test reports (report valid for 5 yrs o
*Manufactures Responsibility Statement
*Any Other Qualifying Documents(ISO ce

Step-2:

Reciving Reply from SEC for Technical Documents


Submission Comments based on the following Status
A: Acceptable - Approved and P.O can be
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Inspection and Test Plan Submission (FAT-Factory Acceptanc


Step-1:
Obtain the Document from HO
Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by

*ITP report

Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the FAT repo
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D
Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

Type Test Plan Document Submission


Step-1:

Obtain the Document from HO


Submit it to the Prequalification and Support Division
Checklist for Submission
*Covering Letter and DTS seal & Sign by
*Type Test report (Should not be more tha
*Any Special Test required that also shoul
Note: If the Type test report is more than Five Year past then test
Step-2:

Reciving Reply from SEC for ITP


Submission Comments based on the following Status
A: Acceptable - Approved for the Type Tes
B: Acceptable as Noted- Requset for Som
C: Not Acceptable (Resubmit) -Changed o
See Attached Sheet-Comments on the D

Step-3:

All Documents Should get A status until that the Subm


Each Revision the Step-1 Check lit should be followed
Along with that the Previous Comment Sheet also sho

Note: Each and every submission to Prequalification and Support

ment from Mumbai HO Project Cordinator


pproval from ( SEC-E&DD)
cument Submission
ing Letter & DTS and get Signed from Project Manager

rts (report valid for 5 yrs only from the Date material tested)
Responsibility Statement
alifying Documents(ISO certifcation ect..)

or Technical Documents
ed on the following Status we have to proceed
Approved and P.O can be placed
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S
(FAT-Factory Acceptance test)

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger

ed on the following Status we have to proceed


Approved for the FAT report submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

tion and Support Division Department of SEC

r and DTS seal & Sign by Project Manger


rt (Should not be more than Five Year Report)
st required that also should be submitted
n Five Year past then test should conducted newly and submit

ed on the following Status we have to proceed


Approved for the Type Test Submitted
s Noted- Requset for Some missing Documents and once it submited then it will become
ble (Resubmit) -Changed of Documents Required
Sheet-Comments on the Documents to Rectify.

A status until that the Submission will Continue with Revisions.


Check lit should be followed and with the corrected and updated documents will be submitted
s Comment Sheet also should be attached and Actions taken shoulbe be mentioned in Compliance S

equalification and Support Department of SEC normally takes 3 weeks for reply.

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement

n it will become A status.

s will be submitted
mentioned in Compliance Statement