GOVERNMENT OF THE DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA

MINISTRY OF WATER SUPPLY AND DRAINAGE


NATIONAL WATER SUPPLY AND DRAINAGE BOARD

ORGANIZATION PROFILE

GREATER COLOMBO WATER& WASTEWATER MANAGEMENT


IMPROVEMENT INVESTMENT PROGRAMME

PROJECT MANAGEMENT UNIT,


Ambatale to Elie House DI 1200 mm Dia Transmission Line
Greater Colombo Water & Wastewater Management Improvement
Investment Programme ,
No 65, St Lawrence Road, Colombo 6
Improvement Works in the Ambatale Water Treatment Plant & Intake
SRI LANKA

Gothatuwa to Maligakanda Transmission Line

Contents
Introduction of the Project...........................................................................................................................3
Introduction.........................................................................................................................................4
Estimated Project Cost.........................................................................................................................4
Project Coverage Areas........................................................................................................................5
Project Staff.................................................................................................................................................6
Organization Arrangement...........................................................................................................................9
Design Division of the Project...................................................................................................................10
Project office Contacts...............................................................................................................................12

Introduction of the Project


Background
Colombo city water supply system is one of the oldest in the Asia, Built in 1886s pipes
in the water distribution system. Since then the same distribution system extended to
provide water to cater the high demand with different types of pipes that were available.
The total length is around 900 km of which approximately 563 km is Cast Iron (CI)
pipes. Other pipes are PVC (235 km); DI (30 km); Steel (8 km) and nearly 1.2 km of GI
& AC pipes. Average water supply to the city is 296,000 cubic meters (Cu.m) per day to
satisfy the total domestic & non-domestic demand. The system having different sizes of
service connection sizes varies from 12 mm to 300 mm (1/2 to 12) and nearly 127,000
metered customer service connections.

Colombo Water supply distribution system was operated and maintained by the Colombo
Municipal Council (CMC) until the year 2001. The distribution system was not
rehabilitated as per the standards during that period creating severe problem of high NonRevenue Water (NRW) percentage in the system. However, nearly half of the supplied
water (145,000 Cu.m) does not generate any revenue thus indicating approximately 49%
of NRW (non-revenue water) of the considered area. Since taking over by the NWSDB in
year 2001, the organization has been implementing various strategies to reduce NRW of
Colombo City. Greater Colombo Water and Wastewater Management Improvement
Investment Programme (Project 1 & 2) (hereafter referred as The Project) as a major
step and the project is targeting to reduce the NRW percentage by a significant amount
(from 49% to less than 18%).

Introduction
The Government of Sri Lanka undertakes the Greater Colombo Water and Wastewater
Management Improvement Investment Program with the recommendation of the National
Water Supply and Drainage Board (NWSDB) and the financial assistance from the Asian
Development Bank (ADB), Agence Francaise De Developpment (AFD) and the Government
of Sri Lanka (GOSL).
The project comprises of
(i)

Establishing Greater Colombo NRW reduction mechanism;

(ii)

Rehabilitating reinforcement of the water distribution network with DMA concept for
proper management of system.

(iii)

Strengthening institutional, operational and maintenance capacity of NWSDB;

(iv)

Increasing public awareness on NRW

(v)

Ambatale Water Supply Systems Improvement and energy saving aspects in water
transmission.

The major objectives of the project are:


(i)

To increase of water supply availability and efficiency in Colombo city;

(ii)

Enhance the distribution system and reduce NRW from 49% to 18% by the year 2020;

(iii)

To establish a long-term mechanism to reduce NRW;

(iv)

To enhance the institutional, operational and project management capacity of


NWSDB.

(v)

To maintain continuous supply 7/24 with required pressure.

Estimated Project Cost

PROJECT 1 :
Water supply service improvement project (ADB)

ADB/AFD
(USD
Million)

GOSL
(USD
Million)

Total
(USD
Million)

84

28

112

PROJECT 2 :
1. Water supply service improvement project
(ADB)
(for Water Supply )
2. Towns East of Colombo Water Supply Project
(AFD)
3. Ambatale water supply system improvement &
energy saving project (AFD)
Total

88
( 79.945 )

30
( 27.1 )

118
(107.1)

42.55

15.29

57.84

70

25.14

95.14

284.55

98.43

382.98

Project Coverage Areas

Ambatale to Elie House DI 1200 mm Dia Transmission Line

Improvement Works in the Ambatale Water Treatment Plant & Intake

Gothatuwa to Maligakanda Transmission Line

Project Staff
Name

Designation

S.A.Rasheed
K.L.Edirisingha
V.G.U.Ranjith
W.A.S.D.Perera
T.Suthakaran
V.U.Alawatta
I.L.M.Jawahir
P.S.Muthunayaka
G.D.M.P.Kumara
M.H.C.Perera
B.U.J.Perera
W.P.Dharmasena
H.P.S.Srilal
P.R.S.Amarasekara
H.C.Jayamangala
F.E.P.Silva
A.D.N.C.Madushanka
S.M.B.R.Siriwardhana
L.G.K.Manula
U.L.U.S.Perera
K.D.A.Abeysingha
A.P.Jayarathna
W.M.R.I.Wijerathna
M.S.Jayalath
A.M.D.D.B.Abeykoon
M.H.A.Ahamath
B.A.M.M.S.Dias
U.L.M.Arsath
S.H.S.R.De Silva
J.M.Sareen

Project Director
DPD - ADB
DPD - AFD
DLT
PM (C/S)
PM (C/N)
PM (C/E)
CE
CE
CE
CE
Project Accountant
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer
Engineer

7
K.D.G.U.Wijesiri
H.W.S.Priyarupa
A.N.Nayakage
H.P.S.Amarasekar a
D.N.Ponnamperuma
G.M.Ranasingha
T.Kiresan
R.M.L.N.Rathnayaka
B.M.N.V.Perera
A.H.M.I.S.Abeysingha
K.A.N.M.Gunawardhana
V.W.Hewawasam
A.G.M.Nabrees
S.V.G.Rohana
S.P.Palliyaguru
K.R.D.T.Madushan
S.M.P.H.S.Kumara
W.A.D.S.Kumara
R.M.C.H.Kurawatura
K.G.S.C.Rasikala
M.M.A.Salam
B.M.P.Lasntha
H.L.Chaminda
L.Egodahewa
J.K.Kodikarage
K.D.O.K.B.Jayathilaka
H.M.M.Y.Handapangoda
U.Wanniarachhci
G.A.Priyadarshani
I.U.S.Jayarathna
W.H.A.Chandani
R.M.L.D.K.Rathnayaka
L.R.Priyangika
K.A.C.Dilan
P.S.Koswattage
M.H.M.Sawahir
M.I.Sahir
A.L.M.Jaleel
W.V.R.Ranjanie
U.M.H.Maduwanthi
W.A.C.Damayanthi
K.A.V.Madurangi
H.M.G.Kalhari

Engineer
Engineer
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Engineering Assistant
Sociologist
QS
QS
Acc.Assistant
Acc.Assistant
Acc.Clerk
M.A
Drafsman
Technical Assistant
Project Coordinator
Community Development Officer
GIS Technitian
Private Secretary
Project Secretary
Clerk & Typist
Clerk & Typist
Computer Operator

8
M.P.I.Prabash
K.M.Ameer
R.M.R.Rathnayaka
J.Issadeen
H.M.I.R.Jayawardhana
P.M.J.Premalal
W.P.Wimalaweera
V.K.Sudarma
G.L.R.Kumara
A.S.M.Farhan
Shantha Kumar

Messenger
Office Assistant
Driver
Driver
Driver
Labour
Labour
Labour
Labour
Labour
Labour

Organization Arrangement
Procument and
project
management
Division
GIS and NRW
Division

Project
Management Unit

Design Division
Project Planing
,Monitoring ,
Training and
Asset
Management
Division
Accounts Division

GCWWMIIP
Project
Colombo North

Colombo East

Project
Implementation
Unit

Colombo West

Colombo South

Ambathale Project

10

Design Division of the Project


Design division of the project established at the GCWWMIIP PMU to carried out the required
designs and design review works for the project. Following works are carried out by the design
division.

Design of water supply systems

Structural Design of Buildings / Pump House

Design review of water supply system

Design review of buildings designs

Design division compromised of following staff and facilities

Chief
Engineer
-Design

Engineer
s
Draftma
n
Compute
rs

Design
Division

Plotter

Facilities

Colour
laser
printer
Licenced
Softwares
Mini
Library

11

Description of the works carried out by design division

Review the DMA wise hydraulic models prepared by the Contractors and check the
compatibility with NWSDB design standards, acceptability of designs and make
suggestions for any improvements. Recommend the acceptable designs for approval by
the DTL/DPD.

Review and approve the Package wise Feeder Main models prepared by the Contractors
and check the compatibility with the overall system /security of supply.

Review and approve the Transmission Main models prepared by the Contractors and
check the compatibility with the overall system.
Review the DMA wise detailed designs and drawings of distribution system, Feeder
Mains and any Transmission Mains by the Contractors, check the compliance with the
NWSDB concepts, standards, and requirements. Make any comments for any required
adjustments, and recommend the acceptable designs and drawings for approval by the
DTL/DPD.

Provide required support to the Project Managers during construction, to ensure correct
configuration of pipe systems is maintained by the Contractors

Review any changes to the configuration of pipe systems suggested by the Contractors
due to site conditions during construction, and make prompt comments and
recommendations for approval.

Prepare the Bidding Documents for the contract packages required for the works in the
Project as instructed by the Project Director in collaboration with the Chief Engineer (P
& PM).

Design of Area Engineers office and pump house at Ellie house.

Review the designs of structures and buildings carried out for the Project by the external
Architects and Consultants.

Provide support to the relevant Project Managers during construction of structures and
buildings, to resolve any design issues.

Carry out any other relevant duties pertaining to the Project as instructed by the Deputy
Team Leader/ Deputy Project Director or Project Director.

12

Project office Contacts


General
Tel

: 0112363705

Fax

: 0112363725

Email : cwssiadb@yahoo.com
Location

GCWWMIIP