Appendix I

ITE
M
1.0

2.0
2.1

2.2

DESCRIPTION

PRICE(RM)

PRELIMINARIES
- Preparation of detail drawing for Submission (PDC 2) c/w PE
endorsement
to IWK inclusive of study all the feasibilities of Pump Station
arrangement
and liase closely with Consultant, Client & Contractor to ensure the
work
done accordingly.
- To reply all the comment arise from IWK regarding the submission PDC
2
(Application For Approval Of Sewerage Works) until getting the approval
including site supervision.
- To submit PDC 3 (Certificate Of Structural Plans & Design Calculation),
PDC 4 (Certificate Of Process Design & Design Calculations), PDC 5
(Certificate Of Electrical Drawings, Design Calculations, Equipment Data
And Material Sheets), PDC 6 (Notice Of Commencement Or Resumption
Of
Sewerage Works), PDC 7 (Notice Of Inspection And Testing) & PDC 8
(Notice Of Final Inspection) c/w Licenced Contractor, Mechanical &
Electrical PE endorsement.
-To prepare Construction/Shop Drawings, Structural Drawings and AsBuilt Drawings c/w PE endorsement.
- To prepare Operation & Maintenance Manual. To consult all works from
the beginning until Testing & Commissioning.
- To attend all meeting related to STP works. To liase with Authority &
work
together with Consultant/Contractor to make sure works done
accordingly.
- To supervise during the critical part of Pump Station construction.

20,000.00

20,000.00

15,000.00

TOTAL ITEM 1:
CIVIL & STRUCTURAL WORKS PUMP SUMP
Excavation/Backfiling
Excavation to the required length, width and depth inclusive of
backfilling
compact to the required level, slope protection and disposal of surplus
excavated material to the designated site approved.

2.3

Inlet Works
Excavation to the required length, width and depth inclusive of backfilling
and compact to the required level, slope protection and disposal of
surplus excavated material to the designated site approved and supply
labour and material to construct reinforced concrete of Primary Screen
Chamber, Pump Sump & Valve Chamber inclusive of concrete,
reinforcement, lean concrete, hardcore, formwork and internal wall
rendering with High Alumina cement inclusive of connection to the last
Manhole.
Water Supply And Stand Pipe
To supply, lay and connect 25mm diameter G.I water pipe from the
nearest main pipe to a stand pipe and copper tap within boundary.

3.0

TOTAL ITEM 2:

85,000.00

2,000.00
102,000.00

3.1

110,000.00

3.2
60,000.00
MECHANICAL & ELECTRICAL WORKS
Ductile Iron / AB3P Force Main
To supply and lay 100mm D.I Force Main Pipe c/w all valve, bending, air
valve and all necessary accessories including excavation, road cutting
and backfilling until receiving Manhole - Length of Pipe : 300m

3.3

Inlet Works
Supply and install complete set of Stainless Steel Inlet Screen c/w
Stainless
Steel Perforated Trough equipment inclusive of Mechanical Penstock c/w
Stainless Steel Rod, Stainless Steel Basket Screen, Raw Sewage Pump
c/w
Float Switches & Stainless Steel Guide Rail, FRP Stopboard,
Aluminium Cat Ladder, Lifting Structure, all piping / valve works and etc.

3.4

35,000.00

3,000.00
208,000.00

Electrical Works
Supply and install complete set of equipment inclusive of Electrical
Control
Panel, Electrical Fitting, Safety Signboard, CPR Diagram, Fire
Extinguisher,
Rubber / Safety Mat, First Aid Kit, Spot Light, Flourescent Light and etc.
Testing and Commissioning

TOTAL ITEM :

GRAND TOTAL :

TERMS OF PAYMENT
(1)
(2)
(3)

20% Together with Letter Of Award


75% Progress Payment
5% Upon CF

COMPLETION PERIOD
(a)

1-2 weeks for drawing preparations


3-4 weeks for M&E works together with T&C.
5-6 weeks for C&S works together with T&C.

(b)
(c)

Scope of works DOES NOT include:


1)
2)
3)
4)

Preparation of site to platform level


Rock excavation
Piling & Sheet Piles
Temporary and permanent access road into the plant.

330,000.0
0

5) Fees imposed by the Authorities i.e Contribution fees, Performance Bond, Submission Fees and
Approval Fees.
6) Incoming water supply to the STP compound
7) Incoming power supply cable to the control panel
8) Temporary power/water supply for testing and commissioning of the STP
9) Any spare parts required by the local council/authorities
10) Odor removal equipment impose by Authorities (if required)
11) Any works outside of the STP boundary i.e entrance slab and culvert
PRICE VALIDITY
All price quoted subjected to validity period of one months only.