MC Handbook Section A

INTRODUCTION & OVERVIEW

1.1

Introduction

4
4

1.2

MC Concept

1.3

Computerised MC System

1.4

Abbreviations, Terms & Definitions

STARTING A PROJECT

2.1

What to Establish Early

2.2

MC Philosophy

2.3

Level of MC for Suppliers and Contractors

2.4

MC System

11

2.5

MC Manual

12

2.6

Preservation Manual

12

2.7

MC Procedures

13

2.8

Define Commissioning Packages

13

ENGINEERING DATA

14

3.1

Handling of Engineering Registers

14

3.2

Importing Routines & Discrepancy Reporting

16

3.3

Supplier Engineering & MC Data

17

CP DEFINITION

18

4.1

Development of Commissioning Packages

18

4.2

Commissioning Schedule & Planning Levels

19

4.3

Control of Boundary Drawings

20

MC PACKAGE DEFINITION & CONTENT

23

5.1

Development of MC Packages (MCPs)

23

5.2

Tie-In Scope

26

5.3

Piping

5.3.1
5.3.2
5.3.3
5.3.4

Levels of Tracking
Release of Piping
Testing of Pipework at Contractor Interfaces
Critical Areas to Maintain Control

27
27
30
31
32

Page 1 of 84 (Oct 2000 Edition)

MC Handbook Section A
5.4

Equipment & Cables

5.4.1
5.4.2
5.4.3
5.4.4
5.4.5
5.4.6
5.4.7
5.4.8

Static Vessels
Equipment Motors, Heaters etc
Testing electrical equipment
Lighting & Small Power
Electric Heat Tracing
Instrument Field Cables
Underground Cableworks
Control Cabinets (in CCR & LCRs)

35
35
36
38
39
40
41
42
43

5.5

Steelwork

44

5.6

Lifting Equipment

46

5.7

Civils

46

5.7.1
5.7.2
5.7.3
5.7.4

General
Concrete Structures
Foundations
U/G Pipework (No line numbers) :

46
46
46
48

5.8

Fireproofing

48

5.9

Area Completion

49

5.10

Steam Blowing

50

MC PUNCH-OUT

51

6.1

Punch-out Stages

51

6.2

Punch Item Examples

52

CARRYOVER WORK (COW)

54

PRESERVATION

55

8.1

Preservation Responsibility

55

8.2

Preservation System

55

8.3

Preservation Experience Feedback

57

Valves
Stainless Steel Surfaces
Boxed Items for Long Term Storage

57
59
60

8.3.1
8.3.2
8.3.3

9
10

LIVENING-UP NOTICE
LOOP TESTING

61
63

10.1

Loops Diagram & Loop Register

63

10.2

Guidelines for MCP Definition

65

10.3

Release of Loops for Testing

65

10.4

Loop Testing Organisation

65

Page 2 of 84 (Oct 2000 Edition)

MC Handbook Section A
11

INTRINSICALLY SAFE EQUIPMENT

66

12

CHANGE CONTROL

72

12.1

Site Instructions or Similar Change Instruction

72

12.2

As-Built Status

73

13

STATUS REPORTING

74

13.1

Graphical and Tabular Reporting

74

13.2

Planning Interface

81

13.3

Benchmarking

81

14

DOSSIERS

82

14.1

Handover Dossiers

82

14.2

MC Dossiers

82

Page 3 of 84 (Oct 2000 Edition)

MC Handbook Section A
1 Introduction & Overview
1.1

Introduction
The purpose of this handbook is to provide a concise set of guidelines to establish and maintain
a mechanical completion system on land-based or offshore construction projects.
It is compiled in three distinct sections :Section A

- MC Handbook

Section B

- Sample MC Manual

Section C

- Sample Preservation Manual

Although the manuals in Section B & C are from the Statoil KUP land-based project, they can
equally be adapted to suit offshore projects with the addition of some specific offshore-related
check-sheets.
The main objective of this handbook is to provide a comprehensive understanding of Statoils
MC strategy.
All references to MC in this document implies bringing to a state of Ready for Commissioning,
however, where a project has planned for a distinct pre-commissioning phase then the MC
System, handover routines and manuals would be modified accordingly.
The objective of MC is to bring equipment/systems up to a state where they are ready for
dynamic testing. This comprises of verification that all the required tests and inspections are
performed and deemed to be mechanically complete, all equipment/systems will work for their
intended use and that the maintainability/operability requirements are fulfilled.

1.2

MC Concept
The aim is to establish a common project-wide MC strategy which will enable progressive
verification of the physical progress in-line with the installation and therefore help to achieve a
smooth and timely handover of the scope to the Commissioning Group, in pre-defined
commissioning packages.
In addition, a progressive compilation of a consolidated MC Dossier for each CP from the
various contractors MC Packages will spread the workload over the length of the project thus
avoiding back-end loaded documentation verification activities. This approach will secure
speedy preparation of the Handover Dossier for each commissioning package and subsequent
issue.

Page 4 of 84 (Oct 2000 Edition)

MC Handbook Section A

HANDOVER

Engineering
Construction
MC

Commissioning

Start-Up

The Completions Flag

Contractor No.01

Contractor No.02

Contractor No.03

Others

MC Dept.

MC Dept.

MC Dept.

MC Dept.

Progressive submission by
MC Package

MC Core Group

Handle Engineering Data


Scope Comm.Packages
Process MC Packages
MC Reporting (Project wide)
Interim Milestone reporting
Liaise with Contractors
MC Status meetings
MDP administration
Verification of CP status
Prepare handovers
Prepare MC Dossiers

Project MC
Core Group

Compile & Issue


Handover Dossier
per CP
Compile & Issue
MC Dossier per CP

Page 5 of 84 (Oct 2000 Edition)

MC Handbook Section A
1.3

Computerised MC System
The advantages of having a corporate MC system are well proven and with todays technology,
the benefits of setting up an on-line system are realistic, practical and desirable.
This would enable the server to be strategically placed to optimise system support to all user
groups.
In addition, a corporate approach would establish a consistent standard across all projects and
eventually develop into an instantly recognisable Client system, which would benefit both
Statoil and Contractors, i.e. MC - The Statoil Way.
The MC systems main functionality should include :

1.4

Routines for importing engineering data


Link tags/cables to relevant commissioning packages
Link to appropriate Inspection & Test Records
Link tags/cables to specific event (e.g. for cables : pulled, term1, term2, tested etc)
Allow for allocation of MC Packages to Tags/Cables/Isometrics by contractors
Comprehensive punchlist administration facility (including COW)
Comprehensive status reporting (incl. High level graphical to show trends plus detailed
tabular format )
Preservation system, which will track all items in the preservation programme,
produce weekly work lists and negative observation reporting.

Abbreviations, Terms & Definitions


This section is not intended to be an exhaustive listing of all abbreviation, acronyms, terms and
definitions applicable to all aspects across a typical project, but instead an extract of the
important ones deemed to be essential in the understanding of this document and mechanical
completion in general.

Terms, Acronyms &


Abbreviations

Definitions & Additional Notes

Carry Over Work (COW)

This is work outstanding from the various suppliers, which is to


be finalised by others (in most cases) at the next/final location.
Category "A" items are defined as incomplete work preventing
further testing, commissioning performance or continuous
operation and maintaining of the plant systems. For piping test
packs with A-items, which shall be cleared prior to release of
pressure test, then these shall be flagged on the punchlist in the
appropriate column. All A-items shall be cleared prior to
handover of the Commissioning Package to COMM.

Category A Punch
Item

Category B Punch
Item

Category "B" items have no significance on safe operation and


maintenance of the systems and can be accepted as not
completed at handover provided that the number of such items is
limited and subject to COMM acceptance.

Commissioning
(COMM)

Means the testing and adjustment of an assembly or plant


sections and will comprise of Operational testing under real or
simulated conditions to ensure that it meets all applicable Rules,
Regulations, Codes and Standards and that it fulfils its intended
duty and ready for start-up.

Commissioning
Package (CP)

Is a discrete part of the plant, which enables Commissioning to


be performed in a sequential manner. These would be defined
on marked-up boundary drawings e.g. P&IDs, Single Line
Drawings, Block Diagrams etc.

Page 6 of 84 (Oct 2000 Edition)

MC Handbook Section A
Terms, Acronyms &
Abbreviations

Definitions & Additional Notes

Discipline Punchlist
(DPL)

A DPL is the result of a joint punch-out of the scope of a specific


MCP. The items are detailed, reference to
item/cable/tag/isometric/drawing and categorised as A or B.

EPCS

Engineering, Procurement & Construction Supervision


contractor.

Handover (HO)

The presentation of Commissioning Packages in the form of a


Handover Dossier, which comprises of a Handover Certificate,
MC documentation summary report, multi-discipline punchlist,
copies of relevant MACs, boundary drawings and as-built
drawings. Upon acceptance of the Handover Certificate is
signed and the operational responsibility for the CP is formally
transferred from Contraction Group to the Commissioning
Group.

Handover Dossier

A dossier which summaries the CP status and comprises: Handover Certificate, Multi-Discipline Punchlist, MC Status
Summary Report, Copies of all relevant MACs, boundary
drawings which define the limits of the CP, relevant as-built
drawings and copies of other documentation required by the
Commissioning Group e.g. copies of PSV/TSV calibration
certificate, vessel final closure certificates, instrument loop test
records & as-built loop diagrams.
The original MC Dossier which contains all test and inspection
records would be made available for verification purposes but
not formally delivered to the project until all disciplines fully
completed (i.e. surface protection, heat tracing and insulation).
.

IOM

Installation and Operation Manual (from Vendors)

KUP

Krst Utbyggings Prosjekt (Krst Development Project)

MC Dossier

A specific dossier for each CP that comprises all MC Package


filed by discipline.
Such MC Packages would include MAC, Discipline Punchlist, All
Inspection & Test Records, Additional Charts, Test Reports and
marked-up drawings appertaining to the specific scope.
In addition, a total listing of all tags, cables and isometrics should
be included together with an overall index.

Mechanical Completion
(MC)

Means all checking, verification and testing of fabrication,


construction and installation work performed by the respective
contractors & sub-contractors in order to confirm that the
applicable Rules, Regulations, Codes & Standards are being
met and that the Project requirements as shown on the design
drawings and outlined in the specifications are fulfilled.
The system (i.e. CP) shall be preserved and ready for
Commissioning when Mechanical Completion is completed.

Mechanical Completion
Package (MCP)

A meaningful single discipline group of items belonging to one


specific CP which will ultimately be completed and offered as a
discrete scope for discipline punch-out and acceptance. Typical

Page 7 of 84 (Oct 2000 Edition)

MC Handbook Section A
Terms, Acronyms &
Abbreviations

Definitions & Additional Notes

examples can be found later in this document.


MET

Methanol Project, Tjeldbergodden

MRB

Manufacturer Record Book

Multi-Discipline
Punchlist (MDPL)

This is the term used for the "Final Inspection" of a full


Commissioning Package prior to handover to COMM. It
shall cover all disciplines and the primary aim is to verify
the overall MC status of the package and document all
outstanding items on a consolidated punchlist i.e. MultiDiscipline Punchlist..
This punch-out shall be carried out relatively close to the
planned handover date, however sufficient time should be
allowed to clear any additional A-items that may be identified
and to reduced the number of B-items to an acceptable level for
handover.

PIMS-MC

The on-line computerised mechanical completion system used


by Statoil.

Responsibility Matrix

This matrix details the various levels of inspection, testing and


verification to be carried out by the Contractors, Client/EPCS
Construction Group, Commissioning Group, Third Party and
Vendor/Supplier across all disciplines.
The matrix forms an important part of the project specific MC
Manual and would therefore be customised to suit the project
organisation.
The matrix clearly specifies who witnesses or verifies specific
activities.

Start-Up

Start-up means bringing the plant sections and the complete


plant to operating conditions of all systems, in a defined
sequence to meet the product qualities and production rates
outlined in design documents and specifications.

Page 8 of 84 (Oct 2000 Edition)

MC Handbook Section A

2 Starting a Project
2.1

What to Establish Early


The primary MC tasks at the outset of a new project are as follows :

2.2

Agree on MC philosophy
Agree on level of MC for suppliers and contractors
Agree on a computerised MC system
Establish a project specific MC Manual
Establish a project specific Preservation Manual
Establish project specific MC Procedures
Define Commissioning Packages and Issue Boundary Drawings

MC Philosophy
The MC philosophy is based on the identification of discrete parts of the plant, which can be
commissioned independently.
These are subsequently broken down into smaller single discipline packages and on
completion, each package is offered for punch-out and acceptance. As mentioned in paragraph
1.3, a corporate approach would maintain consistency across projects.
This progressive approach ensures that punch items are circulated back into construction, thus
minimising the number of items outstanding at handover of a complete CP.
There are various options for the completion and compilation of the MC documentation :a)

Prepare, complete and compile in an MC dossier per CP by each contractor.

b)

Prepare, complete and deliver to Client or EPCS Contractor on a progressive basis by


MC Package, thereafter the Client/EPCS MC Group prepares Handover Dossiers and
MC Dossiers.

The preferred option is b), which has been implemented very successfully on both the MET
and KUP projects.
The main disadvantage on option a) is that it is back-end loaded for both the contractors
and client with respect to compiling MC Dossiers for their scope and subsequent
verification/approval by Client/EPCS. In addition, it produces a fragmented set of MC
Dossiers for the site scope i.e. one MC Dossier from each relevant contractor per each CP.

2.3

Level of MC for Suppliers and Contractors


In general, the module yard and site contractors would implement the full MC requirements as
specified in the project specific MC Manual, however, a simplified MC level is normally
applicable to most suppliers and a project specification would be issued to clearly specify these
requirements. (e.g. on KUP E060-SB-A-SS-0014 Mechanical Completion Specification for
Equipment/Fabricated Items)
This is an extremely important aspect of MC and historically has proved to be a potential area
of concern due to late or missing information, which may have impact on the project at a later
phase.

Page 9 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Suppliers MC Dossier Typical Structure

Suppliers Certificate of Compliance


Suppliers Final Acceptance Check Lists for
a) Equipment
b) Piping
c) Electrical
d) Instrumentation
Punchlist
List of Outstanding Work
List of Shipped Loose Items
Relevant Drawings

The above final acceptance check lists tend to be based on main tag numbers (e.g.
Compressor Tag No.) and therefore it is important that all related tag/cable numbers on this
package are included in order to assist with MC punch out and verification of final acceptance.
This could be achieved by the inclusion of a dual purpose Engineering Register and MC Matrix
which would effectively supply all the required key engineering data plus satisfy the MC Status
reporting requirements. In addition, this could be set-up as an on-line facility through the
Internet.

Engineering Register and MC Status


(P.O. No. C-309999)
Equipment :

Instrumentation

Final
Acceptance
FinalCheck List
Piping
Acceptance
FinalCheck List
Equipment
Xxxxx
Acceptance
FinalCheck List Xxxxx
xxxxx
Acceptance Xxxxx
Xxxxx
CheckXxxxx
List
xxxxx
Certificate of Xxxxx
Xxxxx xxxxx
Compliance
Electrical

Xxxxx
xxxxx
Xxxxxxxxx
Xxxxxxxx
Xxxxx
xxx

Actual Date MC Status


10/05/99
OK
09/10/99
OK
15/10/99
PL

Cables :
Cables No. Type Size
From
CL-62-xxxx bbb 3x2.5
PL-62-vvvv
mm 3x

To

Test Result MC Status


OK
PL

Proposed New Engineering/MC Matrix would


comprise a comprehensive listing of all Tag
Nos and Cables for each Main Item (e.g. skid)

MC Punchlist
Item. Descr.
01 Xxxxxxxxx
02 Xxxxxxxx
03 Xxxxx
04 xxx

Tag No.
Description
62-HA-101 xxxxx
62-VD-106 zzzzzz
62-PA-109A cccccc

Outstanding
Work List

Item
01
02
03

Descr.
Xxxxxxxxx
Xxxxxxxx
Xxxxx

Shipped Loose Items

Item
01
02
03
04
05

Descr. Location
Xxxxxxxxx Case 1
Xxxxxxxx Case 2
Xxxxx
On Skid
Xxxxxxx
Xxxx

Drawings

Other key data would be included in M.R.B, I.O.M. and Revisjonsbok (Code Book) :Data Sheets, Power Cable Calculations, IS Loop Calculations, Ex Certification, CE
Certification, Third Party Approval, Nameplate details etc.

Page 10 of 84 (Oct 2000 Edition)

MC Handbook Section A

2.4

MC System
This should be established as early as possible in order that this can be specified in the
relevant contracts/purchase orders. It is strongly recommended that an on-line system be
utilised to allow the latest data and status to be available to all applicable users plus accurate
and up to date reporting.

On-Line MC System
SITE LOCATION
E&I Contractor
Site

Mechanical
Contractor No.2 - Site

Mechanical
Contractor No.1 - Site

SQL SERVER
(Location to Suit)

Project Team
Site

EPCS Contractor

Civil Contractor Site

Module Yard No.1

Module Yard No.2

Page 11 of 84 (Oct 2000 Edition)

MC Handbook Section A

2.5

MC Manual
A project specific MC Manual should be produced and distributed as early as possible in a
project in order that it can be included in the relevant contracts / purchase orders (Refer to
sample manual). A thorough MC strategy and corresponding manual will eliminate the need for
significant revision after contract award.
In addition to the full sized controlled issues, it is also advisable to print reduced B5 sized
uncontrolled issues for general distribution.
The aim is to get all personnel involved in MC activities to be well versed with the requirements
to ensure that the verification level is adhered to and that the quality of the MC documentation
is maintained.
To achieve this end a comprehensive training programme on MC principals combined with the
use of the MC System should be established. To optimise the benefit of such training sessions,
it is preferably to limit them to small groups sharing a common interest in specific aspects of
MC e.g.

2.6

Management Group Focus on status reporting

Planning Group Focus on interfaces with MC & planning system how to best use data

Disciplines Groups Focus on responsibility matrix, MC Certificates and punchlist


standard and routines.

Preservation Manual
A project specific Preservation Manual should be produced and distributed as early as possible
in a project in order that it can be included in the relevant contracts/purchase orders (Refer to
sample manual). A thorough preservation strategy and corresponding manual will eliminate the
need for significant revision after contract award.
In addition to the full sized controlled issues, it is also advisable to print reduced B5 sized
uncontrolled issues for general distribution.
The aim is to get all personnel involved in preservation activities to be well versed with the
requirements and establish good and speedy reporting routine where discrepancies are found
to ensure minimum impact to the integrity of the permanent plant.
A training programme should be set-up for the direct users of the preservation system but in
addition, it is beneficial to details the objectives of preservation to a broader construction group.
This can be achieved by having presentation to each contractor construction group in order to
initiate front-line preventative measures. This should be followed-up on a regular basis at
contractor toolbox meetings.
Emphasis should be made to the

Quality aspects
Commercial aspects

Page 12 of 84 (Oct 2000 Edition)

MC Handbook Section A
Examples of preventative measures that will avoid costly rework and/or additional extensive
cleaning :

2.7

Prevent ingress of debris and water during the construction phase by using end caps,
plugs etc
Protect all stainless steel surfaces from carbon steel contamination caused by
adjacent grinding or welding operations.
Protect fully painted surfaces from contamination or damage. Although there will
always be a need for minor touch-up and repair work, much can be done to prevent
major rework to completed paint system.
Protect valve stems and machined surfaces. This can be a significant source of
problem during the commissioning phase and possibly have long term impact of the
reliability of the plant.
Prevent contamination and damage to cable trays from grinding, welding, sandblasting, painting activities.

MC Procedures
Project specific MC related procedures should be issued as early as possible in order that
personnel involved in MC activities are fully conversant with the requirements.
Some suggested procedures to establish :-

2.8

Commissioning Package Handover Procedure

Punchlisting Procedure (Discipline & Multi-Discipline Stages)

Site Receiving Inspection of Vendor Packages

PSV handling procedure

Engineering Data Importing Routines & Discrepancy Reporting

Construction Blinding Procedure

Construction Temporary Links & Jumpers Procedure

Define Commissioning Packages


This is dealt with in Chapter 4.

Page 13 of 84 (Oct 2000 Edition)

MC Handbook Section A

3 Engineering Data
3.1

Handling of Engineering Registers


This fundamental step provides the foundation for the identification of the MC scope and
therefore it is essential to establish regular import routines from the Engineering Contractor(s)
as their various registers are developed and updated. Some register are included for
information only while the majority are for inclusion in the main MC Database for subsequent
linking to applicable Contractor and MC Package.
There is of course the option for the Engineering Contractor(s) to utilise the MC System
engineering registers as the live master registers.
Typical Engineering Register are :

Piping Line List

Isometric Register

Equipment Register

Instrument Index

Cable Schedule (Electrical, Instrumentation & Telecom)

Electrical Heat Tracing Schedule

Electrical Equipment Register

Junction Box Schedule

PSV Register (may be incorporated into other registers)

Piping Special Items Register

Tie-In Register(s)

Loop Register (it is important that if such an Engineering Register is not established by the
Engineering Contractor, then it should be built up in MC System by the Project Team)

Page 14 of 84 (Oct 2000 Edition)

MC Handbook Section A
Useful Notes and Tips !

Chemical Clean

Hot Oil Flush

Bolt Tension

E060-AD-LL-..

16

E060-AD-LL-..

Isometric No.

Line No.

P&ID

Paint System

Insulation Class

Suggested Control Fields

Heat Tracing

Engineering Data

Seal Weld Plugs

Isometric Register : Expand the isometric register in order to cover other key information
that is extremely useful to the contractors in scoping the MC for piping.

E060-AD-LL-..

Electric Heat Tracing Schedule : This scope tends to be an independent design (e.g.
Raychem) and as it is dependent on the piping design can be difficult to establish as early
as the other engineering registers. Establish a link to piping isometrics and/or tag nos. to
enable an easy allocation of scope to the correct CP No. If a schedule does not exist for
heat tracing tapes, then consideration should be given to producing one, from the load lists
for each distribution board.
PSV Schedule : Establish a PSV/TSV schedule or if the data is incorporated in other
registers (e.g. instrument index or special piping items), then as a minimum, establish a
specific PSV/TSV Report which gives the key engineering information plus the calibration
status. A close interface with the Planning and Commissioning Groups is required to agree
on the optimum timing for re-calibration and reinstatement.
Piping special Items : It is not required to perform individual MC on each item as many of
such items are included on the piping isometrics and would therefore be punched as part
of the relevant piping test pack. (e.g. various in-line manual valves, hose connections,
flame arrestors, etc). It is however advisable to perform specific MC on some items and
these should be flagged in some way to allow an easy download to the MC database (e.g.
sample connections, strainers, orifice plates, interlocks etc).
Tie-In Registers : Tie-in registers will be related to piping, electrical, instrumentation and
telecom tie-in scope to existing plant to enable integration with new plant. These registers
are important to clearly identify what scope was completed during pre-project shutdowns
and that which needs to be executed during the project proper.

Page 15 of 84 (Oct 2000 Edition)

MC Handbook Section A

3.2

Importing Routines & Discrepancy Reporting


The raw engineering data forms the basis for the MC scope and therefore good
handling/importing procedures are essential.
Importing Philosophy :
EPC No.1
Raw Data

EPC No.2
Raw Data

Note : Raw Engineering Data from all


Engineering Sources EPC No.01, 02, 03 etc
(various file formats)

Convert to
Access
Format

Convert to
Access
Format

Produce Report on any duplicate


Tag Nos/Cable Nos

EXTERNAL
MC SYSTEM
MC Engineering Registers
Each register is overwritten with
new downloads

Note : Engineering data held in specific


Registers plus an additional field Source
to indicate the relevant EPC Company /or
Vendor.

MC Main Table

Discrepancy Report

Tag Nos/Cable Nos. plus key


engineering data downloaded

Compares data from new downloads


with Key Data already in system

The MC System master engineering registers would provide a convenient read-only version of
each distinct imported file for the front-end user. These would be dated to clearly show the last
download date.
Typical Engineering Registers are shown in Section 1 of this chapter.

Page 16 of 84 (Oct 2000 Edition)

MC Handbook Section A
Handling Discrepancies :
During the import routines, all new Tag Nos./Cable Nos. would be added to the MC system,
while discrepancies would be subsequently actioned based on discrepancy category.

Discrepancy Category

Action

Removed Objects

Flag objects as DELETED in MC System (records


retained for reference)

i.e. were in previous download but


not in latest
Objects added in advance.

Change source field from MC to relevant


Engineering Contractor Code.

i.e. added by MC Dept. prior to


formal download Source Field
marked MC
Deleted objects.

Flag objects as DELETED in MC System

i.e. where registers retain records but


indicate a deleted date

(records retained for reference)

Duplicates

These would be addressed direct with Engineering.

separate report prior to import

e.g. Possible duplication between Engineering


Contractors/Supplier Block allocation of Tag
Nos./Cable Nos.)

Changes to key fields

Discrepancy Report would show old and new data


and these would be review prior to updating.
Discrepancy Reports filed for historical reference.

3.3

Supplier Engineering & MC Data


It is beneficial to include all vendor tags and cables in the overall MC system and therefore
good routines must be established at the early phase of the project to ensure that all Vendor
engineering data is available electronically through the Engineering Contractor.
Historically, this has proved to be a potential problem area with respect to obtaining timely
downloads of vendor engineering data (tag nos. & cables nos.) on a progressive basis.
Engineering should perform regular verification on vendor data and in addition, that MC Status
is being reported.
On large projects it is worth considering an on-line option for all suppliers data and status as
previously mentioned in paragraph 2.3..

Page 17 of 84 (Oct 2000 Edition)

MC Handbook Section A

4 CP Definition
4.1

Development of Commissioning Packages


The commissioning package definition is normally performed by the Commissioning Group in
conjunction with Operations and comprises discrete multi-discipline parts of the permanent
plant, which allows progressive initial commissioning activities to proceed in-line with the startup sequence. This will then allow a Commissioning Schedule to be produced, which will reflect
the pre-requisite systems required for the commissioning of process systems.

Development of Commissioning Packages


Engineering

Company

Operations

Detailed Start-Up
planning

Agree Start-Up
sequence

Agree Start-Up
sequence

Establish Commissioning
Packages

Establish
Commissioning
Packages

Input comments
by discipline

Review

Mark up drawings,
P&IDs,Block diagrams etc.
to show Commissioning
package boundaries

Distribute to all
Involved parties

Receive/Review colour
Marked-Up boundary
drawings

Receive/Review colour
Marked-Up boundary
drawings

Issue & maintain


controlled sets of colour
marked boundary drawings
to contractors

Page 18 of 84 (Oct 2000 Edition)

MC Handbook Section A

4.2

Commissioning Schedule & Planning Levels


A detailed commissioning schedule is developed from the start-up sequence and the block
diagram below shows the interface with planning levels.

LEVEL 2 PLAN
Cost/Contract
Based

Discipline /Area
Based

Work Breakdown
Structure (WBS)
Key Activities

LEVEL 3 PLAN
Discipline/Area
activities

Start-Up Sequence

System Level
(CP compatible)

Commissioning
Schedule
Detailed to CP No.
level

LEVEL 4 PLAN
System level
activities
(i.e. CP related)

Project Overall Level 4 prepared from


Specific L4 Plans from the various
Contractors.
This allows switch from Area based to
System based reporting.

Level 5 and below developed by


Contractors to level of detail required.
Detailed Level
(CP, Area &
Discipline
compatible)

LEVEL 5 PLAN
Job Card Level
activities

Page 19 of 84 (Oct 2000 Edition)

MC Handbook Section A
4.3

Control of Boundary Drawings


The issue and subsequent control of commissioning package boundary drawings is of prime
importance and the following recommendations should be taken into consideration :a)

Establish a method of identifying the drawings used, distinct from the project drawing
revision. This can be achieved by using a stamp, which states the independent CP revision
of the mark-up drawing.

Commissioning Boundary Drawing

Example Drawing Title Block

Issue Date :
Drawing title
CPB Rev No :
Approved by :

Drawing Number & Revision

Use Drawing No. with CPB Rev No to


control Boundary Drwgs.

Cross out on drawing title block and use the Commissioning Boundary Drawing
revision (in the stamp block) as the CBD Rev No. This is important in order that all
parties including the client and contractors DCC Department can track these as
distinct drawing issues.
The added benefit of implementing such a system is that individual drawings can
be revised and re-issued without the need to issue new full sets. With each new
issue there should be a simply Revision Matrix which lists all boundary drawings
and latest CBD revision numbers.
b)

Only re-issue drawings where there is significant new scope added e.g.

Do not issue for new instruments, which are clearly within the specified CP limits.

Re-issue where CP limits are moved.

Re-issue for new lines, which affect CP definition.

Re-issue if new P&ID generated.

Page 20 of 84 (Oct 2000 Edition)

MC Handbook Section A

CP Limits added on
CAD Drwg.

Example of a manually marked-up P&ID showing CP limits. As can be noted, the


Engineering contractor can also add the CP limits in the CAD system. This is the primary
vehicle to allow the allocation of scope to the relevant commissioning package in the
MC system and subsequently produce a comprehensive definition of each CP at
tag/cable/isometric level.

Page 21 of 84 (Oct 2000 Edition)

MC Handbook Section A

CP splits to suit the planned


energisation sequence.

Example of a manually marked-up Single Line Diagram showing CP limits. This CP


definition will be compatible with the energisation sequence.

Page 22 of 84 (Oct 2000 Edition)

MC Handbook Section A

5 MC Package Definition & Content


5.1

Development of MC Packages (MCPs)


The MC Package definitions are the single-discipline parts of a CP and are defined by the
relevant contractors.
This is shown on the following graphical representations.

Engineering/Company

Contractor

Establish Commissioning
Packages & Issue
Boundary Drawings

Link all Tags and Cables


in the MC System to the
appropriate Commissioning
Package No.
Note : Done on a progressive
basis

Establish
MC Packages
&
Produce MC Test &
Inspection Records
together with supporting
drawings.

Issue MC Packages to
Construction for
progressive completion inline with installation.

Page 23 of 84 (Oct 2000 Edition)

MC Handbook Section A

MC BREAKDOWN
24

2401

MC
MCPacks
Packs
MC Packs
Civil

2402

MC
MCPacks
Packs
MC Packs
Piping

MC
MCPacks
Packs
MC Packs
Mech

Plant
System

2403

MC
MCPacks
Packs
MC Packs
Struct

MC
MCPacks
Packs
MC Packs
Electro

2404

MC
MCPacks
Packs
MC Packs
Instr

MC
MCPacks
Packs
MC Packs
Telecom

MC Acceptance Certificate

MC Acceptance Certificate

Punch List

Punch List

MC Inspection & Test Records

MC Inspection & Test Records

Test Pack Isos

Marked Up Drawings

Commissioning
Packages
MultiDiscipline

MC Discipline
Packages
Single Discipline

Documents included
in MC Discipline
Packages(examples)

Marked Up P&IDs

Sub-contractors to define MC Packages within their scope of work to allow progressive punch-listing and
subsequent release to follow-on disciplines e.g. Piping Test Packs.

Page 24 of 84 (Oct 2000 Edition)

MC Handbook Section A

Completion Sequences
Discipline
Punch Out
PL01

Mechanical
Acceptance
Certificate
MAC

MultiDiscipline
Punch Out

HANDOVER
CERTIFICATE

MDP

Start-Up
Notice
SUN

HOC

CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC

CLEAR PUNCH
CONSTRUCTION
ITEMS.
MC
NO A-ITEMS FOR
CONSTRUCTION
MC
HANDOVER
CONSTRUCTION
MC
PROGRESSIVE
CONSTRUCTION
MC
PUNCH OUT AND
Clear Punch Items
CONSTRUCTION
MC
CLEARANCE
CONSTRUCTION
MC
BY MCPACKAGE
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC

Construction Responsibility
Commissioning Involvement

COMMISSIONING

Commissioning
Responsibility

START-UP

Operations
Responsibility

Page 25 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.2

Tie-In Scope
Most tie-ins will have been performed prior to the project proper and documentation
submitted to client. Where there are post-shutdown tie-ins, then these should be flagged in
the overall Tie-in Register to ensure that they are brought into the overall MC for the main
project scope. In addition, any carryover work from the shutdown phase should be brought
into the project scope and handled as detailed in Chapter 7.
Some examples of tie-ins as follows :

New piping connections on existing lines for new plant.

Extensions to switchgear and distribution boards to cater for new loads.

Upgrading of existing control systems.

Additional instrumentation on existing plant (new transmitters etc).

Modification to existing telecom cabinets to cater for new racks and sub-racks.

It is recommended to create one MCP per discipline for each tie-in.

Typical Piping Tie-In :

LIVE SIDE !

Project Test Limit

Double isolation with closed valve and


spectacle blind in closed position.

Permission required from


Operations/Comm. before joint can be
split to complete project pressure test
to flange limit.

New Line

Field Weld Interface

Pre-project Tie-In
(double isolation)

Project Limit

Page 26 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.3
5.3.1

Piping
Levels of Tracking
The preferred level for tracking piping is by design isometric or part isometric where split. The
main reason for this is that the reconciliation should be against design isometrics to ensure that
all scope is covered. If a project has site-run lines, were no isometric are issued, then either the
line number or a project sketch number can be used for MC purposes.
The contractor(s) would prepare test packs (i.e. Piping MC Package) made up of a group of
isometric within a specific CP, which has the same test pressure as stipulated in the Line List
and which suits the pre-fabrication/erection sequence. This activity should be closely followedup to ensure that the contractors have sufficient resources on test pack definition.
The contractors Testing Engineer would maintain a master set of P&IDs marked-up with all
test pack limits to enable verification that all scope has been covered.
The use of contractor isometrics (shop drawings) is not recommended as these do not tend to
be formally reviewed/approved by the Client/EPCS and therefore discrepancies could exist
between shop and design drawings.
The general rule for MC is to always use design drawing to punch against.
As piping is one of the most substantial and critical activities to track due to its impact on
follow-on discipline (painting, instrumentation, heat tracing, insulation) it is desirable to have a
detailed tracking system that interfaces well with the planning group.
A well-proven system to monitor the fabrication status is to track the pipe spools. This could be
incorporated as an additional reporting function in the MC System as these spools are defined
on the contractors shop isometrics, thus giving both area and system based reporting.

Track MC

Track Fabrication

Design Isometrics

Shop Isometrics

Use for Test Pack


Definition and MC
Punchout

Track/ Report Status


(Spool Level)

Reconcile that all scope


is tested.

Pre-Fab
On-Site
Erected
Welded

Page 27 of 84 (Oct 2000 Edition)

MC Handbook Section A
It is of great benefit to have Test Composite Isometrics produced (normally by contractors) :

Better overview for Test Crews and Punch Teams.

Ideal for verifying that all required vents & drains are in place.

Use as inspection isometrics (Commissioning and Operations).

Identification of plug, which require seal welding.

Typical Example :

Simplified overall isometric view for each


test has advantages :

Helps the Test Crews to prepare and


execute test.
Helps in the punch-out of the test
scope.
Easier to inspect system during test.

Page 28 of 84 (Oct 2000 Edition)

MC Handbook Section A
Notes and Tips :
- Instrument Air Manifolds

Include manifolds with


Instrument Air Header CP as
they may serve many users in
different CPs.
Treat as extention of air header.

With Instrument Air Header CP

With Instrument CP

Page 29 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.3.2

Release of Piping
It is extremely important to release pipework to the follow-on disciplines in order that the actual
workfronts are identified and actioned as soon as possible. To achieve this, a routing card or
stage release card may be used which is effectively signed confirmation that a specific
discipline has completed their scope and is formally released to the next discipline. This not
only releases the work as soon as possible, but also avoids the risk of contractors proceeding
with other disciplines prematurely, resulting in abortive work.

Example of Stage Release Form (released by Test Pack) :-

Sign for each Stage Release to next


discipline.
This would ensure workfront is clearly
identified and avoid abortive work due
to premature release of Test Pack.

Page 30 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.3.3

Testing of Pipework at Contractor Interfaces


There are not always convenient mechanical joints at contractor piping interfaces, therefore it is
important to clearly identify where the responsibility lies for the various MC activities. This can
be achieved by preparing a simple project specific procedure to suit the situation and
organisation. The schematic below is an example of how this could be approached, bearing in
mind that there may be more than two contractors involved.
The main objective is to avoid double testing and to make it clear which contractor takes
ownership of the combined pressure test.

Field Weld Interface.


Not practical or economical to use hydro-plugs,
welded caps or install break flanges.
Solution : Combine to 1 x Interface Test

Contractor No.01

Contractor No.02

FIRST CROSS-BOUNDARY TEST

SECOND CROSS-BOUNDARY TEST

1)
2)
3)
4)
5)
6)
7)
8)
9)

1)
2)
3)
4)
5)
6)
7)

Complete construction.
QC release.
Discipline pre-test punch.
Flush/Test (or vice versa).
Dry/blow out excess water.
Reinstate.
Seal off interface end.
Reinstatement punch.
Copy test pack to Contractor
No.02
10) Complete surface protection to
approx. 1m from tie-in.
11) Complete heat tracing to 1m from
tie-in and coil/protect cable.
12) Complete insulation to 1m from
tie-in and seal end.

Complete construction.
QC release.
Discipline pre-test punch.
Flush/Test (or vice versa).
Dry/blow out excess water.
Reinstate.
Reinstatement punch.

COMPLETION OF TIE-IN
1)
2)
3)
4)
5)
6)
7)

Complete tie-in weld or spool.


QC Release.
Dry FULL interface test.
Reinstate after drying.
Complete surface protection.
Complete heat tracing.
Complete insulation.

Page 31 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.3.4

Critical Areas to Maintain Control


Experience from previous projects clearly identifies key piping related areas which have to be
addressed at the outset of the project, carefully maintained and followed-up.

Flushing standard
Drying
Bolt tensioning
Seal welding of plugs
Construction blinds status
Verification of special items e.g. strainers.

If the MC philosophy is to be maintained i.e. MC means Ready for Commissioning, (includes


pre-commissioning activities), then the above areas must be dealt with satisfactorily.

5.3.4.1

Flushing/Drying :
It is strongly recommended that high cleanliness standards is set at the various vendors and
module yards to ensure that equipment and piping are delivered to site in clean condition.
Some Recommendations :

Use hydro-jetting on pipework


Use optical instruments to inspect equipment (e.g. heat exchangers)
Sweep blast fitting which have internal coating that could be problematic at a later
stage (e.g. on pipework which is to be chemically cleaned)
Use vapour corrosion inhibitors (VCI)

The various contractors complete their piping scope by test pack and this is ideal for
reinstatement, punch-out and release to other discipline, however there is a need to flush and
dry on a system or part system basis to ensure that correct standard of cleanliness and dryness
are achieved.
It is recommended that a specialist group or contractor perform these activities.
Where there is a mandatory dry-out of major piping systems to low dew points prior to
introducing feed stock, it may be worth giving consideration during the design phase to install
vacuum piping (permanent or temporary). This would achieve a much quicker and effective dryout and where permanent vacuum piping was installed, then this could be utilised during future
shutdowns.

5.3.4.2

Bolt Tensioning :
A master set of isometric should be prepared where joint numbers are allocated to all
mechanical joints, which require bolt tensioning. These would then be tracked in the MC
system and a formal notification system set-up if completed joints were broken for any reason.
This would build up to a historical record on all joints based on direct reporting from the
operatives performing the actual work via double label system.

Page 32 of 84 (Oct 2000 Edition)

MC Handbook Section A
Notes & Tips :
Careful consideration should be given to specifying that all labels and bolt caps to be used are
suitable for the service temperature of the lines. Experience has shown that during the
commissioning & start-up phases, the plastic caps melt and cause problems for later
maintenance and also labelling is destroyed.

Bolt Tensioning Control Flowchart :

Bolt Tensioning Mark-Up Drwg :

BOLT TENSIONING STATUS REPORT


Drwg No. BT Date Press A Press B Split Date Reason
Iso No.1
01
Iso No.1
02
Iso No.2
01
Iso No.2
02
Iso No.2
03
Iso No.2
04
Iso No.3
01

Joint No.
Iso No. XXXX

Contractor performs
bolt tensioning on
joint

Update
Master Drwg.

Update
MC System

Contractor labels joint


and caps all bolts
MC Dept. affixes label to
Master Drwg.
Contractor sends
duplicate label to MC
Dept.

And updates MC System

Page 33 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.3.4.3

Seal Welding Control :


This would be controlled in a similar way to the bolt tensioning, with a master set of marked-up
drawings and corresponding status report. In addition, plugs, which are required to be left unwelded until the commissioning phase, should be flagged as such, otherwise they would
normally be welded at the test pack reinstatement stage.
The various contractor would then forward a welding completion slip which contains :-

5.3.4.4

Drawing No.

Weld/Joint No.

Client welding authorisation signature.

WPS/Welder/Date Welded.

Construction Blinds Status :


Construction blinds are used through the construction period for various reason e.g. pressure
tests, preservation, temporary isolation etc.
It is crucial to maintain a comprehensive overall Blind List and be able to extract blinds
applicable to any particular commissioning package. This is a mandatory section for the
Handover Dossier and also a safety requirement.
On the KUP project, it was agreed to let the contractors control their own temporary blinds and
commence formal identification and tracking from the multi-discipline punch-out stage. All
temporary blinds, dust blinds, spectacle blinds in reverse position to that shown on the design
P&IDs, temporary strainers etc. should be listed as punch items on the MDPL and
subsequently allocated a unique blind number.
A blind list can then be produced from the MC System, followed-up and closeout as each item
is cleared and verified.

5.3.4.5

Verification of Strainers :
This would be a witness point in the MC Manual responsibility matrix and therefore signed
verification (Client Construction and/or Commissioning Group) that strainer is clean and
correctly installed. Either a certificate for miscellaneous equipment or a Strainer log could be
completed and MC system updated accordingly. Should be labelled (dated & initialled) and a
notification system set-up if strainers need to be removed for any reason.

Page 34 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4

5.4.1

Equipment & Cables

Static Vessels
The sketch below shows a typical static vessel (column) and how the MCP split should be
approached. The attached pipework should not be included with the vessel, but instead be
included in piping test packs for the relevant CP.
Remember the rule MC is discipline driven.

Mechanical MC Package :
Covers placement, verticality,
holding down bolts, torquing,
grout release, internal inspection,
survey of internals, final closure of
manhole(s).
Dimensional survey report(s) to be
included.

Piping MC Package :
All piping to vessel nozzles would
be covered by a specific test pack.

Surface Protection MC Package :


Covers painting of vessel.

Insulation MC Package :
Cover insulation of vessel

Final Closure Certificate :Witness Point for Comm.


New gaskets to be installed.

Fireproofing MC Package :
Covers fireproofing of vessel skirt.

Page 35 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.2

Equipment Motors, Heaters etc

In general, the rule of thumb is to allocate electrical cables to the same CP as the user.
Example :

Motor

: 22-PA-200C(M)

RCU

: 22-PA-200C-RCU

Power Cable

: PN-22-4012

Control Cable

: CD-22-4012

Outgoing Unit

: 82-EN-641.04P

The above items would be scoped with the same CP as pump 22-PA-200C which is shown on
the colour marked-up P&ID Boundary Drawings.

Mechanical MC Package would include :-

Electrical MC Package would include :-

Pump including all alignment activities relating


to positioning of pump skid, connecting piping
and to driver.

Motor, power cable, control cable, RCU and


Outgoing Unit in Switchboard (see below).

Mechanical/Electrical Split

Page 36 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example of Switchboard :

Example :Outgoing Unit for Pump 22-PA-200C.


82-EN-641.04P

Page 37 of 84 (Oct 2000 Edition)

MC Handbook Section A

Testing electrical equipment

This can be a complex operation due to the interfaces with different systems as shown on the
schematic below and the possibility of separate contractors for the switchgear scope and field
equipment scope. Careful planning is required for the completion of the Electrical Management
System, Process Control System and ESD System in order to avoid multiple testing.

Required Testing :-

Signals between PLC and starter.


Signals between PCDA and starter.
Signals between ESD and starter.
Full loop test from PCDA to starter including signals from ESD and RCU.
Signals between Electrical Management System operator station and PLCs.

Where there is more than one contractor, careful consideration should be given to allocating
the testing of field equipment to the switchgear contractor, as specialised knowledge is required
for the electrical management system and to programme the protection settings. Another option
would be to set up a dedicated testing team which comprises of technicians from both
switchgear and field equipment contractors.

ESD System

Electrical Management System


Operator Station

Interface
Relay Cabinet

Electrical Management System

PCDA

PLCs

Process Control

Motor Starter
Motor Runs

Motor Data required


for starter settings
RCU

5.4.3

Motor

Start From Preference :


1) PCDA
2) Operator Station
3) Starter
If not fully tested from PCDA
then some retesting would be
required.

Page 38 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.4

Lighting & Small Power

In general, there would be specific Commissioning Packages for L&SP scope and these should
be defined to suit the site layout and needs. A good example is the need for lighting to be
energised in order to improve the lighting for construction enabling temporary lighting
arrangements to be removed. Energising as much lighting as possible at an early phase is also
a desirable safety consideration.

Typical MC Packages :L&SP Distribution Board, feeder cables


Outgoing L&SP circuit or groups of circuits

MC Package Split at DB/Feeders and


Outgoing circuits (each or groups)

DB
CCT No.01

Lighting Circuit

Outgoing circuits may be for different


structures, areas etc.
Create MC Packages to suit project
livening-up philosophy.

Page 39 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.5

Electric Heat Tracing

Electric Trace heating tapes are allocated to the same CP as the piping isometric, mechanical
equipment or instrument it protects.
There are options relating to the power supply cables to the first on-line junction box.
-

They can be allocated to the same CP as the applicable distribution board (i.e. 82
CP). This is the preferred split (see diagram below) but does need co-ordination to
ensure that the necessary power supply cables are installed and handed over in order
that system heat tracing can be energised. Consideration should be given to schedule
the full circuit power supply side for the first earliest CP rather than planning for partcircuits. This will allow for more straightforward control and disconnection at JBs can
be added as punch items.

Cable from first JB to on-line JB can be allocated to the same CP as the piping,
mechanical equipment or instrument, while the first cable from distribution board to
first JB can be allocated to same CP as board.

See attached circuit diagram showing alternative CP splits.

Process/Utility CP Nos. may have


different planned handover dates.
Ensure power supply cables are
planned in-line with these dates in
order to allow circuits to be energised.

Heat Trace Tapes TL-??-


CP No. 1
Dist Board
82-EN-???

Power Cables PL-82-


CP No. 2

CCT 12

CP No. 3
Power Supply with L&SP CP

CP Split at on-line Junction boxes


(Go with Process/Utility Systems)

Plan to install full circuit


power supply cables and
punchlist any disconnection
at JB required to energise a
specific Process /Utility CP.

Page 40 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.6

Instrument Field Cables

These would be allocated to the same CP as the field instrument as shown on the colour
marked-up P&ID CP Boundary Drawings, while the multi-core and relevant JB would be
allocated to the earliest CP which they serve (see diagrams below).

System
Cabinet

Marshalling
Cabinet
Multi-Core
Junction Box

Instrument
(Field)

Part of
Multi-Core

Field Cable

System Cable

Multi-Core & JB
allocated to earliest
scheduled CP which
they serve.
Field instrument and field
cable to relevant CP as
per coloured marked-up
CP Boundary Drwgs.

Cabinets & System Cables with


relevant CP for PCDA, ESD or F&G
within a specific substation or
control room.

Instrument Field Cables


(Relevant CP No.)
CP No. 1 (Date 01.05.XX)
CP No. 2 (Date 01.08.XX)
CP No. 3 (Date 01.03.XX)
CP No. 1 (Date 01.05.XX)

Multi-Core Junction
Box

CP No. 2 (Date (01.08.XX)


CP No. 4 (Date 01.10.XX)

This multi-core & JB serves


instruments in 4 different systems
(CP Nos.)
If CP No. 3 is the earliest
scheduled, then the multi-core &
JB would be allocated to that
specific CP No.

Mutli-Core Cable

Page 41 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.7

Underground Cableworks

During the early cable pulling phase it is important to have a control system for the inspection
and release of each layer of underground cables prior to sand filling and ultimate back filling or
placement of covers.
This control should be handled as Civil MC Packages for the culverts and trenches.
Although this involves checking that all cables are correctly positioned, segregated and free of
debris which could cause damage, the specific cables will be allocated to the relevant active
commissioning packages of which they form part.
One method of controlling this is to utilise the unique segment number as detailed on the nodal
layout drawings and use this as the MC Tag No. for sections of trenches or culverts.

Nodal Layout Example :

Nodal Point

Unique Segment Identification (Use as MC Tag No.)


Example : CA411-2-006

CA411-2-006

0581

CA411-2-007

0583

CA411-2-006
0584

0582

CA411-2-008

Cable Culvert from Node 0582-0584

CA411-2-005

0585

Culvert/Trench sections
controlled from nodal point to
nodal point.
Inspect & Release each layer for
sand fill.

Page 42 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.4.8

Control Cabinets (in CCR & LCRs)

Normal practice is to define specific CPs for these systems in order that they can be inspected,
punched and subsequently handed over to allow them to be powered up. Although other work
may require entry to such control panels, it is limited to specific group of authorised technicians.
Examples of such systems :
PCDA

ESD

Fire & Gas

Metering
The exception would be UCPs that are dedicated to specific machines e.g. compressors.
These would be allocated to the same CP as the machine.
Therefore it is recommended to create at least one MC Package per discipline per LCR/CCR
for any specific CP.

LCR XXX
ESD System
Cabinet No.1

ESD System
Cabinet No.2

ESD
Marshalling
Cabinet No.1

Interface Relay
Cabinet No.1

ESD System
Cabinet No.3

ESD
Marshalling
Cabinet No.2

Interface Relay
Cabinet No.2

PBs

Fire Area XXX


Field ESD Pushbuttons
(i.e. CP for each Fire Area including
connecting cables to Marshalling Cabinets)

Normal CP Split
between LCR
Scope
and Field Scope.

This CP could be split in a minimum of 3 x MCPs :


Instrumentation 1 : All ESD cabinets, all IE, PE & IS earthing cables, all inter-connecting
system cables and relevant connecting ESD cables to other LCRs and/or CCR.
Instrumentation 2 : All loop testing related to LCR Internal Pushbuttons and intertrips etc.
Electrical : Interface Relay Cabinets, UPS power supply cables to ESD & IR cabinets and
control cables.

Page 43 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.5

Steelwork
It is important that steelwork MCPs are created such that they are compatible with the erection
schedule. It is possible to use Model Reference Nos, Design Drawings or even Dummy Tag
Nos. for MC purposes, however, whichever system is adopted, it should be consistent across
the project.
The recommendation is to use a reference to a Tag No. or Model Ref. where possible and list
the relevant drawings on the MAC.
Also note that it is worth considering creating separate MCPs for the Primary and Secondary
Structural Steelwork Scope. Again, this is linked to the erection sequence and schedule, where
handrails, ladders, etc are installed at a later date. This allows the primary structure to be fully
inspected, punched and accepted.
Typical MC Package Definition for Steel Structure :-

1 x MC Package
for Steelwork
Create extra MCPs for
secondary steelwork as
required.

1 x MC Package for
Surface Protection
Create extra MCPs for
secondary steelwork surface
protection as required.

1 x MC Package for
Passive Fire Protection
(if applicable)
Grade Level

Example :
The following example is from Krst where suitable Structural Key Plans were produced to
allow easy identification of structure and rack, tracks.
It is advisable to prepare one MC Package per stand-alone structure, and group pre-fabricated
sections of racks/tracks into full or practical portions.
The primary aim is to allow progressive punch-out of the structures and hence re-cycling punch
items back into construction.

Page 44 of 84 (Oct 2000 Edition)

MC Handbook Section A

Example :
Pre-Assemble Rack
(PAR)
Use PAR No as MC
Tag No.

Typical Example :a)

At Module Yard : Create an MC Package for PAR and punch out to applicable design
General Arrangement & Detail Drawings.

b)

At Site : Create an MC Package for the placement, positioning, bolt-down or weld-out.


Such at package would include a dimensional survey report. The site MC package may
include more than one structure e.g. all PARs which form the full rack or discrete section
of a rack.

Page 45 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.6

Lifting Equipment
Powered lifting equipment such as cranes would normally have dedicated commissioning
packages defined for this scope. Where lifting equipment is incorporated as part of other CPs,
then separate mechanical MC Packages should be created for this scope to allow easy
traceability for future re-certification purposes.
Examples :- Monorails, Davits, Lifting Frames and Lifting Lugs.

5.7
5.7.1

Civils
General
The focus for this section is on concrete structures, foundation, roads and underground piping
which is not allocated lines numbers (e.g. oily water drains)

5.7.2

Concrete Structures
MC Packages should be created for each large concrete structure e.g. bridges, jetties,
buildings, sea-water intake pits, basins, weir boxes and these would contain all MC Records for
pour release, piling, traceability to concrete test results, dimensional survey reports and as-built
data/drawings.

5.7.3

Foundations
It is important to track all foundation in the MC system and these can be grouped into practical
MC Packages for specific construction areas. All relevant MC and survey records would be
included in these packages as for the concrete structures noted above and in addition, there
would be foundation release records.
As the various items of equipment, skids, modules, PARs, PAUs, VAUs etc., are delivered to
site, there will be a need to progressively accept and release the applicable foundations.
The priority will be set by the Planning Group and be synchronised to heavy lift and installation
sequences.
The MC System should be used to track this acceptance and release to ensure a smooth
interface between the Civil and Mechanical Contractors. Either Model Ref.Nos, Co-ordinate
References or Dummy Nos. should be used to identify foundations.
Examples :
FD:22-HA-203A

: Foundation for 22-HA-203A

FD:1E-PS-06

: Backflow Area : Miscellaneous Foundations

Prefix FD : for foundation with Equipment Tag No. or Block Ref./Support No.

Page 46 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example of Foundation Layout Drawing :

Foundations for vessels

Group of Foundations for PAU

Foundations for pumps

Page 47 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.7.4

U/G Pipework (No line numbers) :


Where design isometrics are generate for underground piping, then this scope would be
handled in exactly the same way as above ground piping i.e. create test packs of specific
isometrics and mark-up test limits on suitable P&ID or U/G Layouts.
Where U/G piping is not allocated line nos., then meaningful dummy references should be
created in the MC system to identify the scope and these subsequently used to define test
packs.
Example :

MH-39
This test between two
manholes and including one
gully, could be identified as :
MH40-MH41(incl.Gully)

MH-41

5.8

MH-40

Fireproofing
MC Packages should be created for the passive fire protection scope for equipment, structures,
cables and junction boxes. Some examples and recommendations are listed below :

Vessel Skirts Create 1 x MCP per Tag No.

Structures Create 1 x MCP per specific structure or pre-fabricated unit.

Cables & JBs Two options proposed :

Where a CP has been created for Area Completions, then one fireproofing MCP could
be created for each specific sub-area.

Create one fireproofing MCP for all mechanical equipment in each CP, plus one for all
E&I scope in each CP.

Valves Create one fireproofing MCP for all valves in each specific CP if not included
in b).

Page 48 of 84 (Oct 2000 Edition)

MC Handbook Section A

Area Completion
The preparation of MCPs for area completion is an important aspect of mechanical completion
and allows specific focus on Safety and Electrical compliance to Rules and Regulations. It also
establishes a convenient punch-out for specific areas required by Commissioning prior to GasIn.
MC Packages should be generated for each specific area, group of areas or building that can
conveniently be identified on site plot plans, safety layouts, schematic layouts or other suitable
drawings.
The typical focus on these punch outs include :-

Safety equipment in place (fire fighting equipment, first aid equipment etc.)

Mechanical protection of electrical/instrument cables (covers, bumpers etc.)

Removal of construction debris, temporary equipment, containers, grading etc.

Asgard Reception / Feed


& Rundown Pipetrack

MCP Example :- CA 461

2A - De-Ethaniser Overhead
Compressors
2B - Sales Gas Compression
2C - Asgard Fractionation
2D - NGL Extraction Tr. 1
2E - NGL Extraction Tr. 2
3C - Existing Utilities
3D - Europipe II North / South
Pipetrack

CA62
CA401
CA492

Backflow

Propane Cavern / Propane Subs.


/ Cavern Subs.

CA16

3B

CA
46
3

Statpipe Booster Compressor


& EP II Pig Launcher
1E

CA15

1D

Control Room

Statpipe Train 100/200


& Effluent Treatment

Butane Storage &


Jetty 1 & Jetty 2

CA
44
2

CA
45
4

CA421
CA
45
3

4A

CA45

CA34

3A

CA
44
1

CA21

CA
44
8

CA13

Gradetrack 79 / Sleipner / Ethane


Treatment Gasoline Storage

CA461

CA423

CA42

CA462

CA467

Ethane Storage &


Jetty 3 & Pipetracks

CA44

CA411
CA14

CA19

CA412

CA24
CA18

CA443

2D
CA43

1C

CA444

CA445

CA309

CA17

2E

CA
44
9

CA10

CA466

2C

2A

CA5

CA1

1F

2B

CA4

Sea Water Intake


CA
44
6

CA22
CA47

3C

CA481
CA9

5.9

CA3

CA471

1A

Ethane Storage &


Jetty 3 & Pipetracks

CA452

CA451

2F

3D

Statpipe Booster Compressor


& EP II Pig Launcher
CA46

CA491

3B

CA2

1B
1A

CA323
CA8

Example for Site - Area Completion Breakdown


(MC Package per Construction Area or Group of Areas)

Page 49 of 84 (Oct 2000 Edition)

MC Handbook Section A

5.10 Steam Blowing


Steam blowing is regarded as a construction activity as it is performed to achieve the standard
of cleanliness of steam piping systems. It is also required by machine vendors (e.g. steam
turbines) to comply with their guarantee conditions.
There tends to be a significant involvement of the Commissioning Group and they may infact
co-ordinate the whole steam blowing operation as systems have to be brought into service in
order to produce the medium for this activity (e.g. open tie-ins or start-up boilers).
It is recommended to create one MC Package for each steam blow circuit which would include
the following items and would be punched out in the normal manner pre-blow, after blow
sequence completed and reinstated :

Mechanical Acceptance Certificate (MAC)

Punchlist

Marked-up P&IDs

List of in-line items removed (control valves, orifice plate, thermowells, etc.)

Steam Blowing MC Certificate (signed by all parties including Vendor (if applicable))

Final Target Plates or reference to location stored.

Bolt Tensioning records

Temporary piping, dummy spools, silencers, quench-pots etc

Pre-Blow Punch-Out
Ensure readiness for blow
adequate supporting
adequate restraints
temporary pipework in place
sensistive in-line equipment
removed
dummy spools installed
etc.

Perform Sequence of Blows

Perform initial blows

Perfom blow(s) to target


plate

Sign for acceptance when


acceptable results achieved

Post-Blow Punch-Out
Ensure system is fully reinstated
Temporary piping removed
In-line items reinstated
Bolt-tensioning completed
Insulation reinstated

Page 50 of 84 (Oct 2000 Edition)

MC Handbook Section A

6 MC Punch-out
6.1

Punch-out Stages
The punch-out activities are one of the most important aspects of all the MC activities as it
identifies the outstanding scope and deficiencies, which need to be completed and/or rectified.
Although many of the punch items which are identified by the contractors are rectified very
quickly by the personnel directly involved in the day-to-day construction work, there are equally
many punch items that will be followed-up at a later date and in some cases, by other groups or
contractors.
In order to avoid the expenditure of unnecessary man-hours in locating such items at a later
stage, it is of the utmost importance that a high standard of punch item identification/description
is maintained.

Punch-out Guidelines

Additional Remarks

Make items specific.

Do not generalise to groups of items

Reference Tag No./ Cable No. / Isometric


No.

Helpful to quote Layout Drawing for E&I


tags.

State precise location e.g. module,


construction area, elevation etc.

Significant help on towers and multi-level


structures e.g.
a)

State Module No. + El.xxxxxx

b)

State Northing/Easting co-ordinates

Ensure category of item is specified ( A or


B).

Mandatory to agree this at time of punch.

Ensure items required to be cleared pretest are flagged.

Dedicated column on punchlist sheet for


this purpose. These items must be cleared
and verified prior to a piping test pack
being released for pressure test.

If necessary, attach a marked-up drawing to


assist with identification.

Useful for items relating to untagged


equipment e.g.
a)

Marked-up isometrics for piping items


supporting, shims, etc.

b)

Marked-up layout for civil items.

Page 51 of 84 (Oct 2000 Edition)

MC Handbook Section A

6.2

Punch Item Examples


The following are a selection of punch items which highlight the variation in standard of
punchlisting :

Good Standard (blue text)


Poor Standard (red text)

Electrical Example :

PL No.

Item

Object ID

Description

8239-FU-E2041

005

EAB-842-24-L1-02

Drwg : E060-AD-82-EA0087.001

Cat

Disc

Loc
DRV204

Re-instate luminaire and traywork (3m tray, 6m


cable and re-terminate).
8239-FU-E2041

005

Re-instate luminaire EAB-842-24-L1-02

Category missing
Discipline code missing
Location missing
Drwg No would help

Details all information to easily locate


item including Drwg. No. plus
additional information on material
requirements.

Instrumentation Example :
PL No.

Item

Object ID

Description

2002-FU-J2101

001

20-PDT-4152

Drwg : E060-AD-21-JP0019.001

Cat

Disc

Loc
DRV210

Install capillaries and terminate cable. (11m)


2002-FU-J2101

001

Description not specific.


Category missing
Location missing
Drwg No would help

Complete 20-PDT-4152.

Details all information to easily locate


item including Drwg. No. plus specific
information of remaining scope.

Page 52 of 84 (Oct 2000 Edition)

MC Handbook Section A

Mechanical Example :
PL No.

Item

Object ID

Description

Cat

Disc

2106-FI-M0450

089

21-VE-421

2106-FI-M0450

089

21-VE-421

1 black bolt on manways M1&M3 of DRV 202

DRV202

Replace bolts on 21-VE-421 manways

DRV202

OK, but a little more detail would


assist with locating and establish
material requirements.

Loc

Additional information on specific


Manhole No. and number of bolts to be
changed-out is of great benefit.

Piping Example :
PL No.

Item

Object ID

Description

2102-UM-L0023

008

E060-AD-LL-492A21-PL-4550.001

2102-UM-L0023

008

492A-21-PL-4550

Does not specify which Iso Sheet


No. and which support.

Cat

Disc

Pipe support 1104-137/G Bolts to be shotened 2


off. New 85mm length required

Support bolt too long.

Loc

Information identify actual support


number plus materials required.

Impotant Note for Piping : It is good policy to mark up items on a set


of isometrics or test isometrics. Significant benefit to punchlist crews.

Page 53 of 84 (Oct 2000 Edition)

CA 492

MC Handbook Section A

7 Carryover Work (COW)


The outstanding scope, which is identified at the various suppliers and fabrication yards, is
termed carryover work and of primary importance for the following reasons:

To establish a definitive remaining scope, which is formally identified, documented and


agreed between the contracting parties. This will facilitate the closeout of the relevant
purchase orders and/or contracts from both an MC and commercial perspective.

To establish a concise scope which is transferred to other parties at the following location
(module yard or site). This scope needs to be formally issued in order that the responsible
contractor initiates the necessary work preparation, inclusion in their construction plan,
execution of scope, subsequent punch-out and close-out.

Suppliers
COW
7.1.1.1

Module Yards
COW
Action Supplier COW
as directed by Client

Site Project Team


Review and formally
issue COW to relevant
contractors

Site Contractors

Suppliers

Work Prep
Include in plan
Execute
Punch
Closeout
Progress Report

Complete specific
vendor site scope after
installation of
package/skid.

Page 54 of 84 (Oct 2000 Edition)

MC Handbook Section A
8 Preservation
8.1

Preservation Responsibility
It is important to establish clear demarcation lines for preservation responsibility to ensure
continuity and follow-up of preservation activities. The preservation is initiated at the various
suppliers and maintained through the various construction phases.

INITIAL
PRESERVATION

PRESERVATION
MAINTENANCE

Module Yard 1

PRESERVATION
MAINTENANCE

Client Preservation
Supervisor
Preservation Supv.
Piping & Mech.

Module Yard 2

Preservation
Supervisor E &I
Other Contractor

SUPPLIERS

Preservation
Teams
Piping & Mechanical

Preservation
Teams
E&I and Telecom

Other Contractor

Other Contractor

Suppliers

8.2

Module Yards

Site

Preservation System
This is commonly incorporated as part of the MC System and therefore can utilise the
engineering data and more importantly be easily integrated to the overall handover status. The
example below from the KUP MC System (PIMS) shows the link between :

Flagging Tag Nos. to be included in preservation programme.

Linking to Preservation checklist.

Producing Preservation Weekly Work Lists (To-Do Lists).

Recording negative comments/observations and implementing appropriate action.

Page 55 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example of Preservation Control System (PIMS):

Engineering
info.
are transferred
into the
database

Preservation Active =
before the tag is included
in the ToDo-List

1)
2)
3)
4)
5)
6)

Flag all Tag Nos which are to be included in Preservation Programme i.e. PR flag
Link to applicable standard or special checklist.
Activate when arrives on site (or location) i.e. PA flag.
Generate weekly work list ToDo-List.
Action preservation activities.
Report status plus any Negative comments.

The ToDo list is generated on a weekly basis.


When you click the Generate ToDo-list button
in the
ToDo-list , PIMS MC copies all records from
the
Preservationscope-form where PA is ticked

Standard project
preservation
requirements

Specific
preservation
requirements from
equipment vendors

In addition it selects only preservation events


based on the StartPreserv from Preservation
Scope
joined with the period code in preservation
Check Lists

New To-Do list printed out


and used for Site
preservation

Negative comments
are
entered into the

Page 56 of 84 (Oct 2000 Edition)

MC Handbook Section A
8.3

Preservation Experience Feedback


In order to improve the long-term reliability of the plant and to avoid costly corrective action
during the construction phase, it is of great importance to establish a thorough preservation
programme. Such a programme should focus on preventive measures as well as the routine
preservation as specified in the preservation checklists and suppliers requirements.
Three key examples have been selected to highlight areas where close follow-up will have
substantial quality and commercial benefit (based on practical feedback from KUP).

8.3.1

Valves
Ensure that temporary protection tape on valve stems is applied during blasting and painting at
the various pre-fabrication locations and that it is removed, stem cleaned, greased and retaped. If not done, blast grit which has penetrated the tape is a source of corrosion and
contamination which may caused damage to the stem and/or valve packing. Close follow-up
will avoid costly rework to valves at a later stage when access also becomes a major factor in
the commercial implications.
Potential rework :

Need to remove paint from valve stems

Clean and/or repair valve stems/packing

Replace or repair sticking or damaged valves

Examples of valve spindles being painted during the pre-fabrication


stage.
This causes significant problems for construction and commissioing.

THIS HAS QUALITY & COMMERCIAL IMPACT

Page 57 of 84 (Oct 2000 Edition)

MC Handbook Section A
Poor or no preservation to valve
stems.
Possible sticking valve, repair or
replacement would be required.

Preserved but corrosion underneath


denso-tape.
Ensure machined surfaces are
coated with a suitable oil or grease
prior to applying protective tape.

Protection tape applied for


blasting/painting operations at prefab stage and left on.
Ingress of shot/grit blast has caused
corrosion.
Remove, clean, grease and re-tape
prior to shipment.

ALL HAVE QUALITY & COMMERCIAL IMPACT

Page 58 of 84 (Oct 2000 Edition)

MC Handbook Section A
8.3.2

Stainless Steel Surfaces


Ensure the stainless steel surfaces, fully painted surfaces, cables trays etc., are protected
during grinding, welding or blasting operations in adjacent areas. Again, if this is not properly
controlled becomes a source of major rework and hence needs to be addressed at the frontline
i.e. to the foremen and workforce via toolbox meetings etc.
Potential rework :

Chemical cleaning of external stainless steel surfaces which are contaminated with
carbon steel

High pressure cleaning or sweep-blasting of fully painted surfaces in order to remove


contaminated top coat and subsequent re-coating.

Example of carbon steel contamination of statinless steel material.


Protect adjacent materials and equipment when performing grinding,
welding and blasting activities.

THIS HAS QUALITY & COMMERCIAL IMPACT

Example of carbon steel contamination of fully painted structural


steelwork. Protection covers and mats will minimise damage.

THIS HAS QUALITY & COMMERCIAL IMPACT

Page 59 of 84 (Oct 2000 Edition)

MC Handbook Section A

8.3.3

Boxed Items for Long Term Storage

Ensure that all items, which are received, boxed and will be stored for considerable periods, are
open and inspected to ensure that initial preservation is intact e.g. spare parts, commissioning
spares.
Potential rework :

Parts require specialised cleaning/repair.


Parts not fit for purpose and need to re-order.
Potential delays in repair and maintenance of plant.

These examples show the need to


open and inspect all items to ensure
intial preservation is intact.
Assuming that items are preserved
for long term storage can lead to
cases like these.
When spares are required make
sure they are fit for purpose by
implementing good preservation
routines.

ALL HAVE QUALITY & COMMERCIAL IMPACT

Page 60 of 84 (Oct 2000 Edition)

MC Handbook Section A
Livening-Up Notice

9 Livening-Up Notice
There is a need during construction to liven-up electrical systems or part systems in order to
perform the various MC activities or it is required by the project.
Examples :a)

Liven-up motors to perform rotation checks and 4-hour uncoupled runs.

b)

Liven-up lighting circuits to provide better overall lighting for construction.

c)

Liven-up heat tracing for frost protection.

The control of this should be handled by the MC system and this could easily be extended to
cover the livening-up during the commissioning period (i.e. E-LUN and C-LUN).

LUN Table in MC System


LUN No: Scope Description
0001
xxxxxxx
0002
zzzzzzzz
0003
0004

Objects Table in MC System


ObjectID: Description
CL-62-NNNN vvvvvvv
PL-62-NNNN xxxxxxx
PL-62-NNNN zzzzzzzz
PL-64-NNNN ccccccc

LUN
0100
0210
0250
0500

Additional fields can be added for


C-LUN and E-LUN to easily control
livening-up during the
commissioning period

Print Livening-Up Notice


Notice details specific listing of
cables to be livened-up and the
reason required.
Formal approval required.

Page 61 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example of LUN :

Description of scope and


where it is fed from i.e.
Switchboard cubicle.

List of cables to be
livened-up.

Page 62 of 84 (Oct 2000 Edition)

MC Handbook Section A

10 Loop Testing
10.1 Loops Diagram & Loop Register
It is not very common for the EPCS Contractors to produce a definitive Loop Register and if this
should be the case, then it is strongly advisable to create one for MC purposes.
This will greatly simplify the accurate reporting of :-

Loop testing status

Identification of I.S. Loops

Linking software tags.

Release of Loops

Loop Register Suggested Structure :-

Loop No.

Drawing No.

Type

I.S. Flag

24-F-2016

XXXXXXXXX

IN

Nnnn mmmm

25-P-2624

YYYYYYYYY

IN

kkkk

25-X-2906

ZZZZZZZZZZ

IN

74-GD-4021

FFFFFFFFFF

FG

Loop Reference No.


Used in the MC system to :
Linking field tags & cables

Linking to relevant multicores

Linking to software tags

Loop Release

Loop Status Reporting

Remarks

Facilates reporting of I.S.


Calculation scope and
status.
(Tabular & S-Curves)

Page 63 of 84 (Oct 2000 Edition)

MC Handbook Section A
Loop Diagram Example :-

Loop Number
All relevant Tag Nos and
Field Cables linked with this
number.

Instrinsically Safe Loop

Page 64 of 84 (Oct 2000 Edition)

MC Handbook Section A

10.2 Guidelines for MCP Definition


The simple recommendation is to create one MC Package for the loop testing scope for each
CP. It is important that the as-built loop diagrams are prepared as the loops are tested i.e. as
attachment to the MC Loop Test Certificate and that a master set are maintained at a central
location which is normal the CCR.
These MC Packages should be discipline punched in he normal manner and in order that all
temporary links and jumpers are controlled, these should be include as individual punch items.
These can then be allocated a unique link number and a link register can be produced from the
MC System for inclusion in the Handover Dossier.

10.3 Release of Loops for Testing


As this activity is dependent on completion by other disciplines and commences at an
advanced stage on construction, it tends to on the critical-path for most projects.
It is therefore of paramount importance that the available loops are identified and released to
the Test Teams without delay in order to maximise the work front.
To achieve this in an effective manner, the field components and cables of the loop have to be
tracked in the MC system. In addition, the related multi-core junction box(es), multi-core
cable(S), barrier (if applicable) and system cable(s) also need to be taken into consideration to
allow verification that a full loop from field to control room can be released.
With careful planning during the detailed engineering phase, the majority of this data can be
made available through the Instrument Index., however any additional time/effort expended to
provide such a loop release facility, would be a wise investment.

Import Tag Nos.

Import Cable Nos.

From Mater Instrument


Index, including Loop
Reference

From Mater Cable Schedule and create


Loop Reference for field cables in MC
system.

MC SYSTEM

MC SYSTEM TABLE

Tag No. & Loop No.


Cable No. & Loop No.
Barrier No. & Loop No.
Multi-core & Loop No.
System Cable & Loop No.

Multiple System Items


e.g.
Multi-core JBs
Multi-core cables
System cables

LOOP RELEASE
Release of Loops based on MC
on all components

10.4 Loop Testing Organisation


This organisation is usual made up of Field Teams, Personnel in CCR, Client Construction
personnel and also Commissioning personnel. Due to the interfaces with both the PCDA and
ESD systems, it is strongly recommended that vendor representatives for both systems should
be engaged on a full-time basis during the loop-testing phase.

Page 65 of 84 (Oct 2000 Edition)

MC Handbook Section A

11 Intrinsically Safe Equipment


It is a mandatory requirement that I.S. Calculations are prepared and verified for all equipment
that is required to be intrinsically safe due to operation in a potentially explosive environment.
This is determined by the location of equipment in respect to the Area Classification drawings.
It is important to collate the required certification on a progressive basis during the course of a
project and extract the data required to perform such calculations.

Field instrument Ex data (Veq, leq, Ceq & Leq) from Ex Certification for instrument.

Zener Barrier Ex data (Voc, Isc, Ca & La) from Ex Certification for barrier.

Cable data (R/m, C/m & Z/m) from manufacturers cable datasheets plus as-built length.

Where field equipment is classified a simple apparatus in accordance with EN 50020 Sect 5.4,
then it is equally important that the project obtains the required Letter of Conformity for each
equipment type.
Example (elements in a loop) :Loop

: 46-P-2202

Instrument

: 46-PT-2202

Field Cable

: JZS-46-PT2202

Multicore Cable

: JZS-46-238

System Cable

: JZS-85-L34-3022

Instrument Certification

: BAS No Ex 89C2360

Barrier Certification

: PTB No. Ex-95.D.2165 X

Certification Examples :The following example shows one format for I.S. calculation sheet plus extracts from Excertification with essential data highlighted.

Page 66 of 84 (Oct 2000 Edition)

MC Handbook Section A

I.S. Calculation Sheet


traceabilty to certification
references.

Page 67 of 84 (Oct 2000 Edition)

MC Handbook Section A

Unique Certification
Reference

Equipment Type Code

Page 68 of 84 (Oct 2000 Edition)

MC Handbook Section A

Key Data for


I.S.Calculation

Page 69 of 84 (Oct 2000 Edition)

MC Handbook Section A

Unique Ex Certificate
Reference No.

Protection Type

Page 70 of 84 (Oct 2000 Edition)

MC Handbook Section A

Key Data for


I.S.Calculation

Page 71 of 84 (Oct 2000 Edition)

MC Handbook Section A

12 Change Control
12.1 Site Instructions or Similar Change Instruction
In order to maintain the latest design status it is essential for a project to establish a FastTrack method for both issuing changes as well as maintaining control of design drawings.
Projects may employ differing terminology for such change notifications, however, for the
purposes of this document, they shall be referred to as Site Instructions (S.I.s) and a detailed
project specific procedure should be prepared accordingly. Such a procedure should include a
flowchart, which details the responsible groups/department and would deal with the main
elements shown in the simplified flowchart below.
Typical SI Flowchart (simplified) :

Issue Site Instruction


For change or additional work
scope.

Update SI Registration System


(could be part of MC System)
a) Record CP Nos. affected.
b) Record Drawings affected.

Perform Work

Issue As-Built Details

Notify Client that complete

To relevant Groups/Department
(including mark-ups)

SI Verified by Client

Update Master Design Drawings


(if applicable).

a) Signed-off as completed.
b) Issue punchlist as required.

Cloud change and reference SI


No.

Page 72 of 84 (Oct 2000 Edition)

MC Handbook Section A
Site Instruction Format :
The design of a Site Instruction Form or any other change notification form, would in most
cases already exist as either a corporate or project specific form, however, it may well be worth
creating a new or revised version if it does not cater for the following main elements :
-

Section or additional sheet where affected design drawings are listed.

Section where affected commissioning packages are listed.

Verification Section where Client/EPCS can signed off to confirm that change has
been implemented in the field and relevant as-built drawings marked-up.

This will allow a total overview of changes which impact specific commissioning packages and
there state of completion, thus providing accurate design status for punch out basis.

12.2 As-Built Status


An as-built procedure should be issued early in the project to ensure that all parties are fully
aware of the responsibility to maintain red-line marked-up drawings. Such a procedure should
clearly identify which type of drawings are to be marked-up by the various contractors and
which are to be marked-up by Project Team (Engineering Dept.).
By establishing a thorough procedure and ensuring that it is fully implemented via periodic
verification, the project can be confident that the latest design status is available at all times.
Key objectives :

Create central location(s) for availability of master mark-ups.

Create a steady stream of as-built data to allow progressive mark-up of design drawings.

Maintain traceability to reason for changes via reference to SI No.

Master red-line mark-ups are available for both discipline and multi-discipline punch-out.

Field verification that all changes issued via S.I.s are completed and signed-off.

Page 73 of 84 (Oct 2000 Edition)

MC Handbook Section A

13 Status Reporting
13.1 Graphical and Tabular Reporting
If is essential that concise consistent reporting is adopted on any project and avoid or minimise
any ad-hoc reports. The overall suite of reports should be comprehensive enough to provide :a)

b)

High level reports for management & construction, which show trends e.g. s-curves

CP Handover Status S-Curve

Piping S-Curve By Test Pack

Piping S-Curve By Isometric

Cables S-Curves (Electrical & Instrumentation)

Loop Test S-Curve

Punchlist S-Curve (showing A & B totals against cleared)

Detailed tabular report for analysis, follow-up.

Test Pack Status Report

Loop Test Report

Outstanding Punchlist Items

MC Status Report per CP

CP Comments (Action list for MC Meetings)

Object Status Report (status of all Tags/Cables per CP)

The overall suite of reports should be made available for various level of monitoring :

Overall Project

Specific Contractors

Interim Milestone (i.e. group of CP Nos.)

Page 74 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : CP Handover S-Curve
(Also available for Groups of CPs forming Project Interim Milestones)

Track Planned/Actual Handovers


Other Options :a) Run for Interim Milestones
b) Add Commissioning Curves

Page 75 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Piping Test Pack S-Curve
(Also available for Individual Contractors)

Key Activities Monitored


Delta between QC Released and Tested shows
workfront.
Monitoring reinstatement is critical for release to
other disciplines.

Page 76 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Loop Test S-Curve
(Also shows the release of loops for testing i.e. workfront)

Delta between Loop Released (red) and Tested (blue)


shows Loop Testing Workfront !
CRITICAL ACTIVITY TO CONTROL !

Page 77 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Punch Item S-Curve
(Also available for Individual Contractors)

Track growth of both


A-Items(red) and
B-Items(blue) plus clearance
trends.
Delta shows outstanding scope.
Tabulation gives weekly figures.

Page 78 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Punch Item Summary Report (By CP No)
(Selection by CP, Contractor, Discipline, Category etc)

Monitor and Prioritise outstanding


punch items.
Review valid action codes and
highlight & track where there is a
material requirement.
(CP review/status meeting)

Page 79 of 84 (Oct 2000 Edition)

MC Handbook Section A
Example : Test Pack Status Report (Tabular)
(Also available for Individual Contractors or CP)

Track Key Stages


Follow-up against Piping Test
Plan

Page 80 of 84 (Oct 2000 Edition)

MC Handbook Section A
13.2 Planning Interface
It is important to track and report against Project Interim Milestones and therefore a close
interface to the Planning Dept. is essential for consistent meaningful reporting that will assist
both Contractors and Client Management.
It is strongly recommended that completion meetings be held on a regular basis to evaluate
status of interim milestone and implement the necessary action to secure target dates.
MC status data can also be utilised to enhance Visual Planning posters and notices, which will
increase the awareness of all personnel regarding Project key targets and achievements.

13.3 Benchmarking
The project may require reporting (s-curves) against agreed benchmarks and this can be a
valuable tool to monitor both quality and commercial aspects.
Examples :a)

Set a specific target for the number of Carryover Items (COW) for each Purchase Order.
This would effectively monitor the quality of skids/packages delivered to site.

b)

Set a specific target figure of outstanding punchlist B-items at the handover stage. This
would effectively monitor the quality or state of completeness of each commissioning
package.

Example : This shows start to be worse than the target, however is recovered by some
corrective measures, then again a peak mid-project before brought back to better initial targets.

Delta : Below Red Curve Better than Target


Above Red Curve Worse than Target

NUMBER / QUANTITY

Benchmark Curve

Actual Curve

TIME

Page 81 of 84 (Oct 2000 Edition)

MC Handbook Section A

14 Dossiers
14.1 Handover Dossiers
The intention of a handover dossier is to provide a comprehensive summary of the specific
commissioning package in a format that the Commissioning Group can easily verify without the
need to send through a complete MC Dossier.
Ideally, the submission of a completed MC Dossier could be possible, however from experience
there tends to be back-end discipline scope, which is incomplete and which does not hinder the
start of commissioning. In order to avoid submitting incomplete MC dossiers and updating
these at a later date, it has been found to be a much more practical approach to submit a
Handover Dossier and have the compiled MC dossier made available for detailed verification.
The primary objective is to avoid unnecessary delays, which would have direct impact on the
Commissioning Schedule.

14.2 MC Dossiers
These dossiers are normally compiled on a CP basis and contain all the MC documentation
from the relevant contractors in the form of MC Packages. These are divided by discipline
together with an index of MC Packages contained in each section.
In addition, each dossier should contain a summary report of all tags/cables with traceabilty to
the respective MC Package No.

Section X
Section 6

Section 5
Section 4
Section 3
Section 1

MC Dossier
Index
MC Dossier
CP No. XXXX

1)
2)
3)
4)
5)
6)
7)
8)
9)

Status Report
Electrical
HVAC
Instruments
Piping
Mechanical
Structural
Civils/archt.
Etc.

Doc No

MC Dossier Document No:


Formal Project Document Number
to be registered in DCC system.

Status Report :
Comprehensive listing of all Tag
Nos, Cables, Isometrics forming CP
scope.

Discipline Sections :
Contain all MC Package from all
relevant contractors.
Include index of MCPs in each
section.

Page 82 of 84 (Oct 2000 Edition)

MC Handbook Section A

Handover Philosophy
and MC Responsibility
Single Discipline Multi-Discipline

MC Record

PUNCHLIST

MAC

MDP

HANDOVER

MC
Dossier

H/O
Dossier

H/O
Dossier

Complete MC
Records
in-line with
Construction

Contractors
KUP Field MC
KUP QS
Progressively followup
scope and verify MC
Records (as required)
*See Responsibility
Matrix in MC Manual
KUP QS sign for QC
Release on Pipe
Testing Certificate

Punch List
by MCPackage

Contractors
KUP Field MC

Review/Sign.
Mechanical Acceptance
Certificate
(Only B items)

Contractors
KUP Field MC

Multi Discipline
PunchList when ALL
MACs completed for a
Comm.Package

Contractors
KUP Field MC

Finalise MC Dossier +
Hand Over Dossier

KUP MC Dept.

Issue HO Dossier
to Commissioning
followed by
finalised
MC Dossier

KUP MC Dept.

Commissioning
PunchListMC Packages
when offered up by
contractor.
NOTE:
Contractors must punch
out first.
(Joint discipline punch
out where mutually
agreed)

MAC to be signed
when all A items
cleared and a
reasonable amount of
B items are
outstanding

Participate as required.
MDP may take place with
some outstanding scope
upon agreement with
Comm.
e.g. Insulation / Heat
Tracing
All outstanding discipline
punch items transferred to
MDP.
KUP MC issue Notification !

CompileHandover Dossier
and MC Dossier for each
Commissioning Package

Issue Handover
Dossier to formally
handover each CP to
Commissioning
Group.
MC Dossier to be
made available, but
not issued until
totally finalised.

Page 83 of 84 (Oct 2000 Edition)

MC Handbook Section A
Sample MC Dossier Index :

Page 84 of 84 (Oct 2000 Edition)

MC Handbook Section B
Sample Mechanical Completion Manual

This is a sample MC Manual from the KUP


project, which has been revised at the end of the
project to incorporate some experience feedback.
Such a MC Manual should be prepared to suit the
specific project organisation with particular
emphasis on the development of the
Responsibility Matrix.

HANDOVER

Engineering
Construction
MC

Commissioning

Start-Up

Oct2000 Edition

Sheet No. 1 of 18

KRST UTBYGGINGSPROSJEKT
(KUP)
M.W. Kellogg Limited Job No. 5622

CONTRACT/P.O.

Review Status Code Stamp

C-217091

TAG No.:
N/A

04.10.00

12.04.99

Post Project
Revision for MC
Handbook
General Revision
due to Integration

30.04.98

Revised as recorded

09.03.99

Issued for
Implementation

Rev. No.

Date

For Originator Use:

DESCRIPTION

N/A

A.Dynowski

A.Dynowski

N.Carlsen

A.Dynowski

P.O.Skytterholm

J. Austerheim

P. McLeod

G. Hystad

J. Austerheim

A. Traa

J. Austerheim

Prepared
Checked
ORIGINATOR
KUP MC

Main Contract
Purchase Order
DOCUMENT TITLE

Approved
KUP
CONSTR.

N/A

G.Hystad

G.Velde

Approved
KUP
CONSTR.

Approved
KUP
COMM

N/A

KARTS UTBYGGINGSPROSJEKT (KUP)


MECHANICAL COMPLETION MANUAL
System
Suppliers Document

Area
Code:

DOCUMENT NUMBER:

Rev.

E060 - SB - M YA0001

Filing
Keyword:
Distribution:
Security:
Comments:

WBS

N/A

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 2 of 18
_______________________________________________________________________________
1

PURPOSE................................................................................................................................................ 4

SCOPE..................................................................................................................................................... 4

REFERENCES ....................................................................................................................................... 5

DEFINITIONS........................................................................................................................................ 5
4.1.1
Mechanical Completion (MC) ...................................................................................................... 5

4.1.2

Handover (HO) ............................................................................................................................. 5

4.1.3

Commissioning ............................................................................................................................. 6

4.1.4

Start-up ......................................................................................................................................... 6

4.1.5

Contractor..................................................................................................................................... 6

4.1.6

KUP CONSTR............................................................................................................................... 6

4.1.7

KUP COMM ................................................................................................................................. 6

4.1.8

PA ................................................................................................................................................. 6

4.1.9

Commissioning Package (CP) ...................................................................................................... 6

4.1.10

Mechanical Completion Dossier................................................................................................... 6

4.1.11

MC Package.................................................................................................................................. 7

4.1.12

Responsibility Matrix .................................................................................................................... 7

4.1.13

Punch Item .................................................................................................................................... 8

4.1.14

Discipline Punch-Out ................................................................................................................... 8

4.1.15

Multi-Discipline Punch-Out.......................................................................................................... 8

4.1.16

Notification ................................................................................................................................... 8

4.1.17

PIMS-MC...................................................................................................................................... 8

COMMISSIONING PACKAGES & MC PACKAGES...................................................................... 9


5.1.1
Commissioning Package Definition.............................................................................................. 9
5.1.2

MC Package Definition ................................................................................................................ 9

5.1.3

Relation Between Plant Systems, Commissioing Packages and MC Packages .......................... 10

5.1.4

KUP Completion Sequence Flowchart ....................................................................................... 11

MECHANICAL COMPLETION ACTIVITIES ............................................................................... 12


6.1.1
General ....................................................................................................................................... 12
6.1.2

MC General Responsibilities ...................................................................................................... 12

6.1.3

Mechanical Completion Flowchart - Fabrication Yards/Krst Site ......................................... 13

CARRYOVER WORK (COW)........................................................................................................... 14


7.1.1
COW/MSR Preparation .............................................................................................................. 14
7.1.2

Supporting Technical Documentation (with COW List) ............................................................. 14

7.1.3

Marking of COW Materials ........................................................................................................ 14

PIMS-MC SYSTEM ............................................................................................................................. 15

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 3 of 18
_______________________________________________________________________________
9

RESPONSIBILTY FOR MC ACTIVITIES....................................................................................... 15

10

MECHANICAL COMPLETION INSPECTION & TEST RECORDS .......................................... 16

11

REVISION CHANGE RECORD........................................................................................................ 17

12

APPENDIX NO.01 CONTRACTOR CODES ................................................................................ 18

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 4 of 18
_______________________________________________________________________________

PURPOSE
This Mechanical Completion Manual forms the basis for Mechanical
Completion (MC), for the Krst Utbyggingsprosjekt (KUP).
It also details the MC activities, level of verification and MC documentation
requirements.
Other primary aims and objectives include the following:

Achieve a consistent and adequate standard for MC documentation.


Stipulate the level of verification by KUP CONSTR/KUP COMM.
Use MC as a verification tool for status of project.
Progressive completion of MC Certificates/Records.
Progressive punch-out of the scope of work.
Achieve a consistent standard of punch-listing activities.
Progressive submission of MC Package to KUP MC Dept.
Progressive compilation of MC dossiers.
Achieve good traceability to MC documentation.
Smooth handover of Commissioning Packages to KUP COMM.

SCOPE
The use of this manual is limited to the following:
a) Site Contractors
b) Module Yards Contractors
c) DRV Yard Contractor
d) Multi-Discipline Package Suppliers (as defined in Appendix No.01)
The MC requirements for equipment suppliers are specified in document E060SB-A-SS0014.
This manual does not cover the full scope of work for each individual
Contractor/Supplier and therefore reference shall be made to the relevant contract
documents.

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 5 of 18
_______________________________________________________________________________

REFERENCES

Document No.
E060-AD-A-KB0001
E060-AD-A-KC0002
E060-AD-A-KC0004
E060-AD-A-KK0011
E060-AD-A-KK0012
E060-AD-A-KV-0002
E060-AD-A-SS0001
E060-AD-A-SS0003
E060-AD-A-SS0004
E060-AD-A-SS0010
E060-SB-A-SS0013
E060-SB-A-SS0014
E002-XX-A-YA-5001
N/A

Title
Storage, Handling and Preservation Maintenance Manual
Guidelines for Mechanical completion of Pressure Tests
which Cross from Inner Area to ISBL/OSBL
Commissioning Package Handover Procedure (KUP MC to
KUP Commissioning)
Pressure Safety Valve Handling Procedure
Construction Blinding and Temporary Strainers Procedure
Guidelines for Inspection and Punchlisting Activities
Documentation for Operation-Purchase Order
Requirements
Structure and Contents of Manuals
Instructions for Preparation Fabrication Record Books
Instruction to Sub-Contractors for preparation of As-Built
Drawings and Documents
Initial Preservation Specification for Suppliers
Mechanical Completion Specification for Equipment/
Fabrication Items
Engineering Numbering System (ENS)
PIMS - User Manual

DEFINITIONS

4.1.1

Mechanical Completion (MC)


Means all checking, verification and testing of the fabrication, construction and
installation work performed by the individual Subcontractors to confirm that
applicable Rules, Regulations, Codes and Standards are being met, and that the
Project requirements as shown on drawings and outlined in specifications are
fulfilled. The system shall be preserved/depreserved as per KUP Commissioning
requirements and ready for handover.
All inspection and testing shall be in accordance with the MC Manual and relevant
specifications. No deviations shall be accepted unless prior written approval from
the Company has been obtained.

4.1.2

Handover (HO)
Handover is defined as the stage when all tests and checks are completed and MC
has been obtained for a specified Commissioning Package. A Mechanical
Completion Handover Dossier for the Commissioning Package will then be
prepared which is detailed in Section 6.
5

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 6 of 18
_______________________________________________________________________________

When the Handover Certificate is signed/accepted by KUP COMM the operational


responsibility for the CP is transferred to KUP COMM.
4.1.3

Commissioning
Commissioning means the testing and adjustment of an assembly, system or partsystem, and will comprise operational testing under real hydrocarbons or
simulated conditions to ensure that it meets all applicable Rules, Regulations,
Codes and Standards, fulfils its intended duty and is ready for start-up and
operation.
Legal responsibility for the Commissioning Package during this phase shall fall
with KUP COMM. It should be noted that Contractor support may be required
during this phase and KUP shall identify this in the scope of work relevant to the
Contractors concerned.

4.1.4

Start-up
Start-up means the start-up of plant sections and the complete plant to operating
conditions of all systems, in a defined sequence to meet the product qualities and
production rates outlined in design documents and specifications.
Legal responsibilities for KUP during this phase shall fall with the Company (PA).
It should be noted that Contractor support may be required during this phase, and
PA shall identify this in the scope of work relevant to the Contractors concerned.

4.1.5

Contractor
Means a person or company performing any item of work for the Project.

4.1.6

KUP CONSTR
Means the integrated Statoil/M.W. Kellogg Ltd. construction group.

4.1.7

KUP COMM
Means the Commissioning Group on behalf of the partners in the sgard Unit and
Statpipe and Europipe II Joint Venture.

4.1.8

PA
The operator of Krst Gas Treatment Plant.

4.1.9

Commissioning Package (CP)


Means the logical forming of an assembly, system or part-system enabling initial
commissioning to be performed.

4.1.10 Mechanical Completion Dossier


The file of documents for a specific CP containing Mechanical Completion
Acceptance Certificates, Punch Lists, Test Records, etc. compiled by discipline
(see 6.1 for content overview).

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 7 of 18
_______________________________________________________________________________

4.1.11 MC Package
This is the term used to identify and define a single discipline related group of
items forming an assembly within the boundaries of a specific Commissioning
Package.
The basis for the allocation of items into MC Packages is to enable the scope of
work within each Commissioning Package to be progressively inspected, punched
out and tested, in an effective manner as it is completed.
The following examples of MC Package definitions are for guidance only:

Civil - for each area or structure etc.


Structural - for each specific structure, building, rack etc.
Mechanical/HVAC - for each item of equipment (or group of items) etc.
Piping - for each piping test pack.
Surface Protection - on pipework by piping test pack; for structural steelwork
as per structural package.
Insulation - on pipework by testpack, for mechanical as per mechanical
package.
Fireproofing - for steelwork as per structural package.
Electrical - for each main item or equipment (or group) including feed cables,
control cables, outgoing unit etc.; for each circuit or group of circuits etc.
Instrumentation - by loop components (or group of loop components); group
of stand-alone items etc.
Telecom - by loop components (or group of loop components); group of standalone items etc.

4.1.12 Responsibility Matrix


This matrix details the various levels of inspection, testing and verifications to be
carried out by Contractor, KUP Construction, KUP Commissioning and/or
Vendor/Supplier across all disciplines.
All personnel involved in MC activities shall familiarise themselves with the
relevant sections of this document (Ref. Section 2 of the manual).

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 8 of 18
_______________________________________________________________________________

4.1.13 Punch Item


This is the term used to identify and document incomplete work at time of
discipline punch-out and multi-discipline punch-out.
Each Punch Item identified shall be noted on a punch list, described in sufficient
detail and marked on sketches or drawings as required for the item to be easily
traced.
Punch Items shall be categorised as follows: Category "A" items are defined as incomplete work preventing further testing,
commissioning performance or continuous operation and maintaining of the
plant systems. For pipng test packs, the A item which shall be cleared prior
to release of pressure test shall be flagged on the punchlist. All "A" items shall
be cleared prior to handover of the Commissioning Package to KUP COMM.
Category "B" items have no significance on safe operation and maintenance of
the systems and can be accepted as not completed at handover provided that
the number of such items are limited and subject to KUP COMM acceptance.
4.1.14 Discipline Punch-Out
This is the term used for a discipline related inspection of a MC Package scope
which is presented by the relevant contractor as substantially completed (i.e.
limited punch items).
4.1.15 Multi-Discipline Punch-Out
This is the term used for the "Final Inspection" of a full Commissioning Package
prior to handover to KUP COMM. It shall cover all disciplines and the primary
aim is to verify the overall MC status of the package and document all outstanding
items on a consolidated punchlist i.e. Multi-Discipline Punchlist..
This punch-out shall be carried out relatively close to the planned handover date,
however sufficient time should be allowed to clear any additional "A-items" that
may be identified and to reduced the number of "B-items" to an acceptable level
for handover.
4.1.16 Notification
A Notification system shall be implemented to ensure timely notice to the relevant
personnel via the use of a "Notification" form, of the various MC activities which
require verification as detailed in the Responsibility Matrix.
Contractors may propose other methods for notification of MC activities (e.g.
establishment of MC field/test centre with "Notification" board or similar). This
shall be subject to KUP acceptance.
4.1.17 PIMS-MC
The Statoil on-line computerised Mechanical Completion System.

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 9 of 18
_______________________________________________________________________________

COMMISSIONING PACKAGES & MC PACKAGES

5.1.1

Commissioning Package Definition


The commissioning package (CP) are defined by KUP into logical discrete parts of
the permanent plant which can be commissioned/energised independently from the
remaininig ongoing construction scope. These CPs are allocated a four digit
number with the first two digits indicting the plant system number.
The identification of commissioning packages are shown on colour marked-up
boundary drawings e.g.
P&IDs
Single Line Drawings
Block Diagrams
A full listing of the currently defined CP Nos. are listed in Section 4 of the
manual.

5.1.2

MC Package Definition
MC Package numbering shall be in accordance with the following convention.

NNNN - AA - DNNNN
CP No. (4 digit number)
Refer to Section 4
For complete listing

Sequence Number
4 digits

Two character
Contractor Code
Refer to Appendix No.01

One character
Discipline Code

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

MWKL Job No. 5622

Doc. No.:

E060 - SB - M - YA 0001

Rev. No.: C

Rev. Date: 04.10.00

Page 10 of 17
____________________________________________________________________________________________________________________________________

5.1.3

Relation Between Plant Systems, Commissioing Packages and MC Packages


24

2401

MC
MC
MC
Packs
Civil
Packs
Packs

Plant
System

2402

MC
MC
MC
Packs
Piping
Packs
Packs

MC
MC
MC
Packs
Mech
Packs
Packs

2403

MC
MC
MC
Packs
Struct
Packs
Packs

MC
MC
MC
Packs
Electro
Packs
Packs

2404

MC
MC
MC
Packs
Instr
Packs
Packs

MC
MC
MC
Packs
Telecom
Packs
Packs

MC Acceptance Certificate

MC Acceptance Certificate

Punch List

Punch List

MC Inspection & Test Records

MC Inspection & Test Records

Test Pack Isos

Marked Up Drawings

Marked Up P&IDs

10

Commissioning
Packages
MultiDiscipline

MC Discipline
Packages
Single Discipline

Documents included in
MC Discipline
Packages(examples)

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

MWKL Job No. 5622

Doc. No.:

E060 - SB - M - YA 0001

Rev. No.: C

Rev. Date: 04.10.00

Page 11 of 17
____________________________________________________________________________________________________________________________________

5.1.4

KUP Completion Sequence Flowchart


Discipline
Punch Out
PL01

Mechanical
Acceptance
Certificate

HANDOVER
CERTIFICATE

MultiDiscipline
Punch Out
MDP

MAC

CONSTRUCTION

SUN

HOC

CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC
CLEAR PUNCH
CONSTRUCTION
MC
ITEMS.
NO A-ITEMS FOR
CONSTRUCTION
MC
HANDOVER
CONSTRUCTION
MC
PROGRESSIVE
CONSTRUCTION
MC
PUNCH OUT AND
CLEAR ITEMS
CONSTRUCTION
MC
CLEARANCE
CONSTRUCTION
MC
BY MCPACKAGE
CONSTRUCTION
MC
CONSTRUCTION
MC
CONSTRUCTION
MC

Start-Up
Notice

COMMISSIONING

START-UP

MC

KUP Construction
Responsibility

KUP
Commissioning
Responsibility

11

PA
Responsibility

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 12 of 18
_______________________________________________________________________________

MECHANICAL COMPLETION ACTIVITIES

6.1.1

General
Contractors shall complete all inspection and test records, prepare a discipline
punchlist and a Mechanical Acceptance Certificate for each of their MC
Packages.
The following status codes shall be used on all inspection & test records checklist
boxes :N/A Not applicable shall be written in all check windows or sections on
the individual records when the checks or sections are not applicable for the
corresponding item or equipment.
OK Shall be written in all check windows when the checks/tests have
been performed and accepted.
The check window shall be left blank if the checks/tests are not done. The reason
for not completing the inspection, shall be given in the remark column. If the
check item can not be completed the item shall normally be punch listed, the
punch item be categorised to "A" or "B" and noted on the MC punch list for the
relevant MC Discipline Package with cross reference to check record and item.
When all records reach status "OK" or "NA" with "B" punch items only the MC
Package will be accepted i.e. signing of MAC01.

6.1.2

MC General Responsibilities
General responsibilities are detailed in tabulation below, while specific
responsibilty for MC activities and level of verification are detailed in the
Responsibility Matrix included in Section 2 of the manual with the corresponding
flowchart in Section 3.

12

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 13 of 18
_______________________________________________________________________________

General Responsibilities

Suppl.

Ensure mobilisation of MC personnel as required.


Prepare detailed plan/schedules for of all inspection and
testing activities.
Ensure that subcontractors comply with the same MC
requirements.
Ensure piping test packs are defined within the
package/module/commissiong package (as applicable)
Organise, co-ordinate and notify all MC activities with
Package Eng(PRE), KUP CONSTR and/or KUP
COMM (as applicable).
Ensure PIMS is updated progressively in line with
progress of construction work and MC activities.
Verification of MC activities in accordance with the
Responsibility Matrix in Section 2 of this manual.
Inspection and punch listing shall be carried out in
accordance with relevant specifications, regulations and
approved drawings.
Prepare a Carryover Work List (COW) covering all
outstanding work, which has to be carried out at Krst
(or for Supplier COW possibly at Module Yard).
Compile an MC Dossier for each package/module
including COW and copies of relevant as-built
information, filed by discipline and submitted to KUP
for formal acceptance.
Complete outstanding work from suppliers and/or
module yards (COW) as required.
Prepare and progressively submit MC documentation
by MC Package to KUP MC Dept. for inclusion in the
master MC Dossier per Commissioning Package.
Including punchlist and as-built information.

6.1.3

Site

Y
Y

Fab
Yard
Y
Y

Mechanical Completion Flowchart - Fabrication Yards/Krst Site


See Section 3 of the manual

13

Y
Y

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 14 of 18
_______________________________________________________________________________

CARRYOVER WORK (COW)

7.1.1

COW/MSR Preparation
The Carryover Work List shall be a comprehensive listing prepared by the
supplier/module fabricator and verified by KUP, which details all outstanding
work for the module, package, equipment, etc.
The item numbers on the COW List shall be the same as for the corresponding
discipline Punch List items, with additional final inspection items allocated the
COW No. and a sequential item numbers.
Each Carryover Work List shall have attached a corresponding Material Status
Report MSR (if applicable) which shall give the correct status of material for each
specific item on the COW List.

7.1.2

Supporting Technical Documentation (with COW List)


The Technical Documentation to support COW scope shall be sufficiently detailed
to enable other Contractors to identify and execute the work at site, e.g. marked-up
drawing, technical queries, material certificates, welding and test procedures, etc.
It is fabrication contractor's/supplier's responsibility to compile necessary
documentation for each specific Carryover Work List item.

7.1.3

Marking of COW Materials


This section applies only for equipment/items related to Contractor's scope of
work, which is not installed at the time of transportation to Krst and is identified
on the Carryover Work Lists and associated Material Status Report.
All equipment, KUP provided or Contractor provided and/or fabricated items
which are not installed, shall follow the module at transportation to Krst or be
shipped immediately after to site.
Each item shall be clearly marked with non-perishing marks:
Module No./P.O. No.
Discipline Code
Tag No.
COW List No.
All items shipped separately shall be securely wrapped, packed and preserved in
accordance with approved procedures.

14

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 15 of 18
_______________________________________________________________________________

PIMS-MC SYSTEM
The Statoil MC system will be networked and on-line to KUP and main
Contractors and site and at Module Yards.
The system is centred around the downloaded engineering data from the design
office(s), which will be performed by KUP MC Dept., together with the allocation
of the CP No. to all items.
It is the responsibility of the Contractor to define and allocate MC Packages to all
Tags Nos/Cable Nos/Isometrics within their scope of work.
Contractors shall print out the relevant MC Inspection & Test Records and
progressively complete these in line with MC/construction activities.
PIMS shall also be used for the administration of all punch list items generated at
the suppliers and fabrication sites i.e. Carryover Work (COW), together with all
the site raised punch items.

RESPONSIBILTY FOR MC ACTIVITIES


The responsibilty for MC activities are detailed in the Responsibility Matrix
included in Section 2 of the manual with the corresponding flowchart in Section 3.
It must be recognised that MC work at Krst will proceed in close proximity to
plant under commissioning and/or fully operational.
It is therefore of outmost importance that the KUP Safety Regulations are closely
observed and adhered to by all parties involved.

15

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 16 of 18
_______________________________________________________________________________

10 MECHANICAL COMPLETION INSPECTION & TEST RECORDS


MC certificates, inspection and records are divided into one general group and
specific discipline sections. Blank formats are included in Sections 5 to 17 of the
manual and these may be completed manually or where PIMS-MC application is
available, can be printed with the all available data included (recommended
option).
Section 5 : General MC Forms
Section 6 : Electrical MC Forms
Section 7 : HVAC MC Forms
Section 8 : Instrumentation MC Forms
Section 9 : Piping MC Forms
Section 10 : Mechanical MC Forms
Section 11 : Structural MC Forms
Section 12 : Civil MC Forms
Section 13 : Surface Protection MC Forms
Section 14 : Safety MC Forms
Section 15 : Telecommunication MC Forms
Section 16 : Insulation/Refractory MC Forms
Section 17 : Architectural

16

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 17 of 18
_______________________________________________________________________________

11 REVISION CHANGE RECORD


Rev No.
Rev C
Rev B

Rev A

Details of Revision
Experience feedback - certificates revised
General revison due to Statoil/MWKL Integration and with the primary aim to build in
more flexibilty in the documentation, to streamline and to reduce the volume of certificates.
General revision to simplify the opening narrative section.
Revised MC flowchart at Krst in line with integration and participation of KUP Comm.
Revised and streamlined Responsibilty Matrix.
General change on all signature boxes i.e. references to Subcontractor, EPCS, Company
now changed to Contractor, KUP Contruction, KUP Commissioning respectively.
PL01(B) revised to include a new column to flag A-item required before pressure test.
Introduction of new E&I, T MC Certifcates by MC Package to reduce volume of
documentation.
New MC Cert. E41, 42, 43 & 44.
Revised Telecom Certs. T01 to T13 now by MC Package not individual tag.
New MC Cert. T14 Miscellaneous Telecom Equipment.
Consolidation of Electric Motor MC Certs to reduce number of certificates required,
resulting in the following :E24 & E25 deleted.
E03, E23 & E29 revised.
Revised MC Cert J06 Instrument Junction Boxes.
Revised MC Cert J11 Fire & Gas Loop.
Revised MC Cert J12 Orifice Plate (now cover verification of reinstatement).
New MC Cert. L08 Bolt Tensioning.
New MC Cert. L09 Steam Blowing.
MC Cert M26 Gas Turbines (now re-introduced).
New MC Cert. M27 Machinery Pre-Alignment.
New MC Cert. M31 Pump/Driver Release.
New MC Cert. N02 Structural Steelwork (By Tag No.).
Deletion of Intrinsically Safe Calc Certs J14 & 15 due to separate application developed to
cover this scope.
Deletion of Q11 Cert. L06 to be used.
New MC Cert. Q12, 13, 14 & 15 for Tunnels, Caverns and Site Preparation.
New MC Cert. Z01 Architectural Area.
Added document references under Section 2
General revision to content
Subcontractor codes added
Added Check Form J 09-Instrument Pre-Installation Test/Inspection
Added Check Form Q 11-Civils Flushing and TV Inspection
Revised Check Form E 18-Lighting and Small Power Circuits-Lighting Fixtures
Revised Check Form E 19-Lighting and Small Power Circuits SocketOutlets/Isolators
Revised Check Form E 32-Ex Certification & Data Sheet
Deleted Check Form E33-Ex Certification & Data Sheet Verification

17

Document Title :
KARTS UTBYGGINGSPROSJEKT (KUP) MECHANICAL COMPLETION MANUAL

Doc. No.:
MWKL Job No. 5622

Rev. No.: C

E060 - SB - M - YA 0001
Rev. Date: 04.10.00

Page 18 of 18
_______________________________________________________________________________

12 Appendix No.01 Contractor Codes


Civils Contractors :
Contractor
Code
AF
SE
VD
VS

Contactor/Supplier Name

Scope

AF Spesialprosjekter
Selmer
Veidekke
Vassbakk & Stol

Civils I
Jetty 03 and Tug Boat Jetty
Civils II
Civils site Prep. Camp

Site Contractors :
AB
FO

ABB Offshore Technology


Norske Fabricom

FI

Fabricom

UM

Umoe

E&I,T Hook-up/Installation, Krst Site


OSBL : Mechanical Hook-up/Installation,
Krst Site
ISBL : Mechanical Hook-up/Installation,
Krst Site
Inner Area : Mechanical Hook-up/Installation,
Krst Site

Module Yard Contractors :


FB
FU
GR

Fabricom S.A.
Fabricom Contracting Ltd.
Grootint B.V.

PAT & PAU Fabrication


DRV
PAR Fabrication

Multi-Discipline Package Suppliers :


AA
DE
DI
DR
FR
HA
IS

Aalborg
Demag
Daniel Industries
Dresser Rand
Framatome
William Hare
ISG

KE
KL
KO
KV
MT
NI
PP

Kvrner Eureka
Maskin K. Lund
Kongsberg Offshore
Kvaerner
MafiTrench
Nikkioso
Panaqua Process

WH

Whessoe

Heat Recovery Steam Generator


Propane & Ethane Boil Off Compressors
n-Butane Metering
Sales Gas Compressors & Drivers
Propane Refrigeration Compressors
Steel Buildings
Propane Cavern Cool Down, Vapour Boil-off
Treatment Facility
Seawater Cooling Pumps
Instrument Air Package
Fiscal Metering Packages (Gas & Liquid)
Nitrogen Generation Package
Turbo Expander Packages
Submerged Cryogenic Pumps
Water Demineralisation Plant/Condensate
Polisher Plant
Ethane Storage Tank

18

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev C

Responsibility Codes :
The responsibility codes used in this matrix are as follows :Function

Description

Approval required.

Agreement by signature that specified work is completed to an acceptable standard in


accordance with drawings and procedures.
The letter A does not require mandatory presence of the approving party during the
activity.

Advise to be provided.

Provide information, notification on the timing and availability of referenced activity.

Inspection required.

Carry out examination/overview of responsible party's work, and verify by signature


as required on the relevant MC forms. The party's duty is to inspect the item or area
in question during and/or after completion of the activity.
Where a party only performs a monitoring role e.g. where KUP Comm perform
inspection at their discretion, then they would sign the specific MC forms relating to
scope inspected.

Responsibility to carry
out the work.

Liable/accountable for ensuring the work is carried out.

Witness activitiy.

Verify by physical observation and confirm by signature that test/activity are


carried out in accordance with the requirements specified.
The party has an obligation to witness the activity, and the activity shall not
proceed without the witnessing party`s presence.
The letter W does not involve approval authority. Signature does not constitute
approval of completed work.

Code

(HOLD POINT)

Parties Involved :
The four parties involved are as follows :Symbol:

Description

Contractors (including fabrication, installation and hook-up)

KUP Construction, including Third Party (as required)

KUP Commissioning

Supplier/Vendor

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 1

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev B
Item No:

01

Description

Ref.Docum.

Statutory Inspections

01.01

Plan for any special inspections of the facilities as may be required by local
or governmental authorities or insurance companies, and obtain required
approvals.

01.02

Maintain all QA related coordination and interfaces with authorities, e.g.


DBE until Mechanical Completion.

01.03

Initiate application for the procurement of all permits issued in Company's


name and required for plant installation, use, occupancy and operation.

02

General

02.01

Ensure facilities for disposal of hydrotest fluid are available.

02.02

Provide list of additives minimum 4 months ahead and provide permits from
authority as required.

02.03

Establish and maintain blind lists up until Mechanical Completion handover


and include in Handover Dossier.

02.04

Check and verify nameplates on all items of equipment and rectify any
deficiencies. Check Authority requirements for marking are complied with
(CE marking, etc.)

02.05

Perform inspection of scope to approved drawings and relevant


specifications. Prepare and agree discipline punch lists.

PL01

02.06

Clear and verify construction punch list items.

PL01

02.07

Issue/verify completed MC Packages (I.e. no 'A' punch items).

MAC01

02.08

Compile consolidated Multi-Discipline Punchlist.

MDPL

02.09

Issue notification for Multi-Discipline Punch Out (MDP)

NOT01

02.10

Perform Multi-Discipline Punch Out and agree/sign Multi-Discipline


Punchlist (MDPL).

MDPL Master

02.11

Clear and verify MDPL items.

MDPL Master

02.12

Issue Mechanical Completion Handover Certificate, Handover Dossier and


MC Dossier for each Commissioing Package to KUP Commissioning.

HOC01

03

Blind List

Steel Structures

03.01

Inspect structure is in accordance with drawings and specifications.

N01

03.02

Inspect cladding and accessories comply with local and governmental


regulations

N01

04

Pipework

04.01

Inspect lines internally during construction to ensure that all debris, welding
rods, weld splatter, etc., are removed.

04.02

Perform punch out of own work and clear punch items with the priority on A- PL01
items.

04.03

QC release MC Packages (Test Packs) - By KUP QS Group.

L01

04.04

Release MC Packages (Test Packs) for pressure testing.

L01

04.05

Perform cleaning flushing in accordance with project requirements (post


test upon agreement).

L01

04.06

Perform pressure tests as required by the project specifications; ensure


water is drained on completion of testing. Third Party approval as required.

L01

04.07

Perform drying in accordance with project requirements.

L01

04.08

Reinstate piping test packs after completion and acceptance of


flushing/pressure testing/drying and perform reinstatement punch out. Add
new punch items to new page of punchlist agree/sign.

L01,PL01

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 2

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev B
X

L08

Carry out video inspection as instructed by KUP.

L06

04.11

Perform chemical cleaning on specified lines.

L04

04.12

Perform hot-oil flushing on specified piping system e.g. lube oil.

L05

04.13

Perform steam blowing on specified lines to target plate.

L09

04.14

Install flow coding to lines in accordance with specification 0000-XX-LSF9002

04.15

Install orifice plates after line flushing/testing or as directed by KUP Comm.


Also coordinate with E&I contractor.

04.16

Complete interlock installation.

05

Mechanical Equipment
R

Item No:

Description

04.09

Bolt tension all relevant flange joints in accordance with specifications and
fit plastic caps plus affix signed tag/label to joints.

04.10

Ref.Docum.

J12

05.01

Remove all temporary supports, bracing or other foreign objects that were
installed in vessels,
transformers, rotating machinery, expansion
bellows, spring supports, instruments or other equipment and piping to
prevent damage during shipping, storage, erection and pressure testing.

05.02

Install equipment in accordance to drawings and specifications.

M01-M25

05.03

Perform vacuum box test on tank bases.

M02

05.04

Hydrostatic leak test atmospheric tanks as per code and specification


requirements.

M02

05.05

Check internals of vessels/equipment are in acoordance with drawings and


specifications with respect to dimensional clearances and alignment.

05.06

Check internal cleanliness and completion of equipment prior to 'Final


Closure'.

05.07

Perform cold alignment to project tolerances, prior to attachment of


pipework, tighten holding down bolt and dowel where specified.

05.08

Perform final alignment (some equipment will require supplier witness).

(W)

05.09

Conduct refractory dry out and boil out operations as per Supplier
recommended procedure.

05.10

Inspect and repair refractory as required.

06

M30

M28

Safety Equipment

06.01

Check that personnel protection insulation, protective guards, all ladders,


ladder cages, platforms, safety bars, handrailing, etc. are correctly installed

S20

06.02

Check that utility stations are correctly marked (special warning signs for
Nitrogen)

S20

06.03

Install of all safety equipment.

S01-S11

06.04

Install safety notices, as required by local and governmental regulations

S20

07

Painting, Insulation and Fireproofing

07.01

Complete painting, insulation and/or fireproofing is in accordance with


specifications and to the extent specified on drawings.

R1,R2 or R3

07.02

Perform adhesion tests as required.

Test Report

E01 to E44

08

Electrical Installations

08.01

Perform continuity check, insulation resistance check, pressure test,


insulating oil tests, injection tests according to specifications

08.02

Dry out electrical equipment, if necessary to achieve required insulation


resistance level

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 3

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev B
X

Provide relay tabulations for all protective and time delay relays

08.05

Fill distribution transformers with oil using oil filtration and circulation unit
and circulate oil until the di-electric strength of oil is satisfactory. Check
Buchholz and High Oil Temperature devices for correct operation

08.06

Energize transformer and leave on no load for 24 hours, then phase out
transformers with parallel systems
NB! Approval of local authority is required before equipment is energized!

08.07

Check for correct operating substation DC power systems and UPS


systems

08.08

Check Emergency Generator engine operation and rotation. Check


governor operation. Check output of Generator overspeed test generator,
check synchronism with main, load test generator and check AVR
operation. Check trips and alarm functions and check auto transfer
systems.

08.09

Fill Unit Transformers with oil and circulate until the die electric strength of
oil is satisfactory. Check Buchholz and High Oil Temperature protection for
current operation. Energize transformers, check phase rotation and leave
on soak for 24 hours. Deenergize transformer and check motor rotation.
Check motor insulation monitoring systems.

08.10

Set protective relays and time delays on all switchgear in accordance with
tabulated data. Test relay characteristics at points on the relay calibration
curves as indicated in the tabulated area.

08.11

Energize systems up to main instrument power distribution board,


assuming responsibility for operation and maintenance.

08.12

Energize substations and assume responsibility

08.13

Issue work permits to carry out checks on electrical equipment after


electrical facilities are energized.

08.14

Function test Variable Speed Drives

08.15

Check motor nameplate speed, horsepower and voltage against


specification

E03,E29

08.16

Carry out earthing test and continuity test

E14

08.17

Bump start motors to check direction of rotation

08.18

Run-in motors uncoupled for 4 hours and check bearings (motors > 100kW) E03

08.19

Check that plant lighting is adequate and meets specification

08.20

Carry out functional tests on thyristor controlled heaters

08.21

Visually inspect all cables for correct sizing, spacing and freedom from
kinks and damage

Item No:

Description

08.03

Carry out tests on all switchgear with bus-bars de-energized to ensure


correctness of operating and panel wiring

08.04

Ref.Docum.
E04

E05,13,18,

08.22

Certify clearance for backfilling underground cables

E16

08.23

Check that all electrical tracing is complete and has been tested for both
continuity and insulation integrity.
NB! Tracing must be tested before and after the insulation is installed!

E27,E28

08.24

Check operation of all communication systems

08.25

Energize trace heating circuits and check for correct operation.

09

Instrumentation

09.01

Clean and degrease all instruments and remove shipping stops,


preservation materials, etc.

09.02

Visually check that all instruments, tubing, wiring, and piping are installed
and connected in accordance with project specifications.

09.03

Check the accessibility of all instruments and components for field


adjustments, routine maintenance and removal for overhaul.

09.04

Clean all transmission tubing and control tubing by blowing with dry, filtered
air prior to connection of instrument components.

J01 to J16

J02

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 4

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev B
X

J02

J02

Check wiring connections to local panels on or adjacent to skids and


mechanical packages

09.12

Check fuses and perform voltage checks on the ESD systems, the PCDA
system, and all electrically powered instruments.

09.13

Assist with the PCDA system acceptance test (OSAT)

09.14

Check thermocouples and resistance thermometer circuit from element to


measuring instrument by simulation

09.15

Carry out loop tests in accordance with the loop test procedure

09.16

Maintain log book of installation/removal of orifice plates up to Mechanical


Completion Handover

09.17

Set direct-connected process switches (e.g. alarms, cut-outs) and controls

09.18

Fully pressurize the pneumatic transmitting and control signal systems and
set air pressure regulators to manufacturer's recommendations

09.19

Energize instruments, alarms and shutdown systems

09.20

Energize the ESD systems

09.21

Energize the PCDA system

Item No:

Description

09.05

Leak test pneumatic transmission and control tubing using an approved


method.

09.06

Leak test process impulse tubing using an approved method.

09.07

Remove in-line components as necessary for line flushing operations and


reinstall when completed and dry

09.08

Check the orifice plates against specification

09.09

Test all wiring including thermocouples for correct source of power, polarity,
joining of conductors, continuity, insulation and earthing as appropriate.
Bottom thermocouples in wells.

09.10

Check wiring connections to marshalling, equipment and interface panels in


control room, equipment rooms and substations

09.11

Ref.Docum.

J12

J10,J11

09.22

Maintain instrument power supply

09.23

Check and adjust calibration of all other field and panel mounted
instruments

09.24

Loop test complete control loops, PCDA, HIPPS, PSD, ESD, PA, CCTV,
UHF/VHF, F&G systems to verify capability to measure and operate and to
verify the correct action of the control elements.

09.25

Fill instrument process lines with seals and condensate, etc. test purges
and heat tracing, and then isolate all process connections, steam supplies
and purges, etc.

09.26

Undertake routine maintenance and checking of instrumentation from


Mechanical Completion Handover.

09.27

Check and set hardware range and span of transmitters against those
shown on software

09.28

Input calculated tuning parameters on control loops

09.29

Check fire and gas detection and measurement systems

10

J10

HVAC Systems

10.01

Installed HVAC equipment in accordance with drawings and specifications.

G01-G07

10.02

Inspect and test ducting is in accordance with drawings and specifications.

G08

11

Preservation

11.01

Review Suppliers preservation requirements and if required prepare new


specific checklists.

R/A

11.02

Perform preservation in accordance with default or specific checklists.

11.03

Maintain lubrication charts on equipment until handover.

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 5

MC Responsibilty Matrix
Krst Utbyggingsprosjekt (KUP)
Attachment to : E060-SB-M-YA0001 Rev B
Item No:

Description

11.04

De-preserve as instructed by KUP Comm. with special attention to


removing descicant bags placed inside equipment.

11.05

Prepare and Preservation Verification Certificate & Preservation Dossier.

12

PVC01

Ref.Docum.

Civil Works

12.01

Inspect all driven piles including sheet piles (incl survey results).

Q04

12.02

Inspect formwork and release for concrete pour.

Q01

12.03

Inspect foundations post pour that they are in accordance with drawings
and specifications (incl. survey results).

Q01

12.04

Release foundation for placement of equipment and/or structures.

Q08

12.05

Prepare and release for grouting.

Q02

12.06

Inspect all buildings including services and finishing.

Q07

12.07

Verify that concrete cube test results are acceptable to specifications


(alternative test reports to Q09 may be used upon agreement with KUP).

Q09

12.08

Clean/flush underground piping systems.

Q05

12.09

Carry out leak tests and/or pressure testing of underground piping systems.

Q05

12.10

Inspect and release underground piping for backfilling.

Q10

12.11

Inspect/test sumps, manholes, catchbasins and pits to project drawings


and specifications.

Q03

12.12

Perform video inspection as directed by KUP on underground piping


systems.

L06

Resp.Codes : X - Contractors; C - KUP Construction (T/P as required); O - KUP Commissioning; S - Supplier/Vendor


#Error

06-okt-2000 14:29

Page: 6

Attachment to : E060-SB-M-YA0001 Rev C


FLOWCHART SHOWING SEQUENCE OF MECHANICAL COMPLETION AT FABRICATION YARD
CONTRACTOR

KUP CONSTRUCTION

Construction Complete
Punch own work and clear punch
items. Priority on A-Items

Pre-Test Punch
Participate in pre-test punch out

Perform Punch Out

Perform Punch Out

(by MC Package)
Agree a discipline punchlist and
indicate the category i.e. A or B

Agree formal punchlist by signing


PL01 (incl. CATEGORY)

KUP COMMISSIONING

Clear Punch Items

Verify Cleared Punch Items

Clear Punch Items priority on A

Sign off on original PL01

Perform MC Activities

Verify/Approve

Verify/Approve

In accordance with specified


requirements

In accordance with MC
Responsibilty Matrix with Third Part
attendance as required.

In accordance with MC
Responsibilty Matrix

Reinstatement Punch Out

Reinstatement Punch Out

Reinstatement Punch Out

Agree additional items

Update Discipline Punchlist

Agree additional items

and sign PL01 new page

Agree & sign PL01 new page

and sign PL01 new page

Continue To Clear Items

Verify Cleared Punch Items

Verify Cleared Punch Items

To agreed priorities

Sign off on original PL01

Sign off on original PL01


At KUP Comm.discretion

Compile MC Dossier
Compile MC Packages into MC
Dossier per CP No.

Prepare COW List

Agree COW

Agree COW

Agree new items and

Perform final punch out and

Perform final punch out and

sign 'Master' MDPL

agree COW List & MSR

agree COW List & MSR

Prepare COW/MSR

Verify Cleared MDPL Items

Verify Cleared MDPL Items

Prepare/Sign COW & MSR

Sign off on Master MDPL

Sign off on Master MDPL

Complete MC Dossier

Approve MC Dossier

Finalise MC Dossier per Module

Review and approved

incluing required number

MC dossier for each module

of copies

including COW/MSR

Transporatation to Krst
Send MC Dossier to Site DCC

Attachment to : E060-SB-M-YA0001 Rev C


FLOWCHART SHOWING SEQUENCE OF MECHANICAL COMPLETION AT KRST
CONTRACTOR

KUP CONSTRUCTION

KUP COMMISSIONING

Perform Punch Out

Perform Punch Out

Perform Punch Out

(by MC Package)
*For Piping : Flag A-Items that must
be cleared prior to test

Agree formal punchlist by signing


PL01 (incl. CATEGORY)

Agree formal punchlist by signing


PL01 if attended

Construction Complete
Punch own work and clear punch
items. Priority on A-Items
Issue Notification
via Notice or Notice Board

Clear Punch Items

Verify Cleared Punch Items

Flagged A-Items first priority

Sign off on original PL01

QC Release
QC release piping test packs and
sign L01 certificate

QC Release
KUP QS to QC release piping test
packs and sign L01 certificate

Release for Test (Piping)


Test Engineer verifies all Flagged AItems Cleared
Perform MC Activities
In accordance with specified
requirements

Verify/Approve
In accordance with MC
Responsibilty Matrix

Verify/Approve
In accordance with MC
Responsibilty Matrix

Reinstatement Punch Out

Reinstatement Punch Out

Reinstatement Punch Out

Agree additional items

Update Discipline Punchlist

Agree additional items

and sign PL01 new page

Agree & sign PL01 new page

and sign PL01 new page

Continue To Clear Items

Verify Cleared Punch Items

Verify Cleared Punch Items

To agreed priorities

Sign off on original PL01

Sign off on original PL01


At KUP Comm.discretion

Compile MC Dossier
Compile MC Packages into MC
Dossier per CP No.
Produce Multi-Discipline
Punchlist (MDPL)
Consolidate all outstanding punch
items to one MDPL
Issue MDP Notification
To CP Responsible
Perform MDP

Perform MDP

Perform MDP

Agree new items and

Prepare 'Master' MDPL

Agree new items and

sign 'Master' MDPL

Agree & sign 'Master' MDPL

sign 'Master' MDPL

Continue to Clear Items

Verify Cleared MDPL Items

Verify Cleared MDPL Items

A-Items first priority

Sign off on Master MDPL

Sign off on Master MDPL

Notes :1) Skip steps specific to

Complete MC Dossier
All Test & Inspection Records

piping which do not apply to


other disciplines.
2) Reject loops omitted for
clarity.

Prepare MC Dossier &

Review Handover Dossier

Handover Dossier for

If acceptable

Handover to KUP Comm. incl.

Sign Handover Certificate

Handover Cert. (No A-Items)

and return a copy to KUP MC

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

0001

Area Completion : EPII/Backflow Area (Electrical, Safety)

0002

Area Completion : Propane Cavern Area (Electrical, Safety)

0003

Area Completion : sgard Reception Area (Electrical, Safety)

0004

Area Completion : Unit 46 - CA 461 Area

0005

Area Completion : Ethane Tank - CA 466 Area

0006

Area Completion : Metering Stations - CA 2 & 14 Areas

0007

Area Completion : Jetty III - CA 471 Area

0008

Area Completion : Ethane Treatment - CA 481 Area

0009

Area Completion : Boiler/Sales Gas & Condensate Treatment Area

0010

Area Completion : Basin, Free Area, Seawater Intake, Weir Box Area

0011

Area Completion : T-410, T-420, Fractionation, Future, Process Subst., DEOH Areas

0012

Area Completion : All Exisiting Substations (with KUP Scope)

1501

Feed Gas - Reception & Let Down

1502

Feed Gas Filters

1503

Backflow Piping & Let-Down (early SG to EPII)

1504

Analyser House - Unit 15 (15-ZG-201)

2001

Mercury Removal

2002

Gas Drying - Train 410

2003

Drier Regeneration - Train 410

2004

Gas Drying - Train 420

2005

Drier Regeneration - Train 420

2006

Analyser Shelter - Tr. 410 Driers (20-JA-411)

2007

Analyser Shelter - Tr. 420 Driers (20-JA-421)

2101

NGL Extraction - Train 410, Wash Column

2102

NGL Extraction - Train 410, De-ethaniser

2103

Turboexpander - Train 410 (warm)

2104

Turboexpander - Train 410 (cold)

2105

NGL Extraction - Train 420, Wash Column

2106

NGL Extraction - Train 420, Deethaniser

2107

Turboexpander - Train 420 (warm)

2108

Turboexpander - Train 420 (cold)

2109

Analyser House - Extract. Train 410 (21-ZG-410)

2110

Analyser House - Extract. Train 420 (21-ZG-420)

2113

Building - TEX Tr.410(21-ZH-411)

2114

Building - TEX Tr. 420(21-ZH-421)

2115

O/H Crane - 21-MA-411

2116

O/H Crane - 21-MA-421

2201

Dethaniser Overhead Compressor "A"

2202

Dethaniser Overhead Compressor "B"

2203

Sales Gas Compressor "A"

2204

Sales Gas Compressor "A", Gas Turbine

2205

Sales Gas Compressor "B"

2206

Sales Gas Compressor "B", Gas Turbine

2207

O/H Crane - 22-MA-201A

2208

O/H Crane - 22-MA-201B

2209

Building - Deeth. O/H Compr. Tr.410(22-ZH-201A)

2210

Building - Deeth. O/H Compr. Tr.420(22-ZH-201B)

2211

Building - S.G. Compr. Tr.410(22-ZH-203A)

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 1

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

2212

Building - S.G. Compr. Tr. 420(22-ZH-203B)

2213

O/H Crane - 22-MA-202A

2214

O/H Crane - 22-MA-202B

2216

Fuel Gas Treatment

2301

Sales Gas Metering - Asgard

2302

Sales Gas Metering - Statpipe

2303

Analyser House - Sales gas (23-ZG-201)

2401

Depropaniser

2402

Debutaniser

2403

Butane Splitter

2404

Analyser House - Fractionation (24-ZG-401)

2501

Propane Refrigeration Compressor

2502

Propane Refrigeration System

2503

O/H Crane - 25-MA-400

2504

Building - Prop. Refrig. Comp.(25-ZH-001)

2901

Ethane Treatment

2902

Analyser House - Ethane (29-ZG-101)

3101

sgard Pipeline & Pig Receiver Krst

3104

HPU - sgard Pipeline-Krst

3401

Europipe II - Pipeline & Pig Launcher

3402

HPU - EP II Pipeline

3403

Pipeline Instrumentation at Bokn

4201

Propane Cavern "A"

4202

Propane Cavern "A" - Water Pumps

4203

Propane Cavern "A" - Loading Pumps

4204

Propane Cavern "B"

4205

Propane Cavern "B" - Water Pumps

4206

Propane Cavern "B" - Loading Pumps

4207

i-Butane Storage

4208

n-Butane Storage

4209

Ethane Storage

4601

Propane Compressor "A"

4602

Propane Compressor "B"

4603

Propane Chilling & Vapour Recovery

4604

Ethane Refrigeration Compressor

4605

Ethane Chilling & Vapour Recovery

4606

Temp. Equipment for Cavern Cooldown

4607

Building - Prop./Ethane Compr.(46-ZH-201)

4608

O/H Crane - 46-MA-200

4701

Propane Loading & Cavern Boil-off to Exist.

4702

i-Butane Loading

4703

n-Butane Loading

4704

Ethane Loading - Jetty 3

4705

Gasoline Loading - Jetty 3

4706

O/H Crane 47-MB-210

4707

O/H Crane 47-MB-211

5201

BFW Distribution

5202

HP Steam & Condensate

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 2

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

5203

MP Steam & Condensate

5204

LP Steam Distribution

5205

LP Steam -Train 410

5206

LP Steam -Train 420

5207

LP Condensate Recovery

5208

LP Condensate - Train 410

5209

LP Condensate -Train 420

5210

Condensate Treatment

5211

Waste Heat Boiler 'A'

5212

Waste Heat Boiler 'B'

5213

LP Steam/Condensate - EP II & Metering

5214

LP Steam/Condensate - NGL Chilling & Offsites

5215

Analyser Shelter- Unit 52 (52-JA-501)

5301

Methanol Storage & Inj. - Prop. Caverns (Temp)

5401

Cold Flare Header

5402

Cold Flare - EP II & Metering

5403

Cold Flare - Reception

5404

Cold Flare - Train 410

5405

Cold Flare - Train 420

5406

Cold Flare - Fractionation

5407

Cold Flare - Ethane Treatm. & Offsites

5408

Warm Flare - sgard

5409

LP Flare - Caverns

5410

LP Flare - Ethane Storage

5411

46 Flare - sgard

5412

46 Flare - Caverns

5501

Seawater Intake & Screens

5502

Seawater Pumps

5503

Seawater Distribution and Return

5504

Sea Water Tunnels - AF Scope

5601

Tempered Water System

5602

Tempered Water System - Unit 46

5701

Fuel Gas System

5702

Diesel Oil System

5703

L.P. Fuel Gas System

5704

Analyser House - Fuel Gas (57-ZG-401)

6001

Air Compressor/Drier Package

6002

Instrument Air - Train 410

6003

Instrument Air - Train 420

6004

Instrument Air - Compression Area

6005

Instrument Air - Fractionation

6006

Instrument Air - Reception

6007

Instrument Air - Ethane Treatm./Tank & Jetty 3

6008

Instrument Air - NGL Chilling/Vapour Rec. & Caverns

6009

Instrument Air - Liquid Metering

6010

Instrument Air - Utilities

6011

Instrument Air - EP II & Metering

6013

Plant Air - Train 410

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 3

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

6014

Plant Air - Train 420

6015

Plant Air - Compression Area

6016

Plant Air - Fractionation

6017

Plant Air - Reception

6018

Plant Air - Ethane Treatment & Jetty 3

6019

Plant Air - NGL Chilling/Vapour Rec. & Caverns

6020

Plant Air - Ethane Storage & Liquid Metering

6021

Plant Air - Utilities

6022

Plant Air - EP II & Metering

6023

Building - Air Compr.(60-ZH-401)

6101

Nitrogen Generation Package

6102

Nitrogen - Train 410

6103

Nitrogen - Train 420

6104

Nitrogen - Compression Area

6105

Nitrogen - Fractionation

6106

Nitrogen - Reception

6107

Nitrogen - Ethane Treatment & Jetty 3

6108

Nitrogen - NGL Chill./Vapour Rec. & Caverns

6109

Nitrogen - Liquid Metering

6110

Nitrogen - Utilities

6111

Nitrogen - Ethane Storage

6112

Nitrogen - EP II & Metering

6114

Nitrogen for Caverns Cool Down (Temp.)

6201

Fresh Water Distribution (incl. New Pumps)

6202

Fresh Water - Fractionation

6203

Fresh Water - Train 410

6204

Fresh Water - Train 420

6205

Water Treatment & Distribution

6206

Fresh Water - EP II & Metering

6207

Fresh Water - Propane Caverns

6301

Potable Water Distribution

6302

Potable Water to EP2 from T-63K-284

6401

Oily Water Drains - Holding Basin

6402

Oily Water Drains - Gasoline Metering

6408

Oily Water Drains - Reception

6409

Oily Water Drains - Ethane Treatment

6411

Oily Water Drains - Propane Caverns

6412

Oily Water Drains - Utilities

6413

Oily Water Drains - Europipe II Pig Launcher

6414

Oily Water Drains - Jetty 3

7001

Fire Water Distribution

7002

Fire Water - EP II Pig Launcher

7003

Fire Water - NGL Chilling & Caverns

7101

Firewater Sprinkler & Deluge - Train 410

7102

Firewater Sprinkler & Deluge - Train 420

7103

Firewater Sprinkler & Deluge - Fractionation

7104

Firewater Sprinkler & Deluge - Compression Area

7106

Firewater Sprinkler & Deluge - Ethane Storage

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 4

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

7108

Firewater Sprinkler & Deluge - Flare Drums

7202

Fire Fighting Equipment - Train 410

7203

Fire Fighting Equipment - Train 420

7204

Fire Fighting Equipment - Fractionation

7205

Fire Fighting Equipment - Compressors

7206

Fire Fighting Equipment - Ethane Recovery

7207

Fire Fighting Equipment - Ethane Storage

7208

Fire Fighting Equipment - NGL Chilling & Caverns

7209

Fire Fighting Equipment - Flare Drums

7210

Fire Fighting Equipment - EP II Pig Launcher

7211

Fire Fighting Equipment - Offsites

7401

Fire & Gas Monitoring - Feed Reception

7402

Fire & Gas Monitoring - Train 410

7403

Fire & Gas Monitoring - Train 420

7404

Fire & Gas Monitoring - Fractionation

7405

Fire & Gas Monitoring - Sales Gas Compr.

7407

Fire & Gas Monitoring - EP II Pig Launcher Area

7408

Fire & Gas Monitoring - Ethane Recovery

7409

Fire & Gas Monitoring - Ethane Storage

7410

Fire & Gas Monitoring - Caverns

7411

Fire & Gas Monitoring - Bokn LVS

7412

Fire & Gas Monitoring - Grid Substation

7413

Fire & Gas Monitoring - sgard Intake Subst.

7414

Fire & Gas Monitoring - Refrig./Caverns Subst.

7415

Fire & Gas Monitoring - Process Trains Substation

7416

Fire & Gas Monitoring - Sales Gas Substation

7417

Fire & Gas Monitoring - Jetty LCR

7418

Fire & Gas Monitoring - Centr. Control Room

7419

Fire & Gas Monitoring - EP II Substation

7420

Fire & Gas Monitoring - Receiving Area LER

7424

Fire & Gas Monitoring - Deeth. O/H Compr.

7425

Fire & Gas Monitoring - Gasoline Metering

7426

Fire & Gas Monitoring - Jetty 3

7427

Fire & Gas Monitoring - Sea Water Intake Area

7428

Fire & Gas Monitoring - Sales Gas Metering

7434

F & G Monitoring - 46 Compr. & Chilling Area

7435

Fire & Gas Monitoring - New CER & Effluent Treatment UPS/Battery Rooms

7436

Fire & Gas Monitoring - Analyser House 23-ZG-201

7437

Fire & Gas Monitoring Backflow Area

7438

Fire & Gas Monitoring Propane Fiscal Metering Area

7440

Fire & Gas Cabinets CCR

7441

Fire & Gas Cabinets Receiving LCR

7442

Fire & Gas Cabinets EPII LCR

7443

Fire & Gas Cabinet Cavern LCR

7444

Fire & Gas Cabinet sgard LCR

7445

Fire & Gas Cabinet Sales Gas LCR

7446

Fire & Gas Cabinets Ethane Recv./Jetty LCR

7448

Air Compressor & Water Treatment (FA 24/1)

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 5

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

7449

Fire & Gas Monitoring - Road Tunnel

7501

ESD System - Feed Reception (Field PBs)

7502

ESD System - Train 410 (Field PBs)

7503

ESD System - Train 420 (Field PBs)

7504

ESD System - Compression (Field PBs)

7505

ESD System - Gas Export (Field PBs)

7506

ESD System - Fractionation (Field PBs)

7507

ESD System - Ethane Recovery & Jetty 3 (Field PBs)

7508

ESD System - Ethane Storage (Field PBs)

7509

ESD System - Caverns (Field PBs)

7510

ESD System - Butane Storage/Butane LCR

7520

ESD System CCR (incl. Cabinets/Matrix and PBs in CCR)

7521

ESD Cabinets Receiving LCR (incl. PBs in LCR)

7522

ESD Cabinets EPII LCR (incl. PBs in LCR) and Field PBs

7523

ESD Cabinets Cavern LCR (incl. PBs in LCR)

7524

ESD Cabinets sgard LCR (incl. PBs in LCR)

7525

ESD Cabinets Sales Gas LCR (incl. PBs in LCR)

7526

ESD Cabinets Ethane Recv./Jetty LCR (incl. PBs in LCR)

7530

ESD Intertrips

7531

ESD - Socket Outlet and Welding Outlet Trips

8001

Electrical Power to Grid Substation

8201

Electric Power to sgard Intake Subst.(22kv)

8202

Electric Power to Refrig./Cavern Subst.(6,6kV)

8203

Electric Power to Process Trains Subst.(690V)

8205

Electric Power to Sales Gas Subst. (6,6kv)

8206

Electric Power to Sales Gas Subst. (690v)

8207

Electric Power to EP II Subst. (690V,Temp.)

8208

Electric Power to EP II Subst. (690V,Perm.)

8209

Electric Power to EP II Subst. (400V)

8210

Electric Power to Bokn LVS Subst.

8212

Electric Power Distribution - Train 410 (690V)

8213

Electric Power Distribution - Train 420 (690V)

8214

Electric Power Distribution - Train 410 (400V)

8215

Electric Power Distribution - Train 420 (400V)

8216

Electric Power Distribution - General Process (400V)

8217

Electric Power Distribution - Sales Gas Subst. (400V)

8218

Electric Power Distribution S.G. Compr.A (690V)

8219

Electric Power Distribution S.G. Comp. B (690V)

8220

Electric Power Distribution S.G. Comp. A (400V)

8221

Electric Power Distribution S.G. Compr. B (400V)

8222

Electric Power to Cavern Subst. (690V)

8223

Electric Power to Cavern Subst. (400V)

8224

Electric Power to sgard Intake Subst. (690V)

8225

Electric Power to sgard Intake Subst. (400V)

8226

Lighting & Heat Tracing Distribution from Effluent Treatment Subst. (82-ZE-103)

8227

Lighting & Heat Tracing Distribution from Refrig/Cavern Subst. (82-ZE-106)

8228

Lighting & Heat Tracing Distribution from Butane Subst. (82-ZE-108)

8229

Lighting & Heat Tracing Distribution from Sea Water Subst. (82-ZE-105)

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 6

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

8231

Existing Effl. Treatment Subst.

8234

Booster Compr. Upgrade - Electrical

8235

Electric Power - Propane Liquid Export Metering Package 47-XT-211

8236

Electric Power Distribution - Bokn LVS

8237

Lighting & Heat Tracing Distribution from EP II Subst. (82-ZE-118)

8238

Lighting & Heat Tracing Distribution from sgard Sales Gas Subst. (82-ZE-116)

8239

Lighting & Heat Tracing Distribution from sgard Process Subst. (82-ZE-114)

8240

Electrical - AF Scope

8241

Lighting & Heat Tracing Distribution from sgard Main Intake Subst. (82-ZE-117)

8242

Lighting & Heat Tracing Distribution from Utility Subst. (82-ZE-104)

8243

Lighting & Heat Tracing Distribution from Existing Propane Subst. (82-ZE-107)

8251

Main Intake Subst. - Exist. 82-EM-200

8252

Main Intake Subst. - Exist. 82-EN-700

8253

Effl. Treatm. Subst. - Exist. 82-EN-530

8254

Effl. Treatm. Subst. - Exist. 82-EN-730

8255

Utility Subst. - Exist. 82-EN-541

8256

Utility Subst. - Exist. 82-EN-740

8257

Seaw. Intake Subst. - Exist. 82-EN-550

8258

Seaw.Intake subst. - Exist. 82-EN-750

8259

Butane Subst. - Exist. 82-EN-581

8270

CECS System (Level 3)

8271

CECS System (L1 & 2) - Effluent Treatment Subst.(CCR)

8272

CECS System (L1 & 2) - Main Intake Subst.

8273

CECS System (L1 & 2) - Propane Cavern Subst.

8274

CECS System (L1 & 2) - EPII Subst.

8275

CECS System (L1 & 2) - sgard Process Subst.

8276

CECS System (L1 & 2) - sgard Sales Gas Subst.

8277

CECS System (L1 & 2) - Exisiting Sea Water Subst.

8278

CECS System (L1 & 2) - Existing Utilities Subst.

8279

CECS System (L1 & 2) - Existing Butane Subst.

8281

Existing Effluent Treatment Subst. (82-ZE-103) - IR Cabinet

8282

Existing Utilities Subst.(82-ZE-104) - IR Cabinet

8283

Existing Seawater Subst. (82-ZE-105) - IR Cabinet

8284

Existing Butane Subst. (82-ZE-108) - IR Cabinet

8285

Process Subst. (82-ZE-114) - IR Cabinets

8286

Sales Gas Subst. (82-ZE-116) - IR Cabinet

8287

Main Intake Subst. (82-ZE-117) - IR Cabinet

8301

Emergency Generator (Process Trains Subst.)

8302

Emergency/Essential Power Distr.(sg. Intake Subst.)

8303

Emergency Power - Process Train Subst.

8304

Emergency Power - Sales Gas Subst.

8305

UPS - Grid Subst. (incl.Tie-in work)

8306

UPS - sgard Intake Subst.

8307

UPS - Refrig./Cavern Subst.

8308

UPS - Process Subst.

8309

UPS - Sales Gas Substation

8310

UPS - EP II Subst.

8311

UPS - Bokn LVS

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 7

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

8312

UPS - Effl.Treatment Subst./Distr.Panels in sgard Recv.LCR

8313

UPS in Ethane Recovery/Jetty LCR

8314

Emergency Power from Butane Subst. to 82-EN-560

8351

Butane Subst. - Exist. 83-EE-180

8352

Main Intake Subst. - Exist. 82-ED-502

8401

Earthing - Ring Main

8402

Earthing - Grid Substation (80-ZE-100)

8403

Earthing - sgard Intake Substation (82-ZE-117)

8404

Earthing - Refrig./Cavern Substation (82-ZE-106)

8405

Earthing - Process Substation (82-ZE-114)

8406

Earthing - Sales Gas Substation (82-ZE-116)

8407

Earthing - Jetty LCR (93-ZC-107)

8408

Earthing - EP II Substation (82-ZE-118)

8409

Earthing - Receiving Area LER (93-ZC-106)

8411

Earthing - Central Control Room (93-ZC-100)

8412

Earthing - Propane Cavern Top Area

8413

Earthing - EPII/Backflow Areas

8414

Earthing - Remaining Construction Areas

8415

Earthing - Bokn LVS

85

Existing Seawater Subst.- Exist. 82-EM-350 (De-Comm)

8501

PCDA/ESD - Central Control Room (CCR)

8502

PCDA/ESD - Prop. Caverns/Propane Loading LCR

8503

PCDA/ESD - EP II LCR

8505

PCDA/ESD - sgard LCR (82-ZE-114)

8507

PCDA/ESD - Ethane Recovery/Jetty LCR

8509

Fiscal Metering - Statpipe Gas

8510

Fiscal Metering - Gasoline

8511

Fiscal Metering - Propane

8513

Allocation Meters

8519

Booster Compr. Upgrade - Instrumentation

8520

Machinery Monitoring System

8522

Pipeline Protection System (PPS)

8523

HIPPS - Sales Gas & Booster Compressors, EPII

8525

PCDA/ESD - sgard Recv. LCR (93-ZC-106)

8526

PCDA/ESD - Sales Gas LCR (82-ZE-116)

8529

PCDA/ESD - Aux Cabinet 15-ZC-100-XC02

8530

PCDA/ESD - Existing Butane/Refrigeration LCR

8601

PA System (A&B) from CER

8603

Communication - Bokn LVS

8604

Communication - Kalst

8607

Telephone/Data Netw. - Tie-in to Exist.

8611

PA System (A&B) from Propane Cavern Subst.

8612

PA System (A&B) from EP II Subst.

8613

PA System (A&B) from sgard Process Subst.

8614

Data/Telephone Network in CER

8615

Data/Telephone Network in sgard Recv.LCR

8616

Data/Telephone Network in Propane Cavern Subst.

8617

Data/Telephone Network in sgard Main Intake Subst.

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 8

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

8618

Data/Telephone Network in sgard Process Subst.

8619

Data/Telephone Network in Ethane Recv./Jetty III LCR

8620

Data/Telephone Network in sgard Sales Gas Subst.

8621

Data/Telephone Network in EPII Subst.

8622

Wind/Noise Measuring System

8888

Dummy System - Lighting Distr. (Module Yards)

8889

Dummy System - Heat Tracing Distr. (Module Yards)

8900

Dummy System - Instr. JB's / Multicores (Module Yards)

9001

Site Preparation and Restoration

9002

Civils Foundations - O.S.B.L.

9003

Civils Foundations - Inner Area

9004

Civils Foundations - I.S.B.L.

9005

Civils Trenches/Culverts - O.S.B.L.

9006

Civils Trenches/Culverts - Inner Area

9007

Civils Trenches/Culverts - I.S.B.L.

9101

Roads, Walkways, Paving and Site Restoration

9202

Tug Boat Jetty

9203

Jetty 3

9204

Crane 92-MA-101 on Tug Boat Jetty

9301

Building - Grid Substation(80-ZE-100)

9302

Building - sgard Intake Subst.(82-ZE-117)

9303

Building - Refrigeration/Caverns Subst.(82-ZE-106)

9304

Building - Process Trains Substation(82-ZE-114)

9305

Building - Sales Gas Substation(82-ZE-116)

9306

Building - Jetty LCR(93-ZC-107)

9307

Building - CCR Extension(93-ZC-100)

9308

Building - Europipe II Substation(82-ZE-118)

9309

Building - Receiving Area LER(93-ZC-106)

9310

Storavatn Pumphouse Extention

9311

Building - Effl. Treatment Subst.(82-ZE-103)

9312

O/H Crane - 93-MA-212

9313

Building - Existing CCR Modification

9402

CCTV System from CCR Central Rack

9403

CCTV System from Propane Cavern Subst. Sub-Rack

9404

CCTV System from sgard Sales Gas Subst. Sub-Rack

9405

CCTV System from Bokn LVS.

9701

HVAC - Grid Substation (80-ZE-100)

9702

HVAC - sgard Intake Substation (82-ZE-117)

9703

HVAC - Refrigeration/Caverns Substation (82-ZE-106)

9704

HVAC - Process Trains Substation (82-ZE-114)

9705

HVAC - Sales Gas Substation (82-ZE-116)

9706

HVAC - Jetty LCR (93-ZC-107)

9707

HVAC - Central Control Room (93-ZC-100)

9708

HVAC - Europipe II Substation (82-ZE-118)

9709

HVAC - Receiving Area LER (93-ZC-106)

9710

HVAC - Effluent Treatment Substation

9713

HVAC - Booster Compressor Substation (82-ZE-113)

9714

Future HVAC - Electrical Supply

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 9

MC Manual CP Listing
Krst Utbyggingsprosjekt (KUP)
Attachment to E060-SB-M-YA0001 Rev C
CP No :

Title :

9901

Miscellaneous Steel Structures

N/A

Not applicable to CP Nos (e.g. Preservation Dummy Tags)

T/IN

Tie-In Packages (Shutdown and Post-Shutdown)

NOTE :
THIS LISTING IS FOR INFORMATION ONLY - REFER TO PIMS FOR COMPLETE CONTROLLED LISTING OF
COMMISSIONING PACKAGES.

PIMS 97 - (Concept by Omega AS)

04-okt-2000 16:47

Page: 10

Inspection & Test Record Index


Krst Utbyggingsprosjekt

GENERAL MC FORMS
COW01

CarryOver Work List

HOC01

Handover Certificate

LUN01

Livening Up Notice

MAC01

Mechanical Acceptance Certificate

MSR01

Material Status Report (MSR)

PL01

Discipline Punch List

PL01B

Discipline Punch List ( Blank )

06-Oct-2000 14:58

Page: 1

MC Inspection & Test Record


COW01 CarryOver Work List
Rev : 0
COW List No :

Sheet

of

CP No:

Description :
Equipment :
Site :
Item

Location/Area :

Date :
Drawing and
Document ref. No

Description

MSR

Comments:

COW List Agreed:


Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 6-Oct-00 13:38

Handover Certificate
( HOC01 )
Rev : A
Comm Pack:
Description:
Statement:

It is hereby certified that the system referenced, has been mechanical completed in accordance with
drawings, specifications, inspection and test records, with the exception of outstanding work
according to attached Multi-Discipline Punch List. The referenced system is ready for Commissioning.
System Description:

Part System Description:

Comments / Qualifications:

KUP Construction
Prepared by :

Approved by :

KUP Commissioning
Accepted by :

Accepted by :

Name :
Sign :
Date :
PIMS 97 - arpt (Concept by Omega AS)

09-Oct-2000 12:15

MC Inspection & Test Record


MAC01 - Mechanical Acceptance Certificate

Comm Pack

MC Discipline Pckg No :
Description :

Discipline

Site :

Location/Area

Date :

Statement :

It is hereby certified that the equipment referenced, has been inspected, tested and mechanically completed
in accordance with the attached inspection and test records, but with the exception of outstanding work
according to attached Punch List. ( If applicable )
Punchlist Attached:

Yes

No

Description of plant / equipment :

Comments :

Prepared/Accepted by:

Accepted by :

Contractor

KUP Construction

Accepted by :

Accepted by :

Other:-

KUP Commissioning

Name :

Name :

Name :

Name :

Sign :

Sign :

Sign :

Sign :

Date :

Date :

Date :

Date :

Rev : A

Date/Time: 9-Oct-00 13:50

Muliti Discipline Punch List Master


MDPL Multi Discipline PunchList ( Blank )
MDPL No :
MDItem Original PL No

Item

Object ID

Prepared

Disc Description

Cat

Checked By

Agreed by

Location

Resp

Action

Cleared

Checked

Agreed by

Name :
Sign :
Date :
Rev : 0

Date/Time: 9-Oct-00 13:13

Page: 1

MC Inspection & Test Record


MSR01 Material Status Report (MSR)
Rev : 0
Site:

Module / Equipment:

Item

Material Description

Contractor

Ref. MSR / COW List No:

Date:
P.O. No.

KUP Construction

Other:-

Order
Date

Responsible for ordering


SubContractor Contractor

Delivery Shipped
Date
Loose

Equipment
Marking

KUP Commissioning

Name :
Sign :
Date :
Report: arpt_Completion_Cert-MSR

Date/Time: 9-Oct-00 13:47

Page: 1

MC Inspection & Test Record


PL01 Discipline Punch List

Punch List No :

Commissioning Package :

Discipline :

Responsible SubContractor :

Description :

Item

Description

Object ID:

Punchlist Agreed:

Contractor

Cat Req'd
A/B PreTst

KUP Construction

Other:-

Cleared
Sign & Date

Checked
Sign & Date

KUP Commissioning

Name :
Sign :
Date :
Cert Rev.No: 0

Printed: 9-Oct-00 14:11

MC Inspection & Test Record


PL01B Discipline Punch List ( Blank )

Punch List No :

(Same as MC Pack )

Responsible SubContractor :

CP No :
Sheet

Discipline :

of

Description :
Item

Description

Cat
A/B

Req'd
PreTst

SubContractor Cleared

Contractor Cleared

Sign Date

Sign Date

Comments:

Punchlist Agreed:
Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Rev : A

Printed: 9-Oct-00 13:56

Inspection & Test Record Index


Krst Utbyggingsprosjekt

ELECTRICAL MC FORMS
E01

Generator

E02

Transformer

E03

Electric Motor

E04

Outgoing Unit - Switchgear

E05

Switchgear

E06

Low Voltage Distribution Board

E07

Charger/Inverter

E08

Reactor/Resistor

E09

Heater

E10

Bus-Duct

E11

Control Panel

E12

Batteries

E14A

Electrical Junction Boxes - By MC Package

E14B

Junction Boxes by Circuit

E14C

Electrical Junction Boxes - By Tag

E15A

Lighting Fixtures - By MC Package

E15B

Lighting Fixtures - By Circuit

E15C

Lighting Fixtures

E16A

Socket Outlets/Isolators - By MC Package

E16B

Socket Outlets / Isolators - By Circuit

E17

High Voltage Cable

E18A

LV Electrical Cable - By Cable No.

E18B

LV Electrical Cables - By MC Package

E18C

LV Electrical Cables - By Circuit

E19

Earth Loop Resistance

E20

Underground Cableworks Release

E21

Heat Tracing Installation & A-Test

E22

Heat Tracing Cable B-Test

E23

Heat Tracing Circuit (C-Test)

E30

Electrical - Area Acceptance

06-Oct-2000 14:58

Page: 2

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 1 o9
_____________________________________________________________________________

INTRODUCTION
The testing of electrical items, as required by the specifications, shall be performed by
the responsible contractor.
The requirements in the Check Lists and Test Records for electrical discipline in this
manual are the minimum requirements to be completed, prior to electrical equipment
being handed over to Company for performance of Commissioning and Start-up.

GENERAL
The Contractor shall be responsible for performing all tests and checks as required to
provide a safe, reliable and functionally sound electrical installation.
Where applicable, the test requirement specified herein shall be conducted in
accordance with the manufacturers instructions or under the supervision of a
manufacturers representative when equipment warranties could otherwise be voided.
Details of procedures for testing including additional tables and forms for recording
results, shall be submitted to Company for approval.
Company reserves the right to witness all tests and functions. Contractor shall inform
Company when the various tests are going to take place.
All test equipment shall be provided by Contractor, as defined in their respective
contracts and be subject to approval by Company.
All testing and equipment operation shall be executed in a safe manner in accordance
with procedures stated in Prosedyresamling Elektro/Automasjon.
Periodic clean-up of indoor equipment areas, especially electrical rooms, shall be
performed during construction. As part of the final hand over, Contractor shall thoroughly
clean the areas, including dusting and vacuuming of equipment enclosures on both
outside and inside, to ensure that the equipment is completely free of dust and other
contaminants which could affect performance and reliability of live equipment.

3
3.1

TESTING
HV Cables
All the 6,6kV and 22kV cabling shall be high voltage tested using DC on completion of
glanding and with braiding earthed, but before connection to equipment is made at either
end.
The positive pole of the test equipment shall be earthed and the negative pole of the test
equipment shall be connected to the conductor under test. The remaining conductors of a 3
x Core cable shall be earthed.
The test procedure and test voltage for high voltage cables shall be in accordance with IEC
502, Section 14.4 and 18.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 2 o9
_____________________________________________________________________________

The test voltage shall be increased slowly until the test value is obtained and then
maintained at this value for 5 minutes (after leakage current have stabilised). On equipment
where no disconnection of cable cores is possible, an approval shall be obtained from the
supplier of the equipment to allow the test voltage to be applied to the equipment terminals
for the time specified.
3.2

Electrical Equipment
High-voltage pressure testing of electrical equipment, except cables, shall be carried out
at the manufacturers works with AC at voltage levles in accordance with the relevant
IEC publications.
As repeated exposure to excessively high voltages may introduce weak points in the
insulation of windings, such tests shall not be applied at site to generators, motors, or
transformers.
If however, for special reasons these tests are considered necessary, written approval
from the manufacturer shall be obtained prior to the tests being performed.
All equipment containing insulation oil, such as transformers, circuit breakers etc., shall
have the oil dialectically tested. The test shall be according to IEC 295.
Insulation oil with too low breakdown voltage shall be properly filtered or replaced where
necessary.

3.3

HV Switchgear
Site tests and inspections shall be carried out in accordance with suppliers instructions.
HV testing shall be carried out in accordance with IEC 298 and IEC 60.
The voltage transformers shall be isolated and all incoming and outgoing cables shall be
disconnected.
Padlocking of circuit breakers / contactors shall be used. All necessary precautions shall
be taken to prevent the circuit breakers / contactors from being operated without
authorisation from the Electrical Manager (Driftsleder).
The high voltage tests of the main power circuit shall be carried out on each phase with
the remaining two phases connected to earth. For the test, one pole of the testing supply
is connected to earth and to the frame of the equipment under test.

3.4

Insulation Resistance Tests (IR)


The connections used for insulation resistance tests shall be similar to the ones used on
high voltage testing. A 5000V Megger shall be used for testing the 6,6kV switchgear,
and a 1000V Megger shall be used on the majority of the other applications.
The minimum applicable insulation values shall be as follows :

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 3 o9
_____________________________________________________________________________
Description of Equipment
6,6kV equipment
600V and 440V equipment
Control Circuits
Low voltage equipment

Minimum Insulation Value


20 Megaohms
10 Megaohms
10 Megaohms
1 Megaohm

The measured insulation resistance will increase if the test is carried out at a lower
voltage level.
For the correct comparative interpretation of test data, consequent tests on electrical
equipment shall be carried out at the same voltage level.
The measured resistance value is also dependent on the temperature of the insulation.
See Appendix 1 Nomogram for temperature correction.
Insulation resistance testing of electric motors shall, for motors with system voltage
greater than or equal to 1000V, include the determination of polarization index. This
index is the ratio between the insulation resistance measured after 1 minute and the
ratio measured after 10 minutes of continuous testing at the appropriate voltage.
See Appendix 2 Typical curves for variation of insulation resistances.
3.5

Polarisation Index
If the insulation resistance test for the motor / generator / power transformer windings
are below the minimum acceptable value, the Polarisation Index shall also be measured.
The polarisation index is obtained by use of Megger. Use the Megger for reading of IR
between U, V, W to E with neutral disconnected, i.e. all three phases linked together.
Log the readings after 1 minute and after 10 minutes. The ratio of the 10 minutes value
and the 1 minute value is the Polarisation Index.
Insulation Condition
Excellent
Good
Fair
Questionable
Poor

10:1 min. ratio


>4
3 to 4
2 to 3
1,5 to 2
< 1,5

The listed values are for guidance. Large rotating machinery with a high number of
surface leakages may have a P.I. 25% lower that the above values.

3.6

Equipment General
Tests shall be performed to prove the proper function of all generators, emergency
generators, transformers, circuit breakers, relays, motor control equipment, motors,
motor-operated valves, distribution systems, heating and ventilation systems, lighting
systems, all control circuits, interlocks and alarms.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 4 o9
_____________________________________________________________________________

Checks shall be performed to measure resistance of grounding systems and ground


continuity where applicable.
Checks for correct phase rotation and marking of buses and cables.
Checks for correct installation of earthing, cable termination, glands, cable transits,
cleating of cables, sealing of local panels and junction boxes, proper greased flanges,
nuts, bolts and washers, anti-corrosion treatment etc.
Check illumination level and area lighting requirements to ensure installations conform to
requirements.
Check that all equipment nameplates, instruction signs and circuit directories are
installed. Also tagging for identification purposes of all cables and conductors routed
through cable transits and ending in junction boxes of equipment shall be in accordance
with applicable installation drawings and specification.
3.7

Motors
All motors shall be checked for proper lubrication of the motor bearings.
Motor insulation resistance shall be measured using a megaohmmeter prior to motor
being connected to its supply conductors.
Each motor shall be checked for correct direction of rotation.
Before coupling, motors rated 100kW or higher shall be given a four hour no-load run.
During the running period the motor shall be checked periodically for excessive noise,
vibration and overheating of the bearing housing and motor frame.
Anti-condensation heaters shall be checked for proper function.

3.8

Swithgear and Motor Controllers


The insulation resistance of switchgear and motor control equipment shall be tested in
accordance with manufacturers recommendations before completing the associated
wiring and cable terminations. Tests will normally consists of insulation test between
each phase and ground and between phases.
Before livening up the system, a final insulation test for the entire system shall be
obtained. Bolted bus joints, terminals and other connections for each separate
equipment installation shall be checked for tightness on a selected basis.
All control circuits shall be 100% function-tested.
Protection relays shall be set and tested in accordance with the relay studies. Relays
having an operating characteristic, which varies with time, shall be tested to verify
conformity with manufacturers data.
Thermal overload relays used for motor protection shall be individually checked to
ensure correct setting according to motor nameplate full-load current.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 5 o9
_____________________________________________________________________________
Other devices having variable timing characterisitics, such as time delay relays, shall be
set and tested in accordance with intended control function.

3.9

Relay Testing
Relay testing can be carried out by using primary injection or secondary injection
current.
During initial testing, primary injection testing should be used, as this test includes the
whole circuit. However, since the primary current availability is limited, relays cannot be
checked at high current. Secondary injection testing is therefore recommended as well.
This will in addition provide reference data for future routine testing, in which secondary
injection testing will suffice.
A test at the selected relay setting should also be included where the relay should be
allowed to trip the circuit breaker or contactor. Relay contacts should not be interfered
with unless they are obviously corroded.
After each test it shall be verified that the actual relay setting is in accordance with the
setting laid down in the overall protection scheme of the power system.
It is recommended that the relay shall be provided with an adhesive label, indicatiing the
selected setting and the latest test date.
Insulation tests shall be carried out on the relay wiring using a 500V tester. Care shall be
taken to disconnect any electronic circuits before testing.

3.10 System Phasing Testing


Phase testing of circuits shall be carried out by using appropriate phasing sticks.
3.11 Generator Synchroscope Testing
A generator synchronising system can be tested by using phasing sticks or voltage
transformers.
Preference is given to the method of energising both the running and incoming system
from the same source. The alternator is open-circuited either at the main terminals or at
the neutral poit.
See Appendix 3 - Generator Synchronising System Testing
The test proved the synchroscope, the secondary wiring connections and the voltage
transformers complete.
It the synchroscope / V leads are subsequently removed for any purpose, the
synchronising system shall be tested again.
3.12 Conductivity Testing
Conductivity tests shall be carried out with low resistance test set, e.g. a ducter with at

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 6 o9
_____________________________________________________________________________
least 20DC. The measured voltage drops shall be interpreted on a comparative basis.
For identical connections / circuits the measured values shall not differ by more than
20% from each other.
3.13 Earth Resistance Testing
The resistance to earth of an earthing system or earth mat shall be tested with the
external cabling disconnected. The resistance of separate system shall be lower than :
-

1 Ohm for electrical system and equipment earthing.


1 Mohm for static discharge earthing.

3.14 Insulation Oil Testing


Electrical withstand test shall be carried out using a standard oil testing apparatus with
25mm diameter mushroom-shape electrodes at a distant of 2,5mm apart.
The minimum withstand voltage for one minute without breakdown shall be 40kV, i.e.
160kV/cm.
In contradiction to IEC 422 Maintenance and supervising guide for insulating oils in
service, this value shall apply to all equipment, including switchgear, up to a system
voltage level of 36kV for new as well as used/filtered oil.

ATTACHMENTS

4.1

Appendix 1 Nomogram for temperature correction.

4.2

Appendix 2 Typical curves for variation of insulation resistance.

4.3

Appendix 3 General synchronising system testing.

REVISION CHANGE RECORD


Rewritten post project for MC Handbook. Only minor changes implemented.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 7 o9
_____________________________________________________________________________
Appendix 1 Nomogram for temperature correction.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 8 o9
_____________________________________________________________________________
Appendix 2 Typical curves for variation of insulation resistance.

Document Title: MC Manual Instruction - Testing of Electrical Equipment


Doc. No.:
E060-SB-M-YA0001
MWKL Job No. 5622
Rev. No.: A
Rev. Date: 05.10.00
Page 9 o9
_____________________________________________________________________________
Appendix 3 General synchronising system testing.

MC Inspection & Test Record


E01 Generator
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Rating (kW)

P.O. Package

Drwg.Ref.

Supplier

Duty

DataSheet

Remarks

Item:
1

OK N/A PL Result/Data:
Warning ! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Testing by Manufacturer :

2.01

Confirm tested in accordance with Manufacturer's instructions and under their supervision.

2.02

Confirm Manufacturer's Testform Reference No.

2.03
3

Attach copy of Manufacturer's Testform.


Inspection Checklist :

3.01

Check against data sheet including nameplate/rating plate details.

3.02

No mechanical damage.

3.03

No fluid leaks.

3.04

Nuts and bolts tight.

3.05

Paintwork good.

3.06

Glanding correct and tightened.

3.07

Protection of 'Live' parts correct.

3.08

Earthing correct and securely tightened.

3.09

Instruments correctly installed and tagged.

3.10

Heaters correctly installed.

3.11

All labelling and warning marks correctly installed and visible.

3.12

All cabling and auxilliary wiring neat, undamaged and in accordance with drawings/documentation.

3.13

Terminal blocks correctly marked and segregated.

3.14

Tag No. visible and correct.

3.15

Safety devices correctly installed and accessible (e.g. Emergency Stop)

3.16

CE Mark in place.

3.17
4

Additional Checklist for Containerised Units :

4.01

Unit lighting correctly installed.

4.02

Cable transits correctly installed and tightened.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E02 Transformer
Rev : C
CP No:

Tag No:
Descr:

MC No:

Location

Drwg.Ref

P.O.Package

Duty

Supplier

Remarks

Datasheet

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Testing by Manufacturer :

2.01

Confirm tested in accordance with Manufacturer's instructions and under their supervision.

2.02

Confirm Manufacturer's Testform Reference No.

2.03
3

Attach copy of Manufacturer's Testform.


Inspection Checklist :

3.01

Check against data sheet including nameplate/rating plate details.

3.02

No mechanical damage.

3.03

No fluid leaks.

3.04

Nuts and bolts tight.

3.05

Paintwork good.

3.06

Glanding correct and tightened.

3.07

Protection of 'Live' parts correct.

3.08

Earthing correct and securely tightened.

3.09

All labelling and warning marks correctly installed and visible.

3.10

All cabling and auxilliary wiring neat and undamaged.

3.11

Terminal blocks correctly marked and segregated.

3.12

Cooling fans correctly installed.

3.13

Oil level correct.

3.14

Silica gel breather checked.

3.15

Drainage system checked.

3.16

Tap set correct.

3.17

Tag No. visible and correct.

3.18

CE mark in place.

3.19
3.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E03 Electric Motor
Rev : D
Tag No.

CP No:

Description.

MC No

Location
Supplier

Item:
01
01.01
02

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.
Check for no voltage and proper earthing applied.
Motor Data:

02.01

Record Motor Serial Number

02.02

Data motor.

02.03

Manufacturer.

02.04

kW.

02.05

Voltage.

02.06

Current.

02.07

Power factor.

02.08

Revolution.

02.09

la/ln factor.

02.10

G1/T1 : Record TE value.

02.11

G2/T2 : Record TE value.

02.12

G3/T3 : Record TE value.

02.13

G4/T4 : Record TE value.

02.14

Record Ex-Certificate No.

02.15

Confirm Ex label affixed.

02.16

Record type of Ex protection.

02.17
03

Check equipment against data sheet including nameplate/rating plate details.


Inspection Checklist :

03.01

No mechanical damage.

03.02

No fluid leaks.

03.03

Nuts and bolts tight.

03.04

Paintwork good.

03.05

Terminal boxes correct.

03.06

Cable termination and glanding correct.

03.07

Earthing correct and securely tightened

03.08

All labelling and warning marks correctly installed and visible.

03.09

Tag No. visible and correct.

03.10

Motor free to turn by hand.

03.11

All unused cable entries correctly plugged.

03.12
04
04.01
04.02
06

CE marking in place.
Notes :
Tests marked (A) for motors with system voltage over 1000 V.
Tests marked (B) may be waived for motors below 30kW rating driving centrifugal pumps.
Insulation Resistance Tests (Before Cable Connected) :

06.01

Test voltage (V DC).

06.02

Insulation resistance of motor (phase to earth) :- After 1 min (Mohm)

06.03

(A) Insulation resistance of motor (phase to earth) :- After 10 min (Mohm). See Test Instructions.

06.04
07
07.01
07.02
08
08.01
09

(A) Insulation resistance of motor (phase to earth) :- Polarisation index. See Test Instructions.
Insulation Resistance Tests (After Cable Connected) :
Check cable connection correct.
Insulation resistance motor + cable (phase to earth) (Mohm)
Earthing :
Check the condition of earthing connection at motor and control unit.
Special Items :

09.01

Check anti-condensation heater.

09.02

Test and record results of insulation resistance of heater at 500 V - (Mohm)

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Sheet 1 of 2

Printed: 4-Oct-00 16:28

MC Inspection & Test Record


E03 Electric Motor
Rev : D
Tag No.

CP No:

Description.

MC No

09.03

Test and record results of insulation resistance of temp.detector at 500 V - (Mohm)

09.04
10

Confirm basic inspection sheet completed.


Uncoupled Run

10.01

Record rotation from NDE.

10.02

(B) Measure vibration and reference sheet no.

10.03

(B) Record maximum vibration reading (DE/NDE).

10.04

Record starting time (if over 1 sec.).

10.05

Record starting current (Amps).

10.06

Record no-load current (Amps).

10.07

Record bearing temperature (motors below 30kW : 30min, over 30kW : 210min).

Comments:

Table 1:
Min.

Time (min)

30

60

90

120

150

180

210

Temperature DE (deg Celcius)


Temperature NDE (deg Celcius)
Ambient Temperature (deg Celcius)

Table 2:
Test Record

I N x3

I N x5

x factor

Measured
motor current

Setpoint
thermal relay

Date

Sign

I N / 1N
Trip Time
Trip Time
Trip Time
Trip Time
Trip Time
Trip Time
Trip Time
Trip Time
Trip Time
Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Sheet 2 of 2

Printed: 4-Oct-00 16:28

MC Inspection & Test Record


E04 Outgoing Unit - Switchgear
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Distr. Board

P.O. Package

Circuit No

Data Sheet

Arrgm. Drwg.

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Checklist & Test Results :

1.01

Check circuit labelling.

1.02

Check for mechanical damage.

1.03

Check door interlock.

1.04

Check mechanical position indication.

1.05

Check electrical closing local/remote.

1.06

Check electrical trippel local/remote.

1.07

Check alarm indicators local/remote.

1.08

Check secondary auxilliary wiring.

1.09
2

Tag No. visible and correct.


Earthing :

2.01

Check the condition of earthing bar and connections.

2.02
3

Test the earthing bar contiuity (Mohm).


Insulation Resistance Test of Switching Device at 1000 V

3.01

Test Phase R (MOhm)

3.02

Test Phase S (MOhm)

3.03
4

Test Phase T (MOhm)


Protection Relay Inspection/Test

4.01

Confirm/Record manufacturer.

4.02

Confirm/Record Type.

4.03

Contactor rating.

4.04

Trip setting range (A).

4.05

Primary injection test at selected trip setting (A).

4.06

Earth-fault relay setting (A).

4.07

Measured pick-up current (A).

4.08

Setting After Test : Earth-fault relay setting (A).

4.09

Setting After Test : Setting sealed (A).

4.10
5

Auto reset. Confirm YES/NO


Fuses

5.01

Confirm/Record fuse class.

5.02

Confirm/Record fuse rating.

5.03

Confirm/Record fuse condition.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E05 Switchgear
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Fed From

P.O. Package

Single Line Drwg.

Data Sheet

Arrgm. Drwg.

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Testing by Manufacturer :

2.01

Confirm tested in accordance with manufacturer's instructions and under their supervision.

2.02

Confirm Manufacturer's Testform Reference No.

2.03
3

Attach copy of Manufacturer's Testform.


Inspection Checklist :

3.01

Check installed equipment against data sheet.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Nuts and bolts tight.

3.05

All busbar connections correctly tightened.

3.06

Earthing correct

3.07

Earthing securely tight.

3.08

Phase identification correct.

3.09

Protection of 'Live' parts correct.

3.10

Instruments correctly installed.

3.11

Voltage and Current transformers correctly installed.

3.12

All labelling and warning marks correctly installed and visible.

3.13

Contactors, relays, protection relays etc correctly installled and in accordance with drawings.

3.14

All cabling and auxilliary wiring neat and undamaged.

3.15

Terminal blocks correctly mounted and segregated.

3.16

Tag No. visible and correct.

3.17
3.18

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E06 Low Voltage Distribution Board
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

DistBoardTag

P.O. Package

CircuitNo

Data Sheet

Arrgm. Drwg

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Data :

2.01

Record Serial Number of Distribution Board if there is an EX requirement.

2.02

Confirm Ex label affixed.

2.03

Record Ex-Certificate No. (if applicable).

2.04

Record Type of Ex protection.

2.05
3

Complies with Area Classification.


Inspection Checklist :

3.01

Check installed equipment against data sheet.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Nuts and bolts tight.

3.05

Earthing correct.

3.06

Earthing securely tight.

3.07

Earthing bar correct.

3.08

Terminals correctly mouted and segregated.

3.09

Phase identification correct.

3.10

Busbars and connecting links tight.

3.11

All labelling and warning marks correctly installed and visible.

3.12

All cables and wiring neat and undamaged.

3.13

Protection of 'Live' busbars and spouts correct.

3.14

Megger Test performed.

3.15

Protection equipment correct.

3.16

Tag No. visible and correct.

3.17

Check panels, doors, locks and that keys available.

3.18

Auxilliary contactors and relays correctly installed.

3.19

All cabling and auxilliary wiring neat and undamaged.

3.20
4

Terminal blocks correct.


Protection Relay Inspection/Test

4.01

Confirm/Record manufacturer.

4.02

Confirm/Record Type.

4.03

Contactor rating.

4.04

Trip setting range (A).

4.05

Primary injection test at selected trip setting (A).

4.06

Earth-fault relay setting (A).

4.07

Measured pick-up current (A).

4.08

Setting After Test : Earth-fault relay setting (A).

4.09
5

Setting After Test : Setting sealed (A).


Fuses

5.01

Confirm/Record fuse class.

5.02

Confirm/Record fuse rating.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E07 Charger/Inverter
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Fed From

P.O. Package

Drwg Ref

Data Sheet

Drwg Ref

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Testing by Manufacturer :

2.01

Confirm tested in accordance with manufacturer's instructions and under their supervision.

2.02

Confirm Manufacturer's Testform Reference No.

2.03
3

Attach copy of Manufactuer's Testform.


Inspection Checklist :

3.01

Check installed equipment against data on single line diagram.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Nuts and bolts tight.

3.05

All busbar connections correctly tightened.

3.06

Earthing correct.

3.07

Earthing securely tight.

3.08

Phase identification correct.

3.09

Protection of 'Live' parts correct.

3.10

Instruments correctly onstalled.

3.11

Contactors, relays and fuses correctly installed.

3.12

All labelling and warning marks correctly installed and visible.

3.13

All cables and auxiliiary wiring neat and undamaged.

3.14

Terminal blocks correctly mouted and segregated.

3.15

Glanding correct and tighted

3.16

Tag No. visible and correct.

3.17
3.18
3.19

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E08 Reactor/Resistor
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

Duty

P.O. Package

Single Line Drwg

Datasheet

Dwg Ref

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Data :

2.01

Record Serial Number of Reactor/Resistor if there is an Ex requirement.

2.02

Record Reactor/Resistor Ex-Certificate No. applicable.

2.03
3

Record Type of Ex-certifcation for Reactor/Resistor.


Inspection Checklist :

3.01

Check installed equipment against data on single line diagram.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Earthing correct.

3.05

Earthing securely tight.

3.06

Nuts and bolts tight.

3.07

No fluid leaks.

3.08

Complies with Area Classification.

3.09

Tag No. visible and correct.

3.10
3.11

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E09 Heater
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Duty

P.O. Package

P & ID

Datasheet

Dwg

Supplier

Distr. Board

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Data - Heater :

2.01

Record Serial Number of Heater if there is an Ex requirement.

2.02

Confirm Ex label affixed.

2.03

Record Heater Ex-Certificate No. applicable.

2.04

Record Type of Ex protection for Heater.

2.05

Record Serial Number of Safety Thermostat.

2.06

Record Safety Thermostat Ex-Certificate No. applicable.

2.07

Record Serial Number of Operational Thermostat.

2.08

Record Operational Thermostat Ex-Certificate No. applicable.

2.09
3

Complies with Area Classification.


Inspection Checklist - Heater :

3.01

Check installed equipment against data on single line diagram.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Earthing correct.

3.05

Earthing securely tight.

3.06

Nuts and bolts tight.

3.07

No fluid leaks.

3.08

Tag No. visible and correct.

3.09

Safety devices connected and correctly set

3.10

Cable terminations and glanding correct.

3.11
4

Unused cable entries correctly plugged.


Testing (Heater) :

4.01
4.02
5

Megger test result.


Continuity test through elements result.
Data - Thermostat :

5.01
5.02
6

Record Serial Number of thermostat.


Record Ex-Certificate No. Applicable.
Inspection Checklist - Thermostat :

6.01

Check correct thermostat installed according to drawing and area classification.

6.02

Labelling / numbering / ferruling correct.

6.03

Thermostat mechanically sound, solidy and correctly mounted.

6.04

Capillary installed correctly and mechanically sound.

6.05
7

Tag No. Visible and correct.


Testing (Thermostats) :

7.01
7.02
8

Test for proper operation of safety thermostat.


Test for proper operation of operational thermostat.
Record Settings (Thermostats) :

8.01

Record set point of safety thermostat.

8.02

Record set point of operational thermostat.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E10 Bus-Duct
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

Duty

P.O. Package

Single Line Drwg

Datasheet

Dwg

Supplier

Distr. Board

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check Tag No., Voltage and Current rating.

1.02

Check for any apparent damage / missing parts.

1.03

Check bus insulator suports for cracks or dirty condition.

1.04

Check shipping blocks and supports removed.

1.05

Check that bus-duct is clean and free of debris.

1.06

Check bus enclosure for correctness of mechanical assembly, support and alignment.

1.07
2

Check gaskets, wall seals installed correctly.


Test Checks :

2.01

Check torque bus-bar bolts according to specification.

2.02

Check for proper phasing after installation.

2.03

Megger bus and record.

2.04

Test earthing bar continuity.

2.05

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E11 Control Panel
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Duty

P.O. Package

Single Line Drwg

Datasheet

Dwg

Supplier

Distr. Board

Item:
1

OK N/A PL Result/Data:
Warning! : Ensure Equipment in De-Energised State.

1.01
2

Check for no voltage and proper earthing applied.


Data :

2.01

Record Serial Number of Control Panel if there is an Ex requirement.

2.02

Confirm Ex label affixed.

2.03

Record Ex-Certificate No. (if applicable).

2.04

Record Type of Ex protection.

2.05
3

Complies with Area Classification.


Inspection Checklist :

3.01

Check installed equipment against data sheet.

3.02

No mechanical damage.

3.03

Paintwork good.

3.04

Nuts and bolts tight.

3.05

Earthing correct.

3.06

Earthing securely tight.

3.07

Protection of 'Live' parts correct.

3.08

All labelling and warning marks correctly installed and visible.

3.09

All cables and wiring neat and undamaged.

3.10

Terminal blocks and segregation plates correct.

3.11

Segregation of different voltage correct.

3.12

Anti-condensation heater correctly installed.

3.13

Protection equipment correct.

3.14

Tag No. visible and correct.

3.15

Check panels, doors, locks and that keys available.

3.16

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E12 Batteries
Rev : B
Tag No:

CP No:

Descr:

MC No:

Location

Duty

P.O. Package

Single Line Drwg

Datasheet

Dwg

Supplier

Distr. Board

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check installed equipment against data sheet.

1.02

No mechanical damage.

1.03

Check that all connections are tight and anti-corrosive coating (acid free vaseline) is provided.

1.04

All cells correctly installed.

1.05

Cables correctly installed.

1.06

Protection of 'Live' parts correct.

1.07

All labelling and warning marks correctly installed and visible.

1.08

All intercell connections installed.

1.09

Check liquid level of each cell.

1.10

Check the cells for leakage.

1.11

Test the insulation resistance to earth.

1.12

For lead acid batteries :- Test and record the specific gravity of the electrolyte in each cell (results
below).

1.13

For alkaline batteries :- Test the open circuit voltage of each cell with digital voltmeter (results below).

1.14
2

Tag No. visible and correct.


Discharge Test (C) (M) :

2.01

Record discharge start (h).

2.02

Record discharge finish (h).

2.03

Record total (h).

2.04

Record discharge current (A).

2.05

Record capacity (Ah).

Comments:

Time
Terminal Voltage
Discharge (A)
Room Temperature (deg Celcius)
Specific Gravity / mV per Cell :
Cell No.1
Cell No.2
Cell No.3
Cell No.4
Cell No.5
Cell No.6
Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :
#Error

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E14A Electrical Junction Boxes - By MC Package

Rev : A
MC Package :

CP No:

Description :
Item:
1

1.11

Cables correctly cleated.

1.01

Inspection Checklist :
Check correct junction box installed according to drawing and area classification.

1.12

Terminal blocks are correct type, mechanically sound, mounted and segrated correctly.

1.02

Labelling / numbering / ferruling correct.

1.13

Junction box located correctly to allow easy access for maintenance.

1.03

Junction box mechanically sound, solidly and correctly mounted.

1.14

Mounting rail for PE-Terminals is made of copper (Cu).

1.04

Correct type of cable glands and glands tightened.

1.15

Drain plug inserted.

1.05

Earthing / bonding / shrouding correct.

1.16

Confirm Ex lables affixed (where applicable)

1.06

Termination correct.

1.17

Tag No. Visible and correct.

1.07

Spare holes plugged (i.e. unused cable entries).

1.18

Check correct thermostat installed according to drawing and area classification.

1.08

All nuts, bolts and washers in place and secure.

1.19

Thermostat mechanically sound, solidy and correctly mounted.

1.09

All wiring neat and tidy.

1.20

Capillary installed correctly and mechanically sound.

1.10

Gaskets in place and correct.

1.21

CE mark in place.

Cable No

Checked

Description

Junction Box
Serial No

ACCEPTANCE

Contractor

Ex-Cert

KUP Construction

Thermostat ( if applicable )
Serial No

Other:-

Ex-Cert

Test Safety
Thermostat

Test
Operational

Set Point
Safety Therm

Set Point
Operational

KUP Commissioning

Name :
Sign :
Date :
05-Oct-2000 09:02

Page: 1

MC Inspection & Test Record


E14B Junction Boxes by Circuit
Rev : 0
CP No:

MC Package :
Description :
Distribution Board :

Circuit No :

System Voltage :

Item:
1

Inspection Checklist :

1.01

Check correct junction box installed according to drawing and area classification.

1.02

Labelling / numbering / ferruling correct.

1.03

Junction box mechanically sound, solidly and correctly mounted.

1.04

Correct type of cable glands and glands tightened.

1.05

Earthing / bonding / shrouding correct.

1.06

Termination correct.

1.07

Spare holes plugged (i.e. unused cable entries).

1.08

All nuts, bolts and washers in place and secure.

1.09

All wiring neat and tidy.

1.10

Gaskets in place and correct.

1.11

Cables correctly cleated.

1.12

Terminal blocks are correct type, mechanically sound, mounted and segrated correctly.

1.13

Junction box located correctly to allow easy access for maintenance.

1.14

Mounting rail for PE-Terminals is made of copper (Cu).

1.15

Drain plug inserted.

1.16

Confirm Ex lables affixed (where applicable)

1.17

Tag No. Visible and correct.

1.18

Check correct thermostat installed according to drawing and area classification.

1.19

Thermostat mechanically sound, solidy and correctly mounted.

1.20

Capillary installed correctly and mechanically sound.

1.21

CE mark in place.

Comments:

Object ID

Checked

Record Serial No

Record Ex. Certificate No

Protection Type

Remarks

Note : As-Built Block Diagram sketch ( as required ) or red-line marked up drawings to be attached.
Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 5-Oct-00 08:16

MC Inspection & Test Record


E14C Electrical Junction Boxes - By Tag
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Layout Drwg

P.O. Package

Distr. Board

Data Sheet

Circuit No

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Data :

1.01

Record Serial Number of junction box.

1.02

Confirm Ex label affixed.

1.03
2

Record Ex-Certificate No. (if applicable)


Inspection Checklist :

2.01

Check correct junction box installed according to drawing and area classification.

2.02

Labelling / numbering / ferruling correct.

2.03

Junction box mechanically sound, solidly and correctly mounted.

2.04

Correct type of cable glands and glands tightened.

2.05

Earthing / bonding / shrouding correct.

2.06

Termination correct.

2.07

Spare holes plugged (i.e. unused cable entries).

2.08

All nuts, bolts and washers in place and secure.

2.09

All wiring neat and tidy.

2.10

Gaskets in place and correct.

2.11

Cables correctly cleated.

2.12

Terminal blocks are correct type, mechanically sound, mounted and segrated correctly.

2.13

Junction box located correctly to allow easy access for maintenance.

2.14

Mounting rail for PE-Terminals is made of copper (Cu).

2.15

Drain plug inserted.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E15A Lighting Fixtures - By MC Package

Rev : 0
CP No:

MC Package :
Description :
Item:

OK N/A PL Result/Data:

1.02
2

Confirm Ex label affixed.


Inspection Checklist :

2.01

Check correct lighting fixtures installed according to drawing and area classification.

2.02

Labelling / numbering / ferruling correct.

2.03

Proper identification of emergency lighting.

2.04

Fixtures mechanically sound, solidly and correctly mounted.

2.05

Earthing / bonding /shrouding correct.

2.06

Termination correct.

2.07

Spare holes plugged (i.e. unused cable entries).

2.08

All nuts, bolts and washers in place.

2.09

All wiring neat and tidy.

2.10

Gaskets in place and correct.

2.11

Enclosure / Glasses correctly sealed, clean and undamaged.

2.12

Cables correctly cleated.

2.13

Test Checks :

2.14

Check earth continuity to plant earth.

2.15

Check insulation resistance to earth.

2.16

Check battery light for correct function.

2.17

Verify that fixture with battery back-up are terminated as per manufacturers instructions and link is
removed.

2.18

CE marking in place.

Comments:
Object ID

Checked

Record Serial No

Record Ex. Certificate No

Ex. certification type

Remarks

Note : As-Built Block Diagram sketch to be attached.


Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Rev : 0

Printed: 5-Oct-00 08:18

MC Inspection & Test Record


E15B Lighting Fixtures - By Circuit
Rev : A
CP No:

MC Package :
Description :
Distribution Board :

Circuit No :

System Voltage :

Item:
1

Data

1.01

Record Serial Number of light fixtures in tabulation below.

1.02

Confirm Ex label affixed.

1.03
2

Record Ex-Certificate Nos (if applicable) in tabulation below.


Inspection Checklist :

2.01

Check correct lighting fixtures installed according to drawing and area classification.

2.02

Labelling / numbering / ferruling correct.

2.03

Proper identification of emergency lighting.

2.04

Fixtures mechanically sound, solidly and correctly mounted.

2.05

Earthing / bonding /shrouding correct.

2.06

Termination correct.

2.07

Spare holes plugged (i.e. unused cable entries).

2.08

All nuts, bolts and washers in place.

2.09

All wiring neat and tidy.

2.10

Gaskets in place and correct.

2.11

Enclosure / Glasses correctly sealed, clean and undamaged.

2.12

Cables correctly cleated.

2.13

Test Checks :

2.14

Check earth continuity to plant earth.

2.15

Check insulation resistance to earth.

2.16

Check battery light for correct function.

2.17

CE marking in place.

Comments:

Object ID

Checked

Record Serial No

Record Ex. Certificate No

Protection Type

Remarks

Note : As-Built Block Diagram sketch ( as required ) or red-line marked up drawings to be attached.
Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 5-Oct-00 08:31

MC Inspection & Test Record


E15C Lighting Fixtures
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

Arr. Drwg.

PO Package

Distr. Board

Data Sheet

Circuit No.

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Data

1.01

Record Serial Number of light fixture.

1.02

Confirm Ex label affixed.

1.03

Record Ex-Certificate No. (if applicable).

1.04
2

Confirm Ex protection type.


Inspection Checklist :

2.01

Check correct lighting fixtures installed according to drawing and area classification.

2.02

Labelling / numbering / ferruling correct.

2.03

Proper identification of emergency lighting.

2.04

Fixtures mechanically sound, solidly and correctly mounted.

2.05

Earthing / bonding /shrouding correct.

2.06

Termination correct.

2.07

Spare holes plugged (i.e. unused cable entries).

2.08

All nuts, bolts and washers in place.

2.09

All wiring neat and tidy.

2.10

Gaskets in place and correct.

2.11

Enclosure / Glasses correctly sealed, clean and undamaged.

2.12

Cables correctly cleated.

2.13

Test Checks :

2.14

Check earth continuity to plant earth.

2.15

Check insulation resistance to earth.

2.16

Check battery light for correct function.

2.17

Verify that fixture with battery back-up are terminated as per manufacturers instructions and link is
removed.

2.18

CE marking in place.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E16A Socket Outlets/Isolators - By MC Package
Rev : A
CP No:

MC Package :
Description :
Item:
1

Inspection Checklist :

1.01

Check correct socket oulets/isolators installed according to drawing and area classification.

1.02

Labelling / numbering / ferruling correct.

1.03

Sockets outlets/Isolators mechanically sound, solidly and correctly mounted.

1.04

Earthing / bonding /shrouding correct.

1.05

Termination correct.

1.06

Spare holes plugged (i.e. unused cable entries).

1.07

All nuts, bolts and washers in place.

1.08

All wiring neat and tidy.

1.09

Gaskets in place and correct.

1.10

Cables correctly cleated.

1.11

Terminal blocks correct type and mechanically sound.

1.12

Test phase sequence correct.

1.13

CE Marking in place.

1.14
1.15

Comments:
Object ID

Checked

Record Serial No

Record Ex. Certificate No

Protection Type

Remarks

Note : As-Built Block Diagram sketch ( as required ) or red-line marked up drawings to be attached.
Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 5-Oct-00 08:32

MC Inspection & Test Record


E16B Socket Outlets / Isolators - By Circuit
Rev : A
CP No:

MC Package :
Description :
Distribution Board :

Circuit No :

System Voltage :

Item:
1

Inspection Checklist :

1.01

Check correct socket oulets/isolators installed according to drawing and area classification.

1.02

Labelling / numbering / ferruling correct.

1.03

Sockets outlets/Isolators mechanically sound, solidly and correctly mounted.

1.04

Earthing / bonding /shrouding correct.

1.05

Termination correct.

1.06

Spare holes plugged (i.e. unused cable entries).

1.07

All nuts, bolts and washers in place.

1.08

All wiring neat and tidy.

1.09

Gaskets in place and correct.

1.10

Cables correctly cleated.

1.11

Terminal blocks correct type and mechanically sound.

1.12

Test phase sequence correct.

1.13

CE Marking in place.

1.14
1.15

Comments:

Object ID

Checked

Record Serial No

Record Ex. Certificate No

Protection Type

Remarks

Note : As-Built Block Diagram sketch ( as required ) or red-line marked up drawings to be attached.
Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 5-Oct-00 08:33

MC Inspection & Test Record


E17 High Voltage Cable
Rev : B
Cable No:

CP No:

Description:

MC No:

From

Switchboard

To

Panel No.

CableType

Feeding Equip.

CableSize

System Voltage

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check installed cable against data above and cable schedule.

1.02

Glanding, lockouts and shrouding correct.

1.03

Phase sequence belled out.

1.04

Stress cones correctly installed, stress relieved and earthed.

1.05

Earth conductor / cable armouring continuity.

1.06

Glands comply with Area Classification.

1.07

Bedding correct.

1.08

Radius of bends within specification.

1.09

Labelling correct.

1.10

Comments:

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.

Megger Test :
L1 to Earth :

L1 to L2 :

L2 to Earth :

L2 to L3 :

L3 to Earth :

L3 to L1 :

High Voltage Pressure Test :

(to be performed according to manufacturer's instructions)


Kilovolts applied

Time in minutes

Leak in current in mA

L1 to L2 with L3 to Earth
L2 to L3 with L1 to Earth
L3 to L1 with L2 to Earth

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E18A LV Electrical Cable - By Cable No.
Rev : B
CP No:

Tag No:
Descr:

MC No:

From

Distr. Board

To

Panel No

Cable Type

Feeding Equipm.

Size/Core

System Voltage

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check installed cable against data above and cable schedule.

1.02

Glanding, lockouts and shrouding correct.

1.03

Phase sequence belled out.

1.04

Check that all cable fastening is correct and secure.

1.05

Earth conductor / cable armouring continuity.

1.06

Glands comply with Area Classification.

1.07

Bedding correct.

1.08

Radius of bends within specification.

1.09

Labelling / numbering / ferruling correct.

1.10
2

Spare cores earthed, tightened and identification correct.


Megger Test :

2.01

Record voltage applied (V)

2.02

Results L1 to L2

2.03

Results L2 to L3

2.04

Results L3 to L1

2.05

Results L1, L2, L3 to Earth

2.06

Results L1 to N.

2.07

Results L2 to N.

2.08

Results L3 to N.

2.09

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


E18B LV Electrical Cables - By MC Package
Rev : A
MC Package :

CP No:

Description :
Item:
1

Inspection Checklist :

1.01

Check installed cable against data above and cable schedule.

1.02

Glanding, lockouts and shrouding correct.

1.03

Phase sequence belled out.

1.04

Check that all cable fastening is correct and secure.

1.05

Earth conductor / cable armouring continuity.

1.06

Glands comply with Area Classification.

1.07

Bedding correct.

1.08

Radius of bends within specification.

1.09

Labelling / numbering / ferruling correct.

1.10

Record megger test results below for full circuit.

Cable No

Checked

From Tag

To Tag

Size/Cores

Cable Type :

L1 to L2

L2 to L3

L3 to L1

L1,L2,L3 to E

L1 to N

L2 to N

L3 to N

Note : As-Built Block Diagram sketch ( as required ) or red-line marked up drawings to be attached.
ACCEPTANCE

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
05-Oct-2000 08:45

Page: 1

MC Inspection & Test Record


E18C LV Electrical Cables - By Circuit
Rev : A
MC Package :

CP No:

Description :
Distribution Board :

Circuit No :

System Voltage :

Item:
1

Inspection Checklist :

1.01

Check installed cable against data above and cable schedule.

1.02

Glanding, lockouts and shrouding correct.

1.03

Phase sequence belled out.

1.04

Check that all cable fastening is correct and secure.

1.05

Earth conductor / cable armouring continuity.

1.06

Glands comply with Area Classification.

1.07

Bedding correct.

1.08

Radius of bends within specification.

1.09

Labelling / numbering / ferruling correct.

1.10

Record megger test results below for full circuit.

Cable No

ACCEPTANCE

Checked

Size/Cores

From Tag

Contractor

To Tag

Cable Type :

KUP Construction

L1 to L2

Other:-

L2 to L3

L3 to L1

L1,L2,L3 to E

L1 to N

L2 to N

L3 to N

KUP Commissioning

Name :
Sign :
Date :
05-Oct-2000 08:50

Page: 1

MC Inspection & Test Record


E19 Earth Loop Resistance
Rev : 0
CP No:

MC Package No:
Description:
Reference Drawings :

Components :

Check :

Installation Checks :

Check :

Check :

Rods :

1 : Components noted have been installed.

4 : Rods to correct position.

Wire :

2 : Lock nuts installed.

5 : Cable joints visually inspected.

Insulated Cable :

3 : Cable / Wire bends within radius.

6 : Labelling correct.

Cable / Item :

CableType:

From:

To:

Resistance

Comments:

m Ohms
m Ohms

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
05-Oct-2000 10:11

Page: 1

MC Inspection & Test Record


E20 Underground Cableworks Release

Rev : B
CP No:

Scope:

Contractor

Ref No (Segment No)

Location

Segregation No

Culvert Ref
Coordinates

1. Inspection of Installation of Geotextile Membrane


Inspection to take place :
Date :

Time :
Contractor

Issued by :
KUP Construction

Other:-

Date :
KUP Commissioning

Name :
Sign :
Date :

2. Inspection for Sandfilling Clearance


Inspection to take place :
Date :

Time :
Contractor

Issued by :
KUP Construction

Other:-

Date :
KUP Commissioning

Name :
Sign :
Date :
Sandfilled :
Date :

Sign:

3. Tiling / Cover Completed ( Required before power-up of cables )


Inspection to take place :
Date :

Time :
Contractor

Issued by :
KUP Construction

Other:-

Date :
KUP Commissioning

Name :
Sign :
Date :

Date :

Sign:

4. Inspection for Backfilling Clearance.


Inspection to take place :
Date :

Time :
Contractor

Issued by :
KUP Construction

Other:-

Date :
KUP Commissioning

Name :
Sign :
Date :
Sandfilled :
Date :

Sign:
Printed: 5-Oct-00 08:52

MC Inspection & Test Record


E21 Heat Tracing Installation & A-Test
Rev : C
MC Package:

CP No:

Description.

Item:
1

Inspection Checklist :

1.01

Check cable indent correct.

1.02

Check cable installation correct, secure and in correct position.

1.03

Check junction boxes correct.

1.04

Check glands and locknuts correct and secure.

1.05

Check thermostat correct.

1.06

Check mechanical protection.

1.07

Termination correct.

1.08

End seals correctly installed.

1.09

Check for correct fixing materials used (SS for MIC)

1.10
2

Check for correct bending radius.


A-Test :

2.01

Pre-insulation testing carried out (record results in table below).

Comments:
Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'
Cicuit No.

Earth Loop Impedance


L1 to Earth

Ohms

Continuity
Ohms

L2 to Earth

Isolation
Core to Screen

M Ohms

Comments

Screen to Earth

Heat Tracing Scope : (Isometrics/Lines/Instruments/Tape)


Object ID

Checked

Contractor
Name :
Sign :
Date :

Circuit No

Tracer Type

No. of Elements

KUP Construction

Total Length (m)

Other:-

Connections Soaked

Element Pressure Tested

KUP Commissioning

MC Inspection & Test Record


E22 Heat Tracing Cable B-Test
Rev : A
CP No:

MC Package No:
Description:

Item:
1

Inspection Checklist :

1.01

Check glanding correct.

1.02

Check mechanical protection.

1.03

Check all cores terminated in field.

1.04

Check all cores terminated in distribution panel.

1.05

Confirm items checked. (enter Name in block capital letters).

1.06

Confirm items checked. (enter Date checked).

1.07
2

Confirm items checked. (Signature).


Test Check After Insulation.

2.01
3

Record test results in table below.


Megger Test : (At 500V minimum, but not more than 2500VDC)

3.01
4

Minimum isolation resistance between each core and earth shall be 10 MOhms (Regardless of length).
Record test results in table below.
Thermostat :

4.01

Verify thermostat settings (use comments section if more space needed).

Comments:

Object ID

Checked

Earth Loop

Continuity

Impedance (Ohms )

Contractor
Name :
Sign :
Date :

KUP Construction

Core to Screen

( Ohms )

( M Ohms )

Other:-

Screen to Earth
( MOhms)

Each Core to Earth


( Min. 10 M Ohms)

KUP Commissioning

MC Inspection & Test Record


E30 Electrical - Area Acceptance
Rev : B
CP No:

MC Package No:
Description:
Scope : (Detail Project Drawings)

Data / Results / Check:


OK N/A PL Remarks:

Item:
1

Inspection Checklist :

1.01

Check cable trays and ladders conform to specification and drawings.

1.02

Check location, orientation, cable tray/ladder routing to and from destination, elevations and layout as per
drawings.

1.03

Check all braces and supports are adequate for load.

1.04

Check minimum distance between power and instrumentation cable trays is as per specification.

1.05

Check no sharp edges to cut cables.

1.06

Check no obstruction to pulling cable.

1.07

Check covers, fire stops and partitions installed.

1.08

Check sealing of ducts/pipes.

1.09

Check all bonding of equipment, cable ladders and trays.

1.10

Check that there are no clashes with piping etc.

1.11

Check routing checked for interface with above ground piping.

1.12

Check cable identification, cable fastening, routing and grouping etc.

1.13

Check main earthing.

1.14

Main lighting identification.

1.15

Check main and emergency lighting fixtures are labelled correctly.

1.16

Check socket outlets are labelled correctly.

1.17

Check that all cable transits are correctly installed and tightened.

1.18

Junction boxes and identification as per layout drawing(s).

1.19

Check & Record illumination intensity according to project requirements (LUX).

1.20

Mechanical protection of horizontal/vertical ladders and trays (as required).

1.21

Independent mechanical protection where risk of damage from vehicles.

1.22

Check that all required fireproofing is completed.

1.23

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

HVAC MC FORMS
G01

Fans

G02

Dampers

G03

Filter Coalescers

G04

Sound Attenuators

G05

Steam Humidifiers

G06

Heating/Cooling Coils

G07

Air Terminal Units

G08

HVAC Ducting

06-Oct-2000 14:58

Page: 3

MC Inspection & Test Record


G01 Fans
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm type of fan :- Axial or Centrifugal

1.02

Confirm drive type :- Belt or Direct

1.03

Installed according to specifications and drawings.

1.04

Check nameplate data against data sheet.

1.05

Protective coating complete.

1.06

Internally cleaned.

1.07

Coupling fitted.

1.08

Belt fitted (if apllicable).

1.09

Guard of non-sparking material fitted.

1.10

Guard enclosed, prevents access to rotating parts.

1.11

Maintainance hatch fitted.

1.12

Speed sensor and activator correctly installed.

1.13

Fan rotates freely & direction of rotation clearly marked.

1.14

Tag No. visible and correct.

1.15
1.16
1.17
1.18
1.19
1.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G02 Dampers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm type of damper :- Shut-Off/Fire/PressureControl/Others to be specified.

1.02

Installed according to specifications and drawings.

1.03

Check nameplate data against data sheet.

1.04

Adequately supported.

1.05

Internally cleaned.

1.06

No mechanical damage.

1.07

Indication 'Open/Closed' fitted.

1.08

Function check with compressed Air/Nitrogen after installation.

1.09

Inspection panel fitted.

1.10

Tag No. visible and correct

1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G03 Filter Coalescers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm type of filter/coalescer.

1.02

Installed according to specifications and drawings.

1.03

Check nameplate data against data sheet.

1.04

Maintenance hatch fitted.

1.05

Adequately supported.

1.06

Protective coating complete.

1.07

Drain including water-trap installed.

1.08

Heat tracing installed.

1.09

Internally cleaned.

1.10

Filter medium installed and clean.

1.11

Pressure difference monitor installed.

1.12

Tag No. visible and correct

1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G04 Sound Attenuators
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Protective coating complete.

1.04

Internally cleaned.

1.05

Baffles properly fixed.

1.06

Adequately supported.

1.07

External condition.

1.08

Tag No. visible and correct.

1.09
1.10
1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G05 Steam Humidifiers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm/Record type of humidifier.

1.02

Installed according to specifications and drawings.

1.03

Check nameplate data against data sheet.

1.04

Protective coating complete.

1.05

Automatic drain down installed.

1.06

Manual drain fitted.

1.07

Inspect pipes/nozzles.

1.08

Check water supply.

1.09

Adequately supported.

1.10

Internally cleaned.

1.11

Maintenance panel fitted.

1.12

Tag No. visible and correct.

1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G06 Heating/Cooling Coils
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm type of Coil.

1.02

Confirm Medium.

1.03

Installed according to specifications and drawings.

1.04

Check nameplate data against data sheet.

1.05

Protective coating complete.

1.06

Internally cleaned.

1.07

Inspect pipes/nozzles.

1.08

Adequately supported.

1.09

Maintenance hatch fitted.

1.10

Tag No. visible and correct.

1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G07 Air Terminal Units
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Protective coating complete.

1.04

Adequately supported.

1.05

Mixing box with actuator installed.

1.06

Heating battery installed.

1.07

Insulation complete.

1.08

Internally cleaned.

1.09

Constant air volume regulator installed.

1.10

Maintenance hatch fitted.

1.11

Tag No. visible and correct.

1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


G08 HVAC Ducting
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg

Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm position :- From:

1.02

Installed according to specifications and drawings.

To:

1.03

Protective coating complete.

1.04

Fireproofing complete.

1.05

Thermal insulation complete.

1.06

Internally cleaned.

1.07

Adequately supported.

1.08

Balancing dampers correctly set.

1.09

Supply / Extract grills fitted.

1.12
1.13
2

Testing :

2.01

Air leak test after installation.

2.02

Air leakage test certificate attached.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

INSTRUMENT MC FORMS
J01

Instrument Cables

J02

Instruments (incl piping/tubing)

J03

Control Valves

J04

Safety Relief Valves

J05

Control Panels

J06

Instrument Junction Boxes

J07

Instrument Calibration

J08

Valve Calibration

J09

Instrument Pre-installation Test Inspection

J10

Loop Test Record

J11

Fire & Gas Loop

J12

Orifice Plate Calibration/Installation

J13

Optical Fibre Cable

J16

Bursting Disc

06-Oct-2000 14:58

Page: 4

MC Inspection & Test Record


J01 Instrument Cables
Rev : 0
CP No:

MC Package No:
Description:
Reference Drawings :

Components :

Check :

Installation Checks :

Check :

Check :

Rods :

1 : Components noted have been installed.

4 : Rods to correct position.

Wire :

2 : Lock nuts installed.

5 : Cable joints visually inspected.

Insulated Cable :

3 : Cable / Wire bends within radius.

6 : Labelling correct.

Cable / Item :

CableType:

From:

To:

Resistance

Comments:

m Ohms
m Ohms

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
05-Oct-2000 11:12

Page: 1

MC Inspection & Test Record


J02 Instruments (incl piping/tubing)
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

LineNo

P.O Package

P & ID

Data Sheet

Loop Dwg No

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check instrument against data sheet and manufacturer's data plate.

1.02

Record Serial No. of instrument.

1.03

Instrument installed according to specifications.

1.04

Location in accordance with drawings and requirements.

1.05

Instrument supported properly.

1.06

Instrument has good service ability.

1.07

Instrument Tag.No. affixed and traffolyte label visible.

1.08

Flow direction correct.

1.09

Functional Test completed. Refer to calibration certifcate J07 or J08 (as applicable).

1.10

Instrument enclosure mounted correctly.

1.11

Instrument enclosure weather tight.

1.12

Electrical heater in enclosure operational.

1.13
2

Instrument earthing complete.


Instrument Piping/Tubing :

2.01

Confirm type of hook-up :- Process/Pneumatic/Hydraulic.

2.02

Correct piping/tubing used.

2.03

Piping/Tubing supported properly.

2.04

Piping/Tubing heat tracing checked.

2.05

Instrument tubing fittings correctly installed.

2.06

Are slopes on piping/tubing as specified.

2.07

Leak-Pressure Test : Has piping/tubing been tested to specification.

2.08

Confirm test pressure.

2.09

Piping/Tubing cleaned with dry air.

2.10

All dirt and cutting debris removed from Piping/Tubing .

2.11

Piping/Tubing chemically cleaned.

2.12

Piping/Tubing 'Hot-Oil' flushed.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J03 Control Valves
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

LineNo

P.O Package

P & ID

Data Sheet

Loop Dwg No

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Valve according to data sheet.

1.02

Position and orientation correct.

1.03

Direction of flow correct.

1.04

Labelling correct.

1.05

Position/Booster correctly installed.

1.06

Flange bolts tight.

1.07

Correct gasket.

1.08

Air supply to actuator installed.

1.09

Check if valve can be removed for service.

1.10

Tag No. visible and correct.

1.11
1.12

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J04 Safety Relief Valves
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

Set Pressure

P.O Package

Line No

Data Sheet

P & ID

Supplier

DwgNo

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check valve in accordance with data sheet.

1.02

Record serial number.

1.03

Record design Set Pressure (barg).

1.04

Check/Record calibration procedure used.

1.05

Record medium used.

1.06

Record seat lift pressure. (Barg)

1.07

Record seat reseat pressure. (Barg)

1.08

Bubble leak test. (per min)

1.09
1.10
2

Re-installation Checklist :

2.01

Record re-installation date.

2.02

Reinstallation check :- Gaskets, Flanges, bolts etc.

2.03

Tag No. visible and correct.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J05 Control Panels
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

P & ID

P.O Package

DwgNo

Data Sheet
Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Correct control panel according to data sheet and manufacturer's data plate.

1.02

Installation according to specifications.

1.03

Location in accordance with layout drawing.

1.04

No mechanical damage.

1.05

Equipment Tag No., labeling and warning marks visible, easily readable and installed in accordance
with specifications.

1.06

Nuts and bolts tight.

1.07

Paintwork good.

1.08

Earthing correct.

1.09

Earthing and termination securely tight.

1.10

Protection of 'Live' parts correct.

1.11

All cables and auxilliary wiring neat and undamaged.

1.12

Terminal blocks and segregation plates correct.

1.13

Anti-condensation heater correctly installed.

1.14

Pneumatic installation in panel correct.

1.15

Tag No. visible and correct.

1.16

All fuses/MCBs are correct rating.

1.17

Check panel interior is free from dust and debris.

1.18
1.19
1.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J06 Instrument Junction Boxes
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

Type

P.O Package

Dwg No

Data Sheet

Cable No

Supplier

Hook up dwg

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

NOTE : REFER TO RELEVANT CABLE TEST RECORDS FOR TERMINATION CHECKLIST ITEMS

1.02

Check correct junction box installed according to drawing and area classification.

1.03

Labelling and numbering correct.

1.04

Junction box mechanically sound, solidly and correctly mounted.

1.05

Correct type of cable glands and glands tightened.

1.06

Earthing / bonding / shrouding correct.

1.07

Spare holes plugged (i.e. unused cable entries).

1.08

All nuts, bolts and washers in place and secure.

1.09

Gaskets in place and correct.

1.10

Terminal blocks correct type and mechanically sound.

1.11

Junction box located correctly to allow easy access for maintenance.

1.12

Tag No. visible and correct.

1.13

Drain plug installed.

1.14
1.15
1.16
1.17

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J07 Instrument Calibration
Rev : A
Tag No:

CP No:
MC No:

LDR No :

PCDA Ref. No :

Location

Hookup Dwg

Data Sheet

P & ID

Supplier

Layout Dwg

Loop Dwg

Remarks

Input using :

Unit:

Output
Rising / Switching:

Unit:

Switches:

Unit:

Input
Falling:

Unit:

Output
Falling / Switching:

Unit:

Input falling / rising:

Contacts open at
Contacts close at

Item:
1

OK N/A PL Result/Data:
Instrument (Data) :

1.01

Record Serial Number:

1.02
2

Record instrument calibration results in table above.


Switches (Data)

2.01
3

Record switches calibration results in table above.


Additional Checklist Items :

3.01

Overrange checked to (no calibration change observed):

3.02

Note : 'CALIBRATED' - label affixed:

3.03

Record Test instruments used.

3.04

Record Test instrument serial numbers.

Comments:

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

MC Inspection & Test Record


J08 Valve Calibration
J08
Tag No.
CP No:
MC No:
LDR No.

PCDA Ref.No.

Location

Hookup Dwg

Data Sheet

P & ID

Supplier

Layout Dwg

Loop Dwg

Remarks

Item:
1

Valve (Data) :

1.01

Record Serial Number:

Calibration Results:

2.01

Record calibration results in the table below.

Inspection A

3.01

Opening time (0 - 100%)

3.02

Fail Safe function tested

3.03

Is valve moving smoothly and continuously

3.04

Backup accumulator filled

3.05

Valve operated with accumulator

3.06

Limit switches function checked

3.07

Test instrument

3.08

'CALIBRATED' label affixed

3.09

Valve position transmitter 0 - 100% closed - open 4 - 20 mA output

3.10
3.11
3.12
4

Inspection B

4.01

Closing time (100 - 0%)

4.02

Fail Safe function tested

4.03

Valve checked for leakage

4.04

Nitrogen precharged to ( BARG )

4.05

Number of strokes, starting from the 'Non-Fail Safe' position.

4.06
4.07
4.08

Comments:

Valve Input Signal (primary) to


Positioner / Pilot :

Unit:

Actuator (secondary)
Input Signal

Unit:

Valve
Opening
100 %

Open

75 %
50 %
25 %
0%

Close

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 9-Oct-00 15:31

MC Inspection & Test Record


J09 Instrument Pre-installation Test Inspection
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Supplier

Model

P & ID

SerialNo

Manufacturer
DataSheet

Item:
1

OK N/A PL Result/Data:
Inspection Checklist

1.01

Check that instrument & data plate is correct according to data sheet

1.02

Check that a Valid Ex Certification is supplied with Instrument

1.03

Check that a Valid Calibration Certificate is supplied with Instrument. See note 1.

1.04
2

Check for mechanical damage.


Testing Cecklist - Standard Instruments

2.01

Remove all shipping stops

2.02

Connect test equipment and power up instrument

2.03

Simulate process input and verify that instrument functions correctly according to data sheet

2.04

Check calibration according to calibration certificate

2.05
3

Replace all shipping stops and ensure preservation


Testing Checklist - Valves

3.01

Remove all shipping stops

3.02

Connect test equipment & air supply

3.03

Check that valve moves smoothly and continuously

3.04

Check air failure mode according to data sheet

3.05

Check calibration according to calibration certificate

3.06

Check & record failure to opening time

3.07

Check & record failure to closing time

3.08

Carry-out SOV energise/failure check

3.09

Check Limit Switches

3.10
4

Replace all shipping stops & ensure preservation


Testing Checklist - Displacers ( float type)

4.01

Remove all shipping stops

4.02

Connect test equipement & power up instrument

4.03

Apply simulated weight to displacer to verify presence of output signal

4.04
5

Replace all shipping stops & ensure preservation


Test Cecklist - Inline Instruments

5.01

Remove all shipping stops

5.02

Connect test equipment & power up instrument

5.03

Apply simulated process action to verify presence of output signal

5.04
6

Replace all shipping stops & ensure preservation


Note: Sub-Contractor shall provide a valid calibration Certificate when manufacturer Certificate is not
supplied with equipment.

6.01

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J10 Loop Test Record
Rev : A
Loop No:

P&ID Ref:

Field Tags:

PCDA Tags:

LDR No:

PCDA Ref.No:

Item:
1

CP No:

OK N/A PL Result/Data:
Inspection Checklist (Before Loop Test) :

1.01

Check that all loop components are listed above are correct.

1.02

Process isolated.

1.03

All field items in the loop calibrated.

1.04
2

PCDA system included in the loop check. (NOTE: IF LOCAL FIELD LOOP, ENTER 'NO').
Inputs (Simulate process input then check 1, 2, and 6 )

2.01

Check that transmitter at 0, 25, 50, 75, 100% is within tolerance.

2.02

Check switchpoint and that reset point is within tolerance.

2.03

Check valve(s) position transmitter/limit switches with regard to valve position, and indication on PCDA.

2.04

Simulate 0, 25, 50, 75, 100% of range of thermo-couples and RTDs' to PCDA.

2.05

Check T/Cs' and RTDs' field temperature on PCDA. If not possible, check wiring/polarities and type of
sensors.

2.06

Check that indicators at 0, 25, 50, 75, 100% correspond with transmitter output.

2.07

Check PCDA software alarms (analog).

2.08

Check that analog range and engineering units on PCDA correspond with field device.

2.09

Check digital alarms.

2.10

Check status indications and interlock signals from MCCs', vendor packages, PSD, ESD etc.

2.11

Check raw signals. These cannot be found on nominal graphic or status screen.

2.12
3

Check signal appears on correct graphic display.


Treatment :

3.01

Check pneumatic controllers operation and balance of output.

3.02

Check standard software controller. (Direct/Reverse action etc.)

3.03
4

Check special treatment (Cascade-controller, selector, gap-controller etc.)


Outputs :

4.01

Check that manual output 0, 25, 50, 75, 100% from controller correspond with valve position.

4.02

Check solenoid and/or switch output function.

4.03

Record travel time for valve : to open / to close (sec)

4.04

Check PSD trip according to Cause & Effect diagram.

4.05

Check visual, audible and printout message of alarms.

4.06
5

Operate complete loop at 50% and Auto. Observe direction of valve movement with respect to P&ID.
Work After Loop Check :

5.01

Filling fluids completed.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

SubContractor

EPCS

Company

Name :
Sign :
Date :
Printed: 9-Oct-00 15:32

MC Inspection & Test Record


J11 Fire & Gas Loop
Rev : A
Drwg.Ref:

Loop No:
Field Tags:

PCDA Tags:

LDR No:

PCDA Ref.No:

Item:
1

CP No:

OK N/A PL Result/Data:
Gas Detector

1.01

Isolate power to gas detector and install gas head collection cone and scrubber, ensure tag is affixed

1.02

For gas detectors not in aspirators, calibrate according to item 4 below

1.03

Calibrate detector & record results (enable inhibits are on during alarm settings & calibration) ensure
PCDA override

1.04a

Gas detector Serial No:

1.04b

Resitance referance element ( in Ohms ):

1.04c

Alarm setting low ( in % LEL ):

1.04d

Module zero ( in free air ):

1.04e

Test Gas ( in % Propane in air ):

1.05

Check alarms, accept and resets:

1.06

Check fault indication by O/C & S/C:

1.07
2

Test Gas Certificate No:


Resitance measuring element ( in Ohms ):
Alarm setting high ( in % LEL ):
Reading ( % LEL ):

Restore gas modules & system to normal, remove overrides:


PCDA Alarm Outputs

2.01

Simulate output alarm by coincidence gas, smoke or heat (ensuring all other output trips are isolated)

2.02

Check correct contact function at associated PCDA input termination rack

2.03

Reset alarm & ensure trip contact reset to normal

2.04
3

Remove isolation from switchboard and inform electrical supervisor


Open Path IR Gas Detectors

3.01

Check for stability, physical protection and obstructions.

3.02a

Check calibration - adjust as necessary

3.02b

Alarm setting low ( in % LEL ):

3.02c

Module zero ( in free air ):

3.02d

Test Gas/Filter ( in % Propane in air ):

3.02e

Check alarms, accept and resets:

3.03
4

Alarm setting high ( in % LEL ):


Reading ( % LEL ):

Restore gas modules & system to normal, remove overrides:


Smoke, Heat, Flame Detectors & Manual Call Buttons

4.01

Check end of line resistor fitted in last device in loop

4.02

Check F&G panel has no fault indicators for loop under test

4.03

Ensure any necessary output isolations are on

4.04

Check each detector operates correctly by simulating alarm condition, smoke, heat etc

4.05

For each smoke detector in loop, simulate smoke using approved test medium and check alarm on F&G
panel

4.06

Check flame lens is clean

4.07a

Check detector is covering intended area by using the IR/uV test gun and aiming at detector to find limits
of alarm.

4.07b

Check alarms are on correct graphic display. Check alarm printout message.

4.08

Check each manual alarm push button in the loop alarms

4.09

Check alarms, accept & reset

4.10
5

Check fault indication by O/C & S/C


Lamps / Beacons

5.01

Ensure relevant lamp in each loop operates upon simulating power at output terminals

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J12 Orifice Plate Calibration/Installation
Tag No.
Comm. Pack No:
Location

Line No
P & ID

Data Sheet

Component

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm Orifice Tag No. stamped correctly.

1.02

Record specified I.D.

1.03

Record Actual I.D. (at position A)

1.04

Record Actual I.D. (at position B)

1.05

Record specified O.D.

1.06

Record actual O.D.

1.07

Record specified plate thickness.

1.08

Record actual plate thickness.

1.09

Confirm flatness acceptable.

1.10

Confirm material correct.

1.11

Confirm weep hole position Top/Bottom

1.12

Sign/Date for Calibration Verification - Contractor

1.13

Sign/Date for Calibration Verification - KUP Construction

1.14
2

Sign/Date for Calibration Verification - KUP Commisiioning


Re-installation Checklist :

2.01

Record re-installation date.

2.02

Reinstallation check :- Gaskets, Flanges, bolts etc.

2.03

Tag No. visible and correct.

2.04

Sign in boxes at foot of certificate for installation correctly completed.

Comments:

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.

SubContractor

EPCS

Company

Name :
Sign :
Date :
Printed: 9-Oct-00 15:34

MC Inspection & Test Record


J13 Optical Fibre Cable
Rev : 0
CP No:

Tag No:
Descr:

MC No:

From

Location

To

Service

Cable Type

Remarks

Size/Core

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check cable against specification and drawings.

1.02

Check cable against Data Cable Schedule.

1.03

Check labelling, numbering and ferruling correct.

1.04

Check clamping and cleating correct.

1.05

Check glanding, locknuts and shrouding correct.

1.06

Check cable grouping correct.

1.07

Check cable mechanically protected.

1.08

Check cable terminated correctly.

1.10

Check cable bending radius correct.

1.11

Check bending radius for each fibre when terminated.

1.12

Check armouring is earthed.

1.13
1.14
1.15
1.16
2

Check Attenuation (dB/km)

2.01

Pair Number 01 :

Fibre 1 :-

Fibre 2 :-

2.02

Pair Number 02 :

Fibre 1 :-

Fibre 2 :-

2.03

Pair Number 03 :

Fibre 1 :-

Fibre 2 :-

2.04

Pair Number 04 :

Fibre 1 :-

Fibre 2 :-

2.05

Pair Number 05 :

Fibre 1 :-

Fibre 2 :-

2.06

Pair Number 06 :

Fibre 1 :-

Fibre 2 :-

2.07

Pair Number 07 :

Fibre 1 :-

Fibre 2 :-

2.08

Pair Number 08 :

Fibre 1 :-

Fibre 2 :-

2.09

Pair Number 09 :

Fibre 1 :-

Fibre 2 :-

2.10

Pair Number 10 :

Fibre 1 :-

Fibre 2 :-

2.11

Pair Number 11 :

Fibre 1 :-

Fibre 2 :-

2.12

Pair Number 12 :

Fibre 1 :-

Fibre 2 :-

2.13

Pair Number 13 :

Fibre 1 :-

Fibre 2 :-

2.14

Pair Number 14 :

Fibre 1 :-

Fibre 2 :-

2.15

Pair Number 15 :

Fibre 1 :-

Fibre 2 :-

2.16

Pair Number 16 :

Fibre 1 :-

Fibre 2 :-

2.17
2.18
2.19
2.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


J16 Bursting Disc
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

Line No

P.O Package

P & ID

Data Sheet

DwgNo

Supplier

Item:
1

OK N/A PL Result/Data:
Pre-Installation Inspection Checklist :

1.01

Check against data sheet and manufacturer's data plate/markings.

1.02

Record Serial No. of bursting disc.

1.03
2

Check that there is no physical damage.


Post-installation Inspection Checklist :

2.01

Location in accordance with drawings and requirements.

2.02

Installed in correct orientation.

2.03

Tag.No. affixed and traffolyte label visible.

2.04

Check bolt, nuts and gaskets correct, with bolts correctly tightened.

2.05

Check cabling correctly terminated, glanded.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

PIPING MC FORMS
L01

Piping :- Flushing/Testing/Drying.

L02

Reinstatement Check List

L03

Piping :- Chemical Cleaning

L04

Piping: Hot Oil Flushing

L05

Piping : Video Inspection

L06

Orifice Flanges

L07

Bolt Tensioning

L08

Steam Blowing

11-Oct-2000 11:14

Page: 5

MC Inspection & Test Record


L01 Piping :- Flushing/Testing/Drying.
Rev : B
CP No:

Test Pack No :

Flushing :
Pressure Testing :

Flush Date :

Flush Medium :

Flush Temperature:

Ambient Temperature:

Test Date :

Test Medium :

Water Chloride Content (%) :

Design Pressure :

Test Pressure :

Test Start Pressure :

Test Finish Pressure :

Test Duration :

Test Type :

Hydrostatic :

Static Head :

Service Test :

Pneumatic :

Visual Only :

Alternative :

Leak Test :

NDE Only :

Reference Concessions Request Nos :

Specify ..............................
Test Equipment Serial Nos or Reference Nos:

List Combined Test Nos:

Drying Started (Date/Time) :

Final Dew Point Inlet :

Drying Completed (Date/Time) :

Final Dew Point Outlet :

Drying :
Duration of Drying :

Isometric No :

Rev: Line No :

Orig.P&ID :

QC Released:

Contr.:

KUP:

Release for Testing :

Contr:

KUP:

ACCEPTANCE

Flushed
Name/Date/Sign.

Tested
Name/Date/Sign.

Dried
Name/Date/Sign.

Remarks :

Reinstated
Name/Date/Sign.

Contractor
KUP Construction
Other:KUP Commissioning
Printed: 5-Oct-00 12:25

MC Inspection & Test Record


L02 Reinstatement Check List
MC Package No :

CP No:

Description :
Item:
1

OK N/A PL Result/Data:
Inspection Check List:

1.01

Flushing and hydrostatic testing have been satisfactory completed

1.02

All items used for testing / flushing removed

1.03

Correct bolts and gaskets are installed at all mechanical joints

1.04

All nuts are pulled to required tihtness

1.05

All flange faces are parallel and no visible damage to gaskets

1.06

Sealant on screwed connections is as pre specification

1.07

All vents and drains are correctly installed

1.08

All temporary vents and drains comply with specification

1.09

All process blinds and spades have been installed as indicated on PID

1.10

Spectacle blinds are in the correct flow position

1.11

All pipe cleaning and pickling has been satisfactory completed

1.12

Control valves have been installed in the correct flow position

1.13

Specified block valves have locking devices correctly installed

1.14

All valves are functioning properly and that spindle has been lubricated

1.15

All spindles and chain wheels have been correctly installed

1.16

All relief valves have been correctly installed

1.17

All gauges have been correcty installed

1.18

Restriction and orifice plates have been correctly installed

1.19

All pump suction strainers have been correctly installed

1.20

Correct flow through filters and strainers, traps, check and globe valves

1.21

All gags have been removed from spring supports and expansion bellows

1.22

All pipe seals have been correctly fitted

Comments:

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 11-Oct-00 12:16

MC Inspection & Test Record


L03 Piping :- Chemical Cleaning

CP No:

MC Package No:
Description:
Chemical Cleaning :

Drying :

Pickling Number :

Actual Pickling Date :

Drying Started (Date/Time) :

Pickling Specification :

Pickling Temperature :

Drying Completed (Date/Time) :

Pickling Procedure :

Pickling Duration :

Final Dew Point Inlet :

Pickling Medium :

Final Dew Point Outlet :

Duration of Drying :

Design Iso / Tag No

Iso Rev Line No :

Orig.P&ID :

Remarks :

Client Release for Chemical Cleaning :


Name:

Sign:

Chem. Cleaned
Name/Date/Sign.

Dried
Name/Date/Sign.

Date:

Reinstated
Name/Date/Sign.

Contractor
KUP Construction
Other:KUP Commissioning
Printed: 11-Oct-00 13:17

MC Inspection & Test Record


L04 Piping: Hot Oil Flushing
Rev : 0
CP No:

MC Package No:
Description:

Item:
1

OK N/A PL Result/Data:
Inspection Check List:

1.01

Bearings bypassed and blinded/plugged.

1.02

Piping/Equipment chemically cleaned.

1.03

Reservoir clean and accepted prior to oil filling.

1.04

Type of flushing oil correct.

1.05

Sample points correct.

1.06

Microscopic evaluation of test samples.

1.07

Marked up PID's attached.

1.08

Hot oil flushing log attached

1.09

Laboratory analyses completed.

1.10

Reservoir clean after flushing.

1.11

New filter of correct type installed.

1.12

Initial fill of operational oil.

1.13

System/Equipment tagged/labelled.

1.14

Associated systems accepted.

1.15

System/Equipment reinstated.

Design Iso / Tag No

Iso Rev

Contractor
Name :
Sign :
Date :

Line No:

KUP Construction

Orig.P&ID

Other:-

Remarks

KUP Commissioning

MC Inspection & Test Record


L05 Piping : Video Inspection

MC Package No:

CP No:

Description:
Video Inspection Scope :

Ref. Cassette No :

Entry point :

Isometric No/Tag No

Iso Rev

Line No

Video Inspected
Name/Date/Sign.

Orig.P&ID

Extent(Spools)/Remarks

Test Ref

Reinstated
Name/Date/Sign.

Contractor
KUP Construction
Other:KUP Commissioning
Printed: 11-Oct-00 12:10

MC Inspection & Test Record


L06 Orifice Flanges
Rev : 0
CP No:

Tag No:
Description:

MC No:

Location

P&ID

P.O. Package

Design Isometric

Module

Shop Isometric

Supplier

Shop Isometric

Item:
1

OK N/A PL Result/Data:
Inspection : (UPSTREAM FLANGE)

1.01

Verify upstream flange orientation correct (tappings)

1.02

Verify weld root ground flush

1.03

Record Design Isometric No. above

1.04

Record Shop Isometric No. above

1.05

Record Spool No.

1.06

Record Weld No.

1.07

Name :
..

1.08

Sign :
..

1.09

Date :
..

1.10

Location where verification performed


(Supplier, Module Yard, Site or specify other location)

Inspection : (DOWNSTREAM FLANGE)

2.01

Verify downstream flange orientation correct (tappings)

2.02

Verify weld root ground flush

2.03

Record Design Isometric No. above

2.04

Record Shop Isometric No. above

2.05

Record Spool No.

2.06

Record Weld No.

2.07

Name :
..

2.08

Sign :
..

2.09

Date :
..

2.10

Location where verification performed


(Supplier, Module Yard, Site or specify other location)

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


L07 Bolt Tensioning
Rev : 0
CP No:

Tag No:
Description:

MC No:

Location

P&ID

P.O. Package

Design Isometric

Module

Shop Isometric

Supplier

Shop Isometric

Item:
1

OK N/A PL Result/Data:
Field Checklist

1.01

All joints labelled.

1.02

All bolts have plastic caps installed.

1.03
1.04
2

Documentation

2.01

Contractor marked-up and stamped drawings complete and enclosed.

2.02

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


L08 Steam Blowing
Rev : 0
CP No:

Tag No:
Description:

MC No:

Location

P&ID

Scope

Main Line No.

Item:
1

OK N/A PL Result/Data:
Data :

1.01

Steam source (e.g. Boiler Tag No.)

1.02

Target Plate No.01 material

1.03

Target Plate No.01 size

1.04

Target Plate No.02 material

1.05

Target Plate No.02 size

1.06

Extent of blowing marked-up on P&IDs and attached.

1.07
1.08
2

Pre-Blow Checklist :

2.01

Check silencer location with respect to underground cableworks and pipework (to avoid potential
damage).

2.02

All related piping is fully mechanical completed (including MC documentation).

2.03

Re-check that all sliding supports are free to move.

2.04

Re-check that all support anchors are installed as per design drawings.

2.05

Recheck that supports do not allow excess lateral movement.

2.06

Re-check that all test vent/drain plugs are installed.

2.07

Steam start-up vents available and complete.

2.08

All temporary blow-off piping connected and secure.

2.09

Quick-Release sacrifical valve installed and correct.

2.10

Check that all combustible materials (e.g. wood or plastics) are removed (potential fire hazard).

2.11

Barriers and safety signs erected around area.

2.12

Extent of temporary insulation or personnel protection is adequate (may only require barriers).

2.13
2.14
3

Noise Control :

3.01

Silencer connected and secure

3.02

Water injection system connected and functional

3.03
3.04
4

Steam Blowing Activities/Results :

4.01

Record Date and Time steam blowing activities commenced.

4.02

Duration of initial header heating.

4.03

Number of blows prior to use of target plate(s).

4.04

Record number of blow to target to achieve acceptable result.

4.05

Record Date and Time steam blowing activities accepted.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

MECHANICAL MC FORMS
M01

Heat Exchangers

M02

Vessels & Tanks

M03

Diesel Engines

M04

Centifugal Pumps

M05

Reciprocating Machinery

M06

Submerged Pumps

M07

Manual Hoists, Monorails and Jibs.

M08

Powered Hoists and Cranes

M09

Belt Driven Machinery Alignment

M10

Compressors

M11

Steam Turbines

M12

Gear Units

M13

Refrigeration Compressor Packages

M14

Mixers

M15

Blowers

M16

Sanitary, Sewage & Treatment Plant

M17

Water Treatment Systems

M18

Water Softeners

M19

Flare Tips

M20

Flare Stack and Guys

M21

Centrifuge/Shakers

M22

Air Cooled Heat Exchangers

M23

Miscellaneous Equipment

M24

Fired Heaters

M25

Field Assembled Boilers

M26

Gas Turbines

M27

Machinery Pre-Alignment

M28

Machinery Final Alignment

M30

Final Closing of Vessels and Towers

M31

Pump/Driver Release

MDPL

Multi Discipline Punch List

06-Oct-2000 14:58

Page: 6

MC Inspection & Test Record


M01 Heat Exchangers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

Shell Design Press.

P.O. Package

Tube Design Press.

Data Sheet

Shell Design Temp.

Supplier

Tube Design Temp.

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check namplate data against data sheet.

1.02

Position and orientation correct.

1.03

Support and footings correct with sliding supports free to move.

1.04

Holding down bolts fitted.

1.05

Inspect internal lining.

1.06

Internal clean.

1.07

Jack screws retracted.

1.08

Check anodes are fitted.

1.09

Inspect floating head.

1.10

Inspection nozzles.

1.11

External condition.

1.12

Inspection date.

1.13

Date opened.

1.14

Date closed.

1.15

Plate exchangers. Correct number of plates.

1.16

Plate exchangers. Ring gaskets correct and in good condition.

1.17

Tag No. visible and correct.

1.18
1.19
1.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M02 Vessels & Tanks
Rev : A
CP No:

Tag No:
Descr:

MC No:

P.O. Package

Design Press. 1

LxWxH

Design Temp 1.

Data Sheet

Duty

Supplier

Design Capasity

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

Position and orientation correct.

1.03

Supports and footings correct.

1.04

Holding down bolts fitted.

1.05

Heating coils installed.

1.06

Nozzles (internal & external).

1.07

Internal fittings checked against Vendor drawings.

1.08

Internal coating.

1.09

Internal cleanliness.

1.10

External coating.

1.11

Inspection date.

1.12

Date opened.

1.13

Date closed.

1.14

Manway free to move.

1.15

Lubrication for davit.

1.16

API 650 - Standard Certificate (Tanks)

1.17

Tag No. visible and correct.

1.18
1.19
2

Testing :

2.01

Record bottom plate vacuum pressure.

2.02

Record period of vacuum test.

2.03

Record leak test pressure.

2.04

Record period of leak test.

2.05
2.06
3

Floating Roofs

3.01

Seals tested.

3.02

Pontoons tested.

3.03
3.04

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M03 Diesel Engines
Rev : A
CP No:

Tag No:
Descr:

MC No:

Description

AreaCode

Rev

PIDNo

SystemNo

DwgNo

Supplier

SuperTagNo

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check nanplate data against data sheet.

1.02

Position and orientation correct.

1.03

Mounting correct.

1.04

Holding down bolts fitted.

1.05

Shims correct.

1.06

Dowels fitted.

1.07

Aligment checked. (Ref. form M28)

1.08

Coupling checked.

1.09

Direction of rotation correct.

1.10

Lubricant type correct.

1.11

Lubrication level correct.

1.12

Grease points clear.

1.13

Lubricant oil filters fitted and correct.

1.14

Fuel oil lines checked.

1.15

Fuel stop valve checked.

1.16

Sight glasses checked.

1.17

Fuel oil filters checked.

1.18

Engine coolant system checked.

1.19

Radiator checked.

1.20

Belt tension checked.

1.21

Air intake clear.

1.22

Battery and starting circuit checked.

1.23

Exhaust checked.

1.24

Day Tank checked.

1.25

Barring gear checked.

1.26

Crankcase vent clear.

1.27

Inlet air stop valve.

1.28

External condition.

1.29

Lube oil system cleaned.

1.30

Fuel system cleaned.

1.31

Tag No. visible and correct.

1.32
1.33
1.34
1.35

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M04 Centifugal Pumps
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

P & ID

P.O. Package

Arrgm. Drwg

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Position and orientation correct.

1.04

Mounting correct.

1.05

Holding down bolts fitted.

1.06

Dowels fitted.

1.07

Alignment checked. (Ref. form M28)

1.08

Spacer type coupling installed.

1.09

Coupling guard of non sparking marterial installed.

1.10

Coupling enclosed to prevent access to rotating parts.

1.11

Coupling component match markings performed.

1.12

All coupling bolts fitted.

1.13

Jack screw and driver fitted.

1.14

Lubricant correct

1.15

Constant oiler fitted.

1.16

Oil throwers free.

1.17

Grease points clear.

1.18

Gland cooling fitted.

1.19

Seal fitted.

1.20

Packing fitted.

1.21

Balance line clean.

1.22

Pump case drain valved.

1.23

Pump case drain clear.

1.24

Base plate drain pan line installed.

1.25

Pump vent valved.

1.26

Pump vent clear.

1.27

Shims pack for driver installed (min. 3mm - max. 6mm).

1.28

Suction valve access.

1.29

Inlet strainer access.

1.30

Pump turns by hand.

1.31

Seal flushing and quench.

1.32

Permanent strainer installed

1.33

Direction of rotation arrow correct.

1.34

Tag No. visible and correct.

1.35
1.36
1.37
1.38

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M05 Reciprocating Machinery
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Position and orientation correct.

1.04

Resillient mountings correct.

1.05

Shims correct.

1.06

Holding down bolts fitted.

1.07

Dowels fitted.

1.08

Alignment checked. (Ref. form M28)

1.09

Coupling fitted.

1.10

All coupling bolts fitted.

1.11

Coupling guard fitted.

1.12

Crankcase cover secure.

1.13

Crankcase vent clear.

1.14

Crankcase drain clear.

1.15

Stroke controller correct.

1.16

Lube oil system clean.

1.17

Lubricant type.

1.18

Lube oil correct.

1.19

Lubricating lines clear/ Lube oil system cleaned

1.20

Oil filters coorect.

1.21

Oil level gauges fitted.

1.22

Constant oiler fitted.

1.23

Cooling media.

1.24

Cooling lines clear.

1.25

Exchanger anodes fitted.

1.26

Air intake filter clean.

1.27

Relief valve correct and adjusted.

1.28

Discharge valve access.

1.29

Diaphragm leak detection correct.

1.30

Permanent strainer installed.

1.31

Vibration monitoring fitted.

1.32

Barring gear checked.

1.33

Tag No. visible and correct.

1.34
1.35
1.36

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M06 Submerged Pumps
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrng. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Direction of rotation correct.

1.04

Position and orientation correct.

1.05

Mounting correct.

1.06

Holding down bolts correct.

1.07

Dowels fitted.

1.08

Caisson installed.

1.09

Coupling checked.

1.10

Lubricant type correct.

1.11

Lubricant level correct.

1.12

Gas tight mounting plate.

1.13

Seals fitted.

1.14

Coupling guard fitted.

1.15

Lubricant lines fitted.

1.16

Rotor clearance.

1.17

Suction strainer.

1.18

Discharge valve access.

1.19

Tag No. visible and correct.

1.20

Pump riser / delivery line fitted.

1.21
1.22
1.23
1.24
1.25

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M07 Manual Hoists, Monorails and Jibs.
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Tag No. visible and correct.

1.04

Monorail installation.

1.05

Endstops installed.

1.06

Yellow / zebra stripes painted.

1.07

Marking 'Safe Working Load' (SWL).

1.08

Lifting radius coverage.

1.09

WedlingNDT accepted/documented.

1.10
2

Confirm Monorail Number.


Inspection of Trolley :

2.01

Confirm Trolley Tag No.

2.02

Trolley in correct location.

2.03

Confirm Trolley SWL

2.04

Record Trolley Serial No.

2.05

Trolley correctly installed.

2.06

Trolley spark proof.

2.07
3

Trolley wheels position correct.


Inspection of Hoist :

3.01

Confirm Hoist Tag No.

3.02

Hoist in correct position.

3.03

Confirm Hoist SWL.

3.04

Record Hoist Serial No.

3.05

Hoist spark proof.

3.06
4

CE certification / documentation
Testing :

4.01

Record Trolley test date.

4.02

Record Hoist test date.

4.03

Record Trolley Certificate No.

4.04
5

Record Hoist Certificate No.


Functional Test :

5.01

Functional test of Trolley.

5.02
6

Functional test of Hoist.


Installation Test :

6.01

Record installation test :- Test Load.

6.02

Deflections test results.

6.03

Record Installation Test Certificate No. issued.

6.04

Record Installation Test Certificate date of issue.

6.05

Permanent deflection.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M08 Powered Hoists and Cranes
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1. 03

Tag No. visible and correct.

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.04

Correct orientation.

1.05

Radius of coverage.

1.06

Rail installation.

1.07

Bridge installation.

1.08

Hoist stops installed.

1.09

NDT complete on rail installation.

1.10

Welding/NDT accepted and documented.

1.11

Rail(s) identification.

1.12

Inspect bridge condition.

1.13

Inspect trolley condition.

1.14

Inspect hoist condition.

1.15

Inspect enclosed gears (including lubrication & lubricant type).

1.16

Inspect open gears (including lubrication & lubricant type).

1.17

Inspect wire guides.

1.18

Inspect wire clamps.

1.19

Inspect drum(s) ans sheaves.

1.20

Inspect grease points.

1.21

Inspect if wire correct and lubricated.

1.22

Record Wire Certificate No.

1.23

Record Load Hook Certificate No.

1.24

CE certification / documentation

1.25
2

Anti-condensation heater installed


Functional Test

2.01

Record Test Load

2.02

Run test - Bridge.

2.03

Run test - Trolley.

2.04

Run test - Hoist.

2.05

Record date performed.

2.06

Limit switches - Bridge.

2.07

Limit switches - Trolley.

2.08
3

Record Issued Certificate No.


Installation Test

3.01

Test Load.

3.02

Deflection test.

3.03

Overload protection set point.

3.04

Inspection for visible defects.

3.05

Record date performed.

3.06

Permanent deflection.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M09 Belt Driven Machinery Alignment
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm installed according to specifications and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Record belt manufacturer.

1.04

Record belt number.

1.05

Record type and size of belt.

1.06

Number of belts fitted.

1.07

Antistatic.

1.08

Confirm belt guard fitted.

1.09

Confirm belt tensioning fiited.

1.10

Tag No. visible and correct.

1.11
1.12
2

Alignment :

2.01

Drive and pulley checked for being in plane.

2.02

Confirm method alignment method used (detail in comments below, if required).

2.03

Direction of rotation arrow fitted.

2.04

Rotates freely.

2.05
2.06
2.07

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M10 Compressors
Rev : B
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Alignment checked per Suppliers procedure

1.04

Nozzle loads within tolerances.

1.05

Check for freedom of movement and direction of rotation.

1.06

Bearing housing flushed and relubricated. Record date lubricated.

1.07

No external damper.

1.08

Paintwork intact.

1.09

Hand valves operable.

1.10

Coupling and bolts checked.

1.11

Drain valves and blinds fitted.

1.12

All pipework correctly fitted.

1.13

All controls, protective devices and auxilliary systems correct.

1.14

Barring gear interlock correct.

1.15

Pipe supports fitted and adjusted.

1.16

Maintenance access adequate

1.17

Lube oil system clean.

1.18

Holding down bolts checked.

1.19

Grouting complete and accepted.

1.20

Cooling system clean.

1.21

Seal Gas/Oil system clean.

1.22

Dust blinds installed / removed.

1.23

Tag No. visible and correct.

1.24
1.25
1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M11 Steam Turbines
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Baseplate level and properly grouted, jacksrews removed, foundations tightened.

1.04

Excess piping strain alleviated.

1.05

Final cold alignment to manufacturer's tolerance.

1.06

Check for freedom of movement and direction of rotation.

1.07

Bearing housing flushed and relubricated. Record date lubricated.

1.08

Check carbon packing.

1.09

Governor mechanism free and operable.

1.10

Hand valves operable.

1.11

Check sentinel valve (if supplied).

1.12

Over speed mechanism free and operable. Record Setting of Tripout (RPM)

1.13

Turbine doweled (when specified).

1.14

Casings drained.

1.15

Condenser operable.

1.16

All controls, protective devices and auxilliary systems correct.

1.17

Barring gear interlock correct.

1.18

Pipe supports fitted and adjusted.

1.19

Lube oil system clean.

1.20

Tag No. visible and correct.

1.21
1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M12 Gear Units
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

P & ID

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Baseplate level and properly grouted, jacksrews removed, foundations tightened.

1.04

Final cold alignment of driver to gear unit to manufacturer's tolerance. Record nominal coupling gap :-

1.05

Check for freedom of movement and direction of rotation.

1.06

Inspect internally for cleanliness. Flush and refill. Record lubricant type :-

1.07

Coupling lubricated and closed. Record lubricant type :-

1.08

Coupling guard in place and secured.

1.09

Dowelling complete (when specified).

1.10

All controls, protective devices and auxilliary systems correct.

1.11

Teeth mesh pattern complete.

1.12
1.13
1.14
1.15
1.16
1.17
1.18

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M13 Refrigeration Compressor Packages
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Baseplate level and properly grouted with jackscrews removed and foundations tightened.

1.04

Excess piping strain alleviated.

1.05

Final cold alignment to manufacturer's tolerance. Record nominal gap :

1.06

Check compressor and driver for freedom of movement.

1.07

Driver check for correct rotation (uncoupled).

1.08

Check level of lubricant. Record lubricant type :

1.09

Check motor bearing lubrication. Record lubricant type :

1.10

Add refrigerant as required. Record refrigerant type :

1.11

Belts installed or coupling lubricated and closed. Record lubricant type :

1.12

Belt or coupling guard in place and secure.

1.13

Compressor and driver dowelled (when specified).

1.14

Vents and drains correct.

1.15

Non-return valve fitted correctly.

1.16

Pressure safety valve setting correct.

1.17

All controls, protection devices and auxilliary systems correct.

1.18

Pipe supports fitted and adjusted.

1.19

Suction piping chemically cleaned.

1.20

Lube oil system clean.

1.21

Tag No. visible and correct.

1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M14 Mixers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Final cold alignment of driver to gear unit to manufacturer's tolerance. Record nominal coupling gap :

1.04

Check for freedom of movement and direction of rotation.

1.05

Inspect internally for cleanliness. Flush and refill. Record lubricant type :

1.06

Coupling lubricated and closed. Record lubricant type :

1.07

Coupling guard in place and secured.

1.08

Dowelling complete (when specified).

1.09

All controls, protective devices and auxilliary systems correct.

1.10

Compare record with nameplate.

1.11

Remove preservatives as necessary.

1.12

Holding down bolts secure, without any distortion.

1.13

Lube oil crankcase, or bearing housing is vented.

1.14

Ancilliary pipework installed correctly and connections tight.

1.15

Check position of impeller from bottom of vessel (via Vendor's drawings)

1.16

Check for transport damage.

1.17

Check that construction mods have been completed.

1.18

Tag No. visible and correct.

1.19
1.20
1.21
1.22
1.23
1.24
1.25

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M15 Blowers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Baseplate level and properly grouted. Jackscrews removed and foundations tightened.

1.04

Remove shipping preservatives from bearing and relubricate. Record lubricant type (when required) :

1.05

Excessive piping strain alleviated.

1.06

Final cold alignment to manufacturer's tolerance. Record nominal coupling gap :

1.07

Check blowers and drivers for freedom of movement.

1.08

Driver checked for correct rotation (uncoupled).

1.09

Gear unit checked per gear unit checklist (when applicable).

1.10

Bearing lube system chemically cleaned, flushed and operable. Record lubricant type :

1.11

Check motor bearing lubrication. Record lubricant type :

1.12

Belts installed or coupling lubricated and closed. Record lubricant type :

1.13

Belt or coupling guard in place and secured.

1.14

Blower and driver dowelled (when specified).

1.15

Casing drained.

1.16

Vents and drains correct.

1.17

Inlet guide vanes set correctly and operable.

1.18

Air filtration system correct.

1.19

All controls, protective devices and auxilliary systems correct.

1.20

Pipe supports fitted and adjusted.

1.21

Louvres set and operable.

1.22

Tag No. visible and correct.

1.23
1.24
1.25
1.26
1.27

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M16 Sanitary, Sewage & Treatment Plant
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

System checked for surface damage.

1.04

Skid No.1 (Aeration Basin, clarifier) anchored to foundation.

1.05

Catwalks, stairways and handrails installed.

1.06

Skid No.2 (Surface Basin) anchored to foundation.

1.07

Blowers installed on Aeration Basin.

1.08

Communitor installed on Surge Basin.

1.09

Transfer pumps installed in Surge Basin.

1.10

Check interconnecting piping : Transfer pump discharge line.

1.11

Check interconnecting piping : Pump discharge line from surge to aeration basin.

1.12

Check interconnecting piping : Overflow line.

1.13

Check interconnecting piping : Waste sludge line.

1.14

Check interconnecting piping : Air header connection.

1.15

Water supply line connected to chlorine mater control house.

1.16

Water supply connected to froth control system.

1.17

Electrical check : Pumps, communitor connected to junction box on Skid No.2.

1.18

Electrical check : Blower connected to local plant.

1.19

Electrical check : Junction box on Skid connected to local panel on Skid No.1.

1.20

Electrical check : Power supply connected to local panel.

1.21

MC check sheets completed for all tagged equipment.

1.22

Tag Nos. visble and correct.

1.23
1.24
1.25
1.26
1.27

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M17 Water Treatment Systems
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Skid mounted day tanks.

1.04

Injection pumps.

1.05

Control systems.

1.06

Bulk storage tanks.

1.07

Chlorinator.

1.08

Mixers.

1.09

Equipment anchored to foundation.

1.10

Structural supports anchored to foundations.

1.11

Pumps and drivers checked for freedom of movement.

1.12

Static mixers installed.

1.13

Chlorine gas line connected to chlorinator.

1.14

Water supply connected to chlorinator.

1.15

Solution lines connected.

1.16

Chlorinator vent connected.

1.17

Acid line connected.

1.18

Solenoid blow down valve installed.

1.19

Power supply connected.

1.20

MC check sheets completed for all tagged equipment.

1.21

Tag Nos. visible and correct

1.22
1.23
1.24
1.25
1.26
1.27

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M18 Water Softeners
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Check for surface damage :- a) Vessels.

1.04

b) Multiport valves.

1.05

c) Water meters.

1.06

d) Dilution water rate of flow indicator.

1.07

e) Brine meter.

1.08

Skid anchored to foundations.

1.09

Water meters installed.

1.10

Prefabricated items installed :- a) Inlet.

1.11

b) Outlet.

1.12

c) Wash and rinse outlet header.

1.13

d) Water meter.

1.14

Dilution water line connected.

1.15

Brine meter and brine rate set valve connected to regeneration brine line.

1.16

Connections complete :-

1.17

a) Water inlet.
b) Soft water outlet.

1.18

c) Raw brine to regeneration brine line.

1.19

d) Wash and rinse to drain.

1.20

Water softener resin filled.

1.21

Electrical :- Power supply connected.

1.22

Tag No. visible and correct.

1.23
1.24
1.25

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M19 Flare Tips
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02
2

Check nameplate and data against datasheet.


Flare Tip :

2.01

Check external surface for damages to flare tip pilot, assemblies and nozzles.

2.02

Check nozzle orientation and elevation.

2.03

Flare tip level and plumb.

2.04

Mounting bolts tightened.

2.05

Pilot burners correctly installed.

2.06

Correct number of thermocouples in place.

2.07

Identify and pipe all connections.

2.08

Ladder installed.

2.09

Visual inspection of welds.

2.10

Inspect and/or apply paint.

2.11
3

Thermocouples wired to the flame front generator.


Flame Front Generator Panel :

3.01

Flame Front Generator Panel : Check nameplate data against data sheet.

3.02

Visual inspection of gauge glass.

3.03

Hand valves operable.

3.04

Anchor bolts tightened.

3.05

Identify and pipe connections.

3.06

Check air flow through each flame generator pipe.

3.07

Alarm switch wired to main control panel.

3.08

Power connected to control panel.

3.09

Wind deflectors fitted.

3.10

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M20 Flare Stack and Guys
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check that all required permits are in files.

1.02

Ensure all start-up procedures are available (vendor instructions).

1.03
2

Ensure all temporary bracing etc. are removed.


Tests :

2.01

Panel and valve box tests complete.

2.02

Check tightness and field installed lines.

2.03

Check for continuity for instruments and electrical cables.

2.04
3

Check records and tests etc.


Inspection :

3.01

Check equipment connected as per flow diagram.

3.02

Verify all instrument as per scope (P&ID) are installed.

3.03

Test/Calibration Certificate for valves/thermocouples are available.

3.04

Checklist for operative pressures are available.

3.05

Check backup battery in flare.

3.06

Check sparking device.

3.07

Check purge lines / connections.

3.08

Check guy wire tension device and check that tensioning device is available for adjustments.

3.09

Check that air horn or other alarm devices are connected for indicative flare operation.

3.10

Warning signs for flare sterile area are installed.

3.11

Check Test (functional) Certificate for flare panel is available.

3.12

Check winch and cable system.

3.13

Check that all flare front lines between panel and flare are sloped and no dead legs are present.

3.14

Check nameplate against data sheet.

3.15
3.16
3.17
3.18
4

Spares :

4.01

Check that spare pilot and thermocouples are available.

4.02

Check replacement procedures (pilot and thermocouples) are available.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M21 Centrifuge/Shakers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Confirm equipment type :- Centrifuge / Shaker

1.02

Installed according to specifications and drawings.

1.03

Check nameplate data against data sheet.

1.04

Position and orientation correct.

1.05

Mounting correct.

1.06

Holding down bolts correct.

1.07

Check hydraulic piping.

1.08

Check hydraulic hoses.

1.09

Grease points checked.

1.10

Alignment checked.

1.11

Coupling and guards installed.

1.12

Belts checked.

1.13

Tag No. visible and correct

1.14
1.15
1.16
1.17
1.18
1.19
1.20

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M22 Air Cooled Heat Exchangers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specifications and drawings.

1.02

Check structure for correctness, line and level, correct bolting etc.

1.03

Check plenum chambers, fanrings sliding pads, bundle packers, bundle bolting, seal plates etc.

1.04

Check that tube bundle header fixing required for transportation only are removed to permit free
expansion of tubes.

1.05

Check as per item 04, to permit (when required), free transverse movement of headers to accomodate
piping expansion.

1.06

Check bundle nameplate, bundle orientation, clearances, header linkages (if required), bundle header
welding etc.

1.07

Check platforms and ladders (where applicable).

1.08

Fan shaft centered and plumb.

1.09

Belt sheave alignment.

1.10

Alignments of gear unit of fan, coupling gap.

1.11

Check gear unit.

1.12

Installation of fan blades and set to proper angle.

1.13

Record degree of pitch :-

1.14

Check blade tip clearance.

1.15

Check fan and drive for freedom of movement.

1.16

Driver checked for correct rotation (uncoupled).

1.17

Check fan and motor lubricant. Record lubricant type :

1.18

Belts installed or coupling lubricated and closed. Record lubricant type :

1.19

Belts, coupling and fan guards in place and secure.

1.20

Bearing housings and drive dowelled (when specified).

1.21

Louvres and actuators installed correctly.

1.22

Direction of rotation marked.

1.23

Fins/tubes undamaged.

1.24

Tag No. visible and correct.

Fixed Type :

Variable Type : Min. -

Max. -

1.25
1.26
1.27
1.28
1.29
1.30

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M23 Miscellaneous Equipment
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

Installed according to drawings and specifications.

1.03

Confirm type of equipment.

1.04

Tag No. visible and correct

1.05

External condition.

1.06
1.07
1.08
1.09
1.10
1.11
1.12
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1.20
1.21
1.22
1.23
1.24
1.25

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M24 Fired Heaters
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:

OK N/A PL Result/Data:

1.01

Installed according to specifications and drawings.

1.02

Check nameplate data against data sheet.

1.03

Heater shell is level, plumb and properly grouted with foundation bolts tightened.

1.04

Welding or bolting of shell inspected.

1.05

Tube supports installed per drawings.

1.06

Refractory anchors installed as per drawings.

1.07

Epoxy coating per specification (when applicable).

1.08

Refractory sound and correct thickness. Expansion joints as per drawing.

1.09

Corbels installed per drawing.

1.10

Tube clearances at walls, roof and heater boxes as per drawing.

1.11

Welding tubes per approved welding procedure of rolling of tubes per specification.

1.12

All Non-Destructive Testing (NDT), Post-Weld heat treatment (PWHT) and Brinell Hardness testing
compete as per specification.

1.13

Skin thermocouples installed as per drawings.

1.14

Hydrotest or Air Test complete as per specifications.

1.15

Stack checked for plumb and bolts tightened.

1.16

Damper, cable and indicator checked as per drawing.

1.17

Burner alignment and orientation checked.

1.18

Burner piping checked.

1.19

Sootblower alignment, cleaned and lubricated.

1.20

Ladder, platforms and stairways checked as per drawings.

1.21

Clearances for thermal expansion checked.

1.22

Ducting checked.

1.23

All debris and foreign material removed and expansion joints are clean.

1.24

Painter's trolley lines in place.

1.25

Tag No. visible and correct

1.26
1.27
1.28
1.29
1.30
1.31
1.32
1.33
1.34
1.35

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M25 Field Assembled Boilers
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

CCTNo

Item:
1

OK N/A PL Result/Data:
Initial checks

1.01

Check nameplate data against datasheet.

1.02

Check tag no. visible and correct.

1.03

Check frame level.

1.04

Check alignment.

1.05

Check grouting.

1.06

Check tightness of anchor bolts.

1.07
2

Check ladders, platforms and stairways to manufactors drawings.


Steam and Mud Drums

2.02

Check manufactors identification certification and code symbol.

2.03

Dimensional check of position/oriantation.

2.04
3

Inspection of tube holes (cleanliness and preparation for tube rolling or welding).
Economiser, superheater, desuperheater, etc.

3.01

Check manufactors identification certification and code symbol.

3.02

Dimensional check of position/oriantation.

3.03
4

Insp. of flanges (correct size, type & rating).


Boiler Tubes

4.01

Check material certification and verify correctness of size, bending and general dimensions against
manufactors drawing.

4.02

Tube welding.

4.03

Visual examination of welding.

Preliminary hydrotest (when applicable).

Drum internals

6.01

Check internals for conformance to approved drawings.

6.02

Check internals for correct installation.

6.03
7

Check for completeness of tube rolling.


Pressure piping

7.01
8

Visual examination of welding.


Attachments to pressure parts.

8.01

Check for conformance to approved drawings and specifications.

8.02
9

All attachments to pressure patrs are complete.


Centrifugal pump(s)

9.01

Check per Centrifugal Pump Checklist.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M26 Gas Turbines
Rev : A
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate and data against datasheet.

1.03

Baseplate level and properly grouted, foundations tightened.

1.04

Excess piping strain alleviated.

1.05

Alignment to manufacturer's tolerance, jack screws retracted.

1.06

Check for freedom of movement and direction of rotation.

1.07

Bearing housing flushed and relubricated. Record date lubricated.

1.08

Skid gib keys checked

1.09

Transmission checked.

1.10

Hand valves operable.

1.11

Coupling guard / closer checked.

1.12

Air inlet assembly correctly installed and clean.

1.13

Enclosure sealing checked.

1.14

Enclosure ventilation checked.

1.15

Exhaust duct system correctly installed and clean.

1.16

All controls, protective devices and auxilliary systems correct.

1.17

Gas generator & P.T. checked

1.18

Pipe supports fitted and adjusted.

1.19

Lube oil system flushed.

1.20

Fuel gas system chemically cleaned.

1.21

Dust blinds installed / Removed.

1.22
1.23
1.24
1.25
1.26
1.27
1.28
1.29
1.30

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M27 Machinery Pre-Alignment
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg.

P.O. Package

Arrgm. Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Preparation

1.01

Foundation surveyed and datum/reference points marked.

1.02

Bolt pocket sleeves cut flush with top of foundation.

1.03

Sleeve pocket cleaned out.

1.04
2

Shims set each side of foundation bolts (clear of pockets) to obtain correct elevation.
Installation

2.01

Bolts, washers and nuts correct.

2.02

Correct bolt projection through baseplate.

2.03

Pump lifted and bolts located correctly in pockets.

2.04

Pump positioned, levelled and aligned to datum marks and blocked to avoid accidental movement.

2.05

Grout release certificate (Q02) issued and approved for gouting of "Bolts Only" - to approx.50mm below
top of foundation.

2.06

Tighten bolts and set final level after grout set.

2.07

Check coupling alignment and adjust shims accordingly to achieve best results (record and attach
figures).

Final Grouting

3.01

On completion/acceptance of above issue second Q02 for baseplate grouting.

3.02

Confirm if final grouting is witnessed by KUP (Sign and Date)

3.03
4

Confirm if cube test taken for grout.


Release for Un-coupled Motor Run

4.01

Release certificate M31 issued to E&I Contractor

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M28 - Machinery Final Alignment

Tag No:

CP No:
MC No:

Location :

P & ID :

P.O. Package :

Arrgm. Drwg. :

Data Sheet :

Revision :

Supplier :

Remarks :

Remarks:

SubContractor (Sign/Date)
Flanges Loose :
Flanges Tight :
Hot Alignment :
Cert Rev.No: 0

EPCS (Sign/Date)

Company (Sign/Date)

MC Inspection & Test Record


M30 Final Closing of Vessels and Towers
Rev : 0
Tag No:

CP No:
MC No:

Location

Dwg

P.O. Package

P & ID

Data Sheet

Revision

Supplier

Remarks

It is hereby verified that the equipment specified has been internally inspected in accordance
with drawings and specifications obtained from Project. The equipment is accepted and
ready for operation.
Item:

OK N/A PL Result/Data:

1.01

Depreservation completed

1.02

Equipment blinded off

1.03

Equipment valve isolated

1.04

Internally cleaned

1.05

Internals correctly installed

1.06

Coating undamaged

1.07

Manways installed with new gaskets and correct bolts installed.

1.08
1.09
1.10

Comments:

Final closure has been effected .............................

Date..........................

Sign.......................

Remarks:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


M31 Pump/Driver Release
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

P & ID

P.O. Package

Arrgm. Drwg.

Data Sheet

Revision

Supplier

Remarks

Item:
1

OK N/A PL Result/Data:
RELEASE FROM MECHANICAL CONTRACTOR

1.01

Confirm that coupling is removed.

1.02

Coupling guard replaced.

1.03

Confirm that driver is secure.

1.04

Confirm that all alignment equipment, tools and aids have been removed.

1.05

Confirm the motor free to turn by hand.

1.06

RELEASED TO E&I CONTRACTOR FOR RUN-TEST :Name : .


Sign

: ..

Date : . ..
Note : No further work to be performed on pump until release form return by E&I Contractor.
1.07

ACCEPTED BY KUP CONSTRUCTION :Name : .


Sign

: ..

Date : . .
2

MOTOR UN-COUPLED RUN TEST

2.01

Test completed and MC Certificate (E03) completed.

2.02

E&I CONTRACTOR RELEASE BACK TO MECHANICAL CONTRACTOR :Name : .


Sign

: ..

Date : . .
2.03

ACCEPTED BY KUP CONSTRUCTION :Name : .


Sign

: ..

Date : . .

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

STRUCTURAL MC FORMS
N01

Structural Steelwork

N02

Structural Steelwork (By Tag No.)

06-Oct-2000 14:58

Page: 7

MC Inspection & Test Record


N01 Structural Steelwork
MC Package No:

CP No:

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Pre-erection checks completed.

1.02

Main columns, beams of roof members are plumb, level and aligned.

1.03

Secondary columns of beams are plumb, level and aligned.

1.04

Bracings are properly installed.

1.05

Structural bolts and washers are in place.

1.06

Bolts are according to specification and correctly tightened.

1.07

Sliding connections are properly made.

1.08

Sheeting rails are properly installed.

1.09

Purlins are properly installed.

1.10

Roof cladding is properly installed.

1.11

Side cladding is properly secured.

1.12

Cladding is colour matched.

1.13

Penetrations have closure pieces.

1.14

Windows and doors operate correctly.

1.15

Flashings are fitted.

1.16

Gratings, floor plated, stairway, handrails etc., are completed and safe.

1.17
1.18
1.19

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.
Drawing No :

Rev:

Contractor

Red L. Date: Drawing Title :

KUP Construction

Comments

Other:-

KUP Commissioning

Name :
Sign :
Date :
Rev : B

Printed: 10-Oct-00 15:17

MC Inspection & Test Record


N02 Structural Steelwork (By Tag No.)
Rev : A
CP No:

Tag No:
Descr:

MC No:

Drawings

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Pre-erection checks completed.

1.02

Main columns, beams of roof members are plumb, level and aligned.

1.03

Secondary columns of beams are plumb, level and aligned.

1.04

Bracings are properly installed.

1.05

Structural bolts and washers are in place.

1.06

Bolts are according to specification and correctly tightened.

1.07

Sliding connections are properly made.

1.08

Sheeting rails are properly installed.

1.09

Purlins are properly installed.

1.10

Roof cladding is properly installed.

1.11

Side cladding is properly secured.

1.12

Cladding is colour matched.

1.13

Penetrations have closure pieces.

1.14

Windows and doors operate correctly.

1.15

Flashings are fitted.

1.16

Gratings, floor plated, stairway, handrails etc., are completed and safe.

1.17
1.18
1.19
1.20
1.21
1.22

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

CIVIL MC FORMS
Q01

Civils Concrete Pour Release / Stpevarsel

Q02

Civils Grout Release / Understp

Q03

Drainage Civils Sump, Manholes, Catchbasins and Pits

Q04

Driven Piles (Pre-cast / steel) including Sheet Piling

Q05

UG Piping :- Flushing & Testing

Q07

Buildings - Structure & Finish

Q08

Foundation Release Form / Godkjenningsskjema Fundamenter

Q09

Concrete Test Result

Q10

Underground Piping
Civils Release Form

Q12

Civils Concrete Checklist / Sjekkliste for Betong

Q13

Civils Tunnel Checklist

Q14

Civils Cavern Checklist

Q15

Civils Site Preparation/Roads Checklist

06-Oct-2000 14:58

Page: 8

MC Inspection & Test Record


Q01 Civils Concrete Pour Release / Stpevarsel
Rev : C
CP No:

Tag No:
Descr:

MC No:

SubContractor

Area

Site

Location

Drwg/Rev

Drwg/Rev

Drwg/Rev

Drwg/Rev

Item:
1

OK N/A PL Result/Data:
Inspection - Pre Pour / Fr Stp
.

1.1

Prior to pouring of concrete blinding layer


Fr stping av magerbetong lag

1.2

Formwork and reinforcement (prior to locking)


Forskaling og armering (fr lukking)

1.3

Sub-Contractor's Checklist completed and attached.


Sub-Contractor's Sjekkliste utfylt og vedlagt.

1.4

Survey report attached


Kontroll rapport vedlagt

1.5

KUP survey report attached


KUP kontroll rapport vedlagt

Ready for Inspection (SubContractor) / Klart for Kontroll


.

2.1
3

Sign :
.

Date :

Time :

Pour Schedule (SubContractor) / Planlagt Stpestart


.

3.1
4

Sign :
.

Date :

Time :

Approval to Pour (KUP) / Godkjent for Stping (KUP)


.

4.1

Sign :
.

Date :

Time :

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q02 Civils Grout Release / Understp
Rev : A
CP No:

Tag No:
Descr:

MC No:

SubContractor

Drwg Ref.

P & ID No
Location
Area

Item:
1

OK N/A PL Result/Data:
Mix Design / Mix Design

1.1

Cement; Sand / Sement; Sand

1.2

Non-Shrink / Tilsettingsmiddel for Ekspansjon

1.3

Dry Pack / Trrmrtel

1.4
2

Epoxy / Epoxy
Equipment Release / Frigivelse av Utstyr

2.1

Equipment released for grouting / Utstyr frigjort for understp

2.2

MECH (SubContractor)

2.3

Sign :

2.4

EPCS Contractor

2.5

Sign :

2.6

Company (if required)

2.7
3

Sign :

Date :

Time :

Date :

Time :

Date :

Time :

Inspection / Inspeksjon

3.1

Surface are prepared for grout / Overflate klargjort for understp

3.2

Bolt sleeves & block-outs cleared and clean / Utsparinger klare / rengjort

3.3

Displaced air can be vented / Luftlommer kan fjernes

3.4

Formwork is properly fitted / Forskaling montert & tilpassert

3.5
4

Facilities for curing are available / Utstyr for herding er tilgjengelig


Ready for Grout / Klar for Understp (SubContractor)

4.1
5

Sign :

Date :

Time :

Approval to Grout / Godkjent til Understp (EPCS Contractor)

5.1

Sign :

Date :

Time :

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q03 Drainage Civils Sump, Manholes, Catchbasins and Pits
Rev : 0
CP No:

Tag No:
Descr:

MC No:

SubContractor

Area

P & ID No

Flush Date

Site

Flush Temp

Location

Flush Medium

Item:
1

OK N/A PL Result/Data:
Equipment Release

1.1

Excavation to correct dimensions

1.2

Bottom undisturbed or compacted

1.3

Binding

1.4

Bottom Slab (Pour Release Audited)

1.5

Walls (Pour Release Audited)

1.6

Roof (Pour Release Audited)

1.7

Shuttering dismantled and removed

1.8

Precast concrete manhole section

1.9

Tanking - water proofing

2.0
2.1

Internally cleaned
Water fill test (if applicable)

2.10
2.2

Embedments and intergal foundations

2.3

Backfill and compact (if applicable)

2.4

Proprietary GRP seperation

2.5
2.6
2.7
2.8
2.9

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q04 Driven Piles (Pre-cast / steel) including Sheet Piling
Rev : 0
CP No:

Tag No:
Descr:

MC No:

SubContractor

Drwg.No.

Location

Drwg.No

Item No

Drwg.No

Description

Item:
1

OK N/A PL Result/Data:
Inspection

1.1

Pile Referance No

1.2

Location

1.3

Length of pre-formed pile

1.4

Time of driving

1.5

Ground level prior to driving

1.6

Working level

1.7

Driven length of pile

1.8

Cut off level

1.9

Toe elevation

2.0
2.1

Type of packing
Intermediate set

2.10
2.2

Intermediate set

2.3

Final set (mm. per 10 blows)

2.4

Final set (No.blows per 25 mm)

2.5
2.6
2.7
2.8
2.9

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q05 UG Piping :- Flushing & Testing
Ref: L06 - for video inspection verification
Comm. Pack No:

Test Pack:

Flushing :

Pressure Testing :

Flush Date :

Test Date :

Flush Medium :

Test Medium :

Flush Temperature:

Ambient Temperature :

Design Pressure :

Test Start Pressure :

Test Finish Pressure :

Test Duration :

Design
Isometric No :

Line No :

Orig. P&ID :

Comments:

QC Released (Name / Date / Sign.) :

Contr.:

Release for Testing :

Name:

Company:

Sign:

Flushed
Name/Date/Sign.

Date:

Tested
Name/Date/Sign.

SubContractor:
EPCS:
3. Party:
Company:
Printed: 5-Oct-00 10:37

MC Inspection & Test Record


Q07 Buildings - Structure & Finish
Rev : A
CP No:

Tag No:
Descr:

MC No:

SubContractor

Drwg. Ref.

Location

Remarks

Item No
Description

Item:
1

OK N/A PL Result/Data:
Structure

1.01

Excavation complete. / Utgraving ferdig.

1.02

Sub-grade compaction. / Grunn komprimert.

1.03

Foundation complete. / Fundamenter ferdig.

1.04

Drainage tested. / Drenering ferdig.

1.05

Columns & bearings installed. / Syler & brere ferdig.

1.06

Floor slab; slabs. / Plater; dekker ferdig.

1.07

Roof complete. / Tak ferdig.

1.08

Walls erected. / Vegger ferdig.

1.09

Interior partitions complete. / Invendige konstrukstrosjoner ferdig.

1.10
1.11
1.12
2

Installations Installed & Tested. / Installert og Testet.

2.01

Plumbing. / Rrleggerarbeide.

2.02

Electrical power & lighting. / Elektrisk opplegg & lys.

2.03

Air conditioner. / HVAC.

2.04
2.05
3

Finishing

3.01

Exterior walls & woodwork. / Ytre vegger & treverk.

3.02

Interior & woodwork. / Innvendige arbeider.

3.03

Ceilings. / Undertak.

3.04

Floors. / Gulv.

3.05
3.06
3.07
3.08
3.09
3.10

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q08 Foundation Release Form / Godkjenningsskjema Funda
Rev : A
CP No:

Tag No:
Descr:

MC No:

SubContractor

Drwg. Ref.

Location

Remarks

Item No
Description

Item:
1

OK N/A PL Result/Data:
Inspection / Inspeksjon

1.1

Foundations complete and prepared for grout.


Fundamenter ferdig og klar for gysemasse.

1.2

Centre lines and elevation marked and checked by Mech SubContractor.


Sentrering / Hyde, merket & sjekket.

1.3

Anchor bolts size and spacing correct.


Ankerbolter, strrelse / mellomrom sjekket.

1.4

Anchor bolts straight, threads clean, sleeves clear.


Ankerbolter, rette / skrugjenger rene, utsparinger klar.

1.5

Backfill completed and compacted as per specification.


Tilbakefylling ferdig & komprimert I.h.t. spesifikasjon.

1.6

All QC documantation complete.


Alle QC dokumentasjon ferdig.

Acceptance of Foundation / Godkjenning av Fundament

2.1

Civil SubContractor

2.2

Sign :

2.3

Mechanical SubContractor

2.4

Sign :

Date :
Date :

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q09 Concrete Test Result
Rev : A
CP No:

Tag No:
Descr:

MC No:

SubContractor

Pour Location 1

Layout Drwg

Pour Location 2

Site

Pour Location 3

Area

Test Report Ref

Item:
1

OK N/A PL Result/Data:
Inspection / Data

1.1

Concrete Cube Number

1.2

Concrete Grade

1.3

Date cast

1.4

Weight of cube

1.5

Density Fresh

1.6

Slump

1.7
2

V/C Ratio
First Test (7 Days)

2.1

Test No.1 Date

2.2

Test No.1 Age

2.3

Density at Test No.1 age

2.4

Applied load

2.5

Strength required

2.6

Strength attained

2.7
3

Pass of fail
Second Test (28 Days)

3.1

Test No.2 Date

3.2

Test No.2 Age

3.3

Density at Test No.2 age

3.4

Applied load

3.5

Strength required

3.6

Strength attained

3.7

Pass of fail

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q10 Underground Piping

MC Pack No:

CP No:

SubContractor

Area

P & ID No

Layout Drwg

Site

Layout Drwg

Location

Layout Drwg

Item:
1

Inspection
Inspeksjon

1.1

Prior to backfilling
Fr Tilbakefylling

1.2

Stretching of GRE piping performed (attach documentation)


Strekking av GRE Rr utfrt

1.3

Flushing / TV-inspection (Note separate form to be attached)


Flushing/TV Inspeksjon

1.4

Leak testing, pressureless pipes (Note separate form to be attached)


Lekkasjetest, ikke Trykkrr.

1.5

Pressure testing, pressure pipes (Note separate form to be attached)


Trykktest, Trykkrr

1.6

Coating and wrapping of u/g metallic pipe and components


Overflatebehandling og Wrapping av Metall Rr U.Ground

1.7

Other, as specified
Annet, som beskrevet

Ready for inspection (SubContractor)


Klar for Inspeksjon

2.1

Sign :
.

Backfilling Schedule (SubContrator)


Tilbakefylling Plan

3.1

Sign :
.

Prepared by (SubContrator)
Klargjort Av

4.1

Sign :
.

Approved by (EPCS Contrator)


Godkjent Av

5.1

Sign :
.

Backfilled
Tilbakefyllt

6.1

Sign :
.

Date :

Date :

Date :

Date :

Date :

Comments:

Note : 'Data, Results or Check' column valid entries are :- a) OK, b) NA, c) Blank, to be completed later on clearance of punchlist items d) Enter data or results.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

MC Inspection & Test Record


Q12 Civils Concrete Checklist / Sjekkliste for Betong
Rev : 0

MC Package :

Comm. Pack No:

Description :

Item:
1

OK N/A PL Result/Data:
Inspection / Inspeksjon

1.01

Installed according to specifications and drawings.


Installert i henhold til spesifikasjoner og tegninger.

1.02

Concrete finish acceptable.


Betongoverflate godkjent.

1.03

Survey report attached.


Kontroll rapport vedlagt.

1.04

Survey conclusion satisfactory.


Resultat av kontroll tilfredstillende.

1.05

Embedded item clean and protected.


Innstpninggods rengjord.

Comments:

Foundation ID :

Area :

Description :

Remarks :

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q13 Civils Tunnel Checklist
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Description
Area
Remarks

Item:
1

OK N/A PL Result/Data:
Inspection of Permanent Rock Support
Inspeksjon av Permanentsikring

1.1

Rockbolts
Rockbolter

1.2

Shotcrete application acceptable


Sprytebetong

Survey
Mlinger

2.1
3

Confirm profile survey completed (attach or reference documentation)


Tverrsmittsmlinger ferdig
Cleanliness
Ryddig

3.1
4

General clean-up and removal of temporary equipment


Nedrigging og rydding
Other
Annet

4.1
5

Road condition
Vei standard
KUP FINAL RELEASE FOR CLOSURE/WATER FILL :-

5.1a

Name :
.

5.1b

Sign :
.

5.1c

Date :
.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q14 Civils Cavern Checklist
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Description
Area
Remarks

Item:
1

OK N/A PL Result/Data:
Inspection of Permanent Rock Support
Inspeksjon av Permanentsikring

1.1

Rockbolts
Rockbolter

1.2

Shotcrete application acceptable


Sprytebetong

Survey
Mlinger

2.1
3

Confirm profile survey completed (attach or reference documentation)


Tverrsmittsmlinger ferdig
Concrete Works

3.1

Floor

3.2

Floor slope correct

3.3
4

Concrete around fill lines


Cleanliness
Ryddig

4.1
5

General clean-up and removal of temporary equipment


Nedrigging og rydding
Other
Annet

5.1

Pipe support bolts

5.2

Holes for temperature elements


Hull for temperaturmlere

5.3
6

Penetration caissons installed correctly


Cavern Closure
Kaverne Stenging

6.1
7

Cavern plugs installed


Kaverne plugg installert
KUP FINAL RELEASE FOR CLOSURE/WATER FILL :-

7.1a

Name :
.

7.1b

Sign :
.

7.1c

Date :
.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


Q15 Civils Site Preparation/Roads Checklist
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Contractor

Drwg No

Location

Drwg No

Area

Drwg No
Remarks

Item:
1

OK N/A PL Result/Data:
Inspection
Inspeksjon

1.01

Installed according to specifications and drawings.


Installert i henhold til spesifikasjoner og tegninger.

1.02

Crushed rock layer(s) completed.


Betongoverflate godkjent.

1.03

Backfilling completed.
Tilbakefylling ferdig.

1.04

Compaction completed.
Sammenpressing ferdig.

1.05

Survey report attached.


Kontroll rapport vedlagt.

1.06

Survey conclusion satisfactory.


Resultat av kontroll tilfredstillende.

KUP Release for Asphalt Surfacing (if applicable)


KUP Godkjent for Asfalt Vei Dekking.

2.1a

Name :
.

2.1b

Sign :
.

2.1c

Date :
.

Road Surace Inspection


Vei Dekke Inspeksjon

3.1

Installed to specifications and drawings.


Installert i henhold til spesifikasjoner og tegninger.

3.2

Asphalt surfacing thickness correct.


Asfalt tykkelse korrekt.

3.3

Asphalt surface quality/structure.


Asfalt overflate kvalitet/stuktur.

3.4

Transition to drains and manholes etc.


Overgang til avlp og manhull etc.

3.5

Slopes correct.
Tverrfall korrekt.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

SURFACE PROTECTION MC FORMS


R01

Surface Protection (Equipment)

R02

Surface Protection (Piping)

R03

Surface Protection (Structural)

06-Oct-2000 14:58

Page: 9

MC Inspection & Test Record


R01 Surface Protection (Equipment)
Rev : 0
CP No:

Tag No:
Descr:

MC No:

P.O. Package

Arrng. Drwg.

Location

Remarks

Data Sheet
Supplier

Item:
1

OK N/A PL Result/Data:
Surface Preparation

1.01

1.

1.02

2.

1.03

3.

1.04

Humidity %RH

1.05

DB Temperature DegC

1.06
2

Coating Specification

2.01

1.

2.02

2.

2.03
3

3.
Actual Coating Applied

3.01

1.

3.02

2.

3.03

3.

3.04

4.

3.05

Humidity %RH

3.06

DB Temperature DegC

3.07
3.08
3.09

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


R02 Surface Protection (Piping)
MC Package No:
CP No:
Scope/Refs :

Surface Preparation :

Coating Specification :

Actual Coating Applied :

Location / Area :

1:

1:

1:

Service Descr :

2:

2:

2:

Coating System No.:

3:

3:

3:

Humidity %RH :

Humidity %RH :

DB Temperature Deg C :

DB Temperature Deg C :

Design
Isometric No :

Shop Iso
Rev:

Contractor

Line No :

KUP Construction

Orig.P&ID :

Other:-

Remarks :

KUP Commissioning

Name :
Sign :
Date :
Printed: 10-Oct-00 16:28

MC Inspection & Test Record


R03 Surface Protection (Structural)
MC Package No:
CP No:
Scope/Refs :

Surface Preparation :

Coating Specification :

Actual Coating Applied :

Location / Area :

1:

1:

1:

Service Descr :

2:

2:

2:

Coating System No.:

3:

3:

3:

Humidity %RH :

Humidity %RH :

DB Temperature Deg C :

DB Temperature Deg C :

Design Isometric No :

Rev:

Contractor

Red L. Date :

Drawing Title :

KUP Construction

Remarks :

Other:-

KUP Commissioning

Name :
Sign :
Date :
Printed: 10-Oct-00 16:29

Inspection & Test Record Index


Krst Utbyggingsprosjekt

SAFETY MC FORMS
S01

Dual Agent Hose Reels

S02

Firewater Hydrants

S03

Firewater Monitors

S04

Oscillating Firewater Monitors

S05

Firewater Monitor/Hydrant Assemblies

S06

Foam Systems

S07

Hosereels

S08

Portable Extinguishers

S09

FM200 Clean Agent Systems

S10

Deluge & Sprinkler Systems

S11

Firemans Cabinets

S20

Safety Equipment - Area Acceptance

06-Oct-2000 14:58

Page: 10

MC Inspection & Test Record


S01 Dual Agent Hose Reels
Rev : A
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Skid correctly installed and bolted to deck.

1.04

Firewater/Foam connections to skid correct.

1.05

Electrical connection to skid.

1.06

Check water supply line is insulated up to and including the stop valve.

1.07

Check water supply line is trace-heated up to and including the stop valve.

1.08

Tag No. visible and correct.

1.09

External condition.

1.10
1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S02 Firewater Hydrants
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Hydrant correctly installed.

1.04

Hydrant braced against jet reaction force.

1.05

Check elevation and traverse for unrestricted movement.

1.06

Check hydrant has clear "field of application".

1.07

Check water supply line is insulated up to and including the stop valve.

1.08

Check water supply line is heat-traced up to and including the stop valve.

1.09

Tag No. visible and correct.

1.10

Check coupling caps and chains installed.

1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S03 Firewater Monitors
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Monitor correctly installed.

1.04

Monitor braced against jet reaction force.

1.05

Check elevation and traverse for unrestricted movement.

1.06

Check monitor has clear "field of application".

1.07

Check water supply line is insulated up to and including the stop valve.

1.08

Check water supply line is heat-traced up to and including the stop valve.

1.09

Tag No. visible and correct.

1.10

External condition.

1.11

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S04 Oscillating Firewater Monitors
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Oscillating moitor correctly installed.

1.04

Oscillating moitort braced against jet reaction force.

1.05

Check elevation and traverse for unrestricted movement.

1.06

Check oscillating moitor has clear "field of application".

1.07

Check water supply line is insulated up to and including the stop valve.

1.08

Check water supply line is heat-traced up to and including the stop valve.

1.09

Tag No. visible and correct.

1.10
1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S05 Firewater Monitor/Hydrant Assemblies
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Monitor/Hydrant correctly installed.

1.04

Monitor/Hydrant braced against jet reaction force.

1.05

Check elevation and traverse for unrestricted movement.

1.06

Check monitor/hydrant has clear "field of application".

1.07

Check water supply line is insulated up to and including the stop valve.

1.08

Check water supply line is heat-traced up to and including the stop valve.

1.09

Tag No. visible and correct.

1.10
1.11
1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S06 Foam Systems
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Foam units correctly installed and fixed to foundation/supports.

1.04

Monitors and towers correctly installed and fixed to foundation/supports.

1.05

Monitor panels correctly installed and fixed to foundation/supports.

1.06

Systems piping installed to design drawings.

1.07

System piping hydrotest completed.

1.08

Foam Pouren's correctly installed.

1.09

System pipe supports checked.

1.10

Instrument air supply connected.

1.11

Tag No. visible and correct.

1.12
1.13
1.14
1.15

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S07 Hosereels
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Hose reel correctly installed.

1.04

Cabinet doors functional.

1.05

Tag No. visible and correct.

1.06
1.07
1.08
1.09
1.10

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S08 Portable Extinguishers
Rev : B
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check namplate data against data sheet.

1.03

Record type of extinguisher : A) Dry Chemical - 12kg, B) CO2 - 6kg, C) Specify if other.

1.04

Record colour of extinguisher.

1.05

Location correct.

1.06

Bracket fixing secure.

1.07

Instruction label in place.

1.08

Extinguisher visible.

1.09

Extinguisher charged.

1.10

Record Serial No.

1.11
1.12

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S09 FM200 Clean Agent Systems
Rev : 0
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

FM200 skid correctly installed and fixed/welded to foundation supports.

1.04

FM200 piping installed to drawings.

1.05
1.06
1.07
1.08

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S10 Deluge & Sprinkler Systems
Rev : 0
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Deluge/sprinkler skid correctly installed and fixed/welded to foundation/supports.

1.04

System piping installed to design drawings.

1.05

System piping hydrotest complete.

1.06

System discharge sprayers correctly installed.

1.07

System pipe supports checked.

1.08

Pneumatic heat detector system/pneumatic test complete and approved.

1.09

Pneumatic heat detector system correctly installed.

1.10

Instrument air supply connected.

1.11

Heat tracing and insulation installed and checked.

1.12

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S11 Firemans Cabinets
Rev : 0
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Installed according to specification and drawings.

1.02

Check nameplate data against data sheet.

1.03

Cabinet correctly installed and fixed/welded to foundation/supports.

1.04

Cabinet undamaged.

1.05

Check cabinet contents against specifications.

1.06

Check door fastenings easily open.

1.07

Check cabinet clearly labelled.

1.08

Check instructions for Breathing Apparatus (B.A.) sets included.

1.09
1.10

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


S20 Safety Equipment - Area Acceptance
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Area Code
Drwg No.
Drwg No.
Drwg No.

Item:

Data/Results/Check:

1.01

Central Fire Points.

1.02

Life Buoys.

1.03

Emergency Wire Ladders.

1.04

Stretchers.

1.05

Collapsible Stretchers.

1.06

Eye Baths.

1.07

Safety Showers.

1.08

First Aid Kits.

1.09

Bosun's Chair.

1.10

Breathing Apparatus.

1.11

Safety Signs.

1.12

Escape Routes.

1.13

Penetrations.

1.14

Fire Proofing.

1.15

Fire Extinguishers.

1.16

Fireman's Cabinets.

1.17

Piping and HVAC ducts correctly marked.

1.18
1.19

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

TELECOM MC FORMS
T01

Harbour Radar Systems

T02

Wind Measuring Instruments

T03

Sub-Sea Current Meters

T04

Docking Aid Systems

T05

PA Systems

T06

Automatic Telephones Systems

T07

UHF Radio Equipment

T08

Intercom Equipment

T09

Telex, Telefax and Teletex Equipment

T10

Close Circuit Television Equipment

T11

Radio Paging Equipment

T12

Security Access Systems

T13

Telecomm Cable

T14

Miscellaneous Telecom Equipment

06-Oct-2000 14:58

Page: 11

MC Inspection & Test Record


T01 Harbour Radar Systems

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

No fluid leaks.

1.04

Nuts and bolts tight.

1.05

Paintwork good.

1.06

Glanding correct.

1.07

Protection of 'Live' parts correct.

1.08

Earthing correct.

1.09

Earthing securely tight.

1.10

Unit displays correctly installed.

1.11

Sensors correctly installed.

1.12

Heaters correctly installed.

1.13

All labelling and warning marks correctly installed and visible.

1.14

All cabling and auxilliary wiring neat and undamaged.

1.15

Terminal blocks correct.

1.16

Power supplies correctly installed.

1.17

Air supply correctly installed and sensors checked for air tightness.

1.18

Radar scanner correct installed.

1.19

Equipment racks correctly installed.

1.20

Comments:
Object ID :

Description :

Contractor

DataSheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:16

MC Inspection & Test Record


T02 Wind Measuring Instruments
Rev : A
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Checked to installation drawing.

1.02

Anemometer location and mounting correct.

1.03

Junction box location and mounting correct.

1.04

Cabinet and fittings installed and secured correctly.

1.05

No physical damage to installed items.

1.06

All cable entries and terminations correct.

1.07

Display unit, heater, PSU and control unit check.

1.08

Functional Test :

Functional Test :

2.01

Control unit working correctly.

2.02

Amemometer calibrated.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


T03 Sub-Sea Current Meters
Rev : A
CP No:

Tag No:
Descr:

MC No:

P.O. Package

System Drwg.

Location

Arrgm. Drwg.

Data Sheet

Ref.

Supplier

Remarks

Item:

Data/Results/Check:

Inspection Checklist :

1.01

Checked to installation drawings.

1.02

Checked to installation drawing.Sensor location and mounting correct - Depth in sea-water.

1.03

Junction box location and mounting correct.

1.04

Sensors installed and secured correctly.

1.05

No physical damage to installed items.

1.06

All cable entries and terminations correct.

1.07

Processor, display and PSU check.

1.08

Functional Test :

Functional Test :

2.01

Sensors working correctly.

2.02

Sensors calibrated.

2.03

Display and processor calibrated.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


T04 Docking Aid Systems

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

No fluid leaks.

1.04

Nuts and bolts tight.

1.05

Paintwork good.

1.06

Glanding correct.

1.07

Protection of 'Live' parts correct.

1.08

Earthing correct.

1.09

Earthing securely tight.

1.10

Unit displays correctly installed.

1.11

Sensors correctly installed.

1.12

Heaters correctly installed.

1.13

All labelling and warning marks correctly installed and visible.

1.14

All cabling and auxilliary wiring neat and undamaged.

1.15

Terminal blocks correct.

1.16

Power supplies correctly installed.

1.17

Air supply correctly installed and sensors checked for air tightness.

1.18

Computer correctly installed.

1.19

Equipment racks correctly installed.

1.20

Traffic lights correctly installed.

1.21

Ex. Certificate status verified on sensors.

1.22

Civils works inspected.

1.23
1.24

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:15

MC Inspection & Test Record


T05 PA Systems

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

All loudspeakers and supports correctly installed.

1.04

Nut and bolts tight.

1.05

Paintwork good.

1.06

Glanding correct (all units and junction boxes).

1.07

Protection of 'Live' parts correct.

1.08

Earthing correct.

1.09

Earthing securely tight.

1.10

Unit displays and controls correctly installed.

1.11

All labelling and warning marks correctly installed and visible.

1.12

All cabling and auxilliary wiring neat and undamaged.

1.13

Terminal blocks correct.

1.14

Power supplies correctly installed.

1.15

Cooling fans correctly installed.

1.16

Racks mounted equipment correctly installed.

1.17
1.18

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:15

MC Inspection & Test Record


T06 Automatic Telephones Systems

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight.

1.05

All MDF connections correct and tightened.

1.06

Earthing correct.

1.07

Earthing securely tight.

1.08

Phase identification correct.

1.09

Protection of 'Live' parts correct.

1.10

Telephone extension correctly installed.

1.11

Power supplies correctly installed.

1.12

Ex. telephones correctly installed.

1.13

All labelling and warning marks correctly installed and visible.

1.14

Auxilliary flashing beacons, bells, hooters etc., correctly installed.

1.15

All cabling and auxilliary wiring neat and undamaged.

1.16

Terminal blocks correct.

1.17

Glanding correct.

1.18

Cable routing in buildings.

1.19

Extension cable routes.

1.20

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:15

MC Inspection & Test Record


T07 UHF Radio Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight (Tower and Racks).

1.05

Earthing correct.

1.06

Earthing securely tight.

1.07

Power supply correct.

1.08

Radio feeder correct.

1.09

Antenna and tower correct and tight.

1.10

Control units.

1.11

Transmitters / Receivers.

1.12

All labelling and warning marks correctly installed and visible.

1.13

All cabling and auxilliary wiring neat and undamaged.

1.14

Associated hand-portable units.

1.15

Auxilliary equipment.

1.16

Battery charger (including carrying equipment, spare batteries etc.).

1.17
1.18

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:16

MC Inspection & Test Record


T08 Intercom Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight.

1.05

Earthing correct.

1.06

Earthing securely tight.

1.07

Location correct.

1.08

Cabling correct.

1.09

All labelling and warning marks correctly installed and visible.

1.10

All wiring neat and undamaged.

1.11

Protection of 'Live' parts correct.

1.12

Handsets correct.

1.13

Central control units correct.

1.14

Expansion capability provided.

1.15
1.16

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:17

MC Inspection & Test Record


T09 Telex, Telefax and Teletex Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight.

1.05

Visual inspections.

1.06

Earthing correct.

1.07

Earthing securely tight.

1.08

Terminal identifications correct.

1.09

Protection of metal surface correct.

1.10

Terminals correctly.

1.11

Power connections.

1.12

All labelling and warning marks correctly installed and visible.

1.13

All cabling and auxilliary wiring neat and undamaged.

1.14
1.15

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:17

MC Inspection & Test Record


T10 Close Circuit Television Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Earthing correct.

1.05

Earthing securely tight.

1.06

Nut and bolts tight.

1.07

Camera installed correctly.

1.08

Monitors installed correctly.

1.09

Correct locations.

1.10

Cables and glands.

1.11

Video optical equipment installed correctly.

1.12

Camera cotrol equipment installed correctly.

1.13

Video matrix/switching equipment correct.

1.14

Ex. camera housing.

1.15

Pan and tilt drive equipment correctly installed.

1.16

Power supplies.

1.17

Window, washer and wipers installed and correct.

1.18
1.19
1.20

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:17

MC Inspection & Test Record


T11 Radio Paging Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight.

1.05

Earthing correct.

1.06

Earthing securely tight.

1.07

Protection of 'Live' parts correct.

1.08

All labelling and warning marks correctly installed and visible.

1.09

All cabling and auxilliary wiring neat and undamaged.

1.10

Base station equipment.

1.11

Power supplies.

1.12

Paging unit.

1.13

Battery charger.

1.14
1.15

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:18

MC Inspection & Test Record


T12 Security Access Systems
CP No:

MC Package :
Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

Paintwork good.

1.04

Nut and bolts tight.

1.05

Terminal boxes correct.

1.06

Termination correct.

1.07

Glanding correct.

1.08

Earthing correct.

1.09

Earthing securely tight.

1.10

All labelling and warning marks correctly installed and visible.

1.11

Correct instructions on card readers.

1.12

Correct marking on central computer and display unit.

1.13

Turnstiles correctly installed.

1.14

Sliding gates correctly installed.

1.15

Power supplies.

1.16

Cable runs and entries.

1.17

Civil works.

1.18
1.19
1.20

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
Rev : A

Printed: 10-Oct-00 08:53

MC Inspection & Test Record


T13 Telecomm Cables ( By MC Package )

Rev : A
MC Package :

CP No:

Description :
Item:
1

Inspection Checklist :

1.01

Check cable against specification and drawings.

1.02

Check cable against Data Cable Schedule.

1.03

Check labelling, numbering and ferruling correct.

1.04

Check clamping and cleating correct.

1.05

Check glanding, locknuts and shrouding correct.

1.06

Check cable grouping correct.

1.07

Check cable mechanically protected.

1.08

Check cable terminated correctly.

1.09

Check spare cores earthed.

1.10

Check bending radius correct.

Object ID

Checked

Cable Type

From

To

Size / Cores

MeggerTest

ContinuityTest

Remarks

Note : As-Built Diagram sketch as required or red-line marked up drawings to be attached.


ACCEPTANCE

Contractor

KUP Construction

Other:-

KUP Commissioning

Name :
Sign :
Date :
10-Oct-2000 14:01

Page: 1

MC Inspection & Test Record


T14 Miscellaneous Telecom Equipment

MC Package :

Comm. Pack No:

Description :

Item:
1

Inspection Checklist :

1.01

Check nameplate data against data sheet.

1.02

No mechanical damage.

1.03

All items securely fixed and supported correctly.

1.04

Nut and bolts tight.

1.05

Paintwork good.

1.06

Glanding correct.

1.07

Protection of 'Live' parts correct.

1.08

Earthing correct.

1.09

Earthing securely tight.

1.10

Unit displays and controls correctly installed.

1.11

All labelling and warning marks correctly installed and visible.

1.12

All cabling and auxilliary wiring neat and undamaged.

1.13

Terminal blocks correct.

1.14

Power supplies correctly installed.

Additional Check Items (Add specific checks as required)

2.01
2.02
2.03
2.04
2.05
2.06
2.07
2.08
2.09
2.10

Comments:
Object ID :

Description :

Contractor

Data Sheet

KUP Construction

Other:-

Checked :

Remarks :

KUP Commissioning

Name :
Sign :
Date :
#Error

Printed: 5-Oct-00 13:21

Inspection & Test Record Index


Krst Utbyggingsprosjekt

INSULATION/REFRACTORY/FIREPROOFING MC FORMS
U01

Insulation (Equipment)

U02

Insulation (Piping)

U03

Fireproofing Steelwork

U04

Refractory (Castable Linings)

U05

Fireproofing Equipment

06-Oct-2000 14:58

Page: 12

MC Inspection & Test Record


U01 Insulation (Equipment)
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

P & ID

P.O. Package

Arrng Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Insulation

1.01

Confirm Insulation/Jacketing Class.

1.02

Confirm Insulation Type.

1.03
2

Confirm Insulation thickness.


Pre-Insulation checklist :

2.01

Hydrotest completed.

2.02

Post test punchlist completed.

2.03

Surface preparation acceptable.

2.04
3

Stud, nuts, support rings installed.


Release for Insulation

3.01

Name.

3.02

Date.

3.03
4

Signature.
Inspection / Checklist :

4.01

Insulation correct.

4.02

Jacketing correct.

4.03

Sealing.

4.04

Instruments clear.

4.05

Valve boxes installed.

4.06

Dataplate clear.

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


U02 Insulation (Piping)
Rev : 0

MC Pack No :

CP No:

References :

Check Points :

Release for Insulation :

Inspection :

Location / Area :

Hydrotest Completed :

Results:

Release Date :

Insulation Type :

Service Descr :

Post Test Punchlist Completed :

Name :

Jacketing :

Insulation Code No.:

Surface Preparation Acceptable:

Date :

Sealing :

Fully Reinstated :

Sign :

Valve boxes :

Heat Tracing Tape Completed :

Instrument points clear

Mark 'OK' or 'N/A' in Results Box:


Design
Isometric No :

Iso
Rev:

SubContractor

Line No :

EPCS

Orig.P&ID :

Company

Name :
Sign :
Date :
Printed: 10-Oct-00 16:37

MC Inspection & Test Record


U03 Fireproofing Steelwork
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Title
Description

Item:
1

OK N/A PL Result/Data:
Prior to Installation

1.01

Anchor, hex mesh etc., material type, size, height.

1.02

Welding Procedures.

1.03

Qualification Records (PQR).

1.04

Weld test coupon / sample.

1.05
2

Welding surface.
After Installation

2.01

Visual inspect welding.

2.02

Hammer test as specified.

2.03
3

Repair, re-test performed.


Fibres - Prior to Use

3.01
3.02
4

Chemical analysis of material.


Fibre, length, size diameter.
Fireproofing - Prior to Installation

4.01

Correct type / batch of material.

4.02

Mixing and application procedures.

4.03

Fibre reinforced mixture.

4.04

Shipping storage preservation, shelf life of materials, sequence of operations.

4.05

Required testing, reports, results in accordance with specifications, procedures.

4.06

Fireproofing vendor's recommended method for the installation, curing and drying.

4.07

Optimum water content for each material has been obtained by testing by the installer or by the
manufacturer for the installer.

4.08

Installer has submitted tests performed by the manufacturer of fireproofing and / or fibres.

4.09

Hand packer qualifications.

4.10

Gunner qualifications.

4.11

Water for mixing has been tested.

4.12

Test reports, results.

4.13
5

Surface to be lined in accordance with specifications and procedures.


Fireproofing - During Intallation

5.01

Mixing contents, mixing procedures and application procedures are in accordance to specifications and
procedures.

5.02

Temperature requirements are being maintained.

5.03

Water content of mixture is being recorded.

5.04

Test cubes are being maintained.

5.05
6

Progressive visual inspection.


Fireproofing - After Installation

6.01

Visual inspect surface of fireproofing coating.

6.02

Curing and drying is performed in accordance with specifications and procedures.

6.03

All testing complete, recorded with results submitted as specified.

6.04

Visual and dimensional inspect surface of lining - proper thickness etc.

6.05

Hammer test specified.

6.06

Other inspections : Specify :-

6.07

Method of repair, curing, testing in accordance with specifications and procedures.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


U04 Refractory (Castable Linings)
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

Remarks

P.O. Package

Arrng Drwg.

Data Sheet

Remarks

Supplier

Item:
1

OK N/A PL Result/Data:
Prior to Installation

1.01

Anchor, hex mesh etc., material type, size, height.

1.02

Welding Procedures.

1.03

Qualification Records (PQR).

1.04

Weld test coupon / sample to MET.

1.05
2

Welding surface.
After Installation

2.01

Visual inspect welding.

2.02

Hammer test as specified.

2.03
3

Repair, re-test prior to shoplining or shipment.


Fibres - Prior to Use

3.01
3.02
4

Chemical analysis of material.


Fibre, length, size diameter.
Refractory - Prior to Installation

4.01

Correct type / batch of material.

4.02

Mixing and application procedures.

4.03

Fibre reinforced mixture.

4.04

Shipping storage preservation, shelf life of materials, sequence of operations.

4.05

Required testing, reports, results in accordance with specifications, procedures.

4.06

Refractory vendor's recommended method for the installation, curing and drying of lining.

4.07

Optimum water content for each material has been obtained by testing by the installer or by the
manufacturer for the installer.

4.08

Installer has submitted tests performed by the manufacturer of refractory and / or fibres.

4.09

Hand packer qualifications.

4.10

Gunner qualifications.

4.11

Water for mixing has been tested.

4.12

Test reports, results.

4.13
5

Surface to be lined in accordance with specifications and procedures.


Refractory - During Intallation

5.01

Mixing contents, mixing procedures and application procedures are in accordance to specifications and
procedures.

5.02

Temperature requirements are being maintained.

5.03

Water content of mixture is being recorded.

5.04

Test cubes are being maintained.

5.05
6

Progressive visual inspection.


Refractory - After Installation

6.01

Visual inspect surface of refractory linings.

6.02

Curing and drying is performed in accordance with specifications and procedures.

6.03

All testing complete, recorded with results submitted as specified.

6.04

Visual and dimensional inspect surface of lining - proper thickness etc.

6.05

Hammer test specified.

6.06

Other inspections (e.g. optical instruments, boroscope etc) : Specify :-

6.07

Method of repair, curing, testing in accordance with specifications and procedures.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Inspection & Test Record


U05 Fireproofing Equipment
Rev : 0
CP No:

Tag No:
Descr:

MC No:

Location

System Drwg:

P.O.

Arrg Drwg:

Data Sheet:

Remarks:

Supplier:

Item:
1

OK N/A PL Result/Data:
Prior to Installation

1.01

Anchor, hex mesh etc., material type, size, height.

1.02

Welding Procedures.

1.03

Qualification Records (PQR).

1.04

Weld test coupon / sample.

1.05
2

Welding surface.
After Installation

2.01

Visual inspect welding.

2.02

Hammer test as specified.

2.03
3

Repair, re-test performed.


Fibres - Prior to Use

3.01
3.02
4

Chemical analysis of material.


Fibre, length, size diameter.
Fireproofing - Prior to Installation

4.01

Correct type / batch of material.

4.02

Mixing and application procedures.

4.03

Fibre reinforced mixture.

4.04

Shipping storage preservation, shelf life of materials, sequence of operations.

4.05

Required testing, reports, results in accordance with specifications, procedures.

4.06

Fireproofing vendor's recommended method for the installation, curing and drying.

4.07

Optimum water content for each material has been obtained by testing by the installer or by the
manufacturer for the installer.

4.08

Installer has submitted tests performed by the manufacturer of fireproofing and / or fibres.

4.09

Hand packer qualifications.

4.10

Gunner qualifications.

4.11

Water for mixing has been tested.

4.12

Test reports, results.

4.13
5

Surface to be lined in accordance with specifications and procedures.


Fireproofing - During Intallation

5.01

Mixing contents, mixing procedures and application procedures are in accordance to specifications and
procedures.

5.02

Temperature requirements are being maintained.

5.03

Water content of mixture is being recorded.

5.04

Test cubes are being maintained.

5.05
6

Progressive visual inspection.


Fireproofing - After Installation

6.01

Visual inspect surface of fireproofing coating.

6.02

Curing and drying is performed in accordance with specifications and procedures.

6.03

All testing complete, recorded with results submitted as specified.

6.04

Visual and dimensional inspect surface of lining - proper thickness etc.

6.05

Hammer test specified.

6.06

Other inspections : Specify :-

6.07

Method of repair, curing, testing in accordance with specifications and procedures.

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

Inspection & Test Record Index


Krst Utbyggingsprosjekt

ARCHITECTURAL MC FORMS
Z01

Architectural

11-Oct-2000 14:41

Page: 13

MC Inspection & Test Record


Z01 Architectural
Rev : A
CP No:

Tag No:
Descr:

MC No:

Drawing
Area
Room
Arrng Drwg

Item:
1

OK N/A PL Result/Data:
Inspection Checklist :

1.01

Wall linings, barrier & Insulation

1.02

Raised access floor

1.03

Partitions

1.04

False ceilings

1.05

Access and/or escape hatches

1.06

Floor coating and or covering

1.07

Doors

1.08

Stairs

1.09

Louvres

1.10

Windows and glazing

1.11

Furniture, fixtures, benches, sinks, desks, consoles and fittings

1.12

Plumbing

1.13

Sanitary equipment

1.14

Drainage

1.15

Acoustic elements

1.16

Dcor

1.17

Paintwork

1.18

Penetrations correct

1.19

Redundant penetrations sealed correctly

1.20

Fire walls and/or blast walls

1.21

Signs and notices

1.22

Final clean-up, including under raised access floors

Comments:

Note : 'Tick all Check Item columns under OK - Satisfactory; N/A - Not Applicable; PL - Punch Item(s) against check point. Also record Test Results or Data'

Contractor
Name :
Sign :
Date :

KUP Construction

Other:-

KUP Commissioning

MC Handbook Section C
Sample Preservation Manual

Oct2000 Edition

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 28 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10

APPENDIX

10.1

Electrical Preservation Maintenance Check Lists

10.2

Instrument Preservation Maintenance Check Lists

10.3

Mechanical Preservation Maintenance Check Lists

10.4

Preservation Record Sheet

10.5

Preservation Label

K:\5622kup\shared\Kupproc\preserve

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 29 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10.1

Electrical Preservation Maintenance Check Lists

K:\5622kup\shared\Kupproc\preserve

Preservation Maintenance Check List


EP01

ELECTRIC MOTORS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the motor is not energised other than for heating. If energised,
report to the Maintenance Supervisor or Preservation Supervisor before
proceeding.

02

Check the air humidity in the storeroom is <40%. If >40%, arrange for space
heater to be energised from a temporary supply.

03

When installed, ensure the space heater is working. Check that indication lights on
temporary heating distribution panels are working.

04

Inspect units for corrosion, cleanliness and moisture.

05

Check all permanent data plates or labels are protected with clear wax coating.

06

Manually rotate shaft 2 turns. Applicable only to electric motors with ball or roller
bearings. For other types, refer to Suppliers recommendations.

07

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

08

Inspect connection boxes for moisture and replace vapour corrosion inhibitor (VCI) VCI-101/110/150
if necessary.

09

Ensure seal is intact and screws are coated with acid-free grease after inspecting
connection box. e.g. Poly Butyl Cuprysil grease.

10

Megger test and record insulation resistance.

11

Ensure preservation oil levels in bearing housings are correct, and vent cap is
sealed.

VCI-368,389 or 322
and Vulc-Tape

12

Check preservation on exposed shafts and coupling hubs is intact.

VCI-368,389 or 322

13

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368,389 or 322
preservation to machined surfaces if necessary.

14

Check drain plugs are removed. ( Small plastic plugs)

VCI-386

Aluminium sheeted glass fibre


cloth

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP02

Battery Chargers, Distr. boards, Relay Boxes, Lighting Distr.


Boards, Sub Distr. Boards & UPSs.
(Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Ensure the space heater is working, where installed.

02

Ensure all doors on unit are properly locked.

03

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

04

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

05

Check preservation on cable connections exposed to atmosphere, and re-apply if


necessary.

VCI-368/389/322

06

Report any damaged instruments, indication lights, paint etc. to the Maintenance
Supervisor or Preservation Supervisor.

07

Inspect the connection box for moisture and change VCI emitter if necessary.

08

Inspect inside unit. Report any corrosion damage, moisture etc. If necessary,
carefully clean with dry cloth or vacuum cleaner.

09

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389/322
preservation to machined surfaces if necessary.

10

Ensure that all hinges and fasteners are greased, and that openings and glands
are properly sealed. e.g. Poly Butyl Cuprysil grease.

VCI-101/110

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP03

AIR-COOLED TRANSFORMERS (POLY RESIN TYPE)


(Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the transformer is not energised before carrying out any
preservation work. If energised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

Check the air humidity in the storeroom is <40%. If >40%, arrange for space
heater to be energised from a temporary supply.

03

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

04

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

05

Report any damage to the transformer or paint to the Maintenance Supervisor or


Preservation Supervisor.

06

Check terminals are coated with an acid-free grease. e.g. Poly Butyl Cuprysil
grease.

07

Inspect connection boxes for moisture and replace vapour corrosion inhibitor (VCI) VCI-101
if necessary.

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP04

SWITCHGEAR (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the switchgear is not energised other than for heating. If
energised, report to the Maintenance Supervisor or Preservation Supervisor before
proceeding.

02

Ensure that the heater is working. Check that the individual indicator lights on
temporary heating distribution panel are working. (For H.V., 690V and 400V
switchboard).

03

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

04

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

05

Inspect inside unit. Report any corrosion damage, moisture etc. If necessary,
carefully clean with dry cloth or vacuum cleaner.

06

Report any damaged instruments, indication lights, paint etc. to the Maintenance
Supervisor or Preservation Supervisor.

07

If the switchgear is field located, check the sealing of all entries, and replace
vapour corrosion inhibitor (VCI) necessary.

VCI-101

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP05

PROCESS HEATERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the heater is not energised before carrying out any
preservation work. If energised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

If Heaters are stored, check wooden crates for damage. Report to Maintenance
Supervisor or Preservation Supervisor any damage.

03

If main cable is not connected, open connection boxes and inspect. Report to
Maintenance Supervisor or Preservation Supervisor any corrosion, damage etc. If
necessary, carefully clean with a dry cloth. If main cable is connected, report to the
Maintenance Supervisor or Preservation Supervisor before proceeding.

04

Inspect the connection boxes for moisture and change VCI emitter if necessary.

VCI-101/110

05

Ensure seal is intact and screws are coated with acid-free grease after inspecting
connection box. Add acid-free grease to Exd. flame parts. e.g. Poly Butyl Cuprysil
grease.

PBC grease

06

Check for damage to Heater or paint, and report to Maintenance Supervisor or


Preservation Supervisor if any damage found.

07

Megger test Heaters.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP06

CONTROL, TRANSFORMER AND BATTERY ROOMS


(Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check cleanliness and arrange cleaning of rooms if necessary.

02

Check by measurement, the relative air humidity in the room. Confirm it is <40%.

03

Ensure that the electric air drying units in the rooms are working.

04

Ensure that all doors on units are properly locked.

05

Visually inspect all units within room. Report any corrosion damage, moisture etc.
If necessary, carefully clean with a dry cloth or vacuum cleaner.

06

Inspect for moisture inside panels. Replace the VCI emitter if necessary.

07

Report any damaged instruments, indication lights, paint, electrical connections


etc., to the Maintenance Supervisor or Preservation Supervisor.

VCI-101/110

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP07

GENERATORS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure that generator is not energised, other than for heating. If
energised, report to the Maintenance Supervisor or Preservation Supervisor before
proceeding.

02

Check the air humidity in the storeroom is <40%. If >40%, arrange for space
heater to be energised from a temporary supply.

03

When installed, ensure the space heater is working. Check that indication lights on
temporary heating distribution panels are working.

04

Inspect units for corrosion, cleanliness and moisture.

05

Ensure that PRESERVATION labels are in position and report any damage to the
equipment to Maintenance Supervisor or Preservation Supervisor.

06

Manually rotate shaft 2 turns.


-Applicable only to Generators with ball or roller bearings. For other types, refer to
Suppliers recommendations.

07

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

08

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

09

Inspect connection boxes for moisture and change the VCI emitter if necessary.

VCI-101/110

10

Ensure seal is intact and screws are coated with acid-free grease after inspecting
connection box. e.g. Poly Butyl Cuprysil grease.

PBC grease

11

Megger test and record insulation resistance.

12

Ensure preservation oil levels in bearing housings are correct, and vent cap is
sealed.

VCI-368/389/322 and Vulc Tape

13

Check preservation on exposed shafts and coupling hubs is intact. Repair as


required.

VCI-386

14

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

15

Check all permanent data plates or labels are protected with clear wax coating.

16

VCI-386

DELETED

17

Check the cooling system is coated with preservation oil.

VCI-322

18

Check the level of the fuel/VCI mixture in the fuel system. Top up as required.

VCI-322

19

12

Check Vapour Corrosion Inhibitor in inlet and exhaust manifolds and replace as
necessary. Confirm the VCI is attached to the dust blind.

VCI

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP08

LIGHTING FIXTURES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure that no part of the lighting fixture is energised before carrying
out any preservation work. If energised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

Check if light fittings, glass, protective cover for damage. Report any damage to
Maintenance Supervisor or Preservation Supervisor.

03

Check that all lighting fixtures and floodlights in exposed areas are dry and all
holes are sealed off.

04

Check that flanges on Exd fixtures are correctly greased. e.g. Poly Butyl Cuprysil
grease.

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP09

JUNCTION BOXES, SOCKET OUTLETS AND PUSH


BUTTONS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure that no part of the above equipment is energised before


carrying out any preservation work. If energised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

03

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

04

Check operation of Push Buttons.

05

Inspect boxes for moisture and change the VCI emmiter if necessary.

VCI-101/110

06

Ensure seal is intact and screws are coated with acid-free grease after inspecting
connection boxes. e.g. Poly Butyl Cuprysil grease.

PBC grease

07

Check that acid-free grease is present on the flame path covers on Ex(d)
equipment.

PBC grease

08

Check for mechanical damage. Report any damage to Maintenance Supervisor or


Preservation Supervisor.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP10

HEAT TRACE CABLE (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:
1

Frequency: Description:
4

Preservation Materials:

Check that all installed heat trace cable is properly protected, either by temporary
covers or by original insulation pads.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP11

OIL FILLED TRANSFORMERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure transformer is not energised before carrying out preservation


work. If energised, report to Maintenance supervisor or Preservation Supervisor
before proceeding.

02

Check transformer for damage including radiators and conservator.

03

Check transformer, associated pipe work and flanged joints for leaks.

04

Check transformer oil level.

05

Check VCI emitter in junction boxes.

06

Check Anticondensation heaters are energised in tap changer control panels. (


Large transformes only)

07

Check de-hydrating breather desicant. (Colour should be pink)


If coloured blue contact transformer vendor.

08

Check transformer instrumentation for damage.

09

Check paint work for damage and clean/repair if necessary.

10

Check transformer bushings for damage.

VCI-101/110

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


EP12

NEUTRAL EARTHING RESISTORS

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure transformer is not energised before carrying out preservation


work. If energised, report to Maintenance supervisor or Preservation Supervisor
before proceeding.

02

Check neutral earthing resistor including resistance elements and cable bushings
for damage.

03

Check if clear of dust and debris and clean if necessary.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 30 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10.2

Instrument Preservation Maintenance Check Lists

K:\5622kup\shared\Kupproc\preserve

Preservation Maintenance Check List


JP01

INSTRUMENT AND TELECOM. SYSTEM CUBICLES,


PANELS, TERMINATION RACK, JUNCTION BOXES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Ensure all doors on unit are properly locked and sealed.

Tape

03

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

04

If unit is protected with instrument quality air, ensure that inside pressure is
maintained at 50mm W.G.

05

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

06

Inspect inside unit. Report any corrosion damage, moisture etc. If necessary,
carefully clean with dry cloth or vacuum cleaner.

07

If unit is not protected with instrument quality air, then the moisture content shall
be checked and the VCI emitter replaced as necessary.

08

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

09

Report any damaged instruments, indication lights, paint etc. to Maintenance


Supervisor or Preservation Supervisor.

10

Ensure all hinges and fasteners are greased and that openings and glands are
properly sealed. e.g. Poly Butyl Cuprysil grease.

Aluminium sheeted glass fibre


cloth

VCI-101/110

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP02

SOLENOID VALVES, RECEIVER GAUGES, VA METERS,


HEAT DETECTORS, PRESSURE/TEMPERATURE/LEVEL
TRANSMITTERS AND SWITCHES, ADDRESSABLE
INTERFACE UNITS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating

VCI-386

03

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

04

Inspect inside unit. Report any corrosion damage, moisture etc. If necessary,
carefully clean with dry cloth or vacuum cleaner.

05

Inspect inside each component for moisture content and replace the VCI emmiter
as necessary.

06

Report any damaged instruments, indication lights, paint etc. to Maintenance


Supervisor or Preservation Supervisor.

07

Ensure that all hinges and fasteners are greased, and that openings and glands
are properly sealed. e.g. Poly Butyl Cuprysil grease.

08

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

VCI-101/110

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP03

ACTUATORS AND ACCUMULATORS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised or pressurised before carrying out
any preservation work. If pressurised or energised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

03

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

04

Check that paint surfaces are undamaged. If damaged report to Maintenance


Supervisor or Preservation Supervisor.

05

Check that exposed actuator rod is protected.

06

Check and replace any missing metal end plugs to cable and tubing entries.

07

12

Check that hydraulic actuator or accumulator is totally filled with clean system oil
and, if not piped-up, inlet/ outlet is sealed with metal plugs.

08

12

Check that bleed air holes on diaphragm actuators are protected with metal plugs.

09

12

NOTE:
Valve bodies and spindles are to be preserved as for piping valves. Ref. LP01/LP02

Fin Lube Oil and Vulc Tape

Clean System Oil

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP04

PRESSURE/TEMPERATURE/LEVEL GAUGES, FLOW GLASS


(Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

02

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

03

Ensure that 6mm plywood cover is in place over glass faces. Report any damage
to Maintenance Supervisor or Preservation Supervisor.

04

Ensure that openings and glands are properly sealed with plugs/caps.

05

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP05

SMOKE, GAS DETECTORS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

03

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth or alternative cover/hood

04

Report any damaged detectors, indication lights, etc. to Maintenance Supervisor or


Preservation Supervisor.

05

IMPORTANT NOTE:
SMOKE AND GAS DETECTORS MUST NOT BE EXPOSED TO SILICONE
VAPOUR.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP06

AIR FILTER REGULATOR (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

02

12

Report any damaged Filter/Regulators to Maintenance Supervisor or Preservation


Supervisor.

03

12

Drain the air filter (Push the drain valve to bottom).

04

12

Ensure that inlets/outlets are properly sealed with threaded plugs.

05

12

Ensure that threads on adjusting screws and the air bleed screws are grease
lubricated.

Aluminium sheeted glass fibre


cloth or alternative cover/hood

Complexfett L2 grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP07

ANALYSER PACKAGES, HVAC PANELS, INSTRUMENT


HOUSINGS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Ensure that all doors on unit are properly locked and taped.

03

Check all permanent data plates or labels are protected with clear wax coating.

04

Report any damaged instruments, indication lights, paint, etc. to Maintenance


Supervisor or Preservation Supervisor.

05

Inspect unit internals. Report any corrosion damage, moisture, etc. to Maintenance VCI-368/389/322
Supervisor or Preservation Supervisor. If necessary, carefully clean with dry cloth
or vacuum cleaner.

06

Check internals for moisture and replace VCI emmiter if necessary.

07

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389/322
preservation to machined surfaces if necessary.

08

Ensure that all hinges and fasteners are greased, and that openings and glands
are properly sealed.

09

NOTE:
For the field instruments in the cabinet, refer to JP02, and for gauges refer to JP04.

VCI-386

VCI-101/110

PBC grease

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP08

ASPIRATOR CABINETS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Inspect unit internals. Report any corrosion damage, moisture, etc. to Maintenance
Supervisor or Preservation Supervisor. If necessary, carefully clean with dry cloth
or vacuum cleaner.

04

Check internals for moisture and replace VCI emmiter if necessary.

05

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

06

Report any damaged instruments, indication lights, paint, etc. to Maintenance


Supervisor or Preservation Supervisor.

07

Ensure that all doors on unit are properly locked and taped.

08

Ensure that all hinges and fasteners are greased and that openings and glands are PBC grease
properly sealed.

09

NOTE:
For the detectors in the cabinet refer to JP05.

VCI-101/110

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP09

TELECOMMUNICATIONS FIELD EQUIPMENT (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

03

Report any damaged instruments, indication lights, paint, etc. to Maintenance


Supervisor or Preservation Supervisor.

04

Ensure that any temporary cover is not damaged, missing, or if additional


protection is needed.

05

Ensure that all hinges and fasteners are greased and that openings and glands are PBC grease
properly sealed.

06

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

Aluminium sheeted glass fibre


cloth or alternative cover/hood

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP10

SAFETY RELIEF VALVES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

01

Preservation Materials:

BEFORE INSTALLATION

02

12

BEFORE INSTALLATION : Check preservation on flange faces and internal


surfaces, and refit 10mm plywood flange covers and rubber gaskets.

03

12

BEFORE INSTALLATION : Report any corrosion or damage to internals etc. to


Preservation Supervisor.

04

12

BEFORE INSTALLATION : Check that plastic caps and thread protectors are in
position.

05

VCI-368/389

AFTER INSTALLATION

06

AFTER INSTALLATION : Check pilot operated valves have no damage to sensor


pipework. Pilot filters to be drained off.

07

AFTER INSTALLATION : Check that calibration seal is intact and no visible


damage.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP11

ORIFICE PLATES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

01
02

Preservation Materials:

Orifice Fittings
8

03

Orifice Fittings : Check that there is no external damage and that cover plate seals
are intact. Report any damage to Maintenance Supervisor or Preservation
Supervisor.
Orifice Plates

04

Orifice Plates : Check that the preservation on the orifice plates is not damaged.

05

Orifice Plates : Check that there is no damage to the disc surfaces, i.e.
indentations, marks, scratches.

06

NOTE !
Orifice plates to remain in the stores until specifically requested by the Company.

Denso tape or VCI Stretchfilm

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


JP12

BURSTING DISCS

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Bursting discs shall remain at all times in the original packing, and stored in a dry
place until commencement of system commissioning. They shall not be inspected
or touched, nor shall the protective box be opened.

02

Check the condition of the original packing. Report any damage to the
Maintenance Supervisor or Preservation Supervisor.

03

NOTES:
1. Storage conditions shall be as for sensitive electronic equipment.
2. Commissioning personnel shall be responsible for supervising the removal from
stores for installation.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 31 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10.3

Mechanical Preservation Maintenance Check Lists

K:\5622kup\shared\Kupproc\preserve

Preservation Maintenance Check List


MP01

MAIN AIR COMPRESSOR PACKAGE (CENTRIFUGAL) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised or pressurised before carrying out
any preservation work. If energised or pressurised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

NOTE!
If the compressor internals are removed and preserved for long term storage,
separate from the compressors, the crate with the compressor internals shall not
be unpacked unless Suppliers representative is present.

03

Ensure piping connections are closed with dust blinds to prevent ingress of water
and dirt etc.

04

Check the lube oil system of the compressor packages for leakage. Report to
Maintenance Supervisor or Preservation Supervisor if any discrepancies are found.

05

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

06

Ensure that the protection cover and the plywood sheeting is not damaged and is
properly sealed. Repair as required.

Aluminium sheeted glass fibre


cloth and 10mm thick plywood.

07

Check condition of wooden box containing coupling spacer. If damaged, report to


Maintenance Supervisor or Preservation Supervisor.

08

Check preservation of all machined unpainted surfaces and re-apply when


necessary.

09

Inspect external surfaces and, if necessary, clean up and repair any damaged
coating, in accordance with relevant paint specification.

10

Check preservation on the coupling hubs. Re-apply if necessary.

11

12

Check all instruments are adequately protected, and instrument nozzles blinded off.

12

12

Check preservation on exposed shafts, reapply if nessesary.

VCI-368

13

12

Check Vapour Corrosion Inhibitor in compressor casing. Replace as necessary.

VCI

14

12

Check preservation on coupling spacer in stored wooden box. Touch up as


required.

VCI-368/389

VCI-368/389

VCI-368/389

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP02

TURBO EXPANDER PACKAGE (Rev B)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

NOTE : Refer to Suppliers documentation. The packages shall be preserved in


accordance with the above documentation and in conjunction with this check list.

02

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

03

Ensure that the protection cover and the plywood sheeting is not damaged and is
properly sealed. Repair as required.

Aluminium sheeted glass fibre


cloth and 10mm thick plywood.

04

Ensure piping connections are closed with dust blinds to prevent ingress of water
and dirt etc.

05

Check condition of wooden box containing coupling spacer. If damaged, report to


Maintenance Supervisor or Preservation Supervisor.

06

Check preservation of all machined unpainted surfaces and re-apply when


necessary.

07

Inspect external surfaces and, if necessary, clean up and repair any damaged
coating, in accordance with relevant paint specification.

08

Check preservation on the coupling hubs. Re-apply if necessary.

09

12

Check all instruments are adequately protected, and instrument nozzles are
blinded off.

10

12

Check preservation on exposed shaft, reapply if necessary

VCI-368

11

12

Check Vapour Corrosion Inhibitor in compressor casing. Replace as necessary.

VCI

12

12

Check preservation on coupling spacer in stored wooden box. Touch up as


required.

VCI-368/389/322

13

NOTE!
Lube Oil System
When the commissioning activities are finished, the compressors shall be
represerved by energising the lube oil system for continuous oil circulation.

14

The expander-compressor units and lube oil/seal gas support system to be purge
with dry nitrogen, 0.33 bars ( 5 psig ).
NOTE ! Vendor requirements to be followed.

VCI-368/389/322

VCI-368/389/322

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP03

HYDRAULIC POWER PACKS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating

02

Ensure external hydraulic piping is not hooked up to unit unless it has been
chemically cleaned (to avoid possible contamination).

03

Inspect outside surface and, if necessary, clean up and repair any damaged
coating in accordance with the relevant paint specification.

04

Check that all hydraulic lines and oil side of accumulators are filled with hydraulic
oil. Release all air.

05

Check all open ended pipes and tappings are plugged.

06

Check nitrogen pressure in the nitrogen system. (N2 cylinder and accumulators).

07

Ensure that 6mm plywood cover is in place over pressure gauges and instrument
glass.

08

Check instruments and local panels.

09

12

Check internals for moisture content and change the Vapour Corrosion Inhibitor if
necessary.

VCI-386

Clean system oil

Nitrogen

VCI

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP04

DIESEL ENGINES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not pressurised before carrying out any
preservation work. If energised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Check external surfaces and verify that preservation is in good condition. Re-apply VCI-368/389
preservation to machined surfaces if necessary.

04

Check the cooling system is coated with preservation oil or filled up with a
glycol/water VCI mixture.

VCI-368/389

05

Check the level of the fuel/VCI mixture in the fuel system. Top up as required.

VCI mixture

06

Check that the air filter is sealed.

07

12

Check Vapour Corrosion Inhibitor in inlet and exhaust manifolds and replace as
necessary. Confirm the VCI is attached to the dust blind.

VCI-386

VCI

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP05

GAS TURBINE (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Ref. to suppliers documentation. The package shall be preserved in accordance


with the above documentation and in conjunction with this check list.

02

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

03

Ensure that the protection cover and the plywood sheeting is not damaged and is
properly sealed. Repair as required.

Aluminium sheeted glass fibre


cloth and 10mm thick plywood.

04

Check inlet/exhaust closed.

05

Check enclosure vent ducting closed. ( Inlet / Outlet )

06

Check GT compressor rotor inhibited.

07

Check all doors closed/sealed.

08

Ensure piping connections are closed with dust blinds to prevent ingress of water
dirt etc.

09

Check condition of wooden box containing coupling spacer. If damaged, report to


Maintenance Supervisor or Preservation Supervisor.

10

Check preservation of all machined unpainted surfaces and re-apply when


necessary.

11

Inspect external surfaces and, if necessary, clean up and repair any damaged
coating, in accordance with relevant paint specification.

12

Check preservation on the coupling hub. Re-apply if necessary.

13

12

Check all instruments are adequately protected, and instrument nozzles of


removed instruments are blinded off.

14

12

Check preservation on exposed shafts, reapply if necessary.

VCI-368

15

12

Check Vapour Corrosion Inhibitor in compressor casing. Replace as necessary.

VCI

16

12

Check preservation on coupling spacer in stored wooden box. Touch up as


required.

VCI-368/389/322

17

NOTE!
Lube Oil System
When the MC activities are finished, the compressors shall be represerved by
energising the lube oil system for continuous oil circulation.

VCI-368/389/322

VCI-368/389/322

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP06

PUMPS (ALL TYPES) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not pressurised or pressurised before carrying out
any preservation work. If pressurised or pressurised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Ensure that the protection cover and the plywood sheeting is not damaged and is
properly sealed. Repair as required.

04

Manually rotate shafts 2 turns.

05

Check preservation on exposed pump shaft and repair as necessary.

06

Check wooden box containing pump coupling spacer for damage. Report any
damage to Maintenance Supervisor or Preservation Supervisor.

07

Check that all dust blinds and sealing plugs are tight and that any valves used for
isolating purposes are closed.
Where pipes are connected, 1mm galvanised plate with ample size red painted
spade handle shall be used as dust blinds.

08

12

Check sealing of bearing housing vent. NOTE: If blinds or sealing plugs have been Denso tape
removed or valves opened, report to Maintenance Supervisor or Preservation
Supervisor before proceeding.

09

12

Check levels of preservation oil and top up as required in bearing housing, oil
cooler and lube oil system. If amount added appears excessive look for leaks and
report to Maintenance Supervisor or Preservation Supervisor.

10

12

Check and add preservation as required to exposed machined surfaces on pump VCI-368
and baseplate. Report any damage to pump or paint to Maintenance Supervisor or
Preservation Supervisor.

11

12

Check pump carbon steel inlet/outlet flanges for preservation coating, and replace VCI-368
neoprene gaskets and 10mm plywood blinds (ensure minimum of 4 bolts are used
on the blinds) Re-wrap blank/flange circumference with waterproof adhesive tape.

12

12

Check pump coupling spacer in its wooden box. Re-apply preservation oil as
necessary, and re-wrap in oil paper or VCI-Film (Plastic).

Aluminium sheeted glass fibre


cloth and 10mm thick plywood.

VCI-368

VCI-322

VCI-368 and VCI-Film(Plastic) or


Oil Paper

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP07

PRESSURE VESSELS, ATMOSPHERIC TANKS AND


SHELL/TUBE HEAT EXCHANGERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:
VCI-386

01

Check all permanent data plates or labels are protected with clear wax coating.

02

Check tarpaulin weather protection is fitted correctly.

03

Where heat exchanger shall be nitrogen filled, check nitrogen pressure in the
exchanger.

04

12

Check that all dust blinds and sealing plugs are tight and that any valves used for
isolating purposes are closed.
Where pipes are connected, 1mm galvanised plate with ample size red painted
spade handle shall be used as dust blinds.
NOTE:
If blinds have been removed, report to Maintenance Supervisor or Preservation
Supervisor.

05

12

VCI-368
Check carbon steel inlet/outlet flanges for preservation coating, and replace
neoprene gaskets and 10mm plywood blinds (ensure minimum of 4 bolts are used
on the blinds)

06

12

Check external surfaces and verify that preservation is in good condition. Report
any damaged paint to Maintenance Supervisor or Preservation Supervisor.

Nitrogen

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP08

PLATE HEAT EXCHANGERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not pressurised before carrying out any
preservation work. If pressurised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Ensure weather protection and 10mm plywood protection cover is fitted correctly.
Report any damage to Maintenance Supervisor or Preservation Supervisor.

04

12

Check that all dust blinds and sealing plugs are tight and that any valves used for
isolating purposes are closed.
Where pipes are connected, 1mm galvanised plate with ample size red painted
spade handle shall be used as dust blinds.
NOTE:
If blinds have been removed or valves opened, report to Maintenance Supervisor
or Preservation Supervisor.

05

12

Check external surfaces and verify that preservation is in good condition. Report
any damaged paint to Maintenance Supervisor or Preservation Supervisor.

06

12

Check tensioning bolts are coated with grease, and plastic or rubber protection
sleeve is in position.

VCI-386

Complexfett L2 or
VCI-369 Cor-Lube

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP09

RECOMPRESSION, REINJECTION, PIPELINE GAS


COMPRESSORS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not pressurised or energised before carrying out
any preservation work. If energised or pressurised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

NOTE : Ref. to suppliers documentation. The package shall be preserved in


accordance with Suppliers recommendations, specifications and this check list.

03

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

04

Ensure that the protection cover and the plywood sheeting is not damaged and
that the sealing is intact. Repair as required.

Aluminium sheeted glass fibre


cloth and 10mm thick plywood.

05

Ensure piping connections are closed with dust blinds to prevent ingress of water,
dirt etc.

06

12

Check protection cover is in place. Report to maintenance supervisor any damage


to the casings, valves, piping/tubing, actuators, instruments, cabinets, cables or
applied external preservation.

07

12

Check all instruments are adequately protected, and instrument nozzles of


removed instruments are blinded off.

08

NOTE!
Lube Oil System
When the MC activities are finished, the compressors shall be represerved by
energising the lube oil system for continuous oil circulation.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP10

METERING PACKAGES (Rev B)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not pressurised before carrying out any
preservation work. If pressurised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Ensure piping connections are closed with dust blinds to prevent ingress of water
and dirt etc.

04

Ensure that the protection cover and the plywood sheeting is not damaged and is
properly sealed. Repair as required.

Aluminium sheeted glass fibre


cloth and 10 mm thick plywood

05

Check preservation on all machined unpainted surfaces and re-apply when


necessary.

VCI-368/389/322

06

Inspext external surfaces and, if necessary, clean up and repair any damaged
coating, in according to relevant paint specification.

07

12

Check all instruments are adequately protected and instrument nozzles are blinded
off.

08

VCI-386

INTERNAL INSPECTION ( CARBON STEEL PIPING ) :


Upon arrivel at site ( or when ever acces is possible ) a one-off inspection to be
done. Re-apply VCI, if required, by "fogging".
NOTE :
In accordance with Supliers instructions.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP11

OVERHEAD TRAVELLING CRANES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

12

Check levels of preservation oil in gearboxes. Top up as required. If amount added VCI-322
appears excessive, check for leaks and, if necessary, report to Maintenance
Supervisor or Preservation Supervisor.

04

12

Check protection cover and preservation on open gears, wire and rope guide and,
if necessary, apply grease.

Wiersmremiddel WRP.

05

12

Check and add preservation as required to exposed machined surfaces on crane.


Report any damage to crane or paint to the Maintenance Supervisor or
Preservation Supervisor.

VCI-368/389

06

Ensure eletric heater for hoist motor is energised and functioning.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP12

MANUAL CHAIN HOIST (rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

02

12

Check open gears, chains and chain guide and, if necessary, apply grease.

VCI-369 Cor-Lube H

03

12

Check and add preservation as required to exposed machined surfaces on chain


hoist. Report any damage to chain hoist or paint to the Maintenance Supervisor or
Preservation Supervisor.

VCI-368/389

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP13

FANS (DIRECT AND BELT DRIVEN) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Manually rotate the shaft 2 turns.

04

Move vane handle. Vanes to be left in closed position.

05

Check that blinds and protection are in position.


NOTE: If blinds have been removed, report to Maintenance Supervisor or
Preservation Supervisor.

06

12

Check preservation of all external machined unpainted surfaces, and re-apply


preservation where necessary.

VCI-386

VCI-368/389

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP14

HEATING AND COOLING COILS (HVAC SYSTEM) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Check surface protecting plates and report to Maintenance Supervisor or


Preservation Supervisor any damaged cooling fins.

04

Check that all blinds and sealing plugs are tight.

05

Check if internal preservation is intact.

VCI-386

VCI

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP15

DAMPERS (VCI)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised before carrying out any preservation
work. If energised, report to the Maintenance Supervisor or Preservation
Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating.

03

Inspect outside surface and if necessary clean up and report any damaged coating
to Maintenance Supervisor or Preservation Supervisor.

04

Check that all sealing plugs are tight.

05

Check external condition of actuator and report any damage to Maintenance


Supervisor or Preservation Supervisor.

VCI-386

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP16

DUAL AGENT UNITS, HOSE REELS, FIRE MONITORS ETC.


(Rev B)

Originator :

KUP MC

Doc No :

Issued :

25.03.99

Supplier :

PONo :

C-309522

Supplier Doc No : E060-AD-A-KB0107

Norfass

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

02

Ensure that the protection cover is not damaged and is properly sealed. Repair as
required.

Aluminium sheeted glass fibre


cloth

03

Check that all inlets are plugged/blinded.

04

Check open threads and bearings and


re-apply preservation as necessary.

05

12

Check preservation of all external machined unpainted surfaces, and re-apply


preservation where necessary.

06

12

Inspect external surface and, if necessary, clean up and repair any damaged
coating, in according with relevant paint spesification.

07

12

Lubricate hinges and door-locks on cabinets and skids.

08

12

Deluge Valve Skids :


If heaters are not connected, bleed valve to be opened to avoid entraped water.

09

12

Monitor Towers :
Verify monitor gear lubrication and refill if required.

VCI-368/389

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP17

CO2 EXTINGUISHERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating.

02

Visually inspect all CO2 cylinder pressures on gauge. If leakages are observed,
Maintenance Supervisor or Preservation Supervisor to arrange re-fill by Supplier.

03

Visually inspect all components for mechanical damage. Report to Maintenance


Supervisor or Preservation Supervisor, if required.

04

NOTE:
No corrective action to be carried out by unauthorised personnel.

VCI-386

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP18

WEATHER LOUVRES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Visually check that all temporary protection in areas subject to mechanical


damage is in place. Replace where necessary.

02

Visually inspect panels for weld spatter. Report to Maintenance Supervisor or


Preservation Supervisor if weld spatter is on thin plate elements or louver blades.

03

Preservation as required :Clean all joints, louvred cassettes and fixing points after any sandblasting etc. in
the vicinity, to stop possibility of galvanic corrosion.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP19

FIRED HEATERS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised or pressurised before carrying out
any preservation work. If energised or pressurised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating

03

Refer to Vendor preservation requirements.

VCI-386

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MP20

Originator :

LOADING ARMS (Rev C)

KUP MC

Issued :
PONo :

Doc No :

MP20 Rev. B

Supplier :

FMC EnergySystems

Supplier Doc No : E060-AD-A-KB0047

C-309521

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

WARNING : Ensure the unit is not energised or pressurised before carrying out
any preservation work. If energised or pressurised, report to the Maintenance
Supervisor or Preservation Supervisor before proceeding.

02

Check all permanent data plates or labels are protected with clear wax coating

VCI-386

03

Check and maintain a nitrogen pressure ( 0,05 bar - 0,3 bar ) in the product line
and swivel joints.

Nitrogen.

NOTE : Check that equipment is clearly marked with the


appropriate yellow warning labels.
04

Inspect outside surface and, if necessary, clean up and repair any damaged
coating in accordance with the relevant paint specification.
Repassivate if required, damaged areas of stainless steel parts.

05

12

Lubricate the swivels and the drive shaft with grease ( ref. FMC's maintenance
manual ).

Wiresmre-middel WRP

06

12

Check pantograph and drive cables, and sheaves are coated. Re-apply grease if
necessary.

Wiresmre-middel WRP

07

Note : Event 03. Nitrogen pressure to be maintained and logged daily on 47-MU211 & 47-MU-212.
Nitrogen circulation through the swivel joint drying lines on 47-MU-210 & 47-MV210 twice a week for 1 hour duration.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


MPX1

Temporary Mechanical Checklist for Seawater Intake


Equipment (Suppliers Docs. Not available.)

Originator :

KUP-MC

Doc No :

Issued :

09.11.98

Supplier :

PONo :

Various

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check all permanent data plates or labels are protected with clear wax coating.

VCI-386

02

Check open gears, chains and chain guide and, if necessary, apply grease.

VCI-369 Cor-Lube H

03

Check and add preservation as required to exposed machined surfaces on


chains/gear wheels . Report any damage to chains/gear wheels or paint to the
Maintenance Supervisor or Preservation Supervisor.

VCI-368/389

04

General visual inspection.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


LP01

VALVES (HAND OPERATED & CHECK VALVES)


CORRODABLE MATERIALS (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:
VCI-386

01

Check all permanent data plates or labels are protected with clear wax coating.

02

Check that paint surfaces are undamaged. If damaged report to Maintenance


Supervisor or Preservation Supervisor.

03

Check and confirm that all hand operated valves are in closed position, except for
ball, globe and fail safe OPEN valves, which shall be in the open position.

04

12

For valves in storage, check that all inlet/ outlet flanges are plugged or blinded.

05

12

Check that internal preservation is in good condition. Re-apply as necessary.

06

12

Check that stuffing box is sealed and tightening bolts are hand tight only.

07

12

Check that preservation of carbon steel valve spindles and all threaded spindles is Fin Lube Oil and Vulc Tape
intact.

VCI-368/389/322

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


LP02

BALL VALVES, GLOBE VALVES (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:
VCI-386

01

Check all permanent data plates or labels are protected with clear wax coating.

02

Check that paint surfaces are undamaged. If damaged report to Maintenance


Supervisor or Preservation Supervisor.

03

12

Check that internal preservation is in good condition. Re-apply as necessary.

04

Check and confirm that all hand operated valves are in closed position, except for
ball, globe and fail safe OPEN valves, which shall be in the open position.

05

12

For valves in storage, check that all inlet/ outlet flanges are plugged or blinded.

06

12

Check that preservation of carbon steel valve spindles and all threaded spindles is Fin Lube Oil and Vulc Tape
intact.

07

12

Check that stuffing box is sealed and tightening bolts are hand tight only.

VCI-368/389/322

Denso tape or Vulc Tape

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


LP03

PIPES AND FITTINGS


(ALL CONSTRUCTION PHASES) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check that all spools and lines during the construction and installation phases
have all open ends capped with heavy plastic caps, which are sealed with Denso
tape.

Vulc Tape

02

Check that all long and short term stored pipe spools have all open ends capped
with heavy plastic caps, which are sealed with Denso tape.

Vulc Tape

03

Ensure that preservation is intact on carbon steel flange faces.

VCI-368

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


LP04

PIPING SYSTEM (Dry air or corrosion inhibitor preservation) (Rev A)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

12

WARNING : Ensure the unit is not pressurised before carrying out any
preservation work. If pressurised, report to the Maintenance Supervisor or
Preservation Supervisor before proceeding.

02

12

NOTE : Dry Air Preservation or corrosion inhibitor to be used as applicable.

03

12

Check internal coating of pipe for VCI coverage. Re-preserve as required.


NOTE : USE MUST BE APPROVED BY KUP HSE !

04

12

NOTE : Inspection to be carried out before commissioning.


Perform a video inspection of the, pipe internals to check for corrosion and
cleanliness. If pipe dimension or configuration does not allow for use of a video
camera, visual inspection methods such as boroscope or naked eye shall be
adopted.

05

12

NOTE : Ensure draining/drying made after hydrotest.

Cortec VCI-309/609

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


QP01

COMPUTER ACCESS FLOORS (RAISED)

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Visually check that floor panels are either properly located in the floor grid or
properly stored.
Rectify as required.

02

Visually inspect installed floor panel finishes for mechanical damage or


delamination. Report any damage to Maintenance Supervisor or Preservation
Supervisor.

03

Visually inspect underfloor substructure for:


- Stability
- Loose pedestals
- Damage and corrosion
Rectify as required.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


QP02

FLOOR FINISHES, PARTITIONS, GLAZED PANELS

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:
01

Frequency: Description:
4

Preservation Materials:

Visually check that protection is intact and there is no mechanical damage to


applied finishes. Rectify as required. Report damage to Maintenance Supervisor or
Preservation Supervisor.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


QP03

SUSPENDED CEILINGS

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Visually check that ceiling panels are either properly installed, or properly stored. If
stored, check that the polythene foil protection to the insulation is intact.
Rectify as required.

02

Visually inspect ceiling panels for mechanical damage or distortion. Report


damage to Maintenance Supervisor or Preservation Supervisor.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


UP01

DRY FIX INSULATION

Originator :

Doc No :

Issued :

Supplier :

PONo :

Supplier Doc No :

Ref :

Item:
01

Frequency: Description:
4

Preservation Materials:

Visually check insulation and vapour barrier for mechanical damage. Report any
damage to Maintenance Supervisor or Preservation Supervisor.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


PAR01

Final Preservation Checklist Prior to Transportation (Rev 0)

Originator :

KUP MC

Doc No :

Issued :

10.01.98

Supplier :

PONo :

C309418

Supplier Doc No :

Grootint, Holland

Ref :

Item:

Frequency: Description:

Preservation Materials:

01

Check that all open ended piping has plastic end caps installed and that these are
taped secure to prevent ingress of water/moisture.

End Caps/Waterproof Tape

02

Check that all open flanges have a blank installed (bolted) and taped secure to
prevent ingress of water/moisture.

Blanks/Bolts/Waterproof Tape

03

Check that all piping insulation terminations are suitably sealed to prevent ingress
of water/moisture.

04

Check that all junction boxes and thermostats covers are securely fastened and
taped to prevent ingress of water/moisture.

Waterproof Tape

05

Check that all spare glands in junction boxes and thermostats are sealed with
correct type of blank plugs.

Blank Plugs

06

Check that all electric heat tracing tape free ends are suitably end sealed.

End Seals

07

Check that all power cable free ends are suitably end sealed.

End Seals

08

Check that all lighting fixture have gaskets installed and that covers are securely
fastened.

09

Check that all spare glands in lighting fixtures are sealed with correct type of blank Blank plugs
plugs.

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


PAT01

Originator :

Final Preservation Checklist Prior to Transportation (Rev A)

KUP-MC

Issued :
PONo :

C309405

Ref :

PAT-6..

Item:

Doc No :

E060-ED-A-YE00...001

Supplier :

Fabricom, Belgium

Supplier Doc No : E060-ED-A-YE00...001

Frequency: Description:

Preservation Materials:

01

Check that all open ended piping has plastic end caps installed and that these are
taped secure to prevent ingress of water/moisture.

End Caps/Waterproof Tape

02

Check that all open flanges have a blank installed (bolted) and taped secure to
prevent ingress of water/moisture.

Blanks/Bolts/Waterproof Tape

03

Check that all piping insulation terminations are suitably sealed to prevent ingress
of water/moisture.

04

Check that all junction boxes and thermostats covers are securely fastened and
taped to prevent ingress of water/molsture.

Waterproof Tape

05

Check that all spare glands in junction boxes and thermostats are sealed with
correct type of blank plugs.

Blank Plugs

06

Check that all electric heat tracing tape free ends are suitably end sealed.

End Seals

07

Check that all power cable free ends are suitably end sealed.

End Seals

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Preservation Maintenance Check List


PAU-

Final Preservation Checklist Prior to Transportation (Rev A)

Originator :

KUP-MC

Doc No :

E060-ED-A-YE0062.001

Issued :

22.03.99

Supplier :

Fabricom, Belgium

PONo :

C309405

Supplier Doc No : E060-ED-A-YE0062.001

Ref :

PAU-106

Item:

Frequency: Description:

Preservation Materials:

01

Check that all open ended piping has plastic end caps installed and that these are
taped secure to prevent ingress of water/moisture.

End Caps/Waterproof Tape

02

Check that all open flanges have a blank installed (bolted) and taped secure to
prevent ingress of water/moisture.

Blanks/Bolts/Waterproof Tape

03

Check that all piping insulation terminations are suitably sealed to prevent ingress
of water/moisture.

04

Check that all junction boxes and thermostats covers are securely fastened and
taped to prevent ingress of water/molsture.

Waterproof Tape

05

Check that all spare glands in junction boxes and thermostats are sealed with
correct type of blank plugs.

Blank Plugs

06

Check that all electric heat tracing tape free ends are suitably end sealed.

End Seals

07

Check that all power cable free ends are suitably end sealed.

End Seals

'Frequency' means number of weeks between preservation maintenance.

SubContractor:
Name :
Sign :
Date :

EPCS:

Company:

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 32 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10.4

Preservation Label

FRONT SIDE

K:\5622kup\shared\Kupproc\preserve

REAR SIDE

Doc. no.:
Rev. no.: 0

E060-AD-A-KB0001
Rev. date: 27.10.98
Page 33 of 36

STORAGE, HANDLING AND PRESERVATION MAINTENANCE MANUAL


__________________________________________________________________
_

10.5

Preservation Verification Certificate

K:\5622kup\shared\Kupproc\preserve

Preservation Verification Certificate


( PVC01 )
Commissioning Pack :
Title

Part System :

Statement

It is hereby verified that the equipment and items included in the referenced Commissioning
Package have been preserved and maintained in accordance with the Storage, Handling and
Preservation Maintenance Manual E060-AD-A-KB 0001, Suppliers recommendations and the
preservation status report attached.
Any deviation or outstanding work shall be listed below. Reference shall be made to punch list and
item number as appropriate.
Status report reference:

Comments:

Prepared/Accepted by: PR (Mech)

Prepared/Accepted by:ABB (E/I)

Accepted by Construction

Accepted by : Commissioning

Name :

Name :

Name :

Name :

Sign :

Sign :

Sign :

Sign :

Date :

Date :

Date :

Date :

PIMS 97 - Preservation (Concept by Omega AS)