Beruflich Dokumente
Kultur Dokumente
Our Vision
Key Management
M.Huzaini M. Hussein,
Financial Controller
SreetharanSelvarajah,
Project Manager
Farrah WahidaArsidi,
Procurement Manager
Ahmad JeffridinJais, HR
Manager
QUALITY POLICY
To achieve Total Customer
Satisfaction, we shall strive for
competitiveness, continuous
improvement and excellence
through Human Resource
Development.
SAFETY POLICY
Wewillstrivetomanageallrisksandprevent
allaccidents,injuriesand
occupationalillnessandpollutionthroughth
einvolvementofmanagementandeveryemp
loyeetoidentify,recognize,
control,manageandeliminaterisksassociat
edwithitsactivities.
Page 1
Equity Structure
1.
Authorised Capital
2.
Paid Up Capital
: RM 25,000,000.00
: RM 25,000,000.00
Shareholding Structure
Shareholders
Board of Directors
Page 2
Ministry of Finance
CIDB G7 (B04, CE21, ME15)
DOSH Gas Contractor Company
SIRIM ISO 9001:2008
Petronas License
(357-02053962)
(0120041102-WP099754)
(BP21/396)
(AR5264)
Page 3
No
Description of Scope
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Hoisting Maintenance-Hoists
Hoisting Maintenance-Winches
Hoisting Maintenance - Wire Rope
Instrumentation Maintenance - Pneumatic Actuated Valve
Instrumentation Maintenance -Motor Operated Valve
Instrumentation Maintenance -Regulator
Instrumentation Maintenance -Solenoid Operated Valve
Mechanical Eng. Maintenance -Heat Exchangers, Condensers & Cooler
Mechanical Maintenance - Machining-In-Situ Machining
Mechanical Eng. Maintenance -Living Quarters
Offshore Facilities Construction - Minor Onshore Fabrication - Civil Works
Offshore Facilities Construction - Minor Onshore Fabrication - Mechanical
Offshore Facilities Construction - Repairs of Offshore Facilities
Offshore Facilities Construction - Major Fabrication - Onshore Facilities
Pipeline Construction / Installation - Onshore Pipeline Construction - General
Pipeline & Associated Service -Pipeline Coating
Pipeline & Associated Service - Pipeline Maintenance - Pipeline Cleaning, Inspection &
Repair - Onshore Pipeline Inspection & Repair
Quality Assurance-Material,Corrosion & Inspection- Corrosion Protection
Special Categories Maintenance -Hot Tapping & Line Stopling
Tanks/Tank Farms-Large Tank - 100 KBBL
18.
19.
20.
SWEC Code
SH1020000
SH1050000
SH1080000
SI2010100
SI2010400
SI2010500
SI2010600
SM5010400
SM5080200
SM5170200
SO2020201
SO2020203
SO2010200
SO2020102
SP1020101
SP1020300
SP1040103
SQ1080200
SS1030200
ST1010200
Page 4
Areas of Expertise
Fabrication of Structures and Piping
Maintenance,ShutdownandTurnaround
StructuralFabricationofOffshoreStructures
a) IntegratedMaintenanceFabrication/PaintingWorks
Jackets-Monopod,Tripod,4-Leggedand8Legged,IntegratedTopsides,ProcessandProduction
Modules,
WaterInjectionModules,LivingQuarters,Furnaceand
Boilers,FPSO/FSOConversionandProcessDesks,
TurretandMooringBuoy
Mainlyconcentratedintheoilandgasandpetrochemicalsind
ustriesservicingclientssuchasEPMI,PetronasCarigali,Tiox
ide,AmocoChemicals,WRGrace,FPGOleochemicalsandot
hersectorsofoil/gas.
FabricationandInstallationofPipingSystemfo
rOffshore/OnshoreFacilities
Duplex,StainlessSteel,CopperNickel,LowTempandC
arbonSteelPiping,GalvanizedPipe,GREPipeandPVC
Pipe,SystemHydrotesting,BoltTensioningandHydraTight,ProcessSystemPipingPackages,WaterInjectio
nPackage,ChemicalInjectionPackage,Compression
andDehydrationPackage
b) ShutdownandTurnaroundWorks
Vesselcleaning,
tank
cleaning,insulationworkshot&cold,boiler
repair
andfabricate,scaffoldingworks,blastingandpainting,valve
s
refurbishmentandoverhaulandsupplyofskilledmanpower.
Page 5
Areas of Expertise
Feedwater Heaters
Condensers
Evaporators
Coolers
Shell
Page 6
Project Achievements
Piping Fabrication E&I SAMUR Project Package Piping 3 (Utility & Offsite)
SAMUR Project, Package P3, Above Ground Piping Work Package 3 (Utility & Offsite) with total diameter inch of 216,000
(18 month) worth RM44.5 million.
Providing all necessary equipments, tools, scaffolding, access and related consumables for completing of the works.
Supply of qualified and competent personnel needed to complete the works. This include all prequalification tests required such
as welder qualification and local authority pass.
Test, inspection and calibration as requirement according to contractor specification and owner standards.
Page 7
Project Achievements
RM 12.8 mil
RM 7.4 mil
RM 5.8 mil
RM 10.3 mil
Page 8
Project Achievements
Page 9
Page 10
Project Consulting
Project Management
Structural Fabricator
Maintenance of Equipment
Pipeline Specialist
Chief
3. Farrah WahidaArsidi,
Procurement
Manager,
farrah_wahida@ingresscorp.com.my
4. Ahmad Yazid Omar,
Project
Manager
ahmadyazid@ingresscorp.com.my