project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
(1):C30
(1)
concrete column formwark
(2)
rectangular frame column
cast-in-place concrete
consctructional column
(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commodity concrete
(3)
constructional column
cast-in-place concrete
constructional column
formwork
(1)
constructional column formawork
(2)
cast-in-place concrete
lintel
(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commercial concrete
(3)
lintel
cast-in-place concrete
lintel formwork
(1)
lintel formwork
(2)
M3
M2
M3
M2
M3
M2
6.87
67.24
0.95
15.2
0.69
6.9
1 35
1,350,000
97,500
1,350,000
97,500
1,350,000
97,500
no.
project
code
project name
unit of
measuremen
t
engineering
volume
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
cast-in-place concrete
beam
(1)
beam formwork
(2)
M2
64.12
cast-in-place concrete
beam
(1):C15
concrete strength grade:C15
(2):
concrete mixing requirement:pumpdelivery commercial concrete
M3
10
cast-in-place concrete
beam
(1)
beam formwork
(2)
11
cast-in-place concrete
beam
12
13
RP
comprehensive
unit
priceRP
RP
total price
remark
1,350,000
97,500
7.2
1,350,000
M2
9.94
97,500
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
M3
6.3
1,350,000
cast-in-place concrete
beam
(1)
beam formwork
(2)
M2
52.4
97,500
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
M3
0.3
1,350,000
M3
34.875
2 35
no.
project
code
project name
14
cast-in-place concrete
beam
(1)
beam formwork
(2)
15
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
16
cast-in-place concrete
beam
(1)
beam formwork
(2)
17
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
18
cast-in-place concrete
beam
(1)
beam formwork
(2)
17
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
unit of
measuremen
t
M2
M3
M2
M3
M2
M3
engineering
volume
2.6
7.46
56.78
7.4
63.2
3.83
3 35
RP
comprehensive
unit
priceRP
RP
total price
remark
97,500
1,350,000
97,500
1,350,000
97,500
1,350,000
no.
18
project
code
project name
cast-in-place concrete
beam
(1):10
rebar typespecification: less than
10
19
cast-in-place concrete
rebar material expense
20
(1):10
(1):1020
rebar typespecification:above
10, lower than 20
21
cast-in-place concrete
rebar material expense
22
(1):1020
rebar typespecification:above
cast-in-place rebar
processingmakinginst 10, lower than 22
allation
unit of
measuremen
t
M2
engineering
volume
32.9
1.813
1.813
4.086
4.086
4 35
RP
comprehensive
unit
priceRP
97,500
RP
total price
remark
12,500,000
4,250,000
12,500,000
4,250,000
no.
project
code
project name
(1):20
rebar typespecification:above 20
23
cast-in-place concrete
rebar material expense
24
(1):20
rebar typespecification:above 20
cast-in-place rebar
processingmakinginst
allation
25
26
27
other components
other components
formwork
-0.060
damp-proof course at
elevation -0.060 meter
(1):C25
concrete strength grade:C25
(2):
concrete mixing
requirement:commercial concrete
(3)
other miscellaneous components
(1)
other components formwork
(2)
unit of
measuremen
t
M3
M2
M2
engineering
volume
0.194
0.194
1.62
18.32
105.6
5 35
RP
comprehensive
unit
priceRP
RP
total price
remark
12,500,000
4,250,000
700,000
100,000
50,000
no.
project
code
project name
(1)M5
buid up walls with M5 special mortar
(2)
29
(1)M5
build up walls with M5 cement mortar
(2)
parapets and other walls
(3)Mu10
solid lime-sand brick:Mu10
30
other miscellaneous
project
28
unit of
measuremen
t
M3
M3
items
engineering
volume
37.6
13.2
RP
comprehensive
unit
priceRP
remark
1,350,000
766,705
5,000,000
RP
total price
(1)
ordinary plastering engineering
(2)151:1:6
3%~5%
(3)51:0.5:3
M2
M2
399.81
180.36
6 35
55,000
55,000
no.
project
code
project name
(1)
used for all the internal wall of
workshop
(2)
(3)
(4)
(1)
external wall
(1)
silver grey acrylic acid outer wall
paint
(2)1.2
used for masonry wall above 1.2
meter of workshop external fence
wall
(3)1
set seam on paint outer wall, seam
width 15, seam depth 20, fully
insert black architectural ointment
(1)
1
baseboard 1
(1)
ground 1
(1)150
100 height floor tile baseboard
(2)1
(1)1
unit of
measuremen
t
M2
M2
M2
M2
engineering
volume
180.36
179.85
44.55
31.2
60.1
7 35
RP
comprehensive
unit
priceRP
RP
total price
remark
25,000
35,000
766,705
100,000
162,065
no.
project
code
project name
(1)
(1)1
baseboard 1
unit of
measuremen
t
M2
engineering
volume
31.2
RP
comprehensive
unit
priceRP
162,065
RP
total price
remark
94,786,326
M-1
(1)
finished steel painted soundproof
door
(2)M1(1500*2100)
refer to construction01-construction
table 1
window
(1)88
88 series plastic-steel coombined
sliding window
(2)M-1(1500*1500)
refer to construction01-construction
table 2
PCs
M2
6.75
1,500,000
595,000
5,516,250
items
1,500,000
1,500,000
1,500,000
other miscellaneous
project that may
generate during
construction
68.1
8 35
50,000
3,405,000
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
completion cleanliness
68.1
15,000
1,021,500
construction waste
outward delivery
68.1
75,000
5,107,500
(1)\
M3
108.8
70,000
earthwork outward
delivery
(1)
surplus earthwork deliver outside
M3
42.1
30,000
earthwork backfilling
local backfilling
M3
66.7
55,000
22,081,500
disposal cost
1
68.1
10,000
681,000
68.1
25,000
1,702,500
temporary facilities
cost
68.1
50,000
3,405,000
5,788,500
9 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
tax
ls
44,448,788
44,448,788
administration cost
ls
6,667,318
6,667,318
insurance
ls
11,112,197
11,112,197
ls
11,112,197
11,112,197
profit
ls
66,673,182
66,673,182
remark
140,013,683
total
584,501,565
remark:
1
This quotation is taxed lump sum price for the working contents contained in the construction drawing, including all the quality inspectiontest expenditures for ensuring
the project quality.
2
The quotation should include all industry zone costlocal residents cost generated by all machine
3
The project amount list quotation shall be quoted in US dollar in terms of comprehensive unit price and total price.
4
The price in this project quotation sheet shall include all cost generated during construction preparation, construction, installation, completion, maintenance and warranty,
among which include the construction machine cost(include the transfer and disassembly of large machine), labor, material, management, profit, taxes, policy adjustment
expenses and all risk, responsibilities and construction measure expense indicated in the contract, and all kind of cost that may generate during the construction process.
5
This quotation equals the expense for completing all the working contents stipulated in this bidding document and supplementary document. Items without unit price and total
price won't be paid, and the expense will be assumed containing in the engineering quotation summary list;
10 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
6()
This project adopt the principle of fixed total price remain invariable. Once sign the contract, it shall be regarded as the contractor has taken all risks during the
contract implementation period(except force majeure) into consideration. During the contract implementation period, the contract total price shall not be changed owing to
any reason, such as the change or adjustment of policy or any other market factors. All cost for the bid winner to complete this project shall be contained in the bidding
price. Contract price shall not be adjusted in principle, the parts that can be adjusted are only restricted to the contents clearly required in the bidding document.
11 35
12 35
13 35
14 35
15 35
16 35
17 35
18 35
19 35
20 35
21 35
22 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
(1):C30
(1)
concrete column formwark
(2)
rectangular frame column
cast-in-place concrete
consctructional column
(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commodity concrete
(3)
constructional column
cast-in-place concrete
constructional column
formwork
(1)
constructional column formawork
(2)
cast-in-place concrete
lintel
(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commercial concrete
(3)
lintel
cast-in-place concrete
lintel formwork
(1)
lintel formwork
(2)
M3
M2
M3
M2
M3
M2
12.32
123.2
3.19
51
2.406
28.875
23 35
no.
project
code
project name
cast-in-place concrete
beam
cast-in-place concrete
beam
cast-in-place concrete
beam
beam formwork
(2)
unit of
measuremen
t
M3
engineering
volume
189.797
RP
comprehensive
unit
priceRP
RP
total price
remark
M2
75.22
M3
35.01
M2
13.902
10
cast-in-place concrete
beam
(1)
beam formwork
(2)
11
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
M3
46.716
12
cast-in-place concrete
beam
(1)
beam formwork
(2)
M2
394.3
13
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
M3
1.38
24 35
no.
project
code
project name
14
cast-in-place concrete
beam
(1)
beam formwork
(2)
15
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
16
cast-in-place concrete
beam
(1)
beam formwork
(2)
17
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
18
cast-in-place concrete
beam
(1)
beam formwork
(2)
17
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
unit of
measuremen
t
M2
M3
M2
M3
M2
M3
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
11.53
8.925
71.4
15.125
148.5
5.701
25 35
no.
project
code
project name
18
cast-in-place concrete
beam
(1)
beam formwork
(2)
17
cast-in-place concrete
beam
(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
cast-in-place concrete
beam
(1)
beam formwork
(2)
18
unit of
measuremen
t
M2
M3
M2
(1):10
rebar typespecification: less than
10
19
cast-in-place concrete
rebar material expense
20
(1):10
21
cast-in-place concrete
rebar material expense
(1):1020
rebar typespecification:above
10, lower than 20
engineering
volume
54.185
135.484
903.227
RP
comprehensive
unit
priceRP
RP
total price
remark
27.362
27.362
55.681
26 35
no.
22
project
code
project name
unit of
measuremen
t
(1):1020
rebar typespecification:above
cast-in-place rebar
processingmakinginst 10, lower than 22
allation
(1):20
rebar typespecification:above 20
23
cast-in-place concrete
rebar material expense
24
(1):20
rebar typespecification:above 20
cast-in-place rebar
processingmakinginst
allation
25
26
other components
other components
formwork
(1):C25
concrete strength grade:C25
(2):
concrete mixing
requirement:commercial concrete
(3)
other miscellaneous components
(1)
other components formwork
(2)
M3
M2
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
55.681
1.102
1.102
5.03
48.32
27 35
no.
project
code
project name
-0.060
damp-proof course at
elevation -0.060 meter
(1)20
damp-proofing course thickness:20
(2)1:25%
the weght proporation for cement,
mortar and moisture proof agent is
100:200:5
(1)M5
buid up walls with M5 special mortar
(2)
29
(1)M5
build up walls with M5 cement mortar
(2)
parapets and other walls
(3)Mu10
solid lime-sand brick:Mu10
30
other miscellaneous
project
27
28
unit of
measuremen
t
engineering
volume
M2
27.12
98.175
6.78
M3
M3
items
RP
total price
remark
RP
comprehensive
unit
priceRP
M2
835.45
28 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
(1)
ordinary plastering engineering
(2)151:1:6
3%~5%
(3)51:0.5:3
M2
392.7
(1)
used for all the internal wall of
workshop
(2)
(3)
(4)
M2
392.7
(1)
external wall
(1)
silver grey acrylic acid outer wall
paint
(2)1.2
used for masonry wall above 1.2
meter of workshop external fence
wall
(3)1
set seam on paint outer wall, seam
width 15, seam depth 20, fully
insert black architectural ointment
M2
338.8
(1)
M2
103.95
82.6
1
baseboard 1
(1)150
100 height floor tile baseboard
(2)1
29 35
no.
10
project
code
project name
(1)
(1)1
(1)02,1-1
(1)11ZJ311--3/34
(1)
(1)1
baseboard 1
unit of
measuremen
t
M2
M2
M2
M2
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
60.1
232.98
395.56
192.06
FJLM-1
(1)
(2)(3000*3000)
PCs
30 35
no.
project
code
project name
FM-1
(1)
(2)(2000*2800)
FM-2
(1)
(2)(1500*2100)
FM-3
FM-1
(C-1)
window
BYC-1)
window
(1)
(2)(1000*2100)
(1)
(2)(1000*2100)
(1)6+12+6
(2)
(1)
(2)
unit of
measuremen
t
PCs
PCs
PCs
PCs
M2
M2
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
22.5
11.52
31 35
no.
10
11
project
code
project name
(1)
(2)1200mm,
02J401-T4A07/171/18,5/18
(102J401
T106/11,3/11,5/12
(102J401
T4A07/171/18,5/18
unit of
measuremen
t
(1
(2)800*800
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
16.5
items
32 35
unit of
measuremen
t
engineering
volume
other miscellaneous
project that may
generate during
construction
425
completion cleanliness
425
construction waste
outward delivery
425
(1)\
earthwork outward
delivery
(1)
surplus earthwork deliver outside
earthwork backfilling
local backfilling
no.
project
code
project name
M3
M3
M3
RP
comprehensive
unit
priceRP
RP
total price
remark
1544.99
1250.865
294.125
disposal cost
1
425
425
temporary facilities
cost
425
33 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
tax
ls
administration cost
ls
insurance
ls
ls
profit
ls
total
remark:
1
This quotation is taxed lump sum price for the working contents contained in the construction drawing, including all the quality inspectiontest expenditures for ensuring
the project quality.
2
The quotation should include all industry zone costlocal residents cost generated by all machine
3
The project amount list quotation shall be quoted in US dollar in terms of comprehensive unit price and total price.
34 35
no.
project
code
project name
unit of
measuremen
t
engineering
volume
RP
comprehensive
unit
priceRP
RP
total price
remark
The price in this project quotation sheet shall include all cost generated during construction preparation, construction, installation, completion, maintenance and warranty,
among which include the construction machine cost(include the transfer and disassembly of large machine), labor, material, management, profit, taxes, policy adjustment
expenses and all risk, responsibilities and construction measure expense indicated in the contract, and all kind of cost that may generate during the construction process.
5
This quotation equals the expense for completing all the working contents stipulated in this bidding document and supplementary document. Items without unit price and total
price won't be paid, and the expense will be assumed containing in the engineering quotation summary list;
6()
This project adopt the principle of fixed total price remain invariable. Once sign the contract, it shall be regarded as the contractor has taken all risks during the
contract implementation period(except force majeure) into consideration. During the contract implementation period, the contract total price shall not be changed owing to
any reason, such as the change or adjustment of policy or any other market factors. All cost for the bid winner to complete this project shall be contained in the bidding
price. Contract price shall not be adjusted in principle, the parts that can be adjusted are only restricted to the contents clearly required in the bidding document.
35 35