Sie sind auf Seite 1von 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

(1):C30

concrete strength grade:C30


rectangular frame column (2):
of cast-in-place
concrete mixing requirement:pumpconcrete
delivery commercial concrete

(1)
concrete column formwark

(2)
rectangular frame column

formwork of cast-inincluding all the frame work and


place concrete
auxiliary material needed for
formwork engineering

cast-in-place concrete
consctructional column

(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commodity concrete
(3)
constructional column

cast-in-place concrete
constructional column
formwork

(1)
constructional column formawork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

cast-in-place concrete
lintel

(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commercial concrete
(3)
lintel

cast-in-place concrete
lintel formwork

(1)
lintel formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M3

M2

M3

M2

M3

M2

6.87

67.24

0.95

15.2

0.69

6.9

1 35

1,350,000

9,274,500 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

6,555,900 according to the requirement of


construction drawing, including all
the auxiliary material

1,350,000

1,282,500 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

1,482,000 according to the requirement of


construction drawing, including all
the auxiliary material

1,350,000

931,500 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

672,750 according to the requirement of


construction drawing, including all
the auxiliary material

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M2

64.12

cast-in-place concrete
beam

(1):C15
concrete strength grade:C15
(2):
concrete mixing requirement:pumpdelivery commercial concrete

M3

10

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

11

cast-in-place concrete
beam

12

13

RP
comprehensive
unit
priceRP

RP
total price

remark

1,350,000

47,081,250 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

6,251,700 according to the requirement of


construction drawing, including all
the auxiliary material

7.2

1,350,000

9,720,000 according to the requirement of


construction drawing, including all
the auxiliary material

M2

9.94

97,500

969,150 according to the requirement of


construction drawing, including all
the auxiliary material

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

M3

6.3

1,350,000

8,505,000 according to the requirement of


construction drawing, including all
the auxiliary material

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M2

52.4

97,500

5,109,000 according to the requirement of


construction drawing, including all
the auxiliary material

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

M3

0.3

1,350,000

405,000 according to the requirement of


construction drawing, including all
the auxiliary material

M3

34.875

2 35

no.

project
code

project name

project character description

14

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

15

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

16

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

17

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

18

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

17

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

unit of
measuremen
t

M2

M3

M2

M3

M2

M3

engineering
volume

2.6

7.46

56.78

7.4

63.2

3.83

3 35

RP
comprehensive
unit
priceRP

RP
total price

remark

97,500

253,500 according to the requirement of


construction drawing, including all
the auxiliary material

1,350,000

10,071,000 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

5,536,050 according to the requirement of


construction drawing, including all
the auxiliary material

1,350,000

9,990,000 according to the requirement of


construction drawing, including all
the auxiliary material

97,500

6,162,000 according to the requirement of


construction drawing, including all
the auxiliary material

1,350,000

5,170,500 according to the requirement of


construction drawing, including all
the auxiliary material

no.

18

project
code

project name

cast-in-place concrete
beam

project character description


(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

(1):10
rebar typespecification: less than
10

19

cast-in-place concrete
rebar material expense

20

(1):10

rebar typespecification: less than


cast-in-place rebar
processingmakinginst 10
allation

(1):1020
rebar typespecification:above
10, lower than 20

21

cast-in-place concrete
rebar material expense

22

(1):1020

rebar typespecification:above
cast-in-place rebar
processingmakinginst 10, lower than 22
allation

unit of
measuremen
t

M2

engineering
volume

32.9

1.813

1.813

4.086

4.086

4 35

RP
comprehensive
unit
priceRP

97,500

RP
total price

remark

3,207,750 according to the requirement of


construction drawing, including all
the auxiliary material

12,500,000

purchase rebar according to the


22,662,500 requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

4,250,000

7,705,250 request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

12,500,000

purchase rebar according to the


51,075,000 requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

4,250,000

17,365,500 request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

no.

project
code

project name

project character description

(1):20
rebar typespecification:above 20

23

cast-in-place concrete
rebar material expense

24

(1):20

rebar typespecification:above 20
cast-in-place rebar
processingmakinginst
allation

25

26

27

other components

other components
formwork

-0.060
damp-proof course at
elevation -0.060 meter

(1):C25
concrete strength grade:C25
(2):
concrete mixing
requirement:commercial concrete
(3)
other miscellaneous components
(1)
other components formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering
(1)20
damp-proofing course thickness:20
(2)1:25%
the weght proporation for cement,
mortar and moisture proof agent is
100:200:5

unit of
measuremen
t

M3

M2

M2

engineering
volume

0.194

0.194

1.62

18.32

105.6

5 35

RP
comprehensive
unit
priceRP

RP
total price

remark

12,500,000

purchase rebar according to the


2,425,000 requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

4,250,000

824,500 request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

700,000

1,134,000 according to the requirement of


construction drawing, including all
the auxiliary material

100,000

1,832,000 according to the requirement of


construction drawing, including all
the auxiliary material

50,000

5,280,000 according to the requirement of


construction drawing, including all
the auxiliary material

no.

project
code

project name

project character description

aerated concrete block

(1)M5
buid up walls with M5 special mortar
(2)

plant fence wall and auxiliary wall


(3)A5
concrete block strength grade:A5

29

solid lime-sand brick

(1)M5
build up walls with M5 cement mortar
(2)
parapets and other walls
(3)Mu10
solid lime-sand brick:Mu10

30

other miscellaneous
project

all the miscellaneous project during


the construction of the main part

28

unit of
measuremen
t

M3

M3

items

engineering
volume

37.6

13.2

RP
comprehensive
unit
priceRP

remark

1,350,000

according to the requirement of


50,760,000 construction drawing, including all
the auxiliary material(including all
other wall built-in material like
built-in steel mesh etc.)

766,705

according to the requirement of


10,120,506 construction drawing, including all
the auxiliary material(including all
other wall built-in material like
built-in steel mesh etc.)

5,000,000

RP
total price

according to the requirement of


5,000,000 construction drawing and
specification, including all the
auxiliary material
314,815,306

decoration engineering of pressing and painting workshop


(1)

ordinary plaster work


nail(hang) steel mesh on (2)
the internal wall
nail(hang) steel mesh

internal wall ordinary


plastering

(1)
ordinary plastering engineering
(2)151:1:6

3%~5%
(3)51:0.5:3

M2

M2

399.81

180.36

6 35

55,000

21,989,550 according to all the procedure for


nailing(hanging) steel mesh

55,000

9,919,800 according to all the procedure for


plastering requested in construction
drawing and specification

no.

project
code

project name

project character description

white emulsion paint


internal wall

(1)
used for all the internal wall of
workshop
(2)
(3)
(4)

(1)
external wall

(1)
silver grey acrylic acid outer wall
paint
(2)1.2
used for masonry wall above 1.2
meter of workshop external fence
wall
(3)1
set seam on paint outer wall, seam
width 15, seam depth 20, fully
insert black architectural ointment

(1)

facing brick on internal (2)1.2


wall
(3)2

1
baseboard 1

(1)
ground 1

(1)150
100 height floor tile baseboard
(2)1

(1)1

unit of
measuremen
t

M2

M2

M2

M2

engineering
volume

180.36

179.85

44.55

31.2

60.1

7 35

RP
comprehensive
unit
priceRP

RP
total price

remark

25,000

4,509,000 according to the requirement of


construction drawing, including all
the auxiliary material

35,000

according to the requirement of


6,294,750 construction drawing and
specification, including all the
auxiliary material

766,705

34,156,708 according to the requirement of


construction drawing, including all
the auxiliary material

100,000

according to the requirement of


3,120,000 construction drawing and
specification, including all the
auxiliary material

162,065

according to the requirement of


9,740,096 construction drawing and
specification, including all the
auxiliary material(exclude anticorrosion epoxy coating)

no.

project
code

project name

project character description

(1)
(1)1
baseboard 1

unit of
measuremen
t

M2

engineering
volume

31.2

RP
comprehensive
unit
priceRP

162,065

RP
total price

remark

according to the requirement of


5,056,423 construction drawing and
specification, including all the
auxiliary material

94,786,326

window and door for pressing and paiting workshop

M-1

(1)
finished steel painted soundproof
door
(2)M1(1500*2100)
refer to construction01-construction
table 1

window

(1)88
88 series plastic-steel coombined
sliding window
(2)M-1(1500*1500)
refer to construction01-construction
table 2

PCs

M2

6.75

1,500,000

1,500,000 according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

595,000

4,016,250 according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

5,516,250

other miscellaneous project


1

items

1,500,000

1,500,000
1,500,000

other miscellaneous project

other miscellaneous
project that may
generate during
construction

68.1

8 35

50,000

3,405,000

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

completion cleanliness

68.1

15,000

1,021,500

construction waste
outward delivery

68.1

75,000

5,107,500

(1)\

dig ground terrace


digging excess earthwork engineering/earthwork in elevator
room

M3

108.8

70,000

7,616,000 based on the requirement of


construction drawing and field
actual condition

earthwork outward
delivery

(1)
surplus earthwork deliver outside

M3

42.1

30,000

1,263,000 based on the requirement of


construction drawing and field
actual condition

earthwork backfilling

local backfilling

M3

66.7

55,000

3,668,500 based on the requirement of


construction drawing and field
actual condition

22,081,500

disposal cost
1

safe and civilized


construction cost

68.1

10,000

681,000

night construction cost

68.1

25,000

1,702,500

temporary facilities
cost

68.1

50,000

3,405,000

5,788,500

tax, administration cost,profit

9 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

tax

ls

44,448,788

44,448,788

administration cost

ls

6,667,318

6,667,318

insurance

ls

11,112,197

11,112,197

other miscellaneous fees

ls

11,112,197

11,112,197

profit

ls

66,673,182

66,673,182

remark

140,013,683

total

total price including


taxadministration
costprofit

584,501,565

remark:
1
This quotation is taxed lump sum price for the working contents contained in the construction drawing, including all the quality inspectiontest expenditures for ensuring
the project quality.
2
The quotation should include all industry zone costlocal residents cost generated by all machine

entering/leaving the field, material, labor etc.

3
The project amount list quotation shall be quoted in US dollar in terms of comprehensive unit price and total price.
4

The price in this project quotation sheet shall include all cost generated during construction preparation, construction, installation, completion, maintenance and warranty,
among which include the construction machine cost(include the transfer and disassembly of large machine), labor, material, management, profit, taxes, policy adjustment
expenses and all risk, responsibilities and construction measure expense indicated in the contract, and all kind of cost that may generate during the construction process.
5
This quotation equals the expense for completing all the working contents stipulated in this bidding document and supplementary document. Items without unit price and total
price won't be paid, and the expense will be assumed containing in the engineering quotation summary list;

10 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

6()

This project adopt the principle of fixed total price remain invariable. Once sign the contract, it shall be regarded as the contractor has taken all risks during the
contract implementation period(except force majeure) into consideration. During the contract implementation period, the contract total price shall not be changed owing to
any reason, such as the change or adjustment of policy or any other market factors. All cost for the bid winner to complete this project shall be contained in the bidding
price. Contract price shall not be adjusted in principle, the parts that can be adjusted are only restricted to the contents clearly required in the bidding document.

11 35

12 35

13 35

14 35

15 35

16 35

17 35

18 35

19 35

20 35

21 35

22 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

(1):C30

concrete strength grade:C30


rectangular frame column (2):
of cast-in-place
concrete mixing requirement:pumpconcrete
delivery commercial concrete

(1)
concrete column formwark

(2)
rectangular frame column

formwork of cast-inincluding all the frame work and


place concrete
auxiliary material needed for
formwork engineering

cast-in-place concrete
consctructional column

(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commodity concrete
(3)
constructional column

cast-in-place concrete
constructional column
formwork

(1)
constructional column formawork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

cast-in-place concrete
lintel

(1):C25
concrete strength grade:C250
(2):
concrete mixing
requirement:commercial concrete
(3)
lintel

cast-in-place concrete
lintel formwork

(1)
lintel formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M3

M2

M3

M2

M3

M2

12.32

- according to the requirement of


construction drawing, including all
the auxiliary material

123.2

- according to the requirement of


construction drawing, including all
the auxiliary material

3.19

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

51

2.406

28.875

23 35

no.

project
code

project name

cast-in-place concrete
beam

cast-in-place concrete
beam

cast-in-place concrete
beam

project character description


(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete
(1)

beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering
(1):C15
concrete strength grade:C15
(2):
concrete mixing requirement:pumpdelivery commercial concrete

unit of
measuremen
t

M3

engineering
volume

189.797

RP
comprehensive
unit
priceRP

RP
total price

remark

- according to the requirement of


construction drawing, including all
the auxiliary material

M2

75.22

- according to the requirement of


construction drawing, including all
the auxiliary material

M3

35.01

- according to the requirement of


construction drawing, including all
the auxiliary material

M2

13.902

- according to the requirement of


construction drawing, including all
the auxiliary material

10

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

11

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

M3

46.716

- according to the requirement of


construction drawing, including all
the auxiliary material

12

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M2

394.3

- according to the requirement of


construction drawing, including all
the auxiliary material

13

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

M3

1.38

24 35

- according to the requirement of


construction drawing, including all
the auxiliary material

no.

project
code

project name

project character description

14

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

15

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

16

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

17

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

18

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

17

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

unit of
measuremen
t

M2

M3

M2

M3

M2

M3

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

11.53

- according to the requirement of


construction drawing, including all
the auxiliary material

8.925

- according to the requirement of


construction drawing, including all
the auxiliary material

71.4

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

15.125

148.5

5.701

25 35

no.

project
code

project name

project character description

18

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

17

cast-in-place concrete
beam

(1):C30
concrete strength grade:C30
(2):
concrete mixing requirement:pumpdelivery commercial concrete

cast-in-place concrete
beam

(1)
beam formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

18

unit of
measuremen
t

M2

M3

M2

(1):10
rebar typespecification: less than
10

19

cast-in-place concrete
rebar material expense

20

(1):10

rebar typespecification: less than


cast-in-place rebar
processingmakinginst 10
allation

21

cast-in-place concrete
rebar material expense

(1):1020
rebar typespecification:above
10, lower than 20

engineering
volume

54.185

135.484

903.227

RP
comprehensive
unit
priceRP

RP
total price

remark

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

- according to the requirement of


construction drawing, including all
the auxiliary material

27.362

purchase rebar according to the


- requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

27.362

- request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

55.681

purchase rebar according to the


- requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

26 35

no.

22

project
code

project name

unit of
measuremen
t

project character description

(1):1020

rebar typespecification:above
cast-in-place rebar
processingmakinginst 10, lower than 22
allation

(1):20
rebar typespecification:above 20

23

cast-in-place concrete
rebar material expense

24

(1):20

rebar typespecification:above 20
cast-in-place rebar
processingmakinginst
allation

25

26

other components

other components
formwork

(1):C25
concrete strength grade:C25
(2):
concrete mixing
requirement:commercial concrete
(3)
other miscellaneous components
(1)
other components formwork
(2)

including all the frame work and


auxiliary material needed for
formwork engineering

M3

M2

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

55.681

- request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

1.102

purchase rebar according to the


- requirement of construction drawing
and bidding document(including all
the expense of purchasing and
carrying fee,transportation fee
etc.)

- request all the procedure of


processingmakinginstallation
according to the requirement of
construction drawing

1.102

5.03

- according to the requirement of


construction drawing, including all
the auxiliary material

48.32

- according to the requirement of


construction drawing, including all
the auxiliary material

27 35

no.

project
code

project name

project character description

-0.060
damp-proof course at
elevation -0.060 meter

(1)20
damp-proofing course thickness:20
(2)1:25%
the weght proporation for cement,
mortar and moisture proof agent is
100:200:5

aerated concrete block

(1)M5
buid up walls with M5 special mortar
(2)

plant fence wall and auxiliary wall


(3)A5
concrete block strength grade:A5

29

solid lime-sand brick

(1)M5
build up walls with M5 cement mortar
(2)
parapets and other walls
(3)Mu10
solid lime-sand brick:Mu10

30

other miscellaneous
project

all the miscellaneous project during


the construction of the main part

27

28

unit of
measuremen
t

engineering
volume

M2

27.12

- according to the requirement of


construction drawing, including all
the auxiliary material

98.175

according to the requirement of


- construction drawing, including all
the auxiliary material(including all
other wall built-in material like
built-in steel mesh etc.)

6.78

according to the requirement of


- construction drawing, including all
the auxiliary material(including all
other wall built-in material like
built-in steel mesh etc.)

M3

M3

items

RP
total price

remark

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material

RP
comprehensive
unit
priceRP

decoration engineering of pressing and painting workshop


(1)

ordinary plaster work


nail(hang) steel mesh on (2)
the internal wall
nail(hang) steel mesh

M2

835.45

28 35

- according to all the procedure for


nailing(hanging) steel mesh

no.

project
code

project name

unit of
measuremen
t

project character description

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

internal wall ordinary


plastering

(1)
ordinary plastering engineering
(2)151:1:6

3%~5%
(3)51:0.5:3

M2

392.7

- according to all the procedure for


plastering requested in construction
drawing and specification

white emulsion paint


internal wall

(1)
used for all the internal wall of
workshop
(2)
(3)
(4)

M2

392.7

- according to the requirement of


construction drawing, including all
the auxiliary material

(1)
external wall

(1)
silver grey acrylic acid outer wall
paint
(2)1.2
used for masonry wall above 1.2
meter of workshop external fence
wall
(3)1
set seam on paint outer wall, seam
width 15, seam depth 20, fully
insert black architectural ointment

M2

338.8

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material

(1)

facing brick on internal (2)1.2


wall
(3)2

M2

103.95

- according to the requirement of


construction drawing, including all
the auxiliary material

82.6

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material

1
baseboard 1

(1)150
100 height floor tile baseboard
(2)1

29 35

no.

10

project
code

project name

(1)

project character description

(1)1

(1)02,1-1

(1)11ZJ311--3/34

(1)
(1)1
baseboard 1

unit of
measuremen
t

M2

M2

M2

M2

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

60.1

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material(exclude anticorrosion epoxy coating)

232.98

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material(exclude anticorrosion epoxy coating)

395.56

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material(exclude anticorrosion epoxy coating)

192.06

according to the requirement of


- construction drawing and
specification, including all the
auxiliary material

window and door for pressing and paiting workshop

FJLM-1

(1)
(2)(3000*3000)

PCs

30 35

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

no.

project
code

project name

project character description

FM-1

(1)
(2)(2000*2800)

FM-2

(1)
(2)(1500*2100)

FM-3

FM-1

(C-1)
window

BYC-1)
window

(1)
(2)(1000*2100)

(1)
(2)(1000*2100)

(1)6+12+6

(2)

(1)
(2)

unit of
measuremen
t

PCs

PCs

PCs

PCs

M2

M2

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

22.5

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

11.52

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

31 35

no.

10

11

project
code

project name

project character description

(1)
(2)1200mm,
02J401-T4A07/171/18,5/18

(102J401
T106/11,3/11,5/12

(102J401
T4A07/171/18,5/18

unit of
measuremen
t

(1
(2)800*800

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

16.5

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

- according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

according to the requirement of


construction drawing and
specification, including hardware
and all the auxiliary material

other miscellaneous project


1

items

other miscellaneous project

32 35

unit of
measuremen
t

engineering
volume

other miscellaneous
project that may
generate during
construction

425

completion cleanliness

425

construction waste
outward delivery

425

(1)\

dig ground terrace


digging excess earthwork engineering/earthwork in elevator
room

earthwork outward
delivery

(1)
surplus earthwork deliver outside

earthwork backfilling

local backfilling

no.

project
code

project name

project character description

M3

M3

M3

RP
comprehensive
unit
priceRP

RP
total price

remark

1544.99

- based on the requirement of


construction drawing and field
actual condition

1250.865

- based on the requirement of


construction drawing and field
actual condition

294.125

- based on the requirement of


construction drawing and field
actual condition

disposal cost
1

safe and civilized


construction cost

425

night construction cost

425

temporary facilities
cost

425

33 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

tax, administration cost,profit


1

tax

ls

administration cost

ls

insurance

ls

other miscellaneous fees

ls

profit

ls

total

total price including


taxadministration
costprofit

remark:
1
This quotation is taxed lump sum price for the working contents contained in the construction drawing, including all the quality inspectiontest expenditures for ensuring
the project quality.
2
The quotation should include all industry zone costlocal residents cost generated by all machine

entering/leaving the field, material, labor etc.

3
The project amount list quotation shall be quoted in US dollar in terms of comprehensive unit price and total price.

34 35

no.

project
code

project name

project character description

unit of
measuremen
t

engineering
volume

RP
comprehensive
unit
priceRP

RP
total price

remark

The price in this project quotation sheet shall include all cost generated during construction preparation, construction, installation, completion, maintenance and warranty,
among which include the construction machine cost(include the transfer and disassembly of large machine), labor, material, management, profit, taxes, policy adjustment
expenses and all risk, responsibilities and construction measure expense indicated in the contract, and all kind of cost that may generate during the construction process.
5
This quotation equals the expense for completing all the working contents stipulated in this bidding document and supplementary document. Items without unit price and total
price won't be paid, and the expense will be assumed containing in the engineering quotation summary list;
6()

This project adopt the principle of fixed total price remain invariable. Once sign the contract, it shall be regarded as the contractor has taken all risks during the
contract implementation period(except force majeure) into consideration. During the contract implementation period, the contract total price shall not be changed owing to
any reason, such as the change or adjustment of policy or any other market factors. All cost for the bid winner to complete this project shall be contained in the bidding
price. Contract price shall not be adjusted in principle, the parts that can be adjusted are only restricted to the contents clearly required in the bidding document.

35 35

Das könnte Ihnen auch gefallen