SO ALAN PEPERIKSAAN

SEMESTER DISEMBER

2009/2010

FAKULTI ALAM BINA


UTM

FAKULTIALAM BINA
SOALAN PEPERIKSAAN SEMESTER DISEMBER
2009/2010
BIL

KOD MATA PELAJARAN

NAMA MATA PELAJARAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

SBQ 2122/SBC 1142


SBC 1422
SBQ 3522
SBC 3842
SBQ 4912
SBQ 3314
SBC 2242
SBQ 1223
SBC 1222
SBQ 4412
SBC 2443
SBC 1233
SBQ 2233
SBQ 4314
SBC 2273
SBC 1512
SBQ 3424
SBC 2344
SBC 3533
SBQ 3622
SBC 1123
SBQ 4324

STRUCTURAL DESIGN
ESTIMATING I
LEGAL STUDIES III
BUILDING MAINTENANCE
VALUES MANAGEMENT
CONSTRUCTION MEASUREMENT III
CONSTRUCTION TECHNOLOGY II
CONSTRUCTION TECHNOLOGY I
CONSTRUCTION TECHNOLOGY I
FINANCIAL MANAGEMENT
FINANCIAL MANAGEMENT
BUILDING SERVICES SYSTEM
BUILDING SERVICES II
UKUR BINAAN IV
CONSTRUCTION TECHNOLOGY AND DESIGN
PRINCIPLE OF LAW IN MALAYSIA
BUILDING ECONOMICS
CONSTRUCTION PROJECT MANAGEMENT
CONSTRUCTION AND DEVELOPMENT LAW
PRINCIPLES OF MANAGEMENT
ENGINEERING SURVEY
INFORMATION MANAGEMENT

SBQ 1712

PROFESSIONAL PRACTICE I

24

SBQ 2314

UKUR BINAAN I

25

SBQ 1322

INTRODCUTION TO CONSTRUCTION...

26

SBC 2263

CONSTRUCTION PLANT AND TEMPORARY...

MUKASURAT

30000010222992

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 2122/SBC 1142

COURSE

STRUCTURAL DESIGN

PROGRAM

1 SBQ/1 SBC

TIME

2 HOURS

DATE

5 APRIL 2010

LECTURER

IR. MOHAMAD SALLEH YASIN


PROF. MADYA. BADRUL HISHAM
AHMAD

PERCENTAGE

50 %

INSTRUCTION:

1.

Answer ONE (1) questions from Section A and ONE (1) question from
Section B.

2.

This is an open book examination.

THIS QUESTION PAPER CONSIST OF 5 PAGES INCLUDING THE


FRONT PAGE

SBQ 2122

Section A
Al. a)Explain the roles of structural designer in building construction project.
(8 marks)

b)

In the design process, engineers always use partial safety factor to


converts characteristic values into design values. Explain why they
need such factors and gives examples of the factors.
(8 marks)

A 250 x 600 mm rectangular reinforced concrete beam of span 9.0 m is


shown in Figure Al. The beam is required to support an ultimate
uniformly distributed load of 20 kN/m and two ultimate point loads of
30kN and 50 kN as shown in the figure. Use concrete grade C30 and
steel grade 500 and concrete cover 30 mm.
i.

Sketch the shear force and bending moment diagrams of the

ii.

beam by showing all the important values.


Design main reinforcement for bending.

iii.
iv.

Design shear reinforcement


Sketch the detailing of reinforcements designed in (b) and (c).
(34 marks)
30 kN 50 kN

1 20 kN/m

650
3m ^ 3m ^ j,,
250
Cross-section

FIGURE Al

SBQ 2122

A2. a) Reinforced concrete structure is a combination of several main elements.


State three of the elements and explain the behavior of each element when
subjected to loading. The explanation should be guided with sketch
showing the deformed shape of the element and the location of main
reinforcement.
(12 marks)

b)

Figure A2 shows a reinforced concrete slab 4.0 m x 5.0 m, simply


supported on two reinforced concrete beams. This slab is required to
support a uniformly distributed live load of 3.0 kN/m2 and floor finishes
of 1.0 kN/m2. The design data are as follow:
Characteristic strength of concrete,^
= 30 N/mm2
Characteristic strength of reinforcement, fy
500 N/mm2
Concrete cover, c
= 25 mm
Bar size
= 12 mm

4m

<-

5m
Plan

J^200mm

FIGURE A2

T
Section

i)
ii)
iii)
iv)
v)

Calculate the design load supported by the slab


Determine the bending moment and shear force of the slab.
Design the main and secondary reinforcement. (Requirement for
minimum reinforcement is 0.13%bh)
Check shear, deflection and cracking of the slab.
Sketch the detailing of reinforcement on plan view only.

(38 marks)

SBQ 2122 | 4

Section B

Bl. a) List down three differences between pre-tensioned and post-tensioned


prestressed concrete beam.
(10 marks)

b)

Explain in your own words the reasons why there is a reduction in


prestressing force after a long period of time.
(10 marks)

c)

A pre-tensioned prestressed concrete beam is simply supported over a


span of 16 m and carries a total uniformly distributed service load of
19.5 kN/m, in addition to its own self weight. A standard TY beam
section as shown in Figure Bl is to be used. The following information
is given:
Class 2 category; fci = 40 N/mm2; fcu = 50 N/mm2

i)

a = 0.9; (3 = 0.72

Calculate the stress limits at transfer and service

ii) Select the most economical section for the beam. (Choose between
TY9 and TY10)
(30 marks)
SECTJON PROPERTIES

Design self weight per unit volume has been token ds 25 kN/m*
Yb mm

Zt mm1 * 106

Zb mm1 x 106

App self weight


kN./m

184155

140

6.5B

12.22

4.60

195538

155

8.40

15.98

4.83

500

207936

173

10.85

20.51

5.20

TY4

550

221351

194

13.97

25.68

5.54

W5

600

235780

216

47.70

31.47

5.90

TT6

650

251225

240

22.11

37.77

6.28

vn

700

267685

266

27.23

44.43

6,70

33,10

31.34

7.13

Section No

Depth mm

Area mrn!

TY1

400

TY2

450

TY3

TVS

750

285163

294

TY9

800

303655

322

39-61

58.80

7.59

TY10

850

323157

352

46.93

66*40

8.08

FIGURE Bl

SBQ 2122 I 5

B2. a) Sketch the various stages of a structural steel beam undergoing


bending until it collapse
(10 marks)

b)

Given two sections, one classified as plastic while the other as


compact. Which section will carry bigger load at collapse and explain
why?
(10 marks)

c)

The slab shown in Figure B2 has an overall depth of 200 mm is


designed to carry an imposed load of 3 kN/m2 plus floor finishes and
ceiling loads of 1 kN/m2. It is supported by structural steel beams
457 x 191 x 82 UB (grade S275) and these beams are simply supported
at their ends. All the beams are fully laterally restrained and there is
nominal torsional restrain at supports.
i)

Calculate the total service and ultimate loads on beam B/l-2 and
Beam 2/A-C

ii) Check whether the bending and shear capacities for beam B/l-2 are
adequate.
iii) Calculate the deflection for beam 2/A-C and check whether it is
within the allowable limit.
(30 marks)

|
3.5 ro r . ! . , _________ .J-Sffl.

FIGURE B2

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 1422

COURSE

ESTIMATING I

PROGRAM

1 SBC

TIME

2 HOURS

DATE

5 APRIL 2010

LECTURER

NORAZAM B. OTHMAN

PERCENTAGE

50 %

ARAHAN:
INSTRUCTION:
Jawab mana-mana 4 (empat) soalan.
Answer any 4 (four) questions.
Markah setiap soalan adalah seperti yang dinyatakan.
Marks for each question is as stated.

THIS QUESTION PAPER CONSIST OF 7 PAGES INCLUDING THE FRONT PAGE


r
0
1

SOALAN 1

Jelaskan penggunaan kaedah anggaran unit dan kaedah anggaran keluasan


lantai

yang

lazimnya

digunakan

dalam

mendapatkan

anggaran

kos

pembinaan termasuk kebaikan dan keburukannya.


(25 markah)

QUESTION 1

Explain

the

commonly

usage

used

to

of

the

derive

unit
the

and

superficial

estimated

cost

of

area

estimating

construction

methods

including

its

advantages and disadvantages.


(25 marks)

SOALAN 2

Terangkan

ciri-ciri

bangunan/pembinaan,

tapak

bina

seperti

kemudahan

sedia

lokasi,
ada,

jenis

keadaan

dan

saiz

tanah

serta

topografi yang mungkin memberi kesan kepada penilaian keseluruhan kos


projek dan harga tender.
(25 markah)

QUESTION 2

Explain the characteristics of the site such as location, type and size of the
building/construction,

available

existing

services,

ground

conditions

and

topography which may affect the overall assessment of the cost of project and
the tender price.
(25 marks)

7
2

SOALAN 3

Dengan

menggunakan

kaedah

anggaran

superficial

area,

tunjukkan

pengiraan anggaran kos seterusnya harga tender pembinaan untuk projek


dengan ciri-ciri berikut:

Tajuk projek

: Hotel 3 bintang untuk Budget Services Sdn Bhd

Lokasi

: Tainan Universiti Skudai (bersebelahan kompleks


membeli belah Jay a Jusco)
: 5 tingkat (atas tanah), 1 tingkat (tempat letak

Ketinggian

kereta bawah tanah)


: Bilangan bilik tetamu : 50

Rekabentuk

Bentuk segiempat tepat


Setiap tingkat 70.0m panjang x 20.0m lebar
Tingkat 1 untuk lobi, restoren, dapur, pejabat
pengurusan, bilik seminar, perkhidmatan cucian
pakaian
: Pembinaan akan bermula Julai 2010

Lain-lain

Jika setiap bilik direkabentuk untuk 2(dua) tetamu hotel, apakah kadar unit
kos

semasa

elektrik

setiap

(M&E)

tetamu

serta

kos

hotel

jika

perkakasan

kos

perkhidmatan

dalaman

adalah

mekanikal

dan

40%

kos

dari

pembinaan?
Data

projek

lepas

antara

tahun

1998-2006

untuk

lokasi

Kuala

Lumpur

(Lampiran A) boleh digunakan sebagai rujukan dan pemilaian


(25 markah)

b
3

QUESTION 3

Using superficial area method of estimating, show the calculations of the


estimated cost and the tender price offer for the construction of a project with
the following characteristics:

Project title

: 3 star hotel for Budget? Services Sdn Bhd

Location

: Taman Universiti Skudai (next to Jaya Jusco


Shopping complex)

Height

: 5 floors (above ground), 1 floor (basement car park)

Design

: Number of rooms : 50
Rectangular shape
Each floor 70. Om long x 20. Om wide
Ist floor for lobby, restaurant, kitchen, administrative
offices, seminar rooms, laundry services

Others

: Construction will start in July 2010

If each room is designed to cater for 2(two) guests, what will be the present
unit cost rate for each guest if the cost of the mechanical and electrical
services (M&E) and the cost of interior decorations is 40% of the cost of
construction?
Data of previous projects for the year 1998-2006for Kuala Lumpur (Appendix
A) is given as reference and assessment
(25 marks)

9
4

SOALAN 4

Lakarkan

hubungkait

tradisional

dan

pihak-pihak

jelaskan

yang

bagaimana

terlibat

kaedah

dalam

kaedah

perolehan

perolehan

tersebut

memberi

implikasi kepada harga tender.


(25 markah)

QUESTION 4

Sketch out the relationship of all parties involved in a traditional procurement


method and explain how this procurement method affect the tender price.
(25 marks)

SOALAN 5

Terangkan
bermula

setiap

dari

langkah

perlawaan

yang

terdapat

membuat

tawaran

dalam

prosedur

sehinggalah

surat

tender

yang

setujuterima

dikeluarkan kepada kontraktor.


(25 markah)

QUESTION 5

Explain each steps in the tendering procedure commencing from the invitation
to treat to the issuance of the letter of acceptance to the contractor.
(25 marks)

1 0
5

SOALAN 6

Terdapat

berbagai-bagai

sumber

data

kos

yang

boleh

dirujuk

dalam

penyediaan anggaran kos seterusnya harga tender. Jelaskan bentuk sumber


maklumat yang diterbitkan atau boleh diperolehi dari Jabatan Kerja Raya
(JKR),

Pertubuhan

Juruukur

Malaysia

(ISM),

firma

perunding

Juruukur

Bah an, kontraktor lain dan Jabatan Perangkaan Malaysia.


(25 markah)

QUESTION 6
There are many types and sources of cost data that can be referred to when
preparing cost estimate and tender price. Explain these sources of information
that

are

Pertubuhan

produced
Juruukur

by

or

obtainable

Malaysia

(ISM),

from
Quantity

Jabatan

Kerja

Surveying

Raya

(JKR),

consultant

firms,

other contractors and Jabatan Perangkaan Malaysia.


(25 marks)

11
6

LAMPIRAN A/APPENDIX A

Hotels
RMIm2

Resort Hotel indusive of F.F.&E.


** 3Star budge! hotels, ditto
**"* 5-star luxury hotels, ditto*
* Cost are at lower Tange cost
Al cost are at an average level unless otherwise stated

12
7

SBQ 3522

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 3522

COURSE

LEGAL STUDIES III

PROGRAM

2 SBQ

TIME

2 ya HOURS (2.30 PM - 5.00 PM)

DATE

6 APRIL 2010

LECTURER

NOLIZA ISA

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:

1. Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang
sama.
Answer four (4) questions only. All questions carry equal marks.

2. Kanun Tanah Negara 1965 di sediakan.


National Land Code 1965 is provided.

THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

13

SBQ 3522

Soalan 1
Timbangtara

sering

dikatakan

sebagai

satu

mekanisma

penyelesaian

pertikaian sivil yang berkesan yang dibuat secara judisial. Penimbangtara


memperolehi kuasa menyelesaikan pertikaian dari persetujuan kedua-dua
pihak

yang

bertikaian

di

bawah

peijanjian

timbangtara.

Award

penimbangtara adalah muktamat dan mengikat.

Bincangkan kelebihan dan kekurangan timbangtara sebagai satu kaedah


penyelesaian pertikaian.
(25 markah)

Question 1
Arbitration is often said to be an efficient method of resolving civil disputes
conducted in judicial manner. The arbitrator derives his power to resolve
dispute from the consent of the disputing parties under the arbitration
agreement. The arbitrators award is final and binding on the parties.
Discuss the advantages and disadvantages of arbitration as a method of
resolving disputes.
(25 marks)

Soalan 2
Seseorang pemegang Lesen Pendudukan Sementara di bawah Bab Dua,
Bahagian Empat, Kanun Tanah Negara 1965 tidak memiliki tanah yang ia
didudukinya sepertimana yang dimiliki oleh orang yang diberimilik tanah
kerajaan atau pajakan negeri. Walaubagaimanapun, seksyen 44 Kanun
Tanah Negara 1965 menjamin hak pemegang Lesen Pendudukan Sementara
berhubung dengan kegunaan dan kenikmatan eksklusif, hak sokongan
tanah dan hak ekses.
Dengan

merujuk

kepada

peruntukan

dalam

Kanun

Tanah

Negara

berhubung dengan Lesen Pendudukan Sementara dan kes-kes mahkamah


yang berkaitan huraikan sifat-sifat Lesen Pendudukan Sementara dan hakhak seseorang pemegang lesen tersebut.
(25 markah)

1 k

SBQ 3522

Question 2
A holder of a Temporary Occupation License (TOL) under Part Four, Chapter
Two of the National Land Code 1965 does not own the land as in the case of
a person who has been alienated with a State land or a State lease.
Nevertheless, section 44 of the said Code guarantees the rights of such a TOL
holder with respect to exclusive use and enjoyment of the right of support and
the right of access.

With reference to the provisions in the National Land Code 1965 and the
relevan case law, elaborate the nature of the Temporary Occupation License
and the rights of the holders.
(25 marks)

Soalan 3
Mengikut pengamatan Lord Diplock dalam kes ENG MEE YONG & ORS. v.
LECHUMANAN (1979) 2 MLJ 212 sistem kaveat di Malaysia merupakan
gantian setempat kepada doktrin notis ekuiti di bawah undang-undang
Inggeris. Beliau juga menyamakan kaveat seperti injunksi interlokutori yang
menyekat

penanggung

kaveat

daripada

membuat

sebarang

urusniaga

berhubung dengan tanahnya sehingga mahkamah memutuskan tuntutan


pengkaveat terhadap tanah berkenaan. Matlamat kaveat adalah untuk
memelihara atau mengekalkan status quo pihak-pihak yang berkenaan
sementara menunggu pertikaian mereka di putuskan oleh mahkamah.

Dengan merujuk kepada kenyataan di atas, peruntukan yang berkaitan


dalam Kanun Tanah Negara 1965 dan kes-kes yang relevan, huraikan
fungsi kaveat.
(25 markah)

SBQ 3522

Question 3
Lord Diplock observed in ENG MEE YONG & ORS. v. LECHUMANAN (1979) 2
MLJ 212 that the caveat system in Malaysia has served as a local substitute
for the equitable doctrine of notice under English land law. His lordship also
said that the caveat under the Torrens System has often been likened to a
statutory injunction of an interlocutory nature restraining the caveatee from
dealing with the land pending the determination by the court of the caveators
claim to title to the land. The caveat is principally aimed at maintaining the
status quo of the parties pending the resolution of their disputes by the court.
With reference to the above statement, the relevant sections in the National
Land Code and the case law, explain the functions of caveat.
(25 marks)

Soalan 4
Huraikan kes-kes berikut:(i)

TEH BEE v. K. MARUTHAMUTHU [1977] 2MLJ 7


(10 markah)

(ii)

MOHAMMAD BUYONG v. PEMUNGGUT HASIL TANAH GOMBAK &


ORS[1982] 2 MLJ 53
(15 markah)

Question 4
Elaborate on these cases:(i)

TEH BEE v. K. MARUTHAMUTHU [1977] 2MU 7


(10 marks)

(ii)

MOHAMMAD BUYONG v. PEMUNGUT HASIL TANAH GOMBAK & ORS


[1982] 2 MLJ 53
(15 marks)

1 G

SBQ 3522

Soalan 5
En. Ali adalah tuan punya berdaftar sekeping tanah di bawah kategori
bangunan. Beliau adalah seorang usahawan dan mahu memperluaskan
perniagaannya.

En.

Ali

telah

menggadaikan

tanah

tersebut

kepada

Maybank, Skudai sebagai sekuriti pinjaman. Di sebabkan kemelesetan


ekomoni, En. Ali sukar untuk membuat pembayaran bulanannya. Maybank,
Skudai telah melaksanakan suatu pengurusan kes untuk menolong En. Ali
dalam membuat pembayaran bulanannya, namun En. Ali masih enggan,
gagal dan cuai untuk membuat pembayaran balik pinjamannya.
Nasihatkan Maybank, Skudai akan hak-hak mereka.
(25 markah)
Question 5
En. Ali is a registered proprietor of a piece of land held under building
category. He is a business man and intends to expand his business. He then
charged the land to Maybank, Skudai as a security for a loan. Due to the
economy

recession,

he

found

it

difficult

to

service

his

monthly

loan

instalments. Maybank, Skudai extended assistance to En. Ali in undergoing a


case management to enable him to pay the said monthly instalments, but En.
Ali still failed, refused and neglected to make the monthly repayment of his
loan.
Advise Maybank, Skudai on their rights.
(25 markah)

Soalan 6
En. Ahmad adalah tuan punya tanah yang bersebelahan dengan jalan raya.
Pihak Berkuasa Negeri, melalui Jabatan Keija Raya telah mewartakan
melalui Seksyen 4 Akta Pengambilan Balik Tanah 1960 satu pengisytiharan
pengambilan balik tanah untuk projek pelebaran jalan raya tersebut. Enam
bulan

selepas

warta

tersebut

diterbitkan,

suatu

peristiharan

melalui

Seksyen 8 Akta tersebut di keluarkan. En. Ahmad tidak puas hati bahawa
sebahagian daripada tanahnya terlibat dalam pengambilan balik tanah
tersebut.
r
5

1 7

SBQ 3522

Nasihatkan En. Ahmad tentang haknya untuk membantah pengambilan


balik tanahnya.
(25 markah)
Question 6
En. Ahmad is a registered proprietor of land, adjacent to the main road. The
State Authority through its agency, Public Work Department has gazetted vide
Section 4 of the Land Acquisition Act 1960 a declaration for acquisition of land
for the purpose of the main road upgrading project. Six months after the
publication of the said gazette, a declaration was made vide Section 8 of the
Act. En. Ahmad was not happy that part of his land was identified to be
acquired under the acquisition.

Advise En. Ahmad on his right to object against the acquisition of his land.

(25 marks)

SBC 3842

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER 2 SESSION 2009/2010

COURSE CODE

SBC 3842

COURSE

BUILDING MAINTENANCE

PROGRAM

3 SBC

TIME

2 HOURS (2.30 pm - 4.30 pm)

DATE

6 APPRIL 2010

LECTURER

DR. YAHYA MOHAMAD YATIM

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab 4 SOALAN Sahaja.
Answer 4 Questions Only.
Di mana perlu, nyatakan andaian yang anda buat dengan jelas untuk
disesuaikan dengan jawapan yang anda beri.
Where necessary, please make your own assumptions on any aspects to suit
your answers.

KERTAS SOALAN INI TERDIRI DARIPADA _4_ MUKA SURAT TERMASUK


MUKA SURAT HADAPAN.

1 9

SBC 3842

SOALAN 1

Penyelenggaraan terdiri daripada beberapa aktiviti seperti memastikan


setiap

peralatan

and

peralatan

kemudahan

sentiasa

berada

dalam

dalam

sistem

keadaan yang baik dan boleh beroperasi sekiranya diperlukan.

Penyelenggaran
pengurusan

juga

asset

dikenali

iaitu

sebagai

memastikan

satu

setiap

cabang
asset

tersebut

sentiasa

berada dalam keadaan boleh beroperasi pada tahap yang optimum.


Berdasarkan kepada kedua-dua kenyataan diatas, patut atau tidak sebuah
organisasi yang mempunyai jumlah asset yang banyak, contohnya bangunan,
mengajikan

staf

untuk

melakukan

kerja-keija

penyelenggaraan.

Terangkan

peranan yang perlu dilakukan oleh saorang pengurus penyelenggaraan yang


dilantik oleh organisasi.
(25 Markah)
QUESTION 1

Maintenance encompasses all those activities that maintain facilities &


equipment

in

good

working

order

so

that

systems

can

perform

as

intended.

Maintenance can also be termed as asset management system which


keeps them in optimum operating condition.

Based on the above statements, should or should not an organization with a


number of assets e.g. buildings, employ in-house maintenance staff. Describe
the role of in-house maintenance manager.
(25 Marks)
SOALAN 2
Berdasarkan
kerja

kepada

bagi

penyelenggaran
mengalami

Kerangka

Pengurusan

penyelenggaraan
bagi

kerosakan

Penyelenggaran,

bangunan.

membaikpulih

sebuah

bumbung,

yang

cat

terangkan

Rancangkan
rumah

lusuh

dan

dua
jubin

skop

kerja-keija
tingkat
lantai

yang
yang

tertanggal.
(25 Markah)

20
2

SBC 3842

QUESTION 2
Based on the Maintenance Management Framework (MMF), explain the scopes
of work for the building maintenance. Write a maintenance plan to repair a
double storey house with roof defect, painting peeled and floor tiles broken.
(25 Marks)
SOALAN 3
Kebanyakan

kecacatan

bangunan

adalah

disebabkan

oleh

lembapan,

penggunaan bah an binaan yang salah, rekabentuk bangunan yang lemah


dan

faktor

alam

sekitar.

Akibatnya,

selepas

beberapa

bulan

bangunan

diduduki oleh pembeli, keretakan dan kebocoran air akan mula kelihatan.
(i)

Terangkan jenis-jenis keretakan dan di mana ia biasanya


berlaku di dalam bangunan.
(10 Markah)

(ii)

Nasihatkan pembeli bagaimana masalah keretakan dan


kebocoran air di dalam bangunan mereka boleh dibaikpulih.
(15 Markah)

QUESTION 3
Most building defects are caused by dampness, defective materials used, poor
building design and environmental factors. The obvious result was building
cracks

and

water

leakage

appeared

after

few

month

of

building

being

occupied by the purchaser.


(i)

Explain the types of cracks and where it will normally be found in


a building.
(10 Marks)

(ii)

Advice purchaser how to rectify cracks and water leakage


problems in their building.
(15 Marks)

SOALAN 4
Bincangkan faktor-faktor yang perlu dipertimbangkan apabila membuat bajet
bagi kerja-kerja penyelenggaraan.

21
3

SBC 3842

(25 Markah)
QUESTION 4
Describe the factors to be considered when preparing budget for maintenance
works.
(25 Marks)

SOALAN 5
Bincangkan
bagi

keperluan

menyiasat

tahap

bagi

menyediakan

kondisi

sesebuah

laporan

bangunan

penyiasatan
dan

dilapidation

terangkan

perkara-

perkara yang perlu dimasukkan dalam laporan tersebut.


(25 Markah)
QUESTIONS
Describe

the

necessity

of

having

dilapidation

survey

report

in

building

condition survey and explain the items that should be included in the report.
(25 Marks)

SELAMAT MAJU JAYA


All the Best

22
4

SBQ 4912

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 4912

COURSE

VALUE MANAGEMENT

PROGRAM

2SBC/3SBQ

TIME

2 HOURS (9.00 AM- 11.00 AM)

DATE

9 APRIL 2010

LECTURER

P.M. WAN YUSOFF WAN MAHMOOD

PERCENTAGE

: 40 %

ARAHAN:
INSTRUCTION:
Jawab'empat (4) soalan sahaja.
Soalan satu (1) adalah wajib.
Semua soalan membawa markah yang sama.

Answer four (4) questions only.


Question one (1) is compulsory
All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 12 PAGES INCLUDING


THE FRONT PAGE

SBQ 4912

SOALAN 1

Anda telah dilantik sebagai Perunding Pengurusan Nilai untuk projek


cadangan pembinaan Rumah Kelab (Club House) bagi sebuah padang golf
eklusif yang terletak berhampiran Lapangan Terbang Antarabangsa Sultan
Ismail, Senai, Johor. Pihak klien telah meminta nasihat anda untuk
memilih beberapa jenis penutup bumbung yang sesuai digunakan untuk
rumah kelab berkenaan.

Berdasarkan

beberapa

kriteria

yang

anda

cadangkan,

buat

analisa

pemilihan beberapa jenis penutup bumbung yang patut digunakan daripada


beberapa jenis yang ada dipasaran. Gunakan borang-borang diLampiran A
dan B bagi membantu anda menilai cadangan yang terbaik.
(25 markah)

QUESTION 1

You are appointed as a Value Management Consultant for the proposed


construction of Club House for an exclusive golf course located adjencent to the
Sultan Ismail International Airport, Senai, Johor. The client seeks your advice
for the selection of a few type of suitable roof covering for the club house.

Based on your own criteria, analyse the selection of various type of roof
covering available in the market. Used forms in the Appendix A and B to
evaluate the best proposal.
(25 marks)

24

SBQ 4912

SOALAN 2

a)

Fasa kreativiti merupakan peringkat yang penting didalam sesuatu


bengkel

pengurusan

nilai.

Bincangkan

pendekatan

yang

perlu

diambil oleh ahli kumpulan pengurusan nilai bagi memastikan ianya


dilaksanakan secara efektif.
(13 markah)
b)

Huraikan

dua

meningkatkan

(2)

jenis

pemikiran

teknik
kreatif

yang

biasa

dikalangan

digunakan
ahli

untuk

kumpulan

pengurusan nilai.
(12 markah)

QUESTION 2

a)

Creativity phase is an important stage in value management workshop.


Discuss the approach to be taken by the value management team to
ensure it is effectively conducted.
(13 marks)

b)

Explain two (2) types of techniques used for promoting creative thinking
to members of the value management team.
(12 marks)

SBQ 4912

SOALAN 3
Borang kontrak FIDIC versi terkini telah memasukkan klausa berkaitan
Pengurusan/

Kejuruteraan

Nilai

yang

menyediakan

peruntukan

bagi

Cadangan Pertukaran Pengurusan Nilai (VMCP).

a)

Apakah yang dimaksudkan dengan Cadangan Pertukaran


Pengurusan Nilai (VMCP) serta terangkan kaedah perlaksanaannya.
(10 Markah)

b)

Bincangkan elemen-elemen yang mesti dimasukkan didalaxn sebuah


Cadangan Pertukaran Pengurusan Nilai (VMCP).
(15 Markah)

QUESTION 3
Latest

FIDIC

Form

of

Contract

incorporates

the

Value

Engineering/

Management clause that caters for Value Management Change Proposal


(VMCP) provisions.

a)

What is meant by Value Management Change Proposal (VMCP) and


explain the method of their implementation.
(10 Marks)

b)

Discuss the elements that must be included in the Value Management


Change Proposal (VMCP).
(15 Marks)

SBQ 4912

SOALAN 4
Universiti Teknologi Malaysia bercadang untuk membangunkan sebuah
kampus cawangan baru di Desaru, Kota Tinggi, Johor. Pekeliling Unit
Perancang Ekonomi, Jabatan Perdana Menteri Bilangan 3 Tahun 2009 telah
memutuskan supaya semua program dan projek kerajaan yang bernilai
RM50 juta dan ke atas perlu menggunakan pengurusan nilai. Oleh itu,
pihak pejabat pengarah kerja, Universiti Teknologi Malaysia mahukan
supaya

cadangan

konsep

projek

berkenaan

dirujuk

dan

dinilai

oleh

perunding pengurusan nilai. Sebagai perunding pengurusan nilai yang


dilantik untuk projek tersebut, anda dikehendaki menyediakan satu laporan
yang menerangkan tentang bagaimana anda akan melaksanakan kajian
berkenaan.
(25 markah)

QUESTION 4

Universiti Teknologi Malaysia intends to develop a new branch campus at


Desaru, Kota Tinggi, Johor. Circular of Economy Planning Unit, Prime Minister
Department Number 3 Year 2009 decided that all government programs or
projects value RM 50 millions and above have to apply Value Management.
Hence, Work Director Office, Universiti Teknologi Malaysia wants the concept
proposal for the project to be referred and evaluated by a value management
consultant. As an appointed consultant, you are required to prepare a report
explaining how you are going to implement the study.
(25 marks)

SBQ 4912

SOALAN 5

a)

Apakah yang dimaksudkan dengan Kos kitaran hayat (LCC) dan


terangkan mengapakah ia penting dalam kajian pengurusan nilai.

(10 markah)

b)

Anda dikehendaki mencadangkan sistem penyaman udara kepada


klien anda. Terdapat dua pilihan yang ada untuk dinilai dan
maklumatnya adalah seperti berikut: (Kadar diskaun yang digunakan
adalah 10% - Rujuk lampiran C untuk jadual yang berkaitan).
Sistem A

Sistem B

RM50.000

RM75,000

Caj Tenaga Tahunan

RM2.400

RM 1,500

Persenggaraan (Setiap 5 Tahun)

RM2,500

RM 1,500

Jangka Hayat Sistem

20 Tahun

20 Tahun

Kos Permulaan termasuk


Pemasangan.

Berdasarkan

kesamaan

tahunan

(annual

equivalent)

pebelanjaan

yang terlibat sistem manakah yang akan anda cadangkan kapada


klien anda.
(15 markah)

QUESTION 5

a)

What is meant by Life cycle costing (LCC) and explain why is it


important in Value Management study.
(10 marks)

SBQ 4912

b)

You are required to recommend an air-conditioning system to your


client Two choices are available for assessment and the information
available are as follows: ( a 10% discount rate is applied ) - Refer
appendix C for related tables.)

System A
RM50,000
RM2,400
RM2,500
20 years

Initial cost including installation


Annual Energy Charges
Maintenance (every 5 years)
Life of system

System B
RM75,000
RM1,500
RM 1,500
20 years

Based on the annual equivalent of the expenses incurred, which system


would you recommend to your client?

(15 marks)

SOALAN 6

a)

Terangkan

bagaimana

model

kos

disediakan

dan

bincangkan

kepentingan kos model dalam kajian pengurusan nilai.


(15 markah)

b)

Apakah yang anda faham tentang Hukum Pareto serta terangkan


bagaimanakah ia boleh membantu didalam kajian pengurusan nilai.

(10 markah)
QUESTION 6

a)

Explain how to prepare a cost model and discuss the importance of cost
model in value management study.
(15 marks)

b)

What is meant by Pareto Law and explain how they can help during
value management study.
(10 marks)

2 V

Appendix A

JUDICIAL PHASE

DETERMINING WEIGHTS FOR


EVALUATION

STUDY TITLE
GOALS, DESIRED, CRITERIA, F UNCTIONS,
FEATURES

RAW
SCORE

ASSIGNED
WEIGHT

A.
B.
C.
D.
,

E.

..

F.
G. /
H.
J.
TOTAL

B'

HOW IMPORTANT A
B
c

3. MAJOR PREFERENCE

2. MEDIUM PREFERENCE

1. MiRMOR PREFERENCE

% EQUAL PREFERENCE
G
H

I Appendix B
EVALUATION MATRIX

List the best ideas


to see
which has best
-

trade-off or
optimm ization

potential

ASSIGNED VALUE
IDEAS
PRESENT WAY

WT

TOTAL

5
4
3
2

1
SUB
TOTAL
5

IDEA1

4
3
2

1
SUB
TOTAL
IDEA 2

5
4
3
2

1
SUB
TOTAL
IDEA 3

5
4
3
2

1
SUB
TOTAL
IDEA 4

5
4
3
2

1
SUB
TOTAL
IDEAS

5
4
3
2

1
SUB
TOTAL

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G'
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

.E
VG
G
F
P

RANK

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

RANK

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

RANK

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E.
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

RANK

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

RANK

. ...
E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

SEEK THE BEST - NOT PERFECTION

31

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

E
VG
G
F
P

RANK

*OLE B Pieioni Value of $1 Duo ot the End of n Potions

PVlf, = -------- !-

(I < M

Period
n
I

1%

2 v.

3%

4 V.

5%

6 V.

7%

8%

9 V.

10%

1 1 V.

99C
90:3
9*:6.

900J
9612

9709
9426

9615
92-iC

9524

9434

9070

0900

9346
8734

9259
0573

9091
026-1

9423

9! 51

8H90

0163
7629

7930

7513

0929
7972
7 I 10

8 S 8

0396
7921

9009
81 16
"731 2

B8D5

6638
0227

9174
8-117
7722

7350

7084

6030

6507

8626

0219

7035

7473

7130

6806

6499

6209

5935

6355
5674

6063
6227

6302
51)35
5103
5002
4632

:.nr>3
5(i-l5
54 70 -- 502
5019
1065
.1 2 -1 1
1604
4224
\1 U0 S-

4 339
3903

SHOO
4523
1039
30U6

3522

3220

4209

3875

35C5

317."1

3971
3677

3555

3186
2897

205B
2575
2320
2090

28/5
2507

2
3
4

9C-!0

95>5

9238
9057

6
7
8
9
10

9-?0
93:'
9 rjs
91 3
9K3

nnoo
8700
P535
U360
8203

0375
ni3t
?R'J4
7664
74.11

7003
7099
7307
7026
6756

7462
7107
6 68
G-1-1G
6139

7050
6G51
6274
5910
55U4

5B20
5409
5003

11

eye:

8043

7224

6-196

SH4 7

'2

0 D'-.

7005

6246

0560

4751
4440

13
10

8767
8700

7730

7014
GfltU

52C0
4070

610G

661 1
6419

5775
5553

5303
5051

460(1
4123

v5
ye r 17 ^

7579
7430

4810

4173

4150
3878
3624

0520

7284
71.12

339
5i34

4501

393C
37m

86:3

03g:

7002

0232
6030
5874

0?
835

6961
6/30

5703
5537

1936
4 ,v.6
4564

6598

25

014
0034
?9b-:
7B'6
7798

5375
5219
5007
4919
4776

131)0
4 220
4057
3901
3751

3410
3256
3101
2953

26
27

7 720
70*14

20

7568

.29
30

IB

lJ
20
?'
:?

2J

.If)
40
45
50

e-ua

6468
6342
6217
6095

4363
4155
3957

3503
3305

3387
3IG6
2959
2765
2504

3405
3152
2UI9
2703
2502
231/

3262
2992
2745

2176
I97B

2145

2519
2311
2120
19-15
I7B4

191*7

16.17

I3M

1117

1502
1378
1 ?r,.i

l?28
IH7

1007

3769

3110
2942
2775
2610
24 70
23J0

2-115
2257

1842

1839
1/03
1577
1400

1 160

1015
0923

21JO
2074

1722

13!,2

106-1

0(139

01-63

ICO!)
1504

1252
) 159

0763
0093
0630

nr,n

059/
0530
0405
(1-1.3/

o;if.f.
.0221
0 1 .1 /
0005

0259
0 1 5-1
OHO 1
005-1

2109
1971.

4637

3607

2012

4502
1371

7.153
7.119
:*V
7 059

5631
5521

4243
4 130

3468
3335
3207
OOB3

2670
2551
2429
231-1

1950
18-16
1 741

1406
in 1 4

1073
0!I!I4

0376
01195
0022
07.VI

5000

3554

6?'?

1529
4 10?
3715

3066
2044

2534
2083
1712 .
1407

10 in
1420
1 1 13
0872

1301
0972
0727
05-13

093 7
0668
04 7G
0339

00 7 6
0160
o:n n
0213

0-190
0310
020/
0134

CTT
c:c:

27 81

1 799
1635
I486

1883
1696
1520
1377

3589

5976
5859
5744

2633
. 2394

5316
1017

1240

090/
0017
0730

12 V.

2292
2016
1027
IG31
141.6
1309
1 16i
1037
OU26
0026
0/30
0059
0580
0525
0469
04 19
0374
111 14
OlOU
0107
(Kir. 1
0035

------- tR13%

14%

15"/.

16%

17%

IBV.

19%

20%

2SV.

30%

35%

0050
70.11

87 72

eonr.
7501

0021
7 132

054 7

04 75

0103

7692
5917

048?

or.75

GI07

5337

5150
437 1

1023

<1552
3501

1064
non

5102
3044

5523
4 7Cy 1

7062
5!i:M
4'jo?

0000
6400
5120
40%

7 M3

7102
fiOllli

n333
6941
57Q7

740?

7305
0244

2003

1190

4019

327 7

269.1

2230

1859

4 104

3irm
3332
20*18
2<i;m

1052
1224

132(1
0949
0670

20(10

1911

1 /5G

1615

209?
1678
i:m?
10/4

20/2
. 1594
I .??r

20! 10

.1.14!)
2791
2326
1930

?o;m

31 !'J
2RG0
22'. 5

3r,pi
295<J
?i nr

I6I<J
1372

Mffi
1210

134G
1122

oar.9
0007

0558
0429

0935
Oi/'y

0550
04.10
03!..?

0330
0254
0l!)5

0273
020?
0150
0111

0201
0225
0100
014-1

U0R2
OOGI
00-15
0033
0025

0045

0115

0150
0) Hi
0089
0(768
0053

0092
007-1
0059
004?
00.16

0040
0031
0024
OOIU
0014

00 IB
OOM
0010
0007

0!J0!l

OlBl
0151
0126
0105

0006

0006
0004
0003
0002

OCBi
0073

0030
0024

0011

0004
0003

0002 .
0001

OQGI

0019
0015
mu;*

0002

0001
(HH)i
hi n hi

5428

5 > y.i

0/10
4972

100.1
3762
:ii.?d

i f.fifi
juno
3506
.10/5

in
3759
3,?r.9
?n.i.i

294G

2fi9/

24 72

:i5.ib
3050
.'030
2?i>/

260?
2307

23GG

2tt9

1954

1778

?07G

'.1169

20<2
>007

10?!
1597

1625
14 13

l(M5
1452

1520
>299
1110
0949

0835

1012
00/G
o/:m

0011
Oi.93
0592
0506
04-13

0/08
OGUO
0508
0431
03G5

on io
0520
043/
03C7
0.106

0541

0.V-0
0310
0270
02.H
om/

0309
0202
0222
0108
OlfiO

0259
0218
0IU3
0154
0129

021?

01.15

010!)

01 lit
0097
0082
iifi/n

OOUl
00/7
oor.l

O'J.IO
0013
(ll)dli

oo.ti

0003

Ii931

1252
>079

4jGI

159!)

1401

1.729

i.i 15
I ?',?
I <08
OOUl
0QG8

1329
1078
094 G
0829
0720

1069
0329
0008
0703

0760
0600
U60I
0532
0-171

OG30
0560
0491
O-l.ll
03/0

0531
0IG2
0102
0349
0304

0302
0329
0284
0245

0-117

0331

0201

0211

0359

0291
0255
0224
ni'ir,

0230
0200
0174
Ulf'.l

0102

0109
014.1

015?
01.15
in in

0123
0105
MlId

010?
0053
OlK'/
00 It

0075
0037
fKll9
0009

0055
0026
oti i :i
ooor.

0011
D019
IKIU'.I
0004

0320
0280
01.19
0075
our i
0022

OGH

O'J.IO
0802
or.oi
0596
05'4
044.1

1/04

11G3
0985

iiiim

0G49
0451
O.J/G
0313
02GI

0004

0010
(Kill 1

001?
0007
noon

0002

0001

0000

0001
O(IIH)

0!M.I
0/25

0008
0006
0005
IH 14
0001
0000
IXXIO
0000

0906
0G71
04<J?
0368

mw
0000
0000
00111)
0000

0404
03'C
024 7
0176
0I2G
0090
O0G4
0033
0023
001?
0012

0000
0000
001 >0
0000

Appendix

SI3J

7G95
n/!,0
;>P21

4,0%

TAB(_ d Prevtnl Valu* ol on Annuity of 51 por Pflod lor n PilcxJ

Period
n
1
2
3
4
5

13%

14%

15%

16%

17%

18%

19%

20%

25%

30%

35%

40%

0 9346
) B334
1 B0B0
2 6730 2 6243
3 465) . P 3072
1 2124 4 1002

0 9259
1 7633
2 5771

09174

0 9091

0 0029
1 G90I

00772
1 6467

0 0G96
1 6257

0 0403
1 5405
2 1399
2 0300
3 0576

0 7602
1 3609

0 7407
1 2894

2 2632
2 0550
3 3522

0 0475
1 5G5G
2 1743

0 8333
1 5278

2 3216
2 9137

011021
1 6052
2 2459
2 7902
3 2743

0 0547
1 5B52

3 3121
3 9927

0 0050
1 6681
2 3612
2 0745
3 5172

0 7143

1 7355
2 4869
3 IG99
3 7908

0 9009
1 7)25
2 4437
3 >024
3 G959

0 nooo

1 7591
2 5313
3 2397
3 0097

10161
2 I6G2
2 4356

1 6959
1 9909
2 2200

4 0229
5 2064
5 74G6
6 2469
G 7101

4 4059
5 0330
5 5348
5 9952
64177

4 3553
4 0G04

4 2305
4 7122

5 3349

5 1461
5 5370

3 9975
4 4226
4 7908

3 5002
3 9224
4 2072

3 4090
3 7057
3 95-14

3 3255
3 604G
3 83/2

5B092

5 3282
5 G502

5 1317
5 4262

3
4
4
4

3 684 7

4 5636
4 9076

G nos?
7 1007

6 2005

6%

0 9901
1 9704

0 9804

0 9700

0 9434

1 9135
2 8286
3 7171
4 5797

09GI5
11)001

0 9524

1 9416
2 8839
3 0077
4 7135

2 7?5l
3 6299
4 4518

2 7232
3 5460
1 3295

5 24?)
G 3021
fi 7327

5 0757
5 7064

2 94 10
'3 9020
4 8534

5 4172
6 2303
70197
7 7861

10
11

10 368

12
13^ ^

11 255
12 134
13 004
I3 0GS

1 0594

7%

2 4010
3 0373
3 6048
4 1114

3 7045
4 1604
4 4873

5 2161

S01R8

5 9377

5 G0G9 5 4527

5 2337

5 0170
0 1218

5 0003
5 0424

G 3025
6 4624

G 0021
6 142?

5 420G
5 :>o:j 1 5 3423
5 7245
5 4675
5 04 74 5 5755

6G039
6 7291

5 9542
6 0472

5 6GB5
5 7487

6 0399
6 9380

6 2G5I
6 3729
G 4674
6 5504

6 1200
6 1902

58)78
5 8775

7 0240

6G231

6 2593

5 92BB

7 4353

G 4632
7 1070

0.5302

8 1! 09

7 721 7

7 3601

5 9713
G 5152
7 0236

9 78GB

9 2526

8 7G05

8 3004

7 BB69

7 -1987

7 1300

10 575
11 340

9 9540
10G35

9 3051
9 9nso

0 0G.13
9 3030

ti niun
8 8527

7 9427
0 3577

12 I0G
12 849

II 29G

10 503

9 Wlllfi

9 ?u:.o

0 7455

7 53G1
7 90311 7 4000
n ?4.|;| 7 7Bli2

11 030

ii tie

10 3110 9 71^2

9 1079

8 5595

0 0007

12 561

11 652
12 166

io bub
11 274

10 >06
10 477

9 446G

0 8514

0 3126

9 7632

12 659
13 134

11 GOO 10 020
12 085
11.158

9 603G

8 543G
B 7!56
8 9501

13 590

12 4G2

11 470

10 059
10 336
10 594

9 <216
9 3719

7 8237 * 7 3792 6 9740


B 0216 7 54 BB 7 1196
0 2014 7 70)6
7 2497

98181

11 764
12 042

10 836
11.061
11 272

10017

14 718
15 562

13 570
14 292

16
19

16 308
1 7 226

14 992
15 678

13 166
13 754
14 324

20

IB 046

IG 351

14 877

21

18 05?
19 660

17 011

22

15 4 15
15 937

23

20 456

24

21 243

IB 292
18914

25

22 023

19 523

26
2?
28

22 795 20 121
20 707
23 560
24 31C 21 701
21 844
25 066

17 658

4 7065
5 31)93

5 7590
6 1446
0 4951
G 6137
7 1034

G 4024

G 1944

fi 7499

7 3007

G 9010

7 0061

7 1900

6 4235
0 0202
6B109

6 3649

7 E393

9 1285

B5I36

7 9633

9 2922
9 4424

8 6407

8 0751

8 77 15

8 1757

7 5620
7 644G

9 5B02

B 2064

6 6070

6 3125

59731

6 7429

6 3587

7 7184

6 7921

6 39BB

60113
6 0442

B 3481
8 42)7

7 7043

7 2829
7.3300

6B35I
6 8729

6 4338

7 8431

9 1600
9 2372
10 116 9 300G
10 190 9 3696
10 274' 0 4269

P 4801
8 5470
nooiG
B 6501
R 093B

7 8957

7 3717 6 9061
7 4066 G 9352
7 0426
7 >.104.1 7 44 12 0 0007
7 4 7QI 6 9830
0 02)0
7 4057 7 0027
8 055?

6 4906
6 5135
C 5335
6 5509
0 5600

10 5G7 9 0442
9 7791
9 0620

B 0552
0 951)
900*9

8 1755
0 2430
B 2825

99140

9 0417

8 3045

13 IG3

16 936
17 413

15 247

13 799
M 094

12 550

) 1 469

10 529

9 7066

8 0032
0 9847

12 783

11.654

10 675

9 8226

9 0770

1 7 877
18 327

14 375
14 G43
14 nun

13 003
13 211
13 406

11 826
11 9li7

10010

9 9290
10 027

IB 7G'I
19 mo
19 600

15 903
16 330
11)003
1GJB4
17 292

IS Ml
15 372

13 591
13 705

15 622

13 489 ' 12 303

12 137
12 278
12 409

10 935
11 051
11 150
II ?5B

25 808

22 396

35
40

29 409
32 835

21 407

18 065

10 374

14 490

<15

36 095

24 999
27 355
29 430

23 115
24 519

19 793
20 720

17 159
17 774

15 046
15 456

13 006

11 055
1) 925
12 )0B

50

39 196

31 424

25 730

21 402

18 256

15 762

13 801

12 233- 10 962

1? 94|l
13 332

5 0206
5 1971

7 1016

12 821

16 444

7 3G5B
7 4694

4 7716

4 038G
4 3436
4 6065
4 0332

7 1695
7 2297

14 029
14 .151
14 857

10 201
10371

3 4331
8007
2083
6309
9464

4.9173
5 5024
6 2098
6 R017

16 .
I?

29
30

12%

5%

10 757
I08B1

7 505G
7 0344

7 0700
7 1050
7 GG09 7 1?32
7 6752 7 1327

6 464 1.

0 GIGC
G 04 10
6 6543
0 6605

6 0726
6 0971
6 1102
6 1364
G 1520
0 1656
0 1 77?
0 2153
6 2335
6 242?'
6 2463

2 2006
2 7432
3 >993

4 4506
4 G50G

? 6901
3 1272
3 4076
3 Bl 15
4 0770
4 3030
4 494 1

4 B304

4 0500
4 911114 4 703?

5 1 1113 4 9095
5 2293
5 001)1
5 3242
5 OHIO
5 4053

5 1024

5 4746
5 5339

5 2223

4 1633 . 4 0310
4 33U0
4 1025

2 9514

2 6427

2 3052

3 1611
3 3289

2 0021
2 9247

3 >1631
3 5705

3 0190

2 5075
2 5982
2 6653

1 2245
1 5089
1 8492
2 0352
2 IGOO
2 2628
2 3306
2 3790
2 4138

3 0915

2 7150

4 4005

.1 3271

3 0504

3 1473

4 0105
4 /147

4 4:i!)2
4 5327

4 11023

I 0100
4 0755

3 7251
3 7001
3 024 I

3 1903
3 2233
3 2487

2 7510
2 779?
2 7994
2 8I4.|

3 0593

3 2G02

2 0255

2 4!,59
2 4GII5
2 47/5
2 4039

311074

3 2032
3 294B
3 3037

2 8337
2 B398
2 8443

2 4885
2 4918
2 494 1

3 3105

2 8476
2 8501

2 4?58
2 4970

2 8519

2 4979

2 8533

4 0750
4 9377
4 0B97

5 2732
5 3162

5 0333

5 3527

5 1009

5 6648
5 6964

5 383 7

5 1260

5 4099

5 I486

5 7234

5 4321

5 5845
5 6270

2 1065
2 5007
2 9906

1 4400
1 9520
2 3GIG
2 6B93

5 0700

4 /2IC
4 7746
4 0122
n B435
4 8G96

3 9099
3 9279
3 9424

2 4.1113

3 9539

33158

4 0913
4 9094

3 9631
3 9705

5 1668

4 9245

3 3198
3 3230
3 3254

2 0543

2 4985
2 4909

3 3272

2 8550

2 4992

3 328G

2 8556

2 4994

5 7465

5 4509

5 1822

4 9371

3 9764
3 9011

5 76G2

5 4069

5 195)

4 947G

3 9849

5 7831
5 7975
5 UO'IO
5 8204
5 0294

5 4804
54919
5 5010
5 5000
5 5100

5 2060
5 2)51
5 ??:n
5 2292
5 2.14 7

4^*

3 3297
3 9879
3 9903
3 3305
3 9*J?3 3 3312
3 99311 3 3317
3 0050
.13321

2 05^
f.W4996
5 4907
2 8563
2 40*10
2 0505
2 B5G7 2 4999
? nr,Oil ? 4909

5 8502
5 07)3

5 5306
5 5402

52512
5 2502

4 9915
4 99G0

3 9904

3 3330

3 9995

3 3332

2 8571
2B57I

2 5000
2 5000

5 8773
5 8B0I

5 5523
5 554 1

5 2611

4 9906

3 9990

5 2623

4 9995

3 9999

28571
3 3333
3 3333 * 2 B571

2 5000
2 5000

4 9030
4 '100/
4 9747
4 97nn

* Appendix

11%

4%

6 4 720
7 3255
0 1622
8 9826

5^
IS''1-'

10%

3%

56014

8
9

9%

2%

5 7955
6 7202
7 6517
6 5660
94713

6
7

8%

1%

r>

Appendix

TABLE A.4 ANNUAL EQUIVALENT OF AN INITIAL PAYMENT


ofi (IN l*S)

No.
Rate of interest
of -------------------------------------------------------- ------ !------ -----------yean 4% 5% 6% 7% 8% 9% ZO%

00

1*04000 2*05000 I-06000 1*07000 1*08000 1*09000 1*10000


0*53020 0-53781 0*54544 0*55309 0*56079 0*56847 0*57620
0*36035 0*36721 0*37411 0*38105 0*38805 0*39507 0*402x2
0*27549 0*28201
0*22463 0*23098
0*12329 0'12951
0*08994 0*09634
0*10955 0*12746
0-07358 0*08024
0*06401 0*07095
0*05783 0*06505
0*05358 0*06207
0*05052 0*05828
0*04826 0*05626
0*04655 0*05478
0*04523 0*05367
0*04420 0-05283
0*09022 0*10013
0*04275 0*05x70
0*09009 0*10004
0*04x81 0*05x03
0*04221 0*05063
0*09004 0*10002

l00

X
2
3
4
5
xo
25
20
25
30
35
40
45.
50
55
60
70
So
90
100

0*09002' 0*20002

12

34

SBC2242

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 2242

COURSE

CONSTRUCTION TECHNOLOGY II

PROGRAM

1 SBC

TIME

2 y2 HOURS (9.00 AM - 11.30 AM)

DATE

12 APRIL 2010

LECTURER

EN. SYAMSUL HENDRA B. MAHMUD

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.
Answer four (4) questions only. All questions carry equal marks.

1. Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen


dan kaedah kerja yang dijalankan.
Where necessary, please make your own assumptions on the size of the
items and relevant construction work/activities.
2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.
All drawings must be completed with annotation and side notes.

THIS QUESTION PAPER CONSIST OF 7 PAGES INCLUDING THE FRONT PAGE

SBC2242

SOALAN 1

Sebuah bangunan komersil setinggi 35 tingkat berkerangka keluli akan


dibina di pusat bandaraya Kuala Lumpur yang bakal menempatkan menara
pejabat dan pusat membeli-belah.

a)

Terangkan berserta lakaran yang bersesuaian mengenai sambungansambungan

bagi

struktur-struktur

berikut

menggunakan

kaedah

kimpalan dan kaedah bolt:

i)

Tiang ke tapak tiang

ii) Tiang ke tiang


iii) Rasuk ke tiang

(15 markah)

b)

Terangkan

berserta

lakaran

yang

bersesuaian

mengenai

kaedah

perlindungan api untuk struktur kerangka keluli tersebut.

(10 markah)
QUESTION 1

A 35 storey steel structure commercial building will be built in Kuala Lumpur


city centre which consists of an office tower and shopping complex.

a) Explain with appropriate sketches the connections for these structures using
welding and bolting techniques:

i)

Column to column base

ii) Column to column


iii) Beam to column
(15 marks)

b) Explain with appropriate sketches the fire protection techniques for the steel
structures.
(10 marks)

52

SBC2242

SOALAN 2

a) Huraikan berserta lakaran tentang konsep serta pembinaan bumbung


kerangka portal jenis keluli.
(15 markah)

b) Huraikan kebaikan dan keburukan penggunaan struktur bumbung


cengkerang dan bumbung berlipat.

(10 markah)

QUESTION 2

a) Explain with sketches the concept and construction of steel portal frame
roof

(15 marks)

b) Explain the advantages and disadvantages of shell roof and folded slab roof
structure.
(10 marks)

SBC2242

SOALAN 3

a) Syarikat Crospax telah ditawarkan kontrak untuk kerja perobohan sebuah


bangunan rumah kedai 2 tingkat sedia ada di kawasan Taman Mutiara
Rini, Johor Bahru bagi membina bangunan pejabat 5 tingkat di atas
tanah tersebut. Lokasinya adalah berhampiran kawasan perumahan sedia
ada. Berikan penerangan ringkas kepada pihak klien mengenai:

i)

Kriteria-kriteria yang perlu diambil kira sebelum sesuatu teknik


perobohan tersebut dipilih.

(15 markah)

ii) Langkah-langkah keselamatan yang bersesuaian dengan kerja


perobohan tersebut.

(10 markah)
QUESTION 3

a)

Contractor Crospax has been offered a contract for demolition works of a


double storey shop house in Taman Mutiara Rini, Johor Bahru in order to
build a new 5 storey office building in the proposed area. The location of the
site is nearby the existing residential area. Explain briefly to the client
about:

i) The criterias need to be considered before choosing any types of


demolition techniques.

(IS marks)

ii) The suitable safety precautions for the demolition project.

(10 marks)

54

SBC2242

SOALAN 4

a) Huraikan faktor-faktor yang mempengaruhi pemilihan lantai atas.

(10 markah)

b) Huraikan berserta lakaran mengenai pembinaan papak rata dan lantai


waffle.

(15 markah)

QUESTION 4

a) Describe what are the factors influencing the selection of upper floors.

(10 marks)

b) Explain with sketches the construction of flat slab and Waffle floor.

(15 marks)

SBC2242

SOALAN 5

a)

Cadang dan lakarkan komponen perabot dalaman yang sesuai untuk


ruang tamu rumah kediaman untuk memuatkan buku, majalah, alat
sistem hiburan rumah dan barang hiasan.

(15 markah)

b]

Terangkan fungsi perabot dalaman bagi sebuah kediaman mewah dua


tingkat.

(10 markah)

QUESTION 5

a) Suggest and sketch the suitable components for built in fitment suitable for
living area in residential houses for books, magazines, home theatre system
and decorations.
(1 Smarks)

a) Explain the function of built in fitment for a luxury two storey house

(10 marks)

56

SBC2242

SOALAN 6

a)

Cadangkan dua jenis kemasan lantai, satu jenis kemasan siling dan dua
jenis kemasan dinding yang sesuai bagi sebuah apartment mewah setinggi
10 tingkat. Berikan justifikasi terhadap pemilihan kemasan - kemasan
tersebut.

(25 markah)

QUESTION 6

a)

Suggest two types of floor finishes, one type of ceiling finishes and two
types of wall finishes suitable for a 10 storey luxury apartment. Justify your
choices on the finishes.

(25 marks)

SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

SBQ 1223

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 1223

COURSE

CONSTRUCTION TECHNOLOGY I

PROGRAM

1 SBQ

TIME

2 HOURS (9.00 AM - 11.00 AM)

DATE

12 APRIL 2010

LECTURER

EN. SYAMSUL HENDRA B. MAHMUD

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.
Answer four (4) questions only. All questions carry equal marks.

1. Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen


dan kaedah kerja yang dijalankan.
Where necessary, please make your own assumptions on the size of the
items and relevant construction work/activities.
2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.
All drawings must be completed with annotation and side notes.

THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

58

SBQ 1223

SOALAN 1

a) Lakarkan lima (5) jenis susun atur binaan tangga yang biasa digunakan.

(10 markah)

b)

Berbantukan lakaran berlabel, lakarkan proses pembinaan terperinci


sebuah tangga lurus konkrit tuang in-situ.
(15 markah)

QUESTION 1

a) Sketch five (5) types of staircase layout which are commonly used.

(10 marks)

b) Aided with annotated sketches, sketch the details components of an in-situ


straight concrete staircase.

(15 marks)

SOALAN 2

a)

Berbantukan lakaran berlabel, terangkan mengenai perbezaan di antara


tingkap ram tetap dan tingkap ram boleh laras.

(15 markah)

b)

Pintu panel biasa digunakan di rumah-rumah kediaman. Huraikan


berserta lakaran yang bersesuaian tentang komponen-komponen pintu
panel tersebut.

(10 markah) .

59

SBQ 1223

QUESTION 2

a)

Aided with annotated sketches, explain the difference between fixed


louvered window and adjustable louvered window.

(15 marks)

bj Paneled door are commonly used in residential buildings. Explain using


appropriate sketches the components of the paneled door.

(10 marks)

SOALAN 3

a)

Bincangkan dengan ringkas kelebihan dan kelemahan tiga (3) jenis


kemasan lantai dan dua (2) jenis kemasan dinding yang biasa digunakan
bagi bangunan sekolah.

(15 markah)

b) Bincangkan dengan ringkas faktor pemilihan bagi kemasan lantai yang


biasa digunakan bagi rumah kediaman.

(10 markah)

QUESTION 3

a) Briefly discuss the advantages and disadvantages of three (3) types of floor
finishes and two (2) types of wall finishes commonly used for school
buildings.

(15 marks)

b)

Briefly discuss the functional requirements for floor finishes which is


commonly used for residential housing.
(10 marks)

3
/"N

b(J

SBQ 1223

SOALAN 4

a) Huraikan berserta lakaran mana - mana lima (5) komponen bumbung


cerun yang berikut:

i. Battem
ii. Valley Board
iii. Verge
iv. Wall Plate
v. Rain Water Down Pipe
vi. Common Rafter
vii. Gutter"
(15 markah)

b) Berbantukan lakaran berlabel, terangkan mengenai komponen-komponen


terperinci bagi lean to roof dan monopitch roof.
(10 markah)

QUESTION 4

a) Explain with sketches any five (5) of the following components of staircase:

i. Battem
ii. Valley Board
iii. Verge
iv. Wall Plate
v. Rain Water Down Pipe
vi. Common Rafter
vii. Gutter

(15 marks)

b) Aided with annotated sketches, explain the detail components for lean to roof
and monopitch roof

(10 marks)

61

SBQ 1223

SOALAN 5

a) Huraikan perbezaan di antara dinding galas beban dan dinding tidak


galas beban.
(10 markah)

b) Berbantukan lakaran bernota, huraikan proses pembinaan dinding bata


dengan menggunakan ikatan Flemish.
(15 markah)

QUESTION 5

a) Describe the differences between load bearing wall and non-load bearing
wall.
(10 marks)

b) Aided with annotated sketches, explain the construction process for


brickworks using Flemish bonding.
(15 marks)

SOALAN 6

a) Bincangkan dengan ringkas keperluan fungsi bagi siling yang biasa


digunakan bagi rumah teres dua tingkat.

(10 markah)

b) Berbantukan lakaran bernota, terangkan mengenai komponen siling


gantung.

(15 markah)

SBQ 1223

QUESTION 6

a) Briefly discuss the functional requirements for ceiling which is commonly


used for two storey terrace housing.

(10 marks)

b) Aided with annotated sketches, explain the component for suspended


ceiling.
(15 marks)

SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

SBC1222

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 1222

COURSE

CONSTRUCTION TECHNOLOGY I

PROGRAM

1 SBC

TIME

2 HOURS (9.00 AM - 11.00 AM)

DATE

12 APRIL 2010

LECTURER

EN. SYAMSUL HENDRA B. MAHMUD

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.
Answer four (4) questions only. All questions carry equal marks.

1. Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen


dan kaedah kerja yang dijalankan.
Where necessary, please make your own assumptions on the size of the
items and relevant construction work/activities.
2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.
All drawings must be completed with annotation and side notes.

THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT PAGE

6 k

SB Cl 222

SOALAN 1

a) Lakarkan lima (5) jenis susun atur binaan tangga yang biasa digunakan.

(10 markah)

b) Dengan bantuan lakaran berlabel, lakarkan proses pembinaan terperinci


sebuah tangga lurus konkrit tuang in-situ.
(15 markah)

QUESTION 1

a) Sketch five (5) types of staircase layout which are commonly used.

(10 marks)

b) Aided with annotated sketches, sketch and label the construction process of
an in-situ straight concrete staircase.
(15 marks)

SOALAN 2

a) Bincangkan dengan ringkas keperluan fungsi bagi tingkap yang biasa


digunakan bagi rumah kediaman.

(5 markah)

b) Dengan bantuan lakaran berlabel, terangkan mengenai perbezaan di


antara pintu panel dan pintu rata.
(20 markah)

SBC1222

QUESTION 2

a) Briefly discuss the functional requirements for windows which are commonly
used for residential housing.

(5 marks)

b) Aided with annotated sketches, explain the difference between panelled door
and flat flush door.
(20 marks)

SOALAN 3

a)

Dengan

bantuan

lakaran

berlabel,

terangkan

mengenai

proses

pemasangan kemasan dinding jenis jubin seramik bersaiz 200mm x


200mm bagi bilik air sebuah rumah teres dua tingkat.

(15 markah)

b)

Bincangkan dengan ringkas faktor pemilihan bagi kemasan lantai yang


biasa digunakan bagi rumah kediaman satu tingkat.

(10 markah)

QUESTION 3

a) Aided with annotated sketches, explain the installation process for 200mm x
200mm ceramic tiles finishes for a double storey terrace houses bathroom.

(15 marks)

b)

Briefly discuss the selection factors for floor finishes which is commonly
used in single storey residential housing.
(10 marks)

66

SBC1222

SOALAN 4

a) Huraikan berserta lakaran mana - mana lima (5) komponen-komponen


bumbung cerun yang berikut:

i. Hip Rafter
ii. Jack Rafter
Hi. Valley Rafter
iv. Wall Plate
v. Rain Water Down Pipe
vi. Ridge Board
vii. Verge
(25 markah)

QUESTION 4

a) Explain with sketches any five (5) of the following components of staircase:

i. Hip Rafter
ii. Jack Rafter
iii. Valley Rafter
iv. Wall Plate
v. Rain Water Down Pipe
vi. Ridge Board
vii. Verge

(25 marks)

6 7

SBC1222

SOALAN 5

a) Dengan bantuan lakaran bernota, terangkan mengenai sistem kerangka


yang bersesuaian bagi sebuah rumah banglo dua tingkat.

(15 markah)

b)

Dengan bantuan lakaran bernota, huraikan proses pembinaan dinding


bata dengan menggunakan ikatan Flemish.

(10 markah)

QUESTION 5

a) Aided with annotated sketches, explain the frame system suitable for a
double storey bungalow.
(15 marks)

b) Aided with annotated sketches, explain the construction process for


brickworks using Flemish bonding.
(10 marks)

6b

SBC1222

SOALAN 6

a) Dengan bantuan lakaran bernota, terangkan mengenai komponen siling


gantung.

(25 markah)

QUESTION 6

a) Aided with annotated sketches, explain the component of suspended


ceiling.
(25 marks)

SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

SBC 1233

UTM

Fakulti Alam Bina

UNJVERSITl TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER 2 SESSION 2009/2010

COURSE CODE

SBC 1233

COURSE

BUILDING SERVICES SYSTEM

PROGRAM

1 SBC

TIME

2 HOURS (9.00 pg - 11.00 pg)

DATE

13 APRIL 2010

LECTURER

DR. YAHYA MOHAMAD YATIM

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab 4 SOALAN Sahaja.
Answer 4 Questions Only.
Di mana perlu, nyatakan andaian yang anda buat dengan jelas untuk
disesuaikan dengan jawapan yang anda beri.
Where necessary, please make your own assumptions on any aspects to suit your
answers.

KERTAS SOALAN INI TERDIRI DARIPADA _4_ MUKA SURAT TERMASUK MUKA
SURAT HADAPAN.

7 0
i

SBC 1233

SOALAN 1
Terangkan fungsi komponen-komponen berikut yang berkaitan dengan sistem
kumbahan di dalam bangunan.
(i) Paip air kumbahan dan paip air buangan
(ii) Perangkap Air
(iii) Paip pengudaraan
(iv) Peralatan Kumbahan
(v) Peralatan Air buangan
(25 Markah)
QUESTION 1
Explain the function of sewerage components in building as follows:
(i) Soil and waste stack pipe
(ii) Water trap
(iii) Vent pipe
(iv) Soil Appliances
(v) Waste Appliances
(25 Marks)
SOALAN 2
(i) Terangkan perbezaan diantara sistem pengudaraan semulajadi dengan
pengudaraan makanikal.
(10 Markah)
(ii) Terangkan bagaimana pengudaran semulajadi bagi bangunan satu
tingkat boleh diperolehi dangan berkesan.
(15 Markah)
QUESTION 2
(i) Explain the distinctions of mechanical and natural ventilation system.
(10 Marks)
(ii) Explain how natural ventilation can effectively be achieved in a single
storey house.
(15 Marks)
SOALAN 3:
(i) Lakar dan terangkan bagaimana kitaran refrigeren di dalam penyaman
udara jenis tingkap.
(10 Markah)
(ii) Dengan berbantu lakaran, terangkan bagaimana sistem penyaman udara
unit terpisah dipasang pada bangunan
(15 Markah)

71
2

SBC 1233

QUESTION 3
(i) Sketch and explain the refrigerant cycle in window type air-conditioning
system.
(10 Marks)
(ii) With the aid of sketches, explain how split air-conditioning system be
installed in buildings.
(15 Marks)

SOALAN 4
Lakar (tidak mengikut sekala) rajah pendawaian bagi rumah kediaman bermula
dari fius pemotong bekalan sehingga ke litar akhir serta namakan dan
terangkan fungsi bagi setiap komponen tersebut.
(25 Markah)

QUESTION 4
Sketch (not to scale), name and explain the function of the main component of the
domestic electrical diagram from cutout fuse to the final circuit.
(25Marks)

SOALAN 5
(i) Terangkan keperluan pemasangan lift bagi bangunan tinggi seperti yang
dikehendaki oleh Undang-Undang Bangunan Seragam 1984
(10 Markah)
(ii) Namakan dan terangkan fungsi utama komponen lif electrik.
(15 Markah)

QUESTION 5
(i) Explain the requirement of lift in high-rise buildings as ruled out in Uniform
Building By-Laws 1984.
(10 Marks)
(ii) Name and explain the main component of electric lifts.
(15 Marks)

SOALAN 6
(i) Apakah definisi eskalator.
(5 Markah)
(ii) Terangkan kelebihan dan kekurangan sudut kecondongan eskalator.
(10 Markah)
(iii) Terangkan tiga jenis susunatur eskalator yang biasa dipasang pada
kompleks membeli belah.
(10 Markah).

7 2
3

SBC 1233

QUESTION 6
(i) What is the definition of escalator?
(5 Marks)
(ii) Explain the advantages and disadvantages of the escalator slope.
(10 Marks)
(Hi) Explain three types of escalator layout commonly installed in a shopping
complex.
(10 Marks)

SELAMAT MAJU JAYA


All the Best

73
4

SBQ 2233

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 2233

COURSE

BUILDING SERVICES II

PROGRAM

1 SBQ

TIME

2 HOURS (2.30 PM - 4.30 PM)

DATE

13 APRIL 2010

LECTURER

ISMAIL BIN HARON

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:

Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang
sama.

Answer four (4) questions only. All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 6 PAGES INCLUDING THE FRONT


PAGE
1

SBQ 2233

SOALAN 1
a) Terangkan dengan ringkas klasifikasi risiko yang digunapakai
pada sistem semburan.
( 7 markah )
b) Dengan berbantukan lakaran, terangkan komponen-komponen
asas serta teknik pemasangan sebuah sistem semburan.
( 18 markah)

QUESTION 1
a) Briefly describe the risk classification used in a sprinkler system.
( 7 marks )
b) With the aid of sketches, describe the basic components and
installation techniques of a sprinkler system.
(18 marks )

SOALAN 2
a) Terangkan perbezaan antara sistem penyaman udara kemas-siap
penyejukkan udara dengan sistem kemas siap penyejukkan air.
( 5 markah )
b) Dengan berbantukan lakaran, terangkan prinsip operasi sistem
penyaman udara menggunakan sistem logi pusat air sejuk.
( 20 markah )

SBQ 2233

QUESTION 2

a) Describe the difference between an air cooled packaged and water


cooled packaged air conditioning system.
(5 marks )
b) With athe aid of sketches, describe the operation principles of a
central water chiller air conditioning system.
( 20 marks )

SOALAN 3
a) Terangkan apa yang dimaksudkan dengan Population Equivalents
(PE) dalam perawatan kumbahan.
( 5 markah )
b) Dengan berbantukan lakaran, terangkan prinsip operasi sistem
Turas Pencucur Kadar Tinggi.
( 20 markah )

QUESTION 3
a) Explain what is meant by Population Equivalents (PE) in the sewage
treatment.
( 5 marks )
b) With the aid of sketches, describe the operation principles of the
High Rate Trickling Filter (HRTF) system.
(20 marks )

76

SBQ 2233

SOALAN 4
a) Terangkan ciri-ciri yang menentukan kecekapan sesebuah sistem
lif.
( 10 markah )
b) Terangkan komponen-komponen asas sebuah sistem lif elektrik.
( 15 markah )

QUESTION 4
a) Describe the characteristics that determines the efficiency of a lift
system.
(10 marks )
b) Describe the basic components of an electric lift.
(15 marks )

SOALAN 5
a. Terangkan kelebihan penggunaan tangga gerak berbanding lif di
dalam bangunan.
( 5 markah )

b. Terangkan dengan ringkas fungsi komponen tangga gerak berikut:


i)
ii)
iii)
iv)

Kerangka penyokong utama


Motor tarikan
Anak tangga dan rantai anak tangga
Susur tangga
( 20 markah )

7 7

SBQ 2233

QUESTION 5

a) Describe the advantages of the use of escalators compared to lift in


building.
( 5 marks )

b) Briefly describe the function of the following components of an


escalator:
i)
ii)
iii)
iv)

Main support truss


Traction motor
Steps and step chain
Balustrade
(20 marks )

SOALAN 6
Terangkan dengan ringkas perkara-perkara berikut:
a) Sistem automasi bangunan
b) Sistem penyaman udara jenis unit pisah
c) Sistem melawan kebakaran jenis pemasangan tetap CO2
d) Sistem perlupusan kumbahan jenis parit pengoksidaan
e) Perbezaan antara eskalator, travelator dan walkalator
( 25 markah )

7 6

SBQ 2233

QUESTION 6

Briefly describe the followings:


a) Building automation system
b) Split unit air conditioning system
c) Fixed C02 fire supression system
d) Oxidation ditch sewage disposal system
e) Difference between escalator, travelator and walkalator
( 25 marks )

SBQ 4314

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

UNIVERSITI TEKNOLOGI MALAYSIA


FAKULTI ALAM BINA
PEPERIKSAAN AKHIR SEMESTER II
SESI 2009/2010

KOD MATA PELAJARAN

SBQ 4314

MATA PELAJARAN

UKUR BINAAN IV

KURSUS

3 SBQ

MASA

3 JAM (9.00 AM-12.00 PM)

TARIKH

14 APRIL 2010

PENSYARAH

DR. MOHD SAIDIN BIN MISNAN

MARKAH

40%

ARAHAN KEPADA CALON :


1.
2.
3.

4.

5.
6.

Sila j awab SEMUA soalan.


Sila baca dan fahami soalan serta lukisan dengan teliti sebelum
menjawab.
Pelajar diminta membuat andaian/ as sumption yang munasabah jika
terdapat percangahan maklumat atau maklumat yang disediakan
tidak mencukupi. Andaian-andaian hendaklah dinyatakan di dalam
Senarai Kemusykilan dan dihantar bersama-sama kertas jawapan.
Markah akan diberikan berdasarkan kepada pemahaman terhadap
prinsip pengukuran, ketepatan ukuran, kejelasan huraian dan
keteraturan kerja.
Semua keija pengukuran hendaklah merujuk kepada MCESMM.
Semua lukisan hendaklah dikembalikan bersama kertas jawapan

KERTAS SOALAN INI TERDIRI DARI PAD A _7_ MUKA SURAT TERMASUK
MUKA SURAT HADAPAN.

80

SBQ 4314

SOALAN 1
Berdasarkan

kepada

Lukisan

No.

KPKR/J/R/149336/AM7,

AM8

dan

AM9,

KPKR/J/R/ 149336/ST1, ST2, ST3 dan ST4, ukur kuantiti bagi semua kerja yang
berkaitan dengan Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat,
Pantai

Dalam,

Kuala

Lumpr

(KTM-Pakej

7).

Skop

kerja

termasuk

kerja-kerja

cerucuk, jambatan {prestressed beam), dan pembinaan jalan.


(60 markah)

QUESTION 1
Based

on

the

drawing

No.

KPKR/J/R/149336/AM7,

AM8

and

AM9,

KPKR/J/R/ 149336/ST1, ST2, ST3 and ST4, take-off the quantities of all related
works to Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat, Pantai
Dalam, Kuala Lumpr (KTM-Pakej 7). Scope of works involved are piling works,
bridge works (prestressed beam), and roadworks.
(60 marks)

SOALAN 2

Berdasarkan

kepada

Lukisan

No.

KPKR/J/R/149336/

ST8,

ukur

kuantiti

bagi

semua keija yang berkaitan dengan Precast Vechicular Box Culvert and Sewer
Protection, Projek Pembinaan Lintasan Keretapi Bertingkat di Kampung Selamat,
Pantai Dalam, Kuala Lumpr (KTM-Pakej 7).
(40 markah)

QUESTION 2
Based on the drawing No. KPKR/J/R/149336/ ST8, take-off the quantities of all
related works to Precast Vechicular Box Culvert and Sewer Protection, Pembinaan
Lintasan Keretapi Bertingkat di Kampung Selamat, Pantai Dalam, Kuala Lumpr
(KTM-Pakej 7).

(40. marks)

81

SBC 2273

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 2273

COURSE

CONSTRUCTION
DESIGN

PROGRAM

2 SBC

TIME

2 HOURS 30 MINUTES
(9.00AM - 11.30AM)

DATE

14 APRIL 2010

LECTURER

NURSHIKIN BINTI MOHAMAD


SHUKERY

PERCENTAGE

40 %

TECHNOLOGY

AND

ARAHAN:
INSTRUCTION:
Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.
Answer four (4) questions only. All questions carry equal marks.

1. Di mana perlu, nyatakan andaian anda berkenaan dengan saiz elemen


dan kaedah kerja yang dijalankan.
Where necessary, please make your own assumptions on the size of the
items and relevant construction work/activities.
2. Semua lukisan perlu disertakan dengan huraian dan label lengkap.
All drawings must be completed with annotation and side notes.

THIS QUESTION PAPER CONSIST OF 10 PAGES INCLUDING THE FRONT PAGE

8 I

SBC 2273

SOALAN 1

a)

Terdapat dua (2) implikasi terhadap defmisi kebolehbinaan. Huraikan


implikasi-implikasi tersebut dengan jelas.

(6 markah)

b)

Mengapa perlunya rekabentuk kebolehbinaan dalam projek pembinaan?


(6 Markah)

c)

Huraikankan 16 prinsip-prinsip kebolehbinaan dengan terperinci.


(13 Markah)

QUESTION 1

a)

There are two (2) implications of buildability definition. Elaborate those


implications clearly.

(6 marks)

b)

Why design for buildabilty in construction project?

(6 Marks)

c)

Elaborate 16 principles of buildability in detail.

(13 marks)

SOALAN 2

Terangkan dengan terperinci aktiviti-aktiviti yang terlibat dalam proses


rekabentuk arkitek dan rekabentuk struktur.

(25 markah)

8 b

SBC 2273

QUESTION 2

Explain in detail the activities involved in architectural design and structural


design process.
(25 marks)

SOALAN 3

a)

Terangkan dan lakarkan dengan terperinci sistem lantai berikut:


i)

Papak berusuk

ii)

Sistem lantai rasuk jalur

iii)

Sistem lantai pratuang

iv)

Plat rata

v)

Papak rata
(15 Markah)

b)

Huraikan hanya tiga (3) faktor-faktor yang mempengaruhi pemilihan


sistem lantai yang sesuai.
(10 Markah)

QUESTION 3

a)

Explain and sketch in detail each of following flooring system:


i)

Ribbed slab

ii)

Band beam floor system

iii)

Precast floor system

iv)

Flat plate

v)

Flat slab
(15 Marks)

b)

Elaborate only three (3) factors that influenced in selecting an


appropriate flooring system.

(10 Marks)

<3 v

SBC 2273

SOALAN 4

Sebuah rasuk konkrit bertetulang mempunyai 300mm lebar dan kedalaman


efektif 552mm diperlukan untuk merentang sepanjang 6m. Rasuk tersebut
membawa momen rekabentuk maksimum (M) sebanyak 321.5 kNm dan daya
ricih muktamad (V) sebanyak 214.4kN. Anggapkan diameter penyambung
ialah 10mm, fcu = 30 N/mm2, fy = 460 N/mm2, fvy = 250 N/mm2 dan keadaan
dedahan (cuaca) adalah ringan, rekabentukkan rasuk ini. Rumus dan jadual
rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.
(25 Markah)

QUESTION 4

A reinforced concrete beam which is 300mm wide and effective depth is 552mm
is required to span 6m. The beam carries a maximum design moment (M) of
321.5 kNm and ultimate shear force (V) of 214.4kN. Assuming the diameter of
links is 10mm, fcu = 30 N/mm2, fy = 460 N/mm2, fvy = 250 N/mm2 and the
exposure conditions (weather) are mild, design the beam. Relevant design
formulas and tables are in the APPENDIX.
(25 Marks)

SOALAN 5

Rajah 1 menunjukkan, 400mm tiang segiempat sama membawa beban mati


sebanyak lOOOkN dan beban hidup sebanyak 250kN. Keupayaan galas
selamat tanah ialah 168kN/m2. Rekabentukkan tapak pad segiempat sama
bagi menanggung beban tersebut. Anggapkan kekuatan bahan-bahan
berikut.

Ketumpatan konkrit = 24kN/m3


fcu = 35 N/mm2
fy = 460 N/mm2

20mm diameter bar bagi tetulang lenturan di kedua-dua arah. Rumus dan
jadual rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.

(25 Markah)

90

SBC 2273

Axial load: Dead = 1000kN


Imposed = 250kN

Rajah 1/Figure 1

QUESTION 5

Figure 1 shows, a 400mm square column carries a dead load of lOOOkN and
imposed load of250kN. The safe bearing capacity of soil is 168kN/m2. Design a
square pad footing to resist the loads. Assuming the following materials
strength.
Concrete density = 24kN/m3
feu = 35 N/mm2
fy = 460 N/mm2
20mm diameter bars for bending reinforcement for both directions. Relevant
design formulas and tables are in the APPENDIX.
(25 Marks)

SOALAN 6

Rajah 2 menunjukkan, 6m rentang sebuah rasuk segiempat tepat disokong


mudah membawa beban mati (gk ) sebanyak lOkN/m. Rekabentukkan
tetulang ricih bagi rasuk tersebut menggunakan penyambung keluli lembut
(fvy = 250 N/mm2) bagi kes-kes beban hidup (qk) berikut;

i)

0 kN/m

ii)

10 kN/m

iii)

29 kN/m

iv)

45 kN/m

91

Dimensi ukur lebar rasuk (b) ialah 300mm dan kedalaman efektif (d) ialah
547mm. Anggapkan fcu =25N/mm2 dan saiz bar 4T25 (As= 1960mm2). Rumus
dan jadual rekabentuk yang berkaitan terdapat di dalam LAMPIRAN.

(25 Markah)
b=300mm

H r~
qk=Varies

gk=10kN/m

Rajah 2/Figure 2

QUESTION 6
Figure 2 shows, a simply supported rectangular beam of 6m span carries a
characteristic dead load (gk ) of lOkN/m. Design the shear reinforcement for the
beam using mild steel (fvy = 250 N/mm2) link for the following imposed load (qk)
cases;
v)

0 kN/m

vi)

10 kN/ m

vii)

29 kN/ m

viii)

45 kN/ m

The beam dimensions are breadth b, 300mm and effective depth d, 547mm.
Assuming fu =25N/mm2 and bar size is 4T25 (As = 1960mm2). Relevant design
formulas and tables are in the APPENDIX.
(25 Marks)

SELAMAT MENJAWAB DAN SELAMAT MAJU JAYA

SBC 2273

LAMPIRAN / APPENDIX

Mu .156 bd2fcu
M
As

0.87fyz

z :rf[o.5 + 7(0.25-&/0.9)J< 0.95d


M
fcubd2

V
v

Ultimate load, W = (1.4gk + 1.6qk) x span

i) Deflection criteria
Support Conditions
Cantilever
Simply Supported
Continuous

Span/Effective depth
(rectangular section)
7
20
26

For Initial design


< 7 could be a problem
20 but be cautious
26 or maybe more for a cont. slab

ii) The code (BS8110) requires the final design to pay attention to:
Min and Max reinforcement as a percentage of the gross CSA. (Cl. 3.12.5.3. &
3.12.6.1) - This will on the one hand, help the control of cracking, increase
durability, while on the other assist placing and compaction.
0.24%bh <As<4%bh when fy=250N/mm2
0.13%bh <As<4%bh when fy=460N/mm2

iii) Table values of Asv/Sv (Spacing of links)


Diameter
of links
85
90
(mm)
8
1.183 1.118
10
1.847 1.744
12
2.659 2.511
16
4.729 4.476

Spacing of Links (mm)


100

125

150

1.006 0.805 0.671


1.570 1.256 1.047
2.260 1.808 1.507
4.020 3.216 2.680

93

175

200

225

250

275

300

0.575
0.897
1.291
2.297

0.503
0.785
1.130
2.010

0.447
0.698
1.004
1.787

0.402
0.628
0.904
1.608

0.336
0.571
0.822
1.462

0.335
0.523
0.753
1.340

SBC 2273

iv)

Form and area of links in beams.


ix. Where v < 0.5vc
No links required but provide nominal links for the whole length:
0 87

x. Where 0.5vc < v < (vc + 0.4)


Provide: nominal links for the whole length
0-87
xi. Where (vc + 0.4) < v < 0.8\/fcu or 5 N/mm2
Provide: nominal links and design links
AJSt =

KL^L

0.87f

A further limitation placed on the spacing of links by the BS is that the


maximum spacing should be less than 0.75d, which is obviously necessary to
avoid a failure plane forming which misses the links altogether.

v) Table for design concrete shear stress vc


Effective depth (mm)

100A,
bvd

150

175

200

225

<0.15
0.25
0.50
0.75
1.00
1.50
2.00
>3.00

250

\
1 300
!
i 0.38
S 0.46
1 0.57
i 0.64
S 0.72
! 0.83
0.91
: 1.04

i
i >400
i
[ 0.36
! 0.42
I 0.53
; 0.61
i 0.67
i 0.76
1 0.85
t 0.97

0.46
0.44
0.43
0.41
0.40
0.54
0.52
0.50
0.49
0.48
0.68 ' 0.66
0.64
0.62
0.59
0.76
0.75
0.72
0.70
0.69
0.86
0.83
0.80
0.78
0.75
0.98
0.95
0.91
0.88
0.86
1.08
1.04
1.01
0.97
0.95
1.23
1.19
1.15
1.11
1.08
fcu = 30N/mm2
For fcu = 25 N/mm2 the tabulated values should be divided by 1.062.
For fcu = 35 N/mm2 the tabulated values should be multiplied by 1.053.
For fcu = 40 N/mm2 the tabulated values should be multiplied by 1.10

*94

SBC 2273

vi)

Table of modification factor for tensile reinforcement:


Service
_____________________ M/bd2____________________
stress________ 0.50 0.75 1.00 1.50 2.00 3.00 4.00 5.00 6.00
1.00 2.00 2.00 2.00 1.86 1.63 1.36 1.19 1.08 1.01
1.50 2.00 2.00 1.98 1.69 1.49 1.25 1.11 1.01 0.94
(fy=250) 1.56 2.00 2.00 1.96 1.66 1.47 1.24 1.10 1.00 0.94
2.00 2.00 1.95 1.76 1.51 1.35 1.14 1.02 0.94 0.88
2.50 1.90 1.70 1.55 1.34 1.20 1.04 0.94 0.87 0.82
(fy=460) 2.88 1.68 1.50 1.38 1.21 1.09 0.95 0.87 0.82 0.78
3.00 1.60 1.44 1.33 1.16 1.06 0.93 0.85 0.80 0.76

vii) Table of nominal depths of cover to be used for a variety of


exposure conditions.
Conditions of exposure

Nominal cover (mm)

Mild - protected from weather

25

20

20

20

20

35

30

25

20

Severe - exposed to severe rain

40

30

25

Veiy Severe - salts, fumes etc.

50

40

30

60

50

Moderate - sheltered from weather

Extreme - abrasives e.g. sea water


Max. Free water/cement ratio

0.65 0.60 0.55 0.50 0.45

Min. Cement Content kg/m3

275

300

325

350

400

Lowest grade

C30

C35

C40

C45

C50

viii) Cross-sectional areas of group of bars, As (mm2)


Dia.
Areas in mm2 for groups of bars
(mm) 1
2
3
4
5
6
7i
8
9
11 ^ 12
10....[
6
28
57
85
113 142 170 ! 198 i 226
255 1 283 ; 311
340
50 rioi
8
151 201 252 302 1 352
604
402
453 | 503 i 553
10
79 157 236 314 392 471 ! 550 i 628
707
785 ! 864
942
12 113 226 339 452 566 679 ; 792 | 905 1020 ; 1130 j 1240 1360
16 201 402 603 804 1010 1210 j 1410 j 1610 1810 ; 2010 1 2210 2410
20 314 628 943 1260 1570 1890 |2200 ; 2510 2830 T 3140 ! 3460 3770
25 h491 982 1470 I960 2450 2950 ; 3440 1 3930 4420 : 4910 ! 5400 5890
32 804 1610 2410 3220 4020 4830 j 5630 ! 6430 7240 : 8040 8850 9650
40 1260 2510 3770 5030 6280 7540 ! 8800 i 10100 11300, 12600; 13800 15100
50 196013930 j5890 i 78501 9820
11800!13700! 15700 17700; 19600!21600 23600

9 b

SBC 2273

ix)

Cross-sectional area per meter width for various bar spacing (mm2)
- Foundation design
Spacin g of bars

Bar size
(mm)

6
8
10
12
16
20
25
32
40

50

75

100

566
1 010
1 570
2 260
4 020
6 280
9 820
16 100
25 100

377
671
1 050
1 510
2 680
4 190
6 550
10 700
16 800

283
503
785
1 130
2010
3 140
4910
8 040
12 600

125

226
402
628
905
1 610
2 510
3 930
6 430
10 100

10

150

175

200

250

300

189
335
523
754
1 340
2 090
3 270
5 360
8 380

162
287
449
646
1 150
1 800
2 810
4 600
7 180

142
252
393
566
1 010
1 570
2 450
4 020
6 280

113
201
314
452
804
1 260
1 960
3 220
5 030

94.3
168
262
377
670
1 050
1 640
2 680
4 190

SBC 1512

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

SUBJECT CODE

SBC 1512

COURSE

PRINCIPLE OF LAW IN MALAYSIA

PROGRAM

1 SBC

TIME

3 HOURS (9.00 AM - 12.00 PM)

DATE

14 APRIL 2010

LECTURER

TN. HAJI ROSLI BIN KAMARUDDIN

PERCENTAGE

50%

ARAHAN:
INSTRUCTION:
1.

ANSWER QUESTION NO 1 AND 3 OTHERS


(Jawab soalan No 1 dan 3 soalan yang lain).

2.

CANDIDATES WILL BE PROVIDED WITH CONTRACT ACT 1950


(Calon-calon akan dibekalkan dengan Akta Kontrak 1950).

3.

ANSWER MUST BE SUPPORTED WITH LAW AUTHORITIES


(LAW PROVISIONS AND CASES)
(Jawapan-jawapan hendaklah disokong dengan Otoriti
Undang-Undang).

THIS QUESTION PAPER CONSIST OF 5 PAGES INCLUDING THE


FRONT PAGE

97

dan

Kes

SBC 1512

SOALAN 1

Prinsip jiran merujuk kepada penghakiman klasik dalam Kes Donoghue v

Stevenson [1932] AC 562. Hakim Lord Atkin dalam penghakimannya telah


menyatakan seperti berikut

The rule that you are to love your neighbour becomes in law you
must not injure your neighbour; and the lawyers question Who is my
neighbour receives a restricted reply. You must take reasonable care to
avoid acts or omissions which you can reasonably foresee would be likely
to injure your neighbour. Who, then, in law is my neighbour? The answer
seems to be persons who are so closely and directly affected by my act
that I ought reasonably to have them in my contemplation as being so
affected when I am directing my mind to the acts or omissions which are
called in question...
Berdasarkan prinsip di atas, bincangkan perkara-perkara berikut
a)

Tugas atau kewajipan beijaga-jaga.

(10 markah)

b)

Pemecahan kewajipan berjaga-jaga.

(8 markah)

c)

Satu (1) kes tempatan yang menerimapakai


prinsip dalam Donoghue v Stevenson.

(7 markah)

QUESTION 1

Neighbour principle refer to the classical judgment in Donoghue v Stevenson


[1932] AC 562 Lord Atkin in delivering the judgment has quoted the following:
The rule that you are to love your neighbour becomes in law you
must not injure your neighbour; and the lawyers question Who is my
neighbour> receives a restricted reply. You must take reasonable care to
avoid acts or omissions which you can reasonably foresee would be likely
to injure your neighbour. Who, then, in law is my neighbour? The

SBC 1512

answer seems to be persons who are so closely and directly affected by


my act that I ought reasonably to have them in my contemplation as
being so affected when I am directing my mind to the acts or omissions
which are called in question...

Based on the above principle, discuss the following;


(10 marks)

a)

The duty of care

b)

Breach of duty

c)

One (1) local case applying the principle


laid down in Donoghue v Stevenson

(8 marks)
(7marks)

SOALAN 2

Individu-individu professional seperti Jurutera adalah terdedah kepada risiko


kecuaian professional. Jelaskan yang berikut

(15 markah)

a)

Tahap kewajipan berjaga-jaga.

b)

Tiga (3) langkah-langkah yang perlu di arnbil oleh


Pemaju bagi mengelakkan saman kecuaian di dalam
pembinaan bangunan.

(10 markah)

QUESTION 2

Professional individuals such as Engineers are exposed to the risk of professional


negligence. Explain the following :
a)

The standard of care required.

(15 marks)

b)

Three (3) measures to be taken by a Developer


to avoid negligence suit in building construction.
(10 marks)

99

SBC 1512

SOALAN 3
Bezakan antara kontrak batal dan kontrak boleh batal. Jawapan hendaklah
disokong dengan contoh-contoh kes dan peruntukan undang-undang.
(25 markah)

QUESTION 3
Distinguish between void, and voidable contracts. Answers must be supported by
examples, case law and provisions.
(25 marks)

SOALAN 4
Berdasarkan prinsip Undang-Undang Kontrak dan Akta Kontrak 1950,
nasihatkan Ahmad mengenai keadaan-keadaan berikut
a)

Abu membuat tawaran menjual keretanya kepada Ahmad dengan harga


RM10,000-00.
(10 markah)

b)

Nani yang berumur 14 tahun bersetuju untuk membeli rumah Ahmad.


(7 markah)

c)

Ahmad membuat keputusan tidak membeli kasut Bonia sebelum dia


tiba di kaunter pembayaran.
(8 markah)

100

SBC 1512

QUESTION 4

Based on contract Latu Principles and Contract Act 1950, advice Ahmad on the
following circumstances:
(a)

Abu offers to sell his car to Ahmad for RM10,000-00.


(10 marks)

(b)

Nani, age fourteen, agrees to buy Ahmads house.


(7 marks)

(c)

Ahmad decides not to purchase a Bonia shoe before


reaching the payment counter.

(8 marks)

SOALAN 5
Perhubungan agensi boleh wujud melalui perjanjian. Jelaskan melalui
peruntukan undang-undang dan kes.
(25 markah)

QUESTION 5
An agency relationship can exist through agreement Explain using case law
and provisions.
(25 marks)

SOALAN 6
Nasihatkan Plaintif di dalam tuntutan pemecahan kontrak dan dua (2) remedi
yang boleh dipohon oleh beliau.
(25 markah)

QUESTION 6
Advise Plaintiff on a breach of contract claim and two (2) remedies available to
him.
(25 marks)

101

SBQ 3424

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 3424

COURSE

BUILDING ECONOMICS

PROGRAMME

2 SBQ

TIME

3 HOURS (9.00 AM - 12.00 PM)

DATE

15 APRIL 2010

LECTURER

PROFESSOR AHMAD ROSDAN RAZAK

PERCENTAGE

50%

ARAHAN /INSTRUCTIONS:
Kertas soalan ini mengandungi 8 soalan.
This question paper consists of 8 questions.
Jawab SOALAN 1 DAN 4 SOALAN Lain.
Answer QUESTION 1 and 4 other questions.
Markah setiap soalan adalah seperti yang tertera.
Marks for each question is as shown.

THIS QUESTION PAPER CONSIST OF 10 PAGES INCLUDING THE FRONT PAGE.

SBQ 3424

SOALAN 1 (SOALAN WAJIB)


Seorang pemaju merancang untuk membina sebuah bangunan B di lokasi L2 pada
tahun 2010. Pemaju tersebut pernah melaksanakan
satu bangunan (Bangunan A) yang hampir sama pada
tahun 2005 di lokasi LI.

Maklumat Bangunan
2005

Tahun Tender (Bgn A)

Tender Yang Diterima (Bgn A)

Keluasan Kasar Lantai Dalam (Bgn A)

Ketinggian Bangunan B
(Lantai-Siling)

5m

Indeks Bangunan 2005

100

Indeks Bangunan 2010

110

Indeks Lokasi Bangunan A

102

Indeks Lokasi Bangunan B

105

Peratusan Buka Dinding

30%

RM 6,000,000
8000 m.p.s.

(Ukuran tidak mengikut skala)

Analisis Ringkas Kos Bangunan A


Kos/m2
KKLD
52.50
175.00

Substruktur

Jum. Kos
Elemen
420,000.00

Rangka Struktur

1,400,000.00

Bumbung

540,000.00

67.50

Dinding Luar & Dalam

720,000.00

90.00

Pintu & Tingkap

240,000.00

30.00

Kemasan

700,000.00

87.50

Kemudahan Bangunan

840,000.00

105.00

Kerja-kerja Luar

540,000.00

67.50

No.

Elemen

Permulaan
Jumlah Kos

75.50

600,000.00
6,000,000.00

750.00

Berasaskan kepada maklumat di atas, dapatkan perkara-perkara berikut;


a)

Keluasan Kasar Lantai Dalam untuk Bangunan B.

b)

Nisbah Keluasan Baki Dinding dan Keluasan Kasar Lantai Dalam untuk
Bangunan A.

c)

Anggaran kos Bangunan A pada tahun 2010 di Lokasi L2.

d)

Rancangan Kos Ringkas untuk bangunan B.

e)

Apakah nasihat anda terhadap had kos untuk bangunan B?


(20 Markah)

SBQ 3424

QUESTION 1 (COMPULSORY QUESTION)

A developer plans to build Building B at location L2 in 2010. He has undertaken a


similar project (Building A) in 2005 at Location LI.

Project Information
1

Year of Tender (Bldg A)

2005
RM 6,000,000

Accepted Tender (Bldg A)

Gross Internal Floor Area (Bldg A)

Height of Building B
(Floor-Ceilinq)

5m

Building Index 2005

100

Building Index 2010

110

Location Index Building A

102

Location Index Building B

105

% Area of Openings of Wall

30%

8000 m2

Simplified Cost Analysis of Building A


No.

Element

Total Element
Cost
420,000.00

Cost/m2
GIFA
52.50

1,400,000.00

175.00

Substructure

Frame

Roof

540,000.00

67.50

Wall & Partitions

720,000.00

90.00

Doors & Windows

240,000.00

30.00

Finishes

700,000.00

87.50

Building Services

840,000.00

105.00

External Work

540,000.00

67.50

Preliminaries

600,000.00

75.50

Total Cost

750.00

6,000,000.00

Based on the above available information determine the following;


a)

The Gross Internal Floor Area for Building B.

b)

The Ratio of Net Wall Area and Gross Internal Floor Area for Building B.

c)

Estimated Cost of Building A in 2010 at location L2.

d)

Simplified Cost Plan of Building B.

e)

What is your advise on the Cost Limit for Building B?


(20 Marks)

10/|.

SBQ 3424

SOALAN 2

Berikan ulasan terhadap kenyataan berikut :

Cabaran asas yang dihadapi oleh setiap kumpulan pereka adalah


untuk menukarkan idea yang besar kepada realiti konkrit, besi
keluli, batubata, motar, sistem dan infrastruktur . Pengurusan
proses rekaan bagi memastikan sasaran kualiti dicapai atau
dilebihi, didalam masa dan linkungan belanjawan adalah penting
untuk menyampaikan rekaan dan memerlukan penglibatan yang
proaktif oleh staf pengurusan kos profesional yang komited.

Rekaan

yang

cemerlang

dapat

dimenifestasikan

di

dalam

penyampaian projek didalam masa dan didalam belanjawan yang


dapat memuaskan dan terus memuaskan matlamat klien untuk
fungsi dan kualiti. Pendekatan pengurusan kos yang berstruktur
dapat memperbaiki rekaan dan proses penyampaian secara
signifikan bagi memastikan kepuasan kilen dan pengguna

Melangkahi peranan yang tradisi, generasi barn pengurus kos yang


profesional mesti mendakap satu set kemahiran baru dan di
didalam amalan tersebut akan menjadi seorang individu yang
dapat mempermudahkan penyampaian rekaan yang cemerlang.

Jonathan Moss, FRICS CCC


LEED Accredited Professional

(20 Markah)

SBQ 3424

QUESTION 2

Comment the following statement:

Converting great ideas into reality of concrete and steel, bricks &
mortar, system and infrastructure is the fundamental challenge
facing any design team. The management of the design process to
ensure that quality goals are met or exceeded on time and within
budget is essential to the design delivery and requires the proactive
involvment of committed, professional cost management staff.

Great design is manifested in the one-time and on-budget delivery of


a project that satisfies and continues to satisfy the clients objectives
for function and quality. A structure approach to cost management of
a professional cost manager significantly improves the design
delivery process and ensures client and end-user satisfaction.

Stepping beyond the traditional role, the new generation of


professional cost manager must embrace a new skill set and in so
doing will become the ideal individual to facilitate delivery of great
design.

Jonathan Moss, FRICS CCC


LEED Accredited Professional

(20 marks)

SBQ 3424

SOALAN 3

Seorang klien mempunyai sejumlah peruntukan wang yang maksimum untuk


dibelanjakan ke atas satu projek, tetapi beliau kurang pasti akan jumlah yang tepat.
Beliau telah dinasihatkan untuk melaksanakan satu pendekatan pengurusan kos
yang sistematik di dalam proses rekaan bagi mencapai hubungan ekonomi yang
munasabah diantara kos dan mutu. Rancangan yang dihasilkan akan menentukan
jumlah perbelanjaan untuk setiap elemen fungsi bangunan yang dicadangkan yang
dikaitkan dengan piawaian ruang dan kualiti yang ditetapkan.

a)

Bagaimana anda memberi nasihat kepada klien tersebut untuk menentukan


belanjawan projeknya?
(10 Markah)

b)

Apakah hasil yang dapat diperolehi melalui kaedah sistematik tersebut?


(10 Markah)

QUESTION 3

A client has a maximum amount of money to spend on a project but is unsure as to the
exact amount. He was advised to undertake a systematic approach of cost management
in the design process to maintain a sensible economic relationship between cost and
quality. The resultant plan will state how much is to be spent on each functional
element of the proposed building in relation to a defined standard of space and quality.

a)

How would you advise the client to establish his project budget?
(10 Marks)

b)

Through the above systematic approach what are the possible outcomes?
(10 Marks)

SOALAN 4

Sistem bangunan perindustrian (IBS) adalah berasaskan konsep koordinasi dimensi


dan ruang dengan modul asas dikenali sebagai 1M yang bersamaan dengan 100mm.
Ini akan membolehkan komponen-komponen sistem binaan dihasilkan di kilangkilang atau di luar tapak. Ia juga dikenali sebagai sistem pemasangan binaan
lengkap.
Bincangkan bagaimana sistem bangunan perindustrian boleh memperbaiki ekonomi
proses binaan.
(20 Markah)

107

SBQ 3424

QUESTION 4

Industrialised building system (IBS) is based on the concept of dimensional and space
coordination with a basic module known as 1M that equals 100mm. This will enable a
construction system where components are manufactured at factories or off-site. It is
also known as a complete assembly construction.
Discuss how does Industrialised building system improve the economics of the building
process.
(20 Marks)

SOALAN 5

Sesuatu bangunan di dalam konteks ekonomi adalah satu komoditi yang berkaitan
dengan industri binaan. Di dalam pasaran binaan ia melibatkan pengeluaran
barangan dan perkhidmatan yang memberi kesan kepada bekalan dan permintaan.

a)

Bincangkan perbezaan diantara kos, harga dan nilai.


(10 Markah)

b)

Apakah kriteria-kriteria yang perlu dipertimbangkan untuk pemilihan teknik


anggaran kos bagi bangunan berkenaan.
(10 Markah)

QUESTION 5

A building in economic terms is a commodity related to the construction industry. In the


construction market its involves the production of goods and services affecting supply
and demand.
a)

Discuss the differences between cost, price and value.


(10 Marks)

b)

What are the criterias that has to be considered in the selection of an


estimating technique for such a building.
(10 Marks)

108

SBQ 3424

SOALAN 6

Pemilik bangunan telah mula memberikan lebih perhatian terhadap keseluruhan


kos pemilikan di sepanjang hayat bangunan. Mereka telah memperluaskan
perspektif bukan sahaja dari aspek hayat bangunan tetapi termasuk operasi,
persenggaraan, pembaikan, pengantian, pengubahsuaian dan nilai baki.

a)

Bincangkan pelbagai aspek hayat bangunan yang merupakan satu


komponen yang diperlukan di dalam pengiraan kos pusingan hayat.
(10 Markah)

b)

Sebuah syarikat pelaburan hartanah yang merupakan satu amanah


pelaburan hartanah bercadang untuk membeli secara langsung satu blok
pejabat 40 tingkat apabila siap yang telah ditawarkan oleh sebuah syarikat
pemaju hartanah.
Huraikan penggunaan kos-pusingan-hayat sebagai satu model ekonomi
untuk menilaikan pembelian tersebut serta kepentingan kadar diskaun
didalam pengiraan ekonomi untuk mencerminkan nilai untuk wang bagi
pelabur tersebut.
(10 Markah)

QUESTION 6

Building owners are paying more attention to the total cost of owning and operating a
building over a period of time. They have broaden their perspective not only on the life
span of the building but to also include the operating, maintaining, repairing, replacing,
refurbishment and the residual value.
a)

Discuss the various aspects of a building life as being an essential component


in life-cycle costing calculations.
(10 Marks)

b)

A property investment company which is a Real Estate Investment Trust (REIT)


intended to undertake an outright purchase upon completion a proposed 40storey office block as offered by a property development company.
Describe the application of life-cycle costing as an economic model to evaluate
the purchase and the importance of discount rate in the economic calculations
to reflect the investors time value for money.
(10 Marks)
8

109

SBQ 3424

SOALAN 7

Jawab soalan-soalan berikut;


a) Lakarkan proses rekaan daripada menetapkan keperluan projek sehingga
maklumat pengeluaran dan kaitkan dengan proses perancangan elemen kos
daripada menetapkan belanjawan projek sehingga rancangan kos yang akhir.
(10 Markah)
b) Apakah jangkaan-jangkaan perancangan kos?
(10 Markah)

QUESTION 7

Answer the following questions;


a)

Sketch graphically the process of design from establishing the project need
until production information and the corresponsing process of elemental cost
planning from establishing the project budget until determining the final cost
plan.
(10 Marks)

b)

What are the expectations of cost planning?


(10 Marks)

SOALAN 8

Jawab soalan berikut :


a)

Kos adalah salah satu ukuran untuk fungsi dan prestasi suatu bangunan
dan sepatutnya boleh dimodelkan untuk membolehkan rekaan dinilaikan.
Bincangkan kriteria-kriteria untuk membentuk satu model kos yang baik.
(10 markah)

b)

Analisis kos semasa untuk projek bangunan terdahulu memberikan panduan


terbaik untuk menentukan keberkesanan eknomi yang optimum dimasa
hadapan.
Apakah nasihat- nasihat yang anda dapat berikan untuk membentuk
analisis kos elemen yang lebih bermakna.
(10 markah)

SBQ 3424

QUESTION 8

Answer the following questions;


a)

Cost is one of the measure of the function and performance of a building and
should be capable of being modelled in order for the design to be evaluated.
Discuss the criterias for building up a good cost model.
(10 Marks)

b)

Current analysis of the cost of previous building projects provide the best guide
for determining the optimum economic efficiency in future.
What will be your advice to develop a more meaningful elemental cost
analysis?
(10 Marks)

10

111

SBC2344

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER 2 SESSION 2009/2010

COURSE CODE

SBC 2344

COURSE

CONSTRUCTION PROJECT
MANAGEMENT

PROGRAM

BACHELOR OF SCIENCE IN
CONSTRUCTION

TIME

DATE

THURSDAY, 15 APRIL 2010

LECTURER

ASSOC PROF. DR. ROSLI ABDUL


RASHID

PERCENTAGE

50%

HOURS 30 MINUTES

ARAHAN:
INSTRUCTION:

Anda boleh menjawab dalam Bahasa Malaysia atau Bahasa Inggeris.


Jawapan dalam bahasa campuran tidak akan diterima atau dinilai.
You may answer in Bahasa Malaysia or English. The use of mix language is
not acceptable and will not be assessed.
Jawab Lima (5) daripada tujuh (7) soalan sahaja. Markah bagi setiap soalan
adalah seperti tertera dibawah setiap soalan.
Answer Five (S) out of seven (7) questions. The marks for each question is as
shown below each of the question

THIS QUESTION PAPER CONSIST OF 14 PAGES INCLUDING THE FRONT


PAGE

RAR

H I 2

Mar 2010

SBC2344

SOALAN 1
Pengurus Pembinaan bertanggung jawab menguruskan perkara-perkara
yang ditunjukkan oleh Rajah 1.0 untuk menghasilkan suatu produk binaan
yang berkualiti dalam masa dan kos yang ditetapkan. Bincangkan 2
daripada perkara yang perlu diuruskan oleh pengurus binaan dan apakah
pengetahuan yang perlu dimilikinya untuk menguruskan kedua-dua perkara
itu.

RAJAH 1.0 - PERKARA-PERKARA YANG PERLU DIURUSKAN OLEH


PENGURUS PROJEK

(20 markah)

RAR

Mar 2010

SBC2344

QUESTION 1

A construction manager is responsible for managing the various elements


shown in Fig. 1.0 in order to produce a quality construction, within the
specified time and cost. Discuss any two (2) of the elements that a construction
manager has to manage and what is the knowledge that he/she must have in
order to manage the two elements.

FIGURE 1.0 - ELEMENTS TO BE MANAGED BY PROJECT MANAGER

(20 marks)

RAR

L\.

Mar 2010

SBC2344

SOALAN2
Lampiran *A adalah Struktur Pecahan Keija (SPK) bagi sebuah projek

pembinaan yang tidak disusun mengikut turutan logikal. Ia menyenaraikan


sebahagian daripada keija dan aktiviti yang perlu di laksanakan bagi
membina dan menyiapkan bangunan tersebut. Walaubagaimana pun keijakeija dan aktiviti-aktiviti tersebut tidak disenaraikan mengikut turutan keija
yang munasabah. Sila susunkan semula kerja-keija dan aktiviti-aktiviti
tersebut mengikut turutan keija yang munasabah iaitu mengikut yang mana
yang dahulu, yang mana kemudian dan yang mana bersamaan.
(20 markah)

QUESTION 2
Appendix *A* is a Work Breakdown Structure (WBS) of a construction project
which is not arranged in logical sequential order. It contains a list of some of
the works and activities that need to be carried out for the construction and
completion of the project. However, the listed works and activities are not
arranged in a logical sequence. Re-arrange the given works and activities
according to a logical sequence ie. which one starts earlier than the other,
which one comes later than the other and which ones start at the same time.

(20 marks)

RAR

4 115

Mar 2010

SBC2344

SOALAN3

Proses pengurusan projek pembinaan boleh ditunjukkan seperti dalam Rajah


3.1 dibawah ini. Ia merangkumi Proses Permulaan yang diikuti oleh proses
Perancangan, proses Perlaksanaan, proses Pengawalan dan akhimya proses
Tutup.

Rajah 3.1 - PROSES PENGURUSAN PROJEK

Bincangkan apakah kepentingan proses Pengawalan. Terangkan juga apakah


keija atau tugas yang perlu dijalankan oleh seorang Pengurus Pembinaan
dalam proses pengawalan.

(20 markah)

RAR

116

Mar 2010

SBC2344

QUESTION 3

The process of construction project management can be shown by Figure 3.1


below. It includes the initiation processes which is then followed by the
planning processes, executing, controlling propesses and finally by the closing
processes.

Figure 3.1 - The Process of Project Management

Discuss the importance of controlling processes. Explain also the works or


tasks that a construction project manager has to cany out in the controlling
processes.
(20 marks)

RAR

117

Mar 2010

SBC2344

SOALAN 4

Rajah 4.1 dibawah ini menunjukkan pelbagai jenis pembaziran bahan yang

boleh berlaku disesuatu tapak pembinaan.

BAZIR
ZAHIR

BAZIR TAK
BOLEH ELAK

BAZIR
BAHAN

BAZIR BOLEH
ELAK

BAZIR
GANTIAN

FAKTOR
LUARAN

REKABENTUK PENGILANGAN

BAZIR
BERPOTENSI

BAZIR TAK
SENGAJA

KONTRAKTOR
BAZIR
DIBENARKAN
KESILAPAN
BAZIR
PRATIKAL

BAZIR
PEMOTONGAN

VANDALISMA

KECURIAN

Rajah 4.1 - Jenis-jenis Pembaziran Bahan di Tapakbina

Dengan memberikan contoh-contoh yang sesuai, terangkan jenis-jenis


pembaziran

berikut

dan

bagaimanakah

cara

untuk

meminimakan

pembaziran tersebut:

a)

Pembaziran kesilapan

b)

Pembaziran dibenarkan

c)

Pembaziran berpotensi

d)

Pembaziran praktikal
(20 markah)

RAR

7MG

Mar 2010

SBC2344

QUESTION 4

Figure 4.1 shows the various types of material wastage on construction site.

APPARENT
WASTE

MATERIAL
WASTE

UNAVOIDABLE
WASTE

COMPENSATING
WASTE

EXTERNAL
FORCES

DESIGN

AVOIDABLE
WASTE

MANUFACTURE

POTENTIAL
WASTE

ACCIDENTAL
WASTE

CONTRACTOR
PERMISSIVE
WASTE
ERRORS
PRACTICAL
WASTE

CUTTING AND
WASTE

VANDALISM

THEFT

Figure 4.1 - The Various Sources of Material Wastages on Site

By giving appropriate examples, explain the following types of wastage and


the method of minimizing them.

e)

Accidental waste

f)

Permissive waste

g)

Potential waste

h)

Practical waste
(20 marks)

RAR

1I9

Mar 2010

SBC2344

SOALAN 5
Dibawah ini adalah senarai sebahagian dari aktiviti-aktiviti yang perlu di
jalankan apabila menggunakan Teknik Analisis ABC dalam menguruskan
bahan binaan.
1)

Kenalpasti bahan-bahan yang diperlukan;

2)

Anggarkan atau kirakan kuantiti dan penentuan setiap bahan yang


telah dikenal pasti itu;

3)

Sediakan suatu senarai bahan standard bagi bahan yang telah dikenal
pasti itu;

4)

Dapatkan harga per unit bagi setiap bahan yang disenaraikan didalam
senarai bahan itu;

5)

Anggarkan keperluan bahan disetiap peringkat keija disepanjang


tempuh pembinaan dengan merujuk kepada program keija dan
senarai kuantiti (jika ada);

6)

Tentukan nilai guna setiap jenis bahan dengan mendharabkan


kuantiti bahan dengan harga per unit bahan.

Dengan memberikan contoh yang sesuai, terangkan keija-keija yang perlu


dibuat bagi aktiviti 1, 2 dan 5 dan mengapa aktiviti-aktiviti ini perlu
dijalankan.
(20 markah)

o
c. u
RAR

Mar 2010

SBC2344

QUESTION 5

Below is the list of several of the activities that need to be carried out when
using the ABC Analysis Technique for material management.
1)

Identify the materials required for the project.

2)

Estimate/ compute the quantity and quality (specification) of each of the


material identified

3)

Prepare a standard bill of materials for al the materials identified

4)

Obtain the rate (price per unit) for each the material in the bill

5)

Assess the material requirements at every stage of the work throughout


the construction period by referring to the work programme and bills of
quantities (If any)

6)

Determine the usage value of each type of material - by multiplying the


quantity with the rate (price per unit of the material)

By giving appropriate examples, explain the works that need to be carried out
under activities 1, 2 and S and why they need to be carried out.
(20 marks)

RAR

io

12

Mar 2010

SBC2344

SOALAN 6
Didalam sesuatu projek pembinaan terdapat pelabagai keija atau aktiviti
dimana jentera dan mesin boleh digunakan secara berkesan dan efisyen.
Biasanya penggunaan jentera dan mesin ini melibatkan kos yang tinggi
bergantung kepada kaedah perolehan yang digunakan. Oleh itu kontraktor
perlu bijaksana dalam memilih kaedah yang sesuai untuk mendapatkan
jentera atau mesin yang diperlukan itu. Biasanya, tidak ada kontraktor yang
mampu bermewahan untuk membeli semua jenis jentera atau mesin yang
diperlukan oleh sesuaru projek itu.
Bincangkan apakah pilihan yang ada pada seseorang kontraktor bagi
mendapatkan jentera atau mesin yang diperlukan untuk menjalankan
sesuatu projek itu dan terangkan bilakah setiap kaedah itu sesuai
digunakan.
(20 markah)

QUESTION 6

A project has multifarious activities where plant and machinery can be


employed effectively and efficiently. Usually the use of plant or machine in
construction can be very costly, depending on which method is chosen to
procure them. Therefore, a contractor should be smart to select the method of
procuring the plant and machine needed for his project. No contractor can
afford the luxury of purchasing all types of plant and machinery required by a
project.
Discuss the options available to the contractor in procuring the plant and/or
equipment for a project and explain when each method is suitable.
(20 marks)

RAR

ii 12^

Mar 2010

SBC2344

SOALAN 7

a)

Terangkan apakah yang dimaksudkan dengan risiko projek dan


kepentingannya dalam mencapai objektif projek

b)

Huraikan apakah dia Kenalpasti Risiko dan apakah teknik-teknik


atau kaedah yang boleh digunakan untuk mengenalpasti risiko-risiko
projek?

c)

Terangkan apakah dia Analisis Risiko dan bagaimana menjalankan


analisis kuantitatif bagi risiko?
(20 markah)

QUESTION 7
a)

Explain what Project Risk is and its importance in achieving the project
objectives

b)

Describe what Risk Identification is and what are the instruments that
can be used to identify project risks?

c)

Explain what Risk Analysis is and how quantitative analysis of risk is


carried out?
(20 marks)

RAR

12

1 23

Mar 2010

SBC2344

LAMPIRAN A

Terima surat setuju terima

1.
2.

Membawa masuk trak kecil dan 21. Dirikan pejabat sementara


dumpers
22. Gali tanah gambut dipermukaan
Menyediakan program keija
23. Masukkan tetulang kedalam
induk
acuan bagi asas

3.

Beli insurans

24. Gali lobang untuk asas

4.

Dapatkan bon perlaksanaan

25. Gali untuk turunkan aras tanah

5.

Mengambil milik tapak

26. Dirikan papan tanda

6.

Ukur sempadan

27. Dirikan setor sementara

7.

Ukur topografi

8.

Penyediaan keija setting-up

28. Tuangkan konkrit blinding


untuk asas

9.

Bayar pelbagai pihak berkuasa


bagi mendapat kemudahan
sementara

10. Pembersihan tapak dan


penebangan pokok
11. Penyediaan tapak

29. Pasang acuan untuk asas


30. Tuangkan konkrit untuk asas
31. Pesan konkrit dari pembekal
32. Runding dan ambil bekeija subkontraktor (tukang konkrit)

13. Dirikan dinding penghadang

33. Runding dan ambil bekeija subkontraktor (tukang tetulang


keluli)

14. Bina jalan sementara

34. Pesan tetulang keluli

12. Dirikan woksyop sementara

15. Dirikan kemudahan kebersihan 35. Pesan kayu dan papan lapis
untuk acuan
sementara
16. Runding dan sewa jenkorek dan 36. Runding dan ambil bekeija subkontraktor (tukang kayu untuk
trak
acuan)
17. Pasang bekalan letrik sementara
18. Pasang bekalan air sementara
19. Gali parit untuk rasuk ditanah
20. Ambil bekeija jaga

124
RAR

13

Mar 2010

SBC2344

APPENDIX A

Receipt of letter of acceptance

1. Bringing in small trucks and


dumpers
2.

21. Erect temporary office


22. Excavate top soil

3.

Prepare master work programme 23. Place reinforcement in formwork


to column bases
Purchase of insurances

4.

Obtain performance bond

24. Excavate for column bases

5.

taking possession of the site

25. Excavate to reduce level

6.

Boundary survey

26. Erect signboard

7.

Topography survey

27. Erect temporary stores

8.

Setting-up

9.

Pay various authorities for


temporary services

28. Pour concrete blinding for


column bases
29. Erect formwork for column bases

10. Site clearance and tree cutting

30. Pour concrete to column bases

11. Site preparation

31. Order concrete from supplier

12. Erect temporary workshop

32. Negotiate and employ sub


contractor (concretor)

13. Erect hoarding

33. Negotiate and employ sub


contractor (bar bender)
15. Erect temporary sanitary facilities
34. Order reinforcement bars
16. Negotiate and hire excavator and
35. Order timber and plywood for
trucks
formwork
17. Install temporary electricity
36. Negotiate and employ sub
contractor (carpenter for
18. Install temporary water supply
formwork)
19. Excavate for ground beams

14. Construct temporary road

20. Employ security guards

RAR

14 125

Mar 2010

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 3533

COURSE

CONSTRUCTION & DEVELOPMENT


LAW

PROGRAM

3 SBC

TIME

3 HOURS (9.00 am - 12.00 pm)

DATE

15APRIL 2010

LECTURER

DR NUR EMMA MUSTAFFA

PERCENTAGE

50 %

ARAHAN:
INSTRUCTION:
Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang
sama.
Hanya Kanun Tanah Negara 1965 yang disediakan oleh Jabatan boleh
digunakan semasa peperiksaan.
Answer four (4) questions only. All questions carry equal marks.
Only The National Land Code 1965 provided by the Department can be used
during the examination.

THIS QUESTION PAPER CONSIST OF 7 PAGES INCLUDING THE FRONT PAGE

Soalan 1

a) Huraikan fakta dan prinsip kes-kes di bawah ini.

i) Ahmad b. Saman v Kerajaan Negeri Kedah [2003] 4 MLJ 705

ii) Dato Soo Lai Sing v Kumpulan Sierramas (M) Sdn Bhd & Anor [2004] 3
MLJ 546
[10 markah]

b] A, B dan C adalah pemilik-pemilik bersama satu tanah berimilik yang


dipegang dalam sama bahagian.
A dan B ingin memecahlotkan tanah tersebut tetapi C tidak bersetuju untuk
membuat permohonan pecah lot atau memberikan persetujuannya.

Nasihatkan ketiga-tiga pemilik tanah tersebut tentang hak mereka berkaitan


dengan pemecahan lot ketiga-tiga tanah berkaitan.

[ 15 markah]

Question 1
a) Describe the facts and principles of the cases below.

i) Ahmad b. Saman v Kerajaan Negeri Kedah [2003] 4 MU 705

ii) Dato Soo Lai Sing v Kumpulan Sierramas (M) Sdn Bhd & Anor [2004] 3 MLJ
546

(10 marks)

12 7

b)

A, B and C are registered co-proprietors of an alienated land in equal


share. A and B want to partition the land but C refuses to join in the
application or give his consent.
Advise the three land owners their rights relating to the partition of their co
proprietorships in the three pieces of land.

(15 marks)

Soalan 2
Konsep solus populi suprema lex menyatakan bahawa kepentingan awam
adalah

lebih

utama

dan

dalam

sesetengah

keadaan

kepentingan

persendirian boleh diketepikan kerana kepentingan awam yang lebih tinggi


daripadanya.

Bincangkan maksud konsep di atas dalam konteks Artikel 13 dan 83


Perlembagaan Persekutuan serta sokong perbincangan anda dengan kes-kes
berkaitan.

[25 markah]

Question 2
The concept of solus populi suprema lex states that the public interest is
paramount and that private interest may in certain circumstances be
subordinated to the the higher interest of the public.
Discuss the above said concept in the context of Articles 13 and 83 of the
Federal Constitution and support your discussion with the relevant case law.
[25 marks]

126

Soalan 3

Haji Rabu mempunyai sebidang tanah seluas 150 hektar yang pernah
ditanam dengan getah yang dipegang di bawah dua dokumen hakmilik yang
berbeza dan bersempadan di antara satu sama lain. Jumlah cukai yang
dibayar bagi kedua-dua keping tanah tersebut juga adalah berbeza. Lagak
Property telah menyatakan hasrat mereka kepada Haji Rabu untuk membeli
tanah tersebut untuk dimajukan sebagai kawasan perumahan.

Berdasarkan fakta di atas, nasihatkan Lagak Property mengenai aspekaspek perundangan yang perlu dipenuhi sebelum tanah bekas tanaman
getah itu boleh dimajukan sebagai kawasan perumahan.

(25 markah)

Question 3
Haji Rabu owns a piece of 150-hectares-land which was previously planted
with rubber trees, held under two separate document of titles and shared
the same boundary. The amount of quit rent charged on the land also
differs. Lagak Property has conveyed their interest to Haji Rabu to purchase
the said land to develop it into a residential area.

Based on the facts above, advise Lagak Property on the legal requirements
that they should fulfill before the land which was formerly a rubber
plantation is developed into a residential area.
(25 marks)

1 29

Soalan 4

a) i) Terangkan perbezaan di antara petak aksesori dengan harta bersama.

ii) Huraikan faktor-faktor yang membezakan pegangan unit syer pemilikpemilik petak yang termaktub di bawah Akta Harta Bersama
(Penyelengaraan dan Pengurusan) 2007.

(10 markah)

b] Bezakan di antara komponen dan kuasa yang terdapat diantara Majlis


Perancang Kebangsaan, Majlis Perancangan Wilayah dan Pihak Berkuasa
Perancangan Negeri.

(15 markah)

Question 4
a) i) Explain the differences between accessory parcel and common property.

ii) Describe the factors which determine the holdings of share units of parcel
owners as stipulated under the Common Property (Maintenance and
Management) Act 2007?.
(10 marks)
b) Differentiate the components and powers of National Planning Council,
Regional Planning Council and State Planning Authority.

(15 marks)

1 3 0

Soalan 5

Selesaikan masalah-masalah di bawah ini

a) Mr Be Lee telah membeli sebuah rumah dari Pemaju X. Rumah tersebut


lewat disiapkan 10 bulan dari tarikh yang dijanjikan dalam kontrak. Apakah
tindakan yang boleh diambil oleh Mr Be Lee terhadap Pemaju X. Adakah
jawapan anda berbeza sekiranya Mr Be Lee terpaksa menyewa rumah lain
sementara menantikan rumah yang dibelinya siap?

(12 markah)

b) Mr Be Lee meminta nasihat anda tentang maksud pemilikan kosong


kerana beliau tidak memahami secara terperinci maksud terma tersebut.

(13 markah]

Question 5
Solve the problems below:-

a) Mr Be Lee has bought a house from Developer X. The completion of the


house was delayed for 10 months from the date stipulated in the contract.
What action can Mr Be Lee take against Developer X? Will your answer
differ if Mr Be Lee has to rent a house while waiting for the house to be
completed?

[12 markah]

b) Mr Be Lee seeks your advice on the meaning of vacant possession as he


does not have a thorough understanding of the terms.

[13 markah]

Soalan 6

Perlindungan alam sekitar adalah satu isu yang mencabar di Malaysia. Satu
kaedah perancangan (Penilaian Kesan Alam Sekitar) yang termaktub di
bawah S34A Akta Kualiti Alam Sekitar 1975 telah digubal untuk mengawal
masalah berkaitan alam sekitar. Bincangkan objektif Penilaian Kesan Alam
Sekitar dan prosedur yang perlu diikuti sebelum sebarang aktiviti yang
tersenarai dalam dimulakan.
(25 markah)

Question 6
Environmental protection is a challenging issue in Malaysia. A planning tool
(Environmental Impact Assessemen (EIA) ) which is prescribed under S34A
Environmental Quality Act 1975 has been enacted to prevent environmental
problem. Discuss the objectives of EIA and the procedures to be followed
before any prescribed activities can be embarked upon.

(25 marks)

SBQ 3622

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 3622

COURSE

PRINCIPLES OF MANAGEMENT

PROGRAM

1 SBQ

TIME

2 HOURS

DATE

15 APRIL 2010

LECTURER

DR. ASLAN AMAT SENIN

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:
Jawab SEMUA soalan.
Answer ALL questions.

THIS QUESTION PAPER CONSIST OF 18 PAGES INCLUDING THE


FRONT PAGE

1 3 o

The beginning point for any human resource planning process is the examination of
the current human resource status by making a____________ .
A.

strategic plan

B.

human resource inventory

C.

product evaluation

D.

analysis of customer demands

A written statement of what a job holder does, how it is done, and why it is done is
known as_______________ .
A.

job specification

B.

process departmentalization

C.

goal-oriented job definition

D.

job description

Which of the following statements explain the strength of written tests of selection
tools used by HR department?
I.
_ It is convenient, easy and private for applicants.
II.
It is a powerful tool for employers to select workers.
III.
It must be job related.
IV.
It is a good predictor for supervisory positions.

A.

I & III

B.

I & IV

C.

Ill & IV

D.

All of the above.

The entire HRM process is influenced by the external environment. Each of the
following external factors can have a strong impact on HRM process except

A.

employee labour unions

B.

company web site

C.

demographic trends

D.

government laws

134

5.

6.

7.

8.

9.

Recruitment is the process of____________________.


A.

hiring employees from competitors

B.

locating, identifying, and attracting potential employees

C.

measuring the pressure in the local labor market

D.

hiring from outside the organization

Which of the following is a contribution factor of high costs in HR?


A.

Work-life balance.

B.

Employee health care.

C.

Employee performance management.

D.

Employee training.

Which of the following is a disadvantage of recruiting at universities campuses?


A.

Limited supply.

B.

Generates many unqualified candidates.

C.

May not increase workforce diversity.

D.

Limited to entry-level positions.

All of the following are examples of selection tools except______________________.


A.

application forms

B.

written tests

C.

interviews

D.

induction

Which of the followings should be identified as traditional training methods.

I.
II.
III.
IV.

On-the-job.
Job rotation.
CD-ROM/DVD.
Video conferencing.

A.

I and III

B.

I, II and IV.

C.

II, III and IV.

D.

I and II.

1 35

10.

Which of the following decruitment methods is accomplished by not filling


openings created by normal retirements?

11.

A.

Firing

B.

Layoffs

C.

Attrition

D.

Reduced workweeks

What traditional training method involves employees working with an


experienced worker who provides information, support, and encouragement?

12.

13.

A.

E-leaming

B.

Experiential exercises

C.

Mentoring and coaching

D.

On-the-job training

Which one of the following is not a likely reason for an individual to resist change?
A.

Uncertainty

B.

Increased productivity.

C.

Concern over personal loss.

D.

Belief that the change is not in the organizations best interest.

Initiating change involves identifying which organizational areas might need to be


changed and___________ .

14.

A.

discussing them with the board of directors

B.

hiring a consultant to confirm that change is needed

C.

forming a committee to determine that change is needed

D.

putting the change process in motion

As change agent, managers should be motivated to initiate change because they


are committed to_____________ .
A.

promoting the welfare of their employees

B.

managing and want to do the best they can for everyone

C.

improving their organizations performance

D.

meeting the competition head-on in the market

1 36

15.

refers to the process by which a persons effort are energized, directed,


and sustained toward attaining a goal.

16.

A.

Need configuration

B.

Leadership

C.

Motivation

D.

Effort Management

According to McClelland, the need to make others behave in a way they would
not have behaved otherwise is the need for____________.

17.

A.

affiliation

B.

power

C.

achievement

D.

motivation

The importance that an individual places on a potential outcome or rewards that


can be achieved on the job is known as_______________ .

18.

19.

A.

effort performance linkage or expectancy

B.

operant learning opportunity

C.

valence or attractiveness of rewards

D.

goal-setting behavior

Theory Y assumes that people inherently_____________________ .


A.

want to belong more than anything else

B.

avoid responsibility and need to be closely controlled

C.

want to work and can exercise self-direction

D.

work to satisfy hygiene factors

Which of the following is not a suggestion for motivating employees?


A.

Individualized rewards

B.

Makes goals very difficult to achieve

C.

Match people to job

D.

Recognize individual differences

137

20.

Following the ideas of_______________, managers should check the system to see that
employees perceive the rewards as being equal to the inputs.

21.

A.

expectancy theory

B.

equity theory

C.

goal-setting theory

D.

three-needs theory

If the employees of Petronas began to compare their pay and work conditions to
the pay and work conditions of friends and acquaintances who work in other oil
companies in Malaysia, this process falls under______________ theory.

22.

A.

equity

B.

goal-setting

C.

expectancy

D.

reinforcement

Ali tries to convince the employees that things will get better if they work harder.
As a process of talking to employees, Ali suggested that he will get the salary

. ; : l- raises for the employees based on their harder work. The employees do not
-

believe

that

Ali

can

get

them

salary

raises

for

working

harder.

The

employees____________ is not very strong.


A.

23.

equity

B .

expectancy

C.

valence

D.

instrumentality

The employees of a company were given salary increment of two percent. Several
of the employees feel the raise was too small. This reinforced their feeling that
the company will never pay them based on the value they add, to the company.
This idea refers to___________ .
A.

valence

B.

expectancy

C.

instrumentality

D.

reinforcement

1 3 o

24.

Which of the following suggests that there is a desire for friendly and close
interpersonal relationships at work?

25.

A.

Need for achievement

B.

Need for power

C.

Need for fulfillment

D.

Need for affiliation.

Why more and more companies empowering employees?


A.

Management needs to make quick decision.

B.

26.

Organizational upsizing left many managers with smaller span of control.

C.

Empowerment is appropriate for all circumstances.

D.

Managers must cope with increased work demands.

Which of the following are two of the three key situational factors Fiedler felt
were important in determining leader effectiveness?

27.

A.

Leader-member relations and maturity of followers.

B.

Organizational success and position power.

C.

Task structure and leader-member relations

D.

Maturity of organization and subordinates

Which type of leaders attempts to instill in followers the ability to question not
only established views but those views held by the leader?
A.

Transactional.

B.

Charismatic.

C.

Trait.

D.

Transformational.

/ 3 V

When a young child emulates a professional sports stars behaviour, the star has
what kind of power over the child?
A.

Legitimate

B.

Expert

C.

Coercive

D.

Referent

Which of the following describes the leadership style in which a leader tends to
centralize authority, dictate work methods, make unilateral decisions, and limit
employee participation?
A.

Cultural style

B.

Autocratic style

C.

Democratic style

D.

Laissez-faire style

Which

of

the

following

describes

the

leadership

style

in

which

the

leader

generally gives the group complete freedom to make decisions and complete the
work in whatever way it sees fit?
A.

Cultural style

B.

Autocratic style

C.

Democratic style

D.

Laissez-faire style

The degree to which the job assignments are formalized and procedurized is the
__________ contingency dimension according to Fiedler.
A.

position power

B.

subordinate maturity

C.

task structure

D.

centralization

32.

According to the Ohio State studies, the dimension of leader behaviour that is
defined as the extent to which a leader had job relationships characterized by
mutual trust and respect for group members ideas and feelings is called

33.

A.

initiation

B.

consideration

C.

cultural

D.

physical

Research by Fiedler uncovered three contingency dimensions that define the key

A.

situational factors for determining leader effectiveness

B.

follower factors for determining leader effectiveness

C.

leader behavioural style factors for determining leader


effectiveness

D.

34.

situational factors for determining follower effectiveness

The managerial grid uses_______________ .

A.

a two-dimensional grid for appraising leadership styles

B.

two behavioural dimensions of leadership style

C.

a.two-dimensional grid for determining leadership styles

D.

a two-dimensional grid for assessing the dimensions of


leadership styles

35.

When a team leader secures needed resources, clarifies others expectations of the
team, gathers information from outside, and shares that information with team
members, the team leader is a_________________ .

A.

liaison with external constituencies

B.

coach

C.

conflict manager

D.

troubleshooter

141

36.

37.

38.

What corrects problems at once to get performance back to track?


A.

Basic corrective action

B.

Immediate corrective action

C.

Range of variation

D.

Standard revision

Under clan control, employee behaviours are regulated by_______________________.


A.

peer pressure

B.

shared values and norms

C.

brainwashing

D.

strict hierarchical mechanisms

Managers cannot really know whether their work units are working properly until
theyve evaluated what activities have been done_______________________ .

39.

A.

with those that remain

B.

and have compared actual performance to a desired standard

C.

and evaluate the performance of each of their employees

D.

successfully

A measure of how appropriate organizational goals are and how well an


organization is achieving those goals is known as______________.

40.

A.

situational effectiveness

B.

organizational effectiveness

C.

competitor analysis

D.

environmental scanning

Which of the following is a traditional financial control measure that managers


might employ in the monitoring and measuring of organizational performance?
A.

Ratio analysis

B.

Economic value added

C.

Ethical analysis

D.

Market value added

10

142

41.

42.

Bureaucratic control relies upon_____________________ .


A.

administrative rules and regulations

B.

managerial autonomy

C.

shared values

D.

units acting as individual profit centers

The accumulated end results of all the organizations work activities are called

A.

organizational performance

B.

organizational planning

C.

environmental scanning

D.

scenario planning

43.

is the overall output of goods or services produced divided by the


inputs needed to generate that output.

44.

45.

A.

Factoring

B.

Forfeiting

C.

Correlation

D.

Productivity

Service organizations produce


A.

physical inputs

B.

physical outputs

C.

nonphysical inputs

D.

nonphysical outputs

in the form of services.

Mass customization requires flexible manufacturing and


A.

standardization

B.

continual customer dialogue

C.

competent employees

D.

a quality standards

11

14 3

__________________ management oversees the transformation process that converts


resources such as labor and raw materials into finished goods and services.
A.

Control

B.

Operations

C.

Systems

D.

Planning

University administrators bring together inputs such as professor, books, academic


journals, technology material, classrooms and similar resources to transform
students into educated and skilled individuals who are capable to making
contributions to society. University here refers to what kind of organization?
A.

Bureaucratic

B.

Manufacturing

C.

Humans

D.

Service

Deming believed which of the following?


A.

High productivity comes from good people management.

B.

Managers are the primary source of increased productivity.

C.

Zero defects should be the ultimate quality goal.

D. . Employees should learn movement efficiencies not statistical methods.

Where did the modem era of manufacturing begin?


A.

The coal industry

B.

Southern cotton mills

C.

Automobile factories

D.

Fishing industry

___________ is an example of variable that can foster innovation


A.

Mechanistic structure

B.

Strict rules and regulation

C.

Limited organizational resources

D.

Organic structure

51.

In contrast to Supply Chain Management which internally focuses on efficient


flow of incoming materials or resources to the organization, Value Chain
Management is externally oriented and focuses on both incoming materials and

52.

A.

outgoing products or services

B.

sequences of activities

C.

materials resources

D.

objectives achievement

The ability of a product or service to reliably do what its supposed to do and to


satisfy customer expectations is called_______________________ .
A.

quantity

B.

quality

C.

efficiency

D.

effectiveness

Questions 53 to 56 based on the following scenario.

(Scenario IV
Faisal and Anuar are both managers at a medium-sized plastic moulding company. Faisal
emphasizes to his people that the work must be done,, regardless of circumstances, and
encourages his employees to meet their production quotas. He is generally liked, but
sometimes his employees are not comfortable with his approach. Anuar has tried hard to
build good relationships with his employees and knows each of their families. He
encourages his employees to work hard, but to be certain to take time for themselves and
their families.

53.

Fiedlers contingency model would classify Faisal as________________________ oriented.


A.

employee

B.

organization

C.

task

D.

relationship

13

1 4 5

54.

55.

Fiedlers contingency model would classify Anuar as_________________________oriented.


A.

employee

B.

organization

C.

task

D.

relationship

Which of the following would be assumed by Fiedlers contingency model about


the leadership styles of Faisal and Anuar?

56.

A.

The leadership styles can be adjusted to fit the situation.

B.

The leadership styles are fixed, regardless of the situation.

C.

The leadership styles can be changed with appropriate training.

D.

Faisals style is well suited for unstructured tasks.

Fiedler would expect that the best leadership style was a function of

A.

leader-member relations, task structure, and position power


B.

formal authority, production process, and personality of employees

C.

chain of command, relationships, and power

D.

type of organization, personality of leader, and education of employees

Questions 57 to 60 based on the following scenario^

(Scenario

2)

Tina had just been given the assignment of reporting on the financial health of her
company to the new divisional vice president. The new vice president had asked Tina to
work up several calculations to help her gain an understanding of the companys financial
shape. She quickly pulled out her old financial management textbook and turned to the
chapter on financial ratios to help her answer the questions that were asked.

14

1 46

57.

Her boss asked Tina to provide him with an estimate of how efficiently the firm is
using

its

assets.

Therefore,

Tina

turned

to

the

section

in

her

textbook

on

ratios.

58.

A.

leverage

B.

activity

C.

profitability

D.

liquidity

Her boss also asked Tina to give him an idea of the organizations ability to meet
the

interest

payments

on

its

debt.

Therefore,

Tina

looked

to

the

section

on

ratios.

59.

A.

leverage

B.

activity

C.

profitability

D.

liquidity

Her boss, was also interested in understanding the companys ability to meet short
term obligations, which meant that Tina had to calculate a(n) _____________________________
, ratio.

<

A.

leverage

. B. activity

60.

C.

profitability

D.

liquidity

Her boss was also very interested in examining the organizations use of debt to
finance its assets. Tina needed to calculate a(n)______________________ ratio.
A.

leverage

B.

activity

C.

profitability

D.

equity

15

1 4 7

Questions 61 to 65 based on the following scenario.

(Scenario 3)

Joon Her has recently been appointed human resource manager in a high-tech company. He
has decided that because of the diverse workforce, alternative working hours will be very
attractive to the employees. At the same time, he also planned to change the pay system of the
company to increase the motivation of the employees.

61.

Joon Her allows employees to work four 10-hour days instead of the traditional 5day workweek. This work arrangement is termed_____________________ .

62.

A.

home-based work

B.

a compressed workweek

C.

flextime

D.

job sharing

Joon Her is allowing two people to split a 40-hour-a-week job. They are splitting the

' ; work and the benefits in an arrangement termed_________________________.

63.

A.

flexible work hours

B.

a compressed workweek

C.

flextime

D.

job sharing

Some employees that Joon Her will manage are working from home via computers.
This work arrangement is termed_____________________ .
A.

flexible work hours

B.

flextime

C.

job sharing

D.

telecommuting

16

1 4 6

64.

Joon Her tries to find how strongly employees believed that if they put effort into
their work that they would perform the job satisfactorily. This could be defined as

65.

A.

expectancy

B.

instrumentality

C.

valence

D.

equity

Joon Her has arranged for the bonus system to be changed so that the bonus for
meeting production and quality is much higher than it has ever been before. Joon
Her has altered the_____________________ .
A.

instrumentality

B.

expectancy

C.

valence

D.

performance-reward linkage

Questions 66 to 70 based on the following scenario.

(Scenario 4)
i

As assistant manager of human resources, Sugumaren was in the process of evaluating


what would be the most effective means of gaining new employees who were qualified,
were cost efficient, and could help maintain the companys commitment to a diversified
workforce.

66.

Sugumaren should consider_______________________ as a source of potential candidates


because it reaches large numbers of people and he could get immediate feedback.
The problem with this source is that it may generate many unqualified candidates.
A.

the Internet

B.

employee referrals

C.

college recruiting

D.

professional recruiting organizations

17

149

67. Sugumaren might also consider using________________________ . Even though this source
would have little commitment to his company, it has a good knowledge of industry
challenges and requirements.

68.

A.

the Internet

B.

employee referrals

C.

college recruiting

D.

professional recruiting organizations

A major source of potential employees is___________________________ , which has a large,


centralized pool of candidates, but tends to only be good for entry-level positions.
A.

professional recruiting organizations

B.

the Internet

C.

the company Web site

D.

college recruiting

69.

is a positive source of potential job candidates because of the


knowledge the potential candidate may gain about the employer. However, it may
not increase the diversity and mix of employees.

70.

A.

Employee referral

B.

'Hie Internet ,.s ..

C.

College recruiting............ . ,. . . ^

D.

Professional recruiting organizations

t v.

. u

Sugumaren knew that the company would always use some form of candidate
interviewing. He discovered that all but which of the following suggestions would
help structure a higher-quality interview?
A.

Structure a fixed set of questions for all applicants.

B.

Employ as many interviewers as possible.

C.

Minimize any prior knowledge of applicants background, experience,


interests, test scores, or other characteristics.

D.

Take notes during the interview.

18

SBC 1123

Fakulti Alam Bina

UN1VERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 1123

COURSE

ENGINEERING SURVEY

PROGRAM

1 SBC

TIME

2 HOURS

DATE

15 APRIL 2010

LECTURER

EN. MOHAMAD SAUPI BIN CHE AWANG


EN. AMI HASSAN BIN MD. DIN

PERCENTAGE

40 %

ARAHAN :
INSTRUCTION:

Jawab empat (4) soalan sahaja. Semua soalan membawa markah


yang sama.
Answer four (4) questions only. All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 13 PAGES INCLUDING THE


FRONT PAGE

15

SBC 1123

ARAHAN: JAWAB SEKSYEN A DAN B DALAM BUKU BERASINGAN.

INSTRUCTION: ANSWER SECTION A AND B IN SEPARATE BOOKS.


SEKSYEN A

SECTIONA
JAWAB DUA SOALAN SAHAJA

ANSWER TWO (2) QUESTIONS ONLY


SOALAN 1

a)

Jelaskan dengan ringkas peranan ukur kejuruteraan dalam industri


pembinaan.
(5 markah)

b)

Dengan rajah sesuai, tunjukkan konsep trabas untuk penubuhan jaringan


kawalan ufuk.
(10 markah)

c)

Diberikan:

Jarak X-Y = 39.214 meter


Bearing X-Y = 26 37 27
Koordinat X = (1073.159 m Utara, 1017.572 m Timur)

Kirakan (i) Latit dan Dipat X-Y


(ii) Koordinat Y.
(10 markah)

1 52

SBC 1123

QUESTION 1

a)

Explain briefly the roles of engineering surveying in construction industry.


(5 marks)

b)

With an appropriate diagram, show the concept of traversing for establishing


horizontal control networks.
(10 marks)

c)

Given that:

Distance X-Y - 39.214 meter


Bearing X-Y = 26 3727
Coordinates ofX = (1073.159 m North, 1017.572 m East)

Calculate (i) Latitude and Departure of X-Y


(ii) Coordinates of Y.
(10 marks)

SOALAN 2

a)

Dengan menggunakan rajah yang sesuai, jelaskan perbezaan diantara jarak


ufuk dan jarak cerun.
(5 markah)

b)

Bearing ke satu stesyen dibaca dengan kompas adalah 95 30. Jika pesongan
magnetik adalah 10 barat, kirakan bearing sebenar stesyen tersebut.
(5 markah)

rJo

SBC 1123

c)

Peta dikelaskan mengikut skala, grafik, dan maklumat. Jelaskan dengan


ringkas setiap jenis peta dari segi ciri-ciri dan kegunaannya.
(5 markah)

d)

Anda bercadang melakukan ukur untuk penghasilan pelan bagi satu kawasan
luasnya kira-kira 200 meter x 100 meter. Plot kawasan tersebut perlu dibuat
diatas kertas bersaiz A4 (20sm x 30 sm). Anggarkan skala yang sesuai untuk
plot pelan tersebut.
(10 markah)

QUESTION 2

a)

With an appropriate sketch, explain briefly the differences between horizontal


and slope distances.
(5 marks)

b)

The bearing to a station read from a compass is 95 30. If the magnetic


declination of the area is 10 west, calculate the true bearing of the station.
(5 marks)

c)

Maps are classified based on scale, graphic and information. Explain briefly
each type of maps in terms of its characteristics and usage.
(5 marks)

d)

You are planning to carry out a survey to produce a plan for an area
approximately 200 meters by 100 meters. The plot of the area is to be made on
an A4 paper (20cm x 30 cm). Estimate the appropriate scale for the proposed
plan.

(10 marks)

154

SBC 1123

SOALAN 3

a)

Diberi jumlah keluasan kilang Bio-Chem adalah 3000 ekar. Kirakan keluasan
kilang tersebut dalam unit hektar and m2.
(Faktor penukaran: 1 hektar = 10,000 m2 = 2.471 ekar)
(5 markah)

b)

Dengan merujuk kepada mana-mana projek kejuruteraan, jelaskan dengan


ringkas kepentingan pembinaan lengkung ufuk dan lengkung tegak masingmasing dalam projek tersebut.
(5 markah)

c)

Anda diminta untuk menanda satu lengkung bulatan ufuk mengikut


spesifikasi berikut:
Sudut biasan

40 40

Jejari lengkung

60.00 meter

Rantaian di Titik Silang

4000.20 meter

Dengan bantuan rajah-rajah sesuai:

(i) Gariskan prosidur lapangan untuk menanda lengkung dengan kaedah


sudut pesongan dari titik sentuh.
(5 markah)

(ii) Seterusnya, kirakan jarak tangen dan rantaian di titik sentuh pertama.
(10 markah)

155

SBC 1123

QUESTION 3

a)

Given the total area of the Bio-Chem Factory is 3000 acres. Calculate the area
of the factory in hectare and m2.
(Conversion factor: 1 hectare = 10,000 m2 = 2.471 acres)
(5 marks)

b)

By referring to any engineering project, briefly explain the importance of


constructing horizontal and vertical curves respectively in the project.
(5 marks)

c)

You are requested to set out a horizontal circular curve based on the following
specification:
Deviation angle

40 40

Radius of the curve

60.00 meters

Chainage at Intersection point

4000.20 meters

With the aid of appropriate diagrams,

(i)

Outline the field procedure for setting out the curve using the deflection
angle method from the tangent point.
(5 marks)

(ii) Hence, calculate the tangent length and the chainage at the first tangent
point.

(10 marks)

1 56

SBC 1123

SEKSYEN B
SECTION B

JAWAB DUA SOALAN SAHAJA


ANSWER TWO (2) QUESTIONS ONLY

SOALAN 4

a)

Dengan rajah yang sesuai, takrifkan maksud garisan ufuk, garisan


pandangan dan garisan aras.
(5 markah)

b)

Terangkan dua sumber selisih yang berkemungkinan terdapat dalam keija


ukur aras.
(5 markah)

c)

Apakah ujian dua piket? Mengapa kita laksanakan ujian dua piket?
(5 markah)

d)

Data berikut diperolehi daripada tiga keija ukur aras yang berbeza.
Hitungkan aras laras bagi bendul jalan (batas kaki lima), pagar dan jalan.

Pandangan

Pandangan

Pandangan

Belakang

Antara

Hadapan

3.250
1.130
0.752
2.896

Aras Laras

Komen

135.260

Tanda Aras A

Bendul Jalan

73.270

Tanda Aras B

Pagar
Tanda Aras

2.111
2.397

55.210

Sementara

Jalan

(10 markah)
7

1 57

SBC 1123

QUESTION 4

a)

With an appropriate diagram, define a horizontal line, line of sight and level line.
(5 marks)

b)

Explain two of the most likely sources of error in levelling.


(5 marks)

c)

What is two-peg test? Why we do two-peg test?


(5 marks)

d)

The following data relate to three different levelling surveys. Calculate the
reduced levels of the kerb, fence and road.

Back

Inter

Fore

Reduce

Sight

Sight

Sight

Level

Remarks

135.260

Bench Mark A

Kerb

73.270

Bench Mark B

Fence

55.210

Temporary BM

Road

3.250
1.130
0.752
2.896
2.111
2.397

(10 marks)

158

SBC 1123

SOALAN 5

a)

Apakah garisan kontur? Takrifkan istilah bagi sela kontur ?


(4 markah)

b)

Apakah

faktor-faktor

yang

perlu

diambilkira

dalam

memilih

sela

kontur

semasa penyediaan peta butiran?


(4 markah)

c)

Kaedah total station merupakan prosedur tanah utama yang digunakan pada
hari

ini

untuk

mendapatkan

maklumat

topografi.

Mengapa

pemyataan

ini

betul?
(4 markah)

d)

Senaraikan

perkara-perkara

yang

perlu

ditunjukkan

di

dalam

pelan

Ukur

Butiran yang lengkap selain daripada maklumat butiran itu sendiri.


(3 markah)

e)

Pengukuran

berikut

telah

direkodkan

semasa

menjalankan

keija

ukur

butiran dengan menggunakan total station.

Aras Laras di Steyen A = 19.175 m


Tinggi total station di Stesyen A = 1.495 m
Tinggi prism pole = 1.350 m

Titik Cerapan

Sudut Ufuk

Jarak Ufuk

Beza Tinggi (AH)

00 55' 20"

38.175 m

1.573 m

73 19' 30"

45.078 m

- 2.862 m

88 36' 00"

27.365 m

- 0.482 m

97 16' 30"

35.476 m

2.489 m

105 21' 10"

23.031 m

- 1.832 m

Hitungkan nil ai tinggi titik cerapan 1, 2, 3, 4 and 5.


(10 markah)

SBC 1123

QUESTION 5

a)

What is a contour line? Define the term contour interval.


(4 marks)

b)

What are factors that should be considered in selecting the contour interval for a
detail map?
(4 marks)

c)

The total station method is the primary ground procedure used today for
obtaining topographic information. Why is this true?
(4 marks)

d)

List down the items that need to be shown on a completed Detailed Survey plan
apart from the detail itself.
(3 marks)

e)

The following measurements were recorded using a total station during a detail
survey.

At station A RL = 19.175 m
Height of total station above A = 1.495 m
Height of reflector (prism) on detail pole = 1.350 m

Point

Horizontal

Horizontal

Diff. in Height

sighted

angle

Distance

(AH)

00 55'20"

38.175 m

1.573 m

73 19'30"

45.078 m

- 2.862 m

88 36'00"

27.365 m

- 0.482 m

97 16' 30"

35.476 m

2.489 m

105 21' 10"

23.031 m

- 1.832 m

Calculate the heights of points 1, 2, 3, 4 and 5.

(10 marks)
10

1 60

SBC 1123

SOALAN 6

a)

Berapakah nilai keluasan tanah dalam hektar bagi satu pelan tanah yang
berkeluasan 1613 mm2 yang diukur dengan planimeter tangan tetap jika skala
pelan yang digunakan adalah 1:2500?
(5 markah)

b)

Nilai kordinat yang ditunjukkan di bawah merujuk kepada terabas teodolit


tertutup bagi ABCDEA. Hitungkan luas di dalam hektar bagi kawasan yang
dipagari oleh steyen-stesyen tersebut.

Stesyen

Timur (m)

Utara (m)

51.0

-150.2

300.1

-24.6

220.1

151.3

- 50.0

175.0

-125.2

- 51.1
(10 markah)

c)

Jadual 6.1 menunjukkan nilai ketinggian titik grid pada kedudukan seperti
gambarajah di bawah. Hitung nilai ketinggian purata dan isipadu pengorekan
jika tanah yang hendak digali dari paras 5 meter ke atas.

Titik

Tinggi (m)

6.7

8.3

9.1

7.4

10.2

6.6

7.9

8.4

5.9

Jadual 6.1
11

161

SBC 1123

Panjang AB = BC =10 meter


Panjang AD = DG = 5 meter
A

(10 markah)

QUESTION 6

a)

What is the area of a piece of land in hectare which has a plan area of 1613
mm2 as measured by a Jvced-arm planimeter if the scale of the plan is 1:2500?
(5 marks)

b)

The coordinates shown below refer to a closed theodolite traverse ABCDEA.


Calculate the area in hectares enclosed by the stations.

Station

Easting (m)

Northing (m)

51.0

-150.2

300.1

-24.6

220.1

151.3

-50.0

175.0

-125.2

-51.1
(10 marks)

12

162

SBC 1123

c)

Table 6.1 gives the grid heights as shown by the diagram. Calculate mean height
and volume of excavation if the masses are excavated from height 5 meter
upwards.

Points

Height (m)

6.7

8.3

9.1

7.4

10.2

6.6

7.9

8.4

5.9

Table 6.1

Length of AB = BC =10 meter


Length of AD = DG = 5 meter
A

I
(10 marks)

13

163

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 4324

COURSE

INFORMATION MANAGEMENT

PROGRAM

2 SBQ

TIME

2 HOURS

DATE

16 APRIL 2010

LECTURER

DR. KHERUN NITA ALI

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:

Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang
sama.

Answer four (4) questions only. All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 5 PAGES INCLUDING THE FRONT PAGE

1 64

SOALAN 1
a)

Apakah definisi sistem maklumat?


(5 markah)

b)

Perkakasan, perisian, pengguna dan data adalah komponen-komponen


sistem maklumat. Huraikan beserta contoh setiap komponen ini.
(Setiap komponen membawa 5 markah)
(20 markah)

QUESTION 1
a)

What is the definition of information system?


(5 marks)

b)

Hardware, software, people and data are components of information


system. Describe with example each of these components. (Each
component carries 5 marks)
(20 marks)

SOALAN 2
a)

Berikan definisi telekomunikasi dan sistem telekomunikasi?


(6 markah)

b)

Rangkaian komputer melibatkan dua atau lebih komputer yang


dihubungkan supaya data dapat dipindahkan di antara' keduanya.
Huraikan komponen-komponen asas sesebuah rangkaian komputer?
(12 markah)

c)

Bagaimanakah rangkaian komputer dapat membantu organisasi?


(7 markah)

QUESTION 2
a) Define telecommunication and telecommunication system?
(6 marks)
b) A computer network is a two or more computer being linked together so
that data can be exchanged between them. Describe the basic components
of a computer network.
(12 marks)
c) How does a computer network help an organisation?
(7 marks)

16b

SOALAN 3
a) Huraikan perkara-perkara berikut (setiap perkara membawa 3 markah)
i. Local Area Network
ii. Wide Area Network
iii. Peer-to-Peer Network
iv. Client Server Network
(12 markah)
b)

Apakah pertimbangan yang perlu diambil ketika memilih di antara Peerto-peer Network dan Client Server Network?
(13 markah)

QUESTION 3
a) Describe the following (each carries 3 marks):
i. Local Area Network
ii. Wide Area Network
iii. Peer to Peer Network
iv. Client Server Network.
(12 marks)
b) What are the considerations that should be taken when choosing between
Peer-to-Peer Network and Client Server Networks?
(13 marks)

SOALAN 4
a)

Apakah perzaan di antara intranet dan extranet?


(4 markah)

b)

Huraikan dengan lakaran bagaimana Virtual Private Network berfungsi.


(6 markah)

c)

Bincangkan faedah-faedah Virtual Private Network kepada sesebuah


organisasi.
(15 markah)

QUESTION 4
a)

What is the difference between intranet and extranet?


(4 marks)

b) Describe with sketches how Virtual Private Network works?


(6 marks)
c) Discuss the benefits of Virtual Private Network to an organization.
(15 marks)

SOALAN 5
a)

Bagaimanakah pengetahuan berbeza dari maklumat dan data.


(5 markah)

b)

Terangkan dengan contoh, perbezaan di antara pengetahuan tasit dan


eksplisit?
(6 markah)

c)

Bagaimanakah menguruskan pengetahuan penting kepada organisasi?


(14 markah)

QUESTION 5
a)

How does knowledge difference from information and data?


(5 marks)

b) Explain with examples, the difference between tacit and explicit


knowledge?
(6 marks)
c) How does management of knowledge important to organisations?
(14 marks)

SOALAN 6
a)

Bincangkan aspek-aspek berikut dalam Realiti Maya (setiap aspek


membawa 4 markah)
i.
ii.
iii.
iv.

Computer Generated Environment


Visualisation and interaction
Real time
Human sensory channels
(16 markah)

b)

Dengan besertakan contoh, bincangkan perbezaan Realiti Maya Semi


Immersive dan Realiti Maya Fully Immersive.
(9 markah)

167

QUESTION 6
a)

Discuss the following aspects in Virtual Reality (each aspect carries 4


marks)
i.
ii.
iii.
iv.

Computer Generated Environment


Visualisation and interaction
Real time
Human sensory channels
(16 marks)

b) With examples, discuss the difference between Semi Immersive Virtual


Reality and Fully Immersive Virtual Reality?
(9 marks)

SBQ 1712

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 1712

COURSE

PROFESSIONAL PRACTICE I

PROGRAM

1 SBQ

TIME

2 HOURS

DATE

16 APRIL 2010

LECTURER

DR. FADHLIN ABDULLAH

PERCENTAGE

50 %

ARAHAN:
INSTRUCTION:

Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang
sama.

Answer four (4) questions only. All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 4 PAGES INCLUDING THE FRONT PAGE

1 6 9

SBQ 1712

SOALAN 1
Klien, Arkitek dan Jurutera Struktur adalah diantara pihak-pihak yang
terlibat

di

dalam

sesuatu

projek

pembinaan.

Huraikan

tugas

dan

tanggungjawab mereka semasa peringkat rekabentuk.


(25 markah)

QUESTION 1
Clients, Architects and Structural Engineers are among the parties involved in a
construction project. Describe their duties and responsibilities during the design
stage.
(25 marks)

SOALAN 2
a)

Huraikan

tiga

Pembangunan

(3)

kriteria

Industri

yang

Pembinaan

diambilkira
Malaysia

oleh
untuk

pihak

Lembaga

mendaftarkan

kontraktor tempatan di dalam gred-gred yang berbeza.


(10 markah)

b)

Bincangkan tugas kontraktor semasa peringkat pembinaan di dalam


sesuatu projek pembinaan.
(15 markah)

QUESTION 2
a)

Describe three (3) criteria to be considered by the Construction Industry


Development Board (CIDB) for the registration of contractors in the various
grades.
(10 marks)

b)

Discuss the duties of the contractors during the construction stage in a


construction project.
(15 marks)

SBQ 1712

SOALAN 3
a)

Senaraikan lima (5) pertubuhan profesional yang terlibat dengan


industri pembinaan.
(5 markah)

b)

Terangkan perbezaan diantara Lembaga Juruukur Bahan Malaysia dan


Pertubuhan Juruukur Malaysia.
(20 markah)

QUESTION 3
a)

List down five (5) professional institutions related to the construction


industry.
(5 marks)

b)

Explain the differences between the Board of Quantity Surveyors Malaysia


and the Institution of Surveyors Malaysia.
(20 marks)

SOALAN 4
Huraikan tugas asas seorang Juruukur Bahan di dalam sesuatu projek
pembinaan semasa peringkat pra-kontrak.
(25 markah)

QUESTION 4
Describe the basic duties of a Quantity Surveyor in a construction project during
the pre-contract stage.
(25 marks)

SOALAN 5
Selain daripada Juruukur Bahan, terdapat beberapa profesion ukur yang lain.
Huraikan peranan mana-mana dua (2) profesion ukur tersebut.

(25 markah)
3

1 7 1

SBQ 1712

QUESTION 5
Apart from the Quantity Surveying profession, there are other surveying
professions. Describe the roles of any tu/o (2) of the other surveying professions.
(25 marks)

SOALAN 6
Terangkan dengan ringkas apakah yang dimaksudkan dengan perkara-perkara
berikut:
a)

anggaran awal

b)

senarai kuantiti

c)

dokumen tender

d)

dokumen kontrak

e)

perancangan kos
(25 markah)

QUESTION 6
Explain briefly what is meant by the following:
a)

first estimate

b)

bills of quantities

c)

tender document

d)

contract document

e)

cost planning
(25 marks)

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL SEMESTER EXAMINATION


SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 2314

COURSE

UKUR BINAAN 1

PROGRAM

1SBQ

TIME

3 JAM (9.00 PAGI - 12.00 TENGAHARI)

DATE

19 APRIL 2010

LECTURER

PROF MADYA Sr ZAKARIA MOHD YUSOF

PERCENTAGE

50 %

ARAHAN:
INSTRUCTION:
Jawab semua soalan
Answer all (questions.
Pelajar dibekalkan dengan senaskah Malaysian Standard of
Measurement (Second Edition) dan kertas dimensa yang mencukupi.
Students are supplied with a copy of the Malaysian Standard Method of
Building Measurement (Second Edition) and dimension papers.
Penggunaan telefon bimbit sebagai mesin kira adalah tidak
dibenarkan sama sekali.
The use of handphone as a calculator is strictly prohibited.
KERTAS SOALAN INI TERDIRI DARI PADA 7 MUKASURAT
TERMASUK HELAIAN HADAPAN dan 6 MUKA SURAT LUKISAN.

SOALAN 1

Dengan

berbantukan

contoh

yang

sesuai,

terangkan

dengan

ringkas

10 daripada klausa-klausa berikut dalam Kaedah Pengukuran Setara


bagi

Keija-Kerja

Bangunan

Malaysia

Edisi

Kedua

(SMM2)

seperti

berikut.

a)

Klausa F.3.2

b)

Klausa F.3.9

c)

Klausa F.8.7

d)

Klausa F.ll.l

e)

Klausa F. 12.1

f)

Klausa G.2.1

g)

Klausa G. 10.3

h)

Klausa G.28.2

i)

Klausa LA

j)

Klausa L.5

k)

Klausa M. 1.8

1)

Klausa M.2.1

(20 marks)

QUESTION 1

By giving the appropriate examples, briefly explain only ten (10) of the
following

clauses

as

found

in

the

Malaysian

Standard

Method

of

Measurement of Building Works - Second Edition (SMM2)

a)

Clause F.3.2

b)

Clause F.3.9

174

c)

Clause F.8.7

d)

Clause F. 11.1

e)

Clause F. 12.1

f)

Clause G.2.1

g)

Clause G. 10.3

h)

Clause G.28.2

i)

Clause L.4

j)

Clause L.5

k)

Clause M. 1.8

1)

Clause M.2.1

(20 marks)

SOALAN 2

Rajah A menunjukkan keratan sisi bagi struktur lantai atas konkrit,


manakala

Rajah

menunjukkan

keratan

sisi

bagi

tangga

konkrit.

Terangkan bagaimana keija-keija konkrit dan acuan dalam kedua-dua


rajah tersebut diukur kuantitinya. Jawapan anda hendaklah disokong
dengan

klausa-klausa

yang

berkaitan

dengan

keija-keija

tersebut

berdasarkan SMM2.
(20 markah)

150mm

250mm

150m

Diagram A

17S

200mm
c___________

QUESTION 2

Diagram A shows a cross section of concrete upper floor structure, while


diagram B shows a cross section of concrete staircase. Explains how are
concrete works and formworks in diagram A and B would be measured. Your
explanation must be supported with the related clauses according to SMM2.

(20 marks)

150mm

250mm

150m

Diagram A

177

SOALAN 3

Dengan

berpandukan

kepada

Kaedah

Pengukuran

Setara

bagi

Kerja-

Kerja Bangunan Malaysia - Edisi Kedua (SMM 2) dan penentuan yang


disediakan,

anda

(taking

bagi

off)

Bumbung

dan

dikehendaki
semua

Kemasan

menyediakan

Kerja-Kerja
Siling

yang

Struktur
terkandung

pengukuran

kuantiti

Bumbung,

Kemasan

dalam

lukisan

No.

SBQ2314/PH/01-06.

(60 markah)

QUESTION 3

By referring to Malaysian Standard Method of Measurement of Building


Works - Second Edition (SMM 2) and the specifications provided, you
are required to take-off all Roof Structure Works, Roof Covering and
Ceiling Finishes as shown in the drawing no. SBQ2314/PH/01-06.

(60 marks)

Notes
a. All relevant clauses according to Standard Method of Measurement
for Building Works (SMM2) must be clearly indicated at the end of
each item descriptions.
b. The calculations to obtain final quantities are not required, BUT
the calculations to show how the dimensions are derived must be
clearly shown.

178

In case of insufficient information provided, you are allowed to


make your own assumptions, but it must be clearly stated in the
query list.
Drawings must be handed in together with the answer scripts at
the end of the examination.

Soalan Tamat.
(End of questions)

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBQ 1322

COURSE

INTRODUCTION TO CONSTRUCTION
MEASUREMENT

PROGRAM

1 SBQ

TIME

2 HOURS (9.00 - 11.00 am)

DATE

19 APRIL 2010

LECTURER

ASSOC. PROF Sr ZAKARIA MOHD YUSOF

PERCENTAGE

50 %

ARAHAN:
INSTRUCTION:
Answer all questions.
Pelajar
dibekalkan
dengan
senaskah
Malaysian
Standard
of
Measurement (Second Edition) dan kertas dimensa yang mencukupi.
Students are supplied with a copy of the Malaysian Standard Method of
Building Measurement (Second Edition) and dimension papers.
Penggunaan
telefon
bimbit
dibenarkan sama sekali.

sebagai

mesin

kira

adalah

tidak

The use of handphone as calculator is strictly prohibited.


KERTAS
SOALAN
INI
TERDIRI
DARIPADA
4
MUKASURAT
TERMASUK HELAIAN HADAPAN dan 3 MUKA SURAT LUKISAN.

186

SBC 2263

_____________________ LAMPIRAN 2______________________


Safe working loads of self-propelled and truck mounted
telescopic-jib cranes to BS 1757 ratings
_____
TRUCK MOUNTED
___________________ 22 tonnes crane ___________________
Boom(m) 9.75
13.4
17.1
24.4
Radius (m) BLKD FREE BLKD FREE BLKD FREE BLKD FREE
3.0 22.0 7.0 19.6
5.2
16.9
3.5
18.6
5.8
4.3
4.7
15.1
4.0
16.0
3.2
13.4
3.4
12.0
13.5
4.5
3.5
1.1
6.5
1.8
2.0
8.6
9.5
9.8
2.2
6.0
0.7
5.2
6.0
0.9
1.1
6.5
6.5
1.2
7.5
0.3
4.0
0.6
4.5
0.5
4.5
9.0
2.3
2.5
2.5
12.0
1.4
1.6
15.0
0.9
18.0
0.7
21.0

Boom (rri)
Radius (m)
3.5
4.5
6.0
7.5
9.0
1 2.0
15.0
18.0
21.0
24.0
27.0
30.0

TRUCK MOUNTED
40 tonnes crane
13.4
15.2
11.6
9.75
BLKD BLKD BLKD BLKD
27.0
35.0
30.0
41.0
26.4
23.9
28.8
32.4
22.8
20.8
24.0
24.0
15.4
15.4
15.4
15.4
10.6
10.6
10.6
5.8

18.9
BLKD

16.8
14.5
10.6
5.8
3.8

23.8
BLKD

11.2
10.0
5.8
3.8
2.5
1.7

30.8*
BLKD

7.8
63
4.3
3.2
2.1
1.6
1.1
0.7

9/9

TRUCK MOUNTED
Boom (m) 9.75
Radius (m) BLKD
30.0
3.0
26.0
3.5
20.0
4.5
16.0
6.0
14.0
7.5
9.0
12.0
15.0
18.0
21.0
24.0
27.0
30.0

Boom (m)
Radius (m)
3.0
3.5
4.5
6.0
7.5
9.0
12.0
15.0
18.0
21.0
24.0
27.0
30.0
33.0

10.4
BLKD
59.0
54.0
45.0
36.0
25.0
18.0

13.25
BLKD
17.5
17.5
17.5
14.5
12.5
10.3

30 tonnes crane
16.76 20.37 22.73 30.48*
BLKD BLKD BLKD BLKD
16.4
16.4
15.0 12.0
8.5
13.0 10.5
9.2
7.2
5.0
11.5
8.2
6.2
4.5
10.0
5.6
5.5
43
3.5
3.5
2.7
3.6
2.2
2.3
2.3
1.3
2.0
1.5
0.9

TRUCK MOUNTED
60 tonnes crane
23.5
17.1
20.1
13.4
BLKD BLKD BLKD BLKD
49.0
32.0
39.0
46.0
26.0
35.0
30.0
42.0
22.0
24.0
30.0
36.0
20.0
18.0
25.0
26.0
15.0
17.0
18.0
18.0
10.0
10.0
10.0
6.0
6.0
6.0
4.0

27.1
BLKD

29.9
BLKD

36.2*
BLKD

210
16.0
14.0
9.0
6.0
4.0
3.0
2.0

16.0
13.0
11.0
7.0
6.0
4.0
3.0
20
1.2

7.5
7.0
6.0
5.0
4.0
3.5
2.8
2.2
1.8

SBC 2263

__________________________ LAMPIRAN 1___________________________


Water friction loss in metre per 35 m for clean iron or steel pipe
Flow in
l/min
1040
1135
1325
1515
1890
2270

50

Nominal Diameter in mm
80
100 125 150 200 250
6.47 1.59 0.55 0.23 0.05
7.53 1.86 0.61 0.26 0.06
10.31 2.44 0.82 0.28 0.08
3.17 1.07 0.43 0.11
4.76 1.62 0.67 0.16 0.05
6.83 1.89 0.95 0.23 0.08

65

2650

9.27

3.02

1.25 0.31
1.59 0.4

Total head including friction (m)


300

0.02
0.04

0.13

0.05

2.01 0.49 0.16


2.38 0.61 0.20

0.07
0.08
0.10
0.11
0.13

4160
4540
4920

2.84 0.7
3.29 0.82
3.87 0.95

0.24
0.29
0.34

9.1
12.2
15.2
18.3
21.3
24.4

0.03

0.10

3025
3405
3785

27.4
30.5
33.5

Nominal size (mm


125

150

200

250

300

90 elbow

1.68

50

1.95 2.50

65

80

3.35 4.11

100

4.88

6.40

7.92

9.75

45 elbow

0.79

0.91

1.16

1.52

1.89 2.29 3.05

3.96

4.57

Tee, side outlet

3.66 4.11

5.18

6.71

8.38 10.06 13.26 16.76 20.12

Close return bend 3.96

4.57

5.64

7.32

9.45 11.28 14.94 18.90 22.25

Gate valve

0.37

0.43

0.52

0.76

0.91

Globe valve

16.76 20.12 24.99 35.05 41.15 50.29 65.53 85.34 102.11

1.07

1.37

1.74

6.43

Foot valve

14.02 16.76 19.51 22.86 23.16 23.16 23.16 23.16 23.16

8.05

Total head including friction (m)


7.6
9.1
12.2
15.2
18.3
21.3
24.4
27.4
30.5

2.07

Check valve

Height of pump above water


3.0
4.5 | 6.0
7.5
Capacity (l/min)
4466 3690 2706 1325
4447 3596 2706 1325
4391 5539 2706 1325
4353 3501 2706 1325
4239 3407 2706 1325
3596 3312 2650 1325
2650 2650 2271 1325
1703 1703 1703 1136
757
757
757
757

Minimum capacities for self-priming centrifugal


pumps Model 90M

Length of steel pipe, in metre, equivalent to fittings and valves


Item

Minimum capacities for self-priming centrifugal


pumps Model 75MT______ ______________ ______

9.66 12.89 16.09 19.20 24.69 32.00 38.10

8/9

Height of pump above water (m)


3.0
4.5
6
7.5
Capacity (l/min)
5678
5602
4845
3974
2990
5413
4656
3861
2952
5110
4391
3672
2782
4637
3974
3407
2612
3974
3407
2933
2309
3028
2574
2271
1855
1703
1514
1384
1136
379
379
379
379

SOALAN 1

Dengan
berikut

berbantukan
dalam

Kaedah

contoh

yang

Pengukuran

sesuai,

Setara

bagi

terangkan

fasal-fasal

Kerja-Kerja

Bangunan

Malaysia - Edisi Kedua (SMM2) seperti berikut.

a)

Klausa A.3.2

b)

Klausa A.4.1

c)

Klausa D. 10

d)

Klausa D.ll

e)

Klausa D. 12.3

(20 marks)

QUESTION 1

By

giving

the

appropriate

examples,

explain

the

following

clauses

as

found in the Malaysian Standard Method of Measurement of Building


Works - Second Edition (SMM2)

f)

Clause A.3.2

g)

Clause A.4.1

h)

Clause D. 10

i)

Clause D.ll

j)

Clause D. 12.3

(20 marks)

87

SOALAN 2

Dengan

berpandukan

kepada

Kaedah

Pengukuran

Setara

bagi

Kerja-

Kerja Bangunan Malaysia - Edisi Kedua (SMM 2) dan penentuan yang


disediakan,

anda

(taking

bagi

off)

dikehendaki
semua

Keija

menyediakan
Pengorekan

dan

pengukuran
Kerja

kuantiti

Tanah

seperti

yang terdapat di dalam lukisan berikut:

a. QS1/UB/03/04/01-03

' (80 markah)

QUESTION 2

By referring to Malaysian Standard Method of Measurement of Building


Works - Second Edition (SMM 2) and the specifications provided, you
are

required

to

take-off

all

Excavation

and

Earthworks

shown

in

following Drawings:

a. QS1/UB/03/04/01-03

(80 markah)

Soalan Tamat.
(End of questions)

1 38

NOTES

1.

The pre-contract ground water level for both projects is 3.50m


below existing ground level. It was established on 12th March
2010.

2.

The type of soil found on this site is hard clay to a depth of


5.0m.

The

detail

information

about ground condition, and the

Soil Investigation Report was prepared by the Civil Engineering


Consultant.

3.

All surplus excavated materials shall be removed off site to a


location about 2.0 km from the site.

4.

Filling to all excavations shall be with materials arising from


excavation.

5.

No imported materials shall be used unless approved or directed


by the Superintending Officer (S.0).

189

SBC 2263

r^tXi UW

UTM

Fakulti Alam Bina

UNIVERSITI TEKNOLOGI MALAYSIA

FINAL EXAMINATION
SEMESTER II SESSION 2009/2010

COURSE CODE

SBC 2263

COURSE

CONSTRUCTION PLANT AND


TEMPORARY WORK

PROGRAM

2 SBC

TIME

2 HOURS 30 MINUTES
(9.00 AM-11.30 AM)

DATE

19 APRIL 2010

LECTURER

PROF. MADYA DR. ROSLAN BIN AMIRUDIN

PERCENTAGE

40 %

ARAHAN:
INSTRUCTION:

Jawab empat (4) soalan sahaja. Semua soalan membawa markah yang sama.

Answer four (4) questions only. All questions carry equal marks.

THIS QUESTION PAPER CONSIST OF 9 PAGES INCLUDING THE FRONT PAGE

1 9 3

SBC 2263

SOALAN 1
Sebuah loji pembinaan berharga RM200.000.00 dan akan mempunyai nilai salvaj
RM70,000.00 selepas digunakan selama 5 tahun. Kos baik pulih untuk tempoh 5
tahun dianggarkan berjumlah RM 180,000. Kos pelaburan dianggarkan bernilai
13% setiap tahun. Kebolehsediaan loji dianggarkan 95% di dalam tahun pertama
dan berkurangan sebanyak 5% setiap tahun. Kos gantian dijangka meningkat 6%
setiap tahun. Kehilangan produktiviti juga dianggarkan sebanyak 6% setiap tahun
selepas tahun pertama. Loji ini dirancang kegunaannya untuk 1,900 jam setahun.
Kos untuk sebuah logi gantian ditetapkan pada harga RM125 setiap jam operasi.
Tentukan masa optimum untuk menggantikan loji ini. Gunakan jumlah-digittahun untuk susut nilai dan kos baik pulih.
(25 markah)
QUESTION 1
A construction plant costs RM200,000.00 and will have an estimated salvage value
of RM70,000.00 at the end of 5 years. The repair cost for 5 years is estimated at
RM180,000. The investment cost is estimated at 13% per year. Plant availability is
estimated at 95% in the first year decreasing by 5% per year. Replacement cost is
expected to rise 6% per year. Loss of productivity is also to be 6% per year after the
first year. Plant use is planned for 1,900 hours per year. The cost for a replacement
machine is set at RM125 per hour of operation.
Determine the optimum time for replacement of the plant. Use the sum-of-the-years
digits for depreciation and repair costs
(25 marks)

SOALAN 2
Pengepaman air bersih pada kadar 2270 liter per minit perlu dilakukan dari
sebuah tapak pengorekan. Pam dan talian paip yang dipilih akan dipasang seperti
ditunjukkan di dalam Rajah S2. Kesemua paip, pepasang dan injap bersaiz
150mm dan mempunyai sambungan ulir. Pilih pam empar menyebu-diri yang
sesuai bagi projek ini.
Carta berkaitan pengiraan pemilihan pam disertakan di dalam Lampiran 1.
(25 markah)

2/9

1 94

SBC 2263

(25 markah)

QUESTION 2
In an excavation site, it is necessary to pump 2270 litre per minute of clear water.
The pump and pipeline selected will be installed as illustrated in Figure Q2. All the
pipes, fittings, and valves will be 150mm with threaded connections. Select a
suitable self-priming centrifugal pump for the project.
Relevant tables for pump selection are in Appendix 1.
(25 marks)

SOALAN 3
Tuliskan nota ringkas (menerangkan penggunaan, kelebihan dan kelemahan) ke
atas sistem acuan konkrit berikut:
i)

Acuan Terowong
(8 markah)

3/9

195

SBC 2263

ii)

Acuan Terbang
(8 markah)

iii)

Acuan Gelincir
(9 markah)

QUESTION 3
Write a short notes (describing the application, advantages and limitations) on the
following concrete formwork systems:
i)

Tunnel formwork
(8 marks)

ii)

Flying formwork
(8 marks)

iii)

Slip forms
(9 marks)

SOALAN 4
Tentukan kos purata jangkaan per jam di sepanjang hayat loji bagi memiliki dan
mengandalikan sebuah logi larik di bawah keadaan yang disenaraikan di bawah.
Gunakan kaedah jumlah-digit-tahun untuk mengira susut nilai.
Kos asal logi
Kos tayar
Hayat jangkaan
Nilai salvaj
Kadar perlaburan (faedah)
Cukai, insuran dan penyimpanan
Kuasa didaftarkan
Harga bahan api
Gaji operator
Faktor penggunaan bahan api
Faktor kos servis (% dari kos per jam bahan api)
Kos baik pulih sepanjang hayat (% dari kos asal
tidak termasuk tayar)
Hayat tayar

RM545,000.00
RM95,000.00
8 tahun (2000
jam/tahun)
RM75,000.00

10%
8%
309kW
RM1.80 per liter
RM20 per jam
0.178 liter/hr/kW
33%
90%
3300 jam
(25 markah)

4/9

196

SBC 2263

QUESTION 4
Determine the probable average cost per hour over the life of the equipment for
owning and operating wheel scraper under the conditions listed below. Use the
sum-of-years'-digits method of depreciation.

Plant intial cost


Tyre cost
Estimated life
Salvage value
Investment (interest) rate
Tax, insurance, and storage rate
Rated power
Fuel price
Operators wage
Fuel consumption factor
Service cost factor (% of fuel hourly cost)
Lifetime repair cost (% of initial cost less tires)
Tyre life

RM545,000.00
RM95,000.00
8 years (2000 hrs/year)
RM75,000.00
10%
8%
309kW
RM1.80 per litre
RM20 per hr
0.178 litre/hr/kW
33%
90%
3300 hr
(25 marks)

SOALAN 5
Sebuah kren sangkutan trak digunakan untuk mengangkat sebuah beban seberat
4.5 tan (termasuk bongkah cangkuk dan takal) dari permukaan tanah yang rata
dan tegar ke tengah-tengah sebuah tangki air konkrit tetulang seperti di
tunjukkan di dalam Rajah S5. Kren mesti memberi kelegaan 0.75m di antara
bahagian bawah jorannya dengan bucu tangki tersebut.
Tentukan saiz kren yang minimum untuk melaksanakan tugas ini. Jadual beban
kerja selamat untuk kren sangkutan trak diletakkan di dalam Lampiran 2.
(25 markah)

5/9

1 9 7

SBC 2263

Tangki Air Konkrit


Tetulang Bulat

E
o
00

Circular RC Water Tank

Permukaan tanah rata serta tegar


Flat and well-founded ground surface Apron

Apron

3.0m.

Diameter =11,0m.

3.0m.

Rajah Q5
Figure S5

QUESTION 5
A truck-mounted crane is used to lift a load of 4.5 tonnes (including hook block and
tackle) from a flat and well-founded ground surface to the centre of a reinforced
concrete water tank as shown in Figure Q5. The crane must provide 0.75m gap
between the underside of the boom and the edge of the tank.
Determine the minimum size crane to perform the task. Tables for safe working
loads of truck-mounted crane is in Appendix 2.
(25 marks)

SOALAN 6
Keija-kerja membersihkan sebuah tapak projek perumahan melibatkan
pengorekan tanah serta memunggahnya keluar ke tempat penambakan yang
terletak kira-kira 2.5 km dari tapak tersebut. Tanah yang akan dikorek itu terdiri
daripada:
Jenis tanah
Tanah atas
Tanah liat

Kuantiti
bm3
18,000
25,000

Pemukalan
%
45
30

Jentera-jentera penyodok yang setiap satunya dipasang dengan sauk 1 m3 akan


digunakan untuk memasukkan tanah yang telah dikorek ke dalam trak-trak
muatan 5 m3. Dengan menggunakan andaian yang bersesuaian, tentukan
bilangan jentera penyodok dan trak yang diperlukan untuk menyiapkan projek ini
dalam masa 12 minggu di bawah keadaan-keadaan berikut:

6/9

SBC 2263

Jentera penyodok:
Masa kitaran purata jentera penyodok ialah 25 saat.
-

Faktor isian sank penyodok ialah 95%


Kecekapan bekerja adalah bersamaan dengan 50 minit-jam.

Trak
-

Masa di tempat pembuangan adalah 3 minit.


Kelajuan purata trak:
penuh dengan muatan = 40 km/j
tidak ada muatan = 60 km/j
(25 markah)

QUESTION 6
The site clearing works for a housing development project will involve excavation of
soil and hauling the excavated material to a fill area located approximately 2.5 km
from the site. The soil to be excavated consists of:

Type of soil
Top soil
Clay

Quantity
(bm3)
18,000
25,000

Swellinq
(%)
45
30

Power shovels, each fitted with 1 m3 bucket, will be used to load the excavated soils
into trucks whose capacities are 5 m3. With appropriate assumptions, determine the
number of power showels and trucks required to complete the project in 12 weeks
under the following conditions:
Power showels:
-

Average cycle time of the power shovel is 25 second


Fill factor of the power shovel bucket is 95%
Operating efficiency is equal to a 50 min-hour

Trucks
Time at the dump area will be 3 min
Average speed of the trucks:
loaded haul - 40 km/hr
empty haul = 60 km/hr
(25 marks)

7/9

1 9 9