EKM division
Scope of Work:
The scope of work covers complete repair & maintenance of 150 CNC 3 axes tube bending machine
both(mechanical& electrical) located in Pipe fitting shop as per the details given below.
a. Regular, Periodic, Preventive, Predictive, shutdown and breakdown maintenance of all types
of Mechanical, Hydraulic, and Electrical/Electronics/PCB/Software/PLC/CNC as directed &
specified by theMaintenancedepartment.
b. Preventive maintenance shall be carried out ONCE IN A MONTH & the checklists are to be
filled (in the formats provided by HSL) for eachPreventive Maintenance schedule and also as
recommended by OEM.
c. Thorough lubrication of various drives & sliding mechanisms, racks & pinions, motorsetc.,
shall be carried out ONCE IN A MONTH. These lubrication works shall be recorded in a log
book and submit a copy of the same.
d. Cleaning & Greasing shall be done to all the moving parts of the machine like clamp arm
slide & die arm slide etc.
e. Periodical Maintenance & checking of the Hydraulic pumps, hydraulic motors, flow control
valves, direction control valves, pressure relief valves, servo valves and manifolds to run
effectively.
f. The scope of work contains tuning of all functions included in the machine.
g. The scope of workincludes repair/maintenance of AC unit, UPS, oil chiller unit, electrostatic
liquid cleaner.
h. The scope also contains repair/troubleshoot/maintenance of all the components in the
control cabinet.
i. The scope also covers repair/ trouble shoot/maintenance of PLC unit/monitor/CRT
display/touch screen etc.
j. The scope of work also covers replacement of all damaged electrical/electronic parts as and
when required.
k. The scope of work includes overhauling/repairing of pump motor, hydraulic motor, limit
switches, encoders, LVDTs, servo valves, DC proportional valves, servo valves etc.
l. Thorough maintenance of electrostatic cleaner (ELC) to remove any contaminated particles
in the hydraulic oil.
m. Thorough cleaning & proper housekeeping shall be ensured for all parts of the machine
n. Machine parameter setting &pressure setting adjustment should be carried out with prior
intimation to the Engineer in charge.
o. All the functions of the machine shall work and tuning of all the functions shall be carried
out and any modifications done to the machine parameters/ machine constants to suit the
job conditions shall be clearly submitted in writtenreport format to Engineer-in-charge.
p. Themachine shall work in AUTO/MANUAL mode at all times and is the essence of the
contract.
HSL Scope of supply:
All the required consumables like hydraulic oil, various lubricants, electrical and pneumatic
power, lubricating equipment, mobile material handling machines up to 5 tons capacity shall be
arranged by HSL.
Pre-Qualification:
The vendors having experience in maintenance of tube bending machines shall submit
documentary evidence (Work orders & performance certificate) along with quotation.