Title, Subtitle
CT
TEST PROCEDURE
Format
A4
Rev. 0
Date
15.09.2015
Lang.
En
Date
15.09.2015
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
2 / 10
0
SUMMARY
1.
2.
3.
4.
5.
6.
7.
7.1.
7.2.
8.
9.
10.
10.1.
10.2.
11.
12.
13.
PURPOSE OF TESTS..............................................................................................................3
REFERENCE DOCUMENT...................................................................................................3
SCOPE.......................................................................................................................................3
TERMINOLOGY.....................................................................................................................3
EQUIPMENT UNDER TEST.................................................................................................3
TEST EQUIPMENT REQUIRED..........................................................................................3
GENERAL INSPECTION.......................................................................................................4
MECHANICAL CHECKS......................................................................................................4
ELECTRICAL CHECKS........................................................................................................4
INSULATION RESISTANCE TEST......................................................................................4
CIRCUIT RESISTANCE MEASURES.................................................................................6
PRIMARY CURRENT TEST.................................................................................................6
TRANSFORMERS TURNS RATIO & POLARITY TESTS...........................................7
CONSUMPTION POWER (BURDEN)..........................................................................8
SATURATION CURVE...........................................................................................................9
SPECIAL SAFETY PRECAUTION....................................................................................10
RECORDING OF INSPECTION AND TEST DATA.........................................................10
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
3 / 10
0
1. PURPOSE OF TESTS
Before testing the relaying, metering and measuring equipment, it is necessary to check the associated
current transformers.
2. REFERENCE DOCUMENT
Electrical drawing N
3. SCOPE
All working sites
4. TERMINOLOGY
No applicable.
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
4 / 10
0
7. GENERAL INSPECTION
7.1. MECHANICAL CHECKS
-
Check the oil level and inspect for leakage (where applicable)
Check that primary terminals P1 and P2 are directed in compliance with the drawing
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
5 / 10
0
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
6 / 10
0
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
7 / 10
0
10.1.
TRANSFORMERS TURNS RATIO & POLARITY TESTS
Measure the primary and secondary currents. Test equipment compares primary and secondary current
values and also checks polarity itself.
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
10.2.
SH/OF
8 / 10
0
With three-phase current and for a similar circuit, the readings should be almost identical
for each phase. If the readings show excessive differences, check all the circuit connections
to eliminate contact resistance.
The loop resistance can be calculated or measured using a milliohmmeter.
NOTE:
The primary current tests are performed following the current transformer, relaying,
metering and measuring equipment tests. These tests are the last tests performed on
secondary windings. Check that the unused windings are shorted.
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
9 / 10
0
Project No.
ISSUE DATE
15/09/2015
ENG. N
CT
TEST PROCEDURE
CLIENT N
REV.
SH/OF
10 / 10
0
when connecting a CT to an operating substation, connect the secondary circuits and check
for continuity before connecting the primary winding
when performing work on the secondary circuits of a CT of an operating substation bay, short
out the CT secondary windings upstream the point of intervention before opening the circuit.