ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 1
PRELIMINARIES AND GENERAL
i)
ii)
iii)
iv)
v)
Carried Forward
Bill No. 1
PRELIMINARIES
1A
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
PRELIMINARIES
Definition and interpretation (B1)
1
Item
Documents (B2)
2
Item
N/A
Item
Carried Forward
Bill No. 1
PRELIMINARIES
2A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
7
Item
Item
Item
Item
Item
14
Item
Item
Carried Forward
Bill No. 1
PRELIMINARIES
3A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
15
Item
18
Item
17
Item
Item
Item
Item
Item
Carried Forward
Bill No. 1
PRELIMINARIES
4A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
23
Item
Item
26
Item
Item
Item
Item
Item
Item
Carried Forward
Bill No. 1
PRELIMINARIES
5A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
Item
37
Item
36
Item
Advertising (B6.3)
Item
Item
N/A
Location (B7.1)
40
Item
Water (B7.2)
F:.........................V:............................ T:............................
Item
Electricity (B7.3)
F:......................... V:............................ T:............................
Item
Carried Forward
Bill No. 1
PRELIMINARIES
6A
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
41
Item
Item
Item
Item
Item
Item
Item
Carried Forward
Bill No. 1
PRELIMINARIES
7A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
48
Item
Item
Item
Item
General (B11)
52
Item
Item
Item
Item
Disturbance (B11.5)
Carried Forward
Bill No. 1
PRELIMINARIES
8A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
57
58
Item
Vermin (B11.7)
Item
Item
Item
61
Yes
Yes
No
Yes
Carried Forward
Bill No. 1
PRELIMINARIES
9A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
12.1.7 Services - known (B3.7)
Yes
Yes
Yes
Yes
No
Yes
Yes
Carried Forward
Bill No. 1
PRELIMINARIES
10A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
Carried Forward
Bill No. 1
PRELIMINARIES
11A
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
SPECIFIC PRELIMINARIES
63
64
Item
OVERTIME
Should overtime be required to be worked for any reason
whatsoever, the costs of such overtime are to be borne by the
contractor unless the principal agent has specifically authorised
in writing, prior to the execution thereof, that costs for such
overtime are to be borne by the employer.
F:............................. V:............................ T:............................
65
Item
SITE INSTRUCTIONS
Site instructions issued on site are to be recorded in triplicate in
a site instruction book which is to be maintained on site by the
contractor
F:............................. V:............................ T:............................
66
Item
LABOUR RECORD
At the end of each week the contractor shall provide the
principal agent with a written record, in schedule form, reflecting
the number and description of tradesmen and labourers
employed by him and all subcontractors on the works each day.
Item
The contractor shall not cede nor assign his rights or claims to
any monies due or to become due under this contract
Carried Forward
Bill No. 1
PRELIMINARIES
12A
Item
ESKOM WEIGHBRIDGE
ALMA
Brought Forward
68
69
TRANSPORTATION OF WORKERS
Transportation of workers must not be on open vehicles. The
contractor must provide mini-bus / bus transport from site to the
nearest taxi rank for the duration of the contract
F:...........................V:...........................T:..........................
Carried to Summary
Bill No. 1
PRELIMINARIES
13A
Item
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 2
DEMOLITIONS
REMOVAL OF EXISTING WORK
Breaking up and removing reinforced concrete
1
Carried to Summary
Bill No. 2
DEMOLITIONS
14A
m3
12
38
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 3
EARTHWORKS
EXCAVATIONS
Excavation in existing compacted gravel filling, not
exceeding 2m deep for
1
Foundations
m3
m3
m2
11
FILLING ETC
Approved selected G6 imported material carted on
compacted in 150mm layers to 95% Mod AASHTO density
5
Under ramps
m3
Carried to Summary
Bill No. 3
EARTHWORKS
15A
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 4
CONCRETE
UNREINFORCED MASS CONCRETE
15MPa/19mm concrete
1
m3
11
m3
14
REINFORCED CONCRETE
30MPa/19mm concrete in
3
Foundations
m3
Ground slabs
m3
Ramps
m3
10
Impact protectors
m3
CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with a power
float
7
To surface beds
m2
66
To ramps
m2
48
Carried to Summary
Bill No. 4
CONCRETE
16A
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 5
FORMWORK
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough formwork to sides
1
Carried to Summary
Bill No. 5
FORMWORK
17A
24
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 6
REINFORCEMENT
High tensile steel reinforcement to concrete work
1
Y20 rods
kg
39.46
Y16 rods
kg
867.00
Fabric reinforcement
3
m2
12
m2
66
m2
48
Carried to Summary
Bill No. 6
REINFORCEMENT
18A
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 7
METALWORK
MILD STEEL
1
32
500 x 500 x 25mm thick baseplates four times drilled for 24mm
anchor rods (elsewhere)
No
No
Carried to Summary
Bill No. 7
METALWORK
19A
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 8
PAINTING
ON METAL
Prepare and apply one coat Galvogrip primer, one
undercoat and two coats polyurethane enamel paint on
steel
1
Impact protectors
m2
Carried to Summary
Bill No. 8
PAINTWORK
20A
ESKOM WEIGHBRIDGE
ALMA
Item
No
Quantity
Rate
Amount
BILL NO. 9
WEIGHBRIDGE
1
Item
Item
Item
Carried to Summary
Bill No. 9
WEIGHBRIDGE
21A
ESKOM WEIGHBRIDGE
ALMA
FINAL SUMMARY
Bill
No
Page
No
PRELIMINARIES
13A
DEMOLITIONS
14A
EARTHWORKS
15A
CONCRETE
16A
FORMWORK
17A
REINFORCEMENT
18A
METALWORK
19A
PAINTWORK
20A
WEIGHBRIDGE
21A
Amount
SUBTOTAL
22A