ESKOM WEIGHBRIDGE

ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 1
PRELIMINARIES AND GENERAL
i)

The preliminaries are to be the JBCC Series 2000


Preliminaries prepared by the Joint Building Contracts
Committee, January 2001 edition and shall be deemed
to be incorporated herein

ii)

Tenderers are referred to the abovementioned


documents for the full intent and meaning of each
clause thereof (hereinafter referred to by heading and
clause number only) for which such allowance must be
made as may be considered necessary

iii)

Where standard clauses or alternatives are not


entirely applicable to this contract such modifications,
corrections or supplements as will apply are given
under each relevant clause heading

iv)

Where any item is not relevant to this specific


contract such item is marked N/A (signifying "not
applicable")

v)

If Alternative A as set out in clause B10.3 hereinafter


is to be used for the adjustment of the preliminaries
each item priced is to be allocated to one or more of
the three categories, where "F" denotes a fixed amount
(amount not to be varied), "V" denotes an amount
variable in proportion to value and "T" denotes an
amount in proportion to time
-------------------------

Carried Forward
Bill No. 1
PRELIMINARIES

1A

ESKOM WEIGHBRIDGE
ALMA

Brought Forward

PRELIMINARIES
Definition and interpretation (B1)
1

Definition and interpretation (B1.1 - B1.6.5)

F:............................. V:............................ T:............................

Item

Documents (B2)
2

Checking of documents (B2.1)

F:............................. V:............................ T:............................


3

Item

These bills of quantities contain pages and annexures as


indexed on the index
The items in these bills of quantities are to be read and priced
in conjunction with and the descriptions regarded as amplified
by the Model Preambles for Trades as recommended and
published by the Association of South African Quantity
Surveyors, 1997 edition, and no claim arising from brevity of
description of items fully described in the said Model Preambles
for Trades will be entertained
Item

Provisional bills of quantities (B2.2)

F:............................. V:............................ T:............................


5

These bills of quantities are in Multiple Procurement format i.e.


the "Wet Trades" - earthworks, concrete, formwork and
reinforcement, precast concrete, masonry, waterproofing and
sub-surface drainage are fully measured and the subsequent
trades are budgetary allowances
F:............................. V:............................ T:............................

N/A

Item

Availability of construction documentation (B2.3)


F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

2A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
7

The budgetary allowances allocated for subsequent trades


included in this document will be separately procured, based on
multiple procurement of nominated subcontractors during the
construction period
F:............................. V:............................ T:............................

Item

Tender submission (B2.6)

F:............................. V:............................ T:............................


11

Item

Priced documents (B2.5)

F:............................. V:............................ T:............................


10

Item

Interests of agents (B2.4)

F:............................. V:............................ T:............................


9

Item

Notwithstanding anything contained in this clause tenders shall


be valid for a period of .......12........... weeks from the closing
date of tenders
F:............................. V:............................ T:............................

Item

The site (B3)


12

Defined works area (B3.1)

F:............................. V:............................ T:............................


13

The area of the works to be occupied by the contractor, any


restriction on the area and the limit of access or exit will be
pointed out to the contractor by the principal agent on handing
over of the site
F:............................. V:............................ T:............................

14

Item

Item

Geotechnical investigation (B3.2)

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

3A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
15

Inspection of the site (B3.3)

F:............................. V:............................ T:............................


16

Item

Existing buildings will be occupied and parking areas around


buildings will also be used, and contractor must allow for (B3.4)
F:............................. V:............................ T:............................

18

Item

No claims for extras arising from the contractor having failed to


comply with this clause will be entertained
F:............................. V:............................ T:............................

17

Item

Previous work - dimensional accuracy (B3.5)

F:............................. V:............................ T:............................

Item

Work executed under a previous contract is:


This work is on an existing site
19

Previous work - defects (B3.6)

F:............................. V:............................ T:............................


20

Services - known (B3.7)

F:............................. V:............................ T:............................


21

Item

Services - unknown (B3.8)

F:............................. V:............................ T:............................


22

Item

Item

Protection of trees etc (B3.9)

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

4A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
23

Articles of value (B3.10)

F:............................. V:............................ T:............................


24

Item

Inspection of adjoining properties etc (B3.11)

F:............................. V:............................ T:............................

Item

Management of contract (B4)


25

Management of the works (B4.1)


F:........................ V:............................ T:............................

26

Programming for the works (B4.2)

F:............................. V:............................ T:............................


27

Item

Progress meetings (B4.3)

F:............................. V:............................ T:............................


28

Item

Item

Technical meetings (B4.4)

F:............................. V:............................ T:............................

Item

Samples and shop drawings (B5)


29

Samples of materials (B5.1)

F:............................. V:............................ T:............................


30

Workmanship samples (B5.2)

F:............................. V:............................ T:............................


31

Item

Item

Shop drawings (B5.3)

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

5A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward

Temporary works and plant (B6)


32

Deposits and fees (B6.1)

F:............................. V:............................ T:............................


33

Enclosure of the works (B6.2)

F:............................. V:............................ T:............................


34

Item

Main notice board (B6.5)


F:......................... V:............................ T:............................

37

Item

Plant, equipment, sheds and offices (B6.4)


F:.........................V:............................ T:............................

36

Item

Advertising (B6.3)

F:............................. V:............................ T:............................


35

Item

Item

Subcontractors notice board (B6.6)

F:............................. V:............................ T:............................

N/A

Temporary services (B7)


38

Location (B7.1)

F:............................. V:............................ T:............................


39

40

Item

Water (B7.2)
F:.........................V:............................ T:............................

Item

Electricity (B7.3)
F:......................... V:............................ T:............................

Item

Carried Forward
Bill No. 1
PRELIMINARIES

6A

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
41

Telecommunication equipment (B7.4)

F:............................. V:............................ T:............................


42

Item

Ablution facilities (B7.5)


F:........................ V:............................ T:............................

Item

Prime cost amounts (B8)


43

Responsibility for prime cost amounts (B8.1)

F:............................. V:............................ T:............................

Item

Attendance on N/S Subcontractors (B9)


44

General attendance (B9.1)

F:............................. V:............................ T:............................


45

Special attendance (B9.2)

F:............................. V:............................ T:............................


46

Item

Item

Commissioning - Fuel, water and power (B9.3)

F:............................. V:............................ T:............................

Item

Financial aspects (B10)


Statutory taxes, duties and levies (B10.1)

F:............................. V:............................ T:............................


47

Item

Provision is made in the summary of these bills of quantities for


the inclusion of Value Added Tax (VAT)
F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

7A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
48

Payment of preliminaries (B10.2)

F:............................. V:............................ T:............................


49

Item

Payment certificate cash flow (B10.4)

F:............................. V:............................ T:............................


51

Item

Adjustment of preliminaries (B10.3)

F:............................. V:............................ T:............................


50

Item

Contractor information supply (B10.5)

F:............................. V:............................ T:............................

Item

General (B11)
52

Protection of works (B11.1)

F:............................. V:............................ T:............................


53

Protection/isolation of existing/sectionally occupied works


(B11.2)

F:............................. V:............................ T:............................


54

Item

Notice before covering work (B11.4)

F:............................. V:............................ T:............................


56

Item

Site security (B11.3)

F:............................. V:............................ T:............................


55

Item

Item

Disturbance (B11.5)

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

8A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
57

Works cleaning and clearing (B11.6)


F:......................... V:............................ T:............................

58

Item

Vermin (B11.7)

F:............................. V:............................ T:............................


59

Item

Overhand work (B11.8)

F:............................. V:............................ T:............................

Item

Schedule of variables (B12)


60

Pre-tender information (B12.1)

F:............................. V:............................ T:............................

Item

Information necessary for elections and completion of those


clauses contained in the schedule which are necessary for
tender purposes is given hereunder. Where no information is
given it shall mean that either no details or specific
requirements are available or that the clause is not relevant to
this specific contract
12.1.1 Provisional bills of quantities (B2.2)
The quantities are provisional:
No
12.1.2 Availability of construction documentation (B2.3)
Construction documentation is complete
Yes

61

12.1.3 Interest of agents (B2.4)

Yes

12.1.4 Defined works area (B3.1)

Yes

12.1.5 Geotechnical investigation (B3.2)

No

12.1.6 Existing premises occupied (B3.4)

Yes

Carried Forward
Bill No. 1
PRELIMINARIES

9A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
12.1.7 Services - known (B3.7)

Yes

12.1.8 Protection of trees (B3.9)

Yes

12.1.9 Inspection of adjoining properties (B3.11)


Yes
12.1.10 Enclosure of the works (B6.2)

Yes

12.1.11 Offices (B6.4.3)


Yes
12.1.12 Main notice board (B6.5)

Yes

12.1.13 Subcontractors notice board (B6.6)


No
12.1.14 Water (B7.2)
Alternative Selected: B The contractor must supply if
insufficient
12.1.15 Electricity (B7.3)
- The contractor must supply
12.1.16 Telecommunications (B7.4)
Alternative selected: A
12.1.17 Ablution facilities (B7.5)
None availible - the contractor must supply
12.1.8 Special attendance (B9.2)

No

12.1.19 Protection of the works (B11.1)

Yes

12.1.20 Protection of existing/sectionally occupied works


(B11.2)
Protection is required :
Yes
12.1.21 Disturbance (B11.5)
62

Yes

Post tender information (B12.2)

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

10A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward

12.2.1 Payment of preliminaries


Alternative selected: B
12.2.2 Adjustment of preliminaries
Alternative selected: A
12.2.3 Additional agreed preliminaries items
None...............................................................-

Carried Forward
Bill No. 1
PRELIMINARIES

11A

ESKOM WEIGHBRIDGE
ALMA

Brought Forward

SPECIFIC PRELIMINARIES
63

PROPRIETARY BRANDED PRODUCTS


The contractor shall take delivery of, handle, store, use apply
and/or fix all proprietary branded products in strict accordance
with the manufacturers' instruction after consultation with the
manufacturer's authorised representative
F:............................. V:............................ T:............................

64

Item

OVERTIME
Should overtime be required to be worked for any reason
whatsoever, the costs of such overtime are to be borne by the
contractor unless the principal agent has specifically authorised
in writing, prior to the execution thereof, that costs for such
overtime are to be borne by the employer.
F:............................. V:............................ T:............................

65

Item

SITE INSTRUCTIONS
Site instructions issued on site are to be recorded in triplicate in
a site instruction book which is to be maintained on site by the
contractor
F:............................. V:............................ T:............................

66

Item

LABOUR RECORD
At the end of each week the contractor shall provide the
principal agent with a written record, in schedule form, reflecting
the number and description of tradesmen and labourers
employed by him and all subcontractors on the works each day.

F:............................. V:............................ T:............................


67

Item

NON CESSION OF MONIES

The contractor shall not cede nor assign his rights or claims to
any monies due or to become due under this contract

F:............................. V:............................ T:............................

Carried Forward
Bill No. 1
PRELIMINARIES

12A

Item

ESKOM WEIGHBRIDGE
ALMA

Brought Forward
68

HEALTH & SAFETY


The contractor shall provide a Health & Safety plan upon
request and comply with all regulations and applicable laws.
The contractor must comply with the latest addition of the act
as no claims in this regard will be recognised.
F:........................... V:.........................T:............................
Item

69

TRANSPORTATION OF WORKERS
Transportation of workers must not be on open vehicles. The
contractor must provide mini-bus / bus transport from site to the
nearest taxi rank for the duration of the contract
F:...........................V:...........................T:..........................

Carried to Summary
Bill No. 1
PRELIMINARIES

13A

Item

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 2
DEMOLITIONS
REMOVAL OF EXISTING WORK
Breaking up and removing reinforced concrete
1

Surface bed not exceeding 200mm thick for new foundations


(elsewhere)
Cut straight cut through existing 200mm thick reinforced
concrete surfacebed for new foundations (elsewhere)

Carried to Summary
Bill No. 2
DEMOLITIONS

14A

m3

12

38

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 3
EARTHWORKS
EXCAVATIONS
Excavation in existing compacted gravel filling, not
exceeding 2m deep for
1

Foundations

m3

m3

m2

11

Extra over all excavations for carting away


2

Surplus material from excavations and/or stock piles on site to


a dumping site to be located by the contractor
Risk of collapse of excavations

Sides of trench and hole excavations not exceeding 1,5m deep


Keeping excavations free of water

Keeping excavations free of all water other than subterranean


water
Item

FILLING ETC
Approved selected G6 imported material carted on
compacted in 150mm layers to 95% Mod AASHTO density
5

Under ramps

m3

Carried to Summary
Bill No. 3
EARTHWORKS

15A

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 4
CONCRETE
UNREINFORCED MASS CONCRETE
15MPa/19mm concrete
1

In filling below ground slab

m3

11

In filling below ramps

m3

14

REINFORCED CONCRETE
30MPa/19mm concrete in
3

Foundations

m3

Ground slabs

m3

Ramps

m3

10

Impact protectors

m3

CONCRETE SUNDRIES
Finishing top surfaces of concrete smooth with a power
float
7

To surface beds

m2

66

To ramps

m2

48

Carried to Summary
Bill No. 4
CONCRETE

16A

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 5
FORMWORK
ROUGH FORMWORK (DEGREE OF ACCURACY II)
Rough formwork to sides
1

To edges exceeding 150mm but not exceeding 300mm high

Carried to Summary
Bill No. 5
FORMWORK

17A

24

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 6
REINFORCEMENT
High tensile steel reinforcement to concrete work
1

Y20 rods

kg

39.46

Y16 rods

kg

867.00

Fabric reinforcement
3

Type 193 mesh reinforcement in foundations

m2

12

Type 245 fabric reinforcement in ground slabs

m2

66

Type 311 fabric reinforcement in concrete ramps

m2

48

Carried to Summary
Bill No. 6
REINFORCEMENT

18A

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 7
METALWORK
MILD STEEL
1

24mm diameter x 900mm long threaded rods cast into concrete


including nuts and washers
No

32

500 x 500 x 25mm thick baseplates four times drilled for 24mm
anchor rods (elsewhere)

No

5mm thick sheet steel formwork around impact protectors bent


to detail 2,28m girth x 800mm high girth

No

Carried to Summary
Bill No. 7
METALWORK

19A

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 8
PAINTING
ON METAL
Prepare and apply one coat Galvogrip primer, one
undercoat and two coats polyurethane enamel paint on
steel
1

Impact protectors

m2

Carried to Summary
Bill No. 8
PAINTWORK

20A

ESKOM WEIGHBRIDGE
ALMA
Item
No

Quantity

Rate

Amount

BILL NO. 9
WEIGHBRIDGE
1

Heavy duty electronic weighbridge 22m long x 3m wide with a


loading capacity of 70 tons installed complete including load
cells, lightning protection and operational PC, printer and
software system and all necessary electrical installation. All
installed and calibrated according to manufacturers
specification in compliance with SANS 1649

Item

Allow for profit

Item

Allow for attendance

Item

Carried to Summary
Bill No. 9
WEIGHBRIDGE

21A

ESKOM WEIGHBRIDGE
ALMA
FINAL SUMMARY
Bill
No

Page
No

PRELIMINARIES

13A

DEMOLITIONS

14A

EARTHWORKS

15A

CONCRETE

16A

FORMWORK

17A

REINFORCEMENT

18A

METALWORK

19A

PAINTWORK

20A

WEIGHBRIDGE

21A

Amount

SUBTOTAL

Value Added Tax (14%)

Carried to Form of Offer and Acceptance (Page 2)