Sie sind auf Seite 1von 61

A PROJECT REPORT ON

ELBOW MECHANISM
SUBMITED TO THE GOVERNMENT POLYTECHNIC PUNE,
(An Autonomous Institute of Government of Maharashtra)

IN THE PARTIAL FULFILLMENT OF THE FINAL YEAR


DIPLOMA COURSE IN MECHANICAL ENGINEERING
SUBMITED BY.
1. Tanuja Vijaykumar Kashid
2. Sourav Siddheshwar Kotgund
3. Sanket Virbhadra Kothale
4. Sheryas Prakash Misale
5. Pagar Jagdish Dharma
6. Pasalkar Aditya Laxman

En.No. 1324222
En. No. 1324226
En. No. 1324227
En. No. 1324228
En. No. 1324230
En. No. 1324231

GUIDED BY

Mr . P. U. Garge
DEPARTMENT OF MECHANICAL ENGINEERING
PUNE-411 016
(AN AUTONOMOUS INSTITUTE OF GOVT. OF MAHARASHTRA)
2015-16

GOVERNMENT POLYTECHNIC PUNE


(AN AUTONOMOUS INSTITUTE OF GOVT. OF MAHARASHTRA)
PUNE-411 016

CERTIFICATE
This is to certified that the project work entitled ELBOW MECHANISM is a benefited
work carried out by the below mentioned students in partial fulfilment for the award of
Diploma in MECHANICAL ENGINEERING of GOVERNMENT POLYTECHNIC,
PUNE during the year 2015-2016. It is certified that all corrections/ suggestions indicated for
Internal Assessment have been incorporated in this report. The project report has been
approved as it satisfies the Academic requirements in respect of project work prescribed for
Diploma in MECHANICAL ENGINEERING.
NAME OF STUDENT

1. Tanuja Vijaykumar Kashid


2. Sourav Siddheshwar Kotgund
3. Sanket Virbhadra Kothale
4. Sheryas Prakash Misale
5. Pagar Jagdish Dharma
6. Pasalkar Aditya Laxman

Prof. P.U. Garge


Project Guide

Dr. M. Giridhar
Head of Department

ENROLLMENT NO.

En.No. 1324222
En. No. 1324226
En. No. 1324227
En. No. 1324228
En. No. 1324230
En. No. 1324231

Dr. D. R. Nandanwar
Principle

External Examiner

ELBOW MECHANISM

ACKNOWLEDGEMENT

We take this momentous opportunity to express our heartfelt gratitude, ineptness &
regards to vulnerable and highly esteemed guide, Mr. P.U.Garge, for providing us an
opportunity to present our project on ELBOW MECHANISM.

We with full pleasure converge our heartiest thanks to Our project guide Mr.
P.U.Garge,

Lecturer,

Department

of

Mechanical

Engineering,

Government

Polytechnic Pune, for their invaluable advice and wholehearted cooperation without
which this project would not have seen the light of day.

We attribute hearties thanks to all the faculty of the department of mechanical and
friends for their valuable advice and encouragement

Thanking.

GOVERNMENT POLYTECHNIC PUNE 1

ELBOW MECHANISM

INDEX OF CHAPTERS

Sr.No.
1.

Chapter Name

Pg.No.
6

Introduction
1.1. Function of transmission.
1.2. Types of transmission.
1.3. Need for project.
1.4. Solution.

2.

Construction & Working.

11

2.1. Construction.
2.2. Working.
2.3. Advantages & Disadvantages.
2.4. Simple gear train.
3.

Design

17

3.1. System Design.


3.2. Mechanical Design.
3.3. Input Data.
3.4. Design of Propeller Shaft.
3.5. Design of Gears.
3.6. Design of Input Shaft.
3.7. Design of Output Shaft.
GOVERNMENT POLYTECHNIC PUNE 2

ELBOW MECHANISM
3.8. Design of Bearing Bush.
3.9. Design of Bent Pins.
4.

33

Process Sheet
4.1. Process Sheet For Pulley.
4.2. Process Sheet For L-H Output Shaft.
4.3. Process Sheet For R-H Output Shaft.
4.4. Process Sheet For R-H Input Shaft.
4.5. Process Sheet For L-H Input Shaft.
4.6. Process Sheet For L-H_BRG_HSG.
4.7. Process Sheet For R-H_BRG_HSG.
4.8. Process Sheet For Central_BRG_HSG.
4.9. Process Sheet For Cover Ring.

5.

Test & Trial on ELBOW MECHANISM.

46

6.

Operation Table.

48

6.1. Sample Calculation.


7.

Result Table.

52

8.

Cost Analysis.

54

9.

Conclusion & Future Scope

58

10.

Bibliography

60

GOVERNMENT POLYTECHNIC PUNE 3

ELBOW MECHANISM

--------DEFINATION OF PROJECT--------

P-

Planning before carrying out the work

R- row material required for the work

O- Organization of the work

J- joint effort put in to the work

E- estimation of material required in the work

C- Costing of the work

T- techniques used in performing

GOVERNMENT POLYTECHNIC PUNE 4

ELBOW MECHANISM

Project Abstract / Summary : ABSTRACT

This project EL-BOW TRANSMISSION being compact and portable


equipment, which is skilful and is having practice in transmitting power at right
angle without any gears being manufactured. The El-bow Mechanism transmits
the input power towards the output side such a way that the angular forces
produced in the slacks are transmitted with the help of rods which takes up the
input power and the right angle drive is transferred towards the output slack
and rod assembly. Hence very little friction plays while the power is being
transmitted.
Hunting and back lash errors are absent. Therefore, it is appreciated
that efficiency as high as 90-92% are possible in gear less transmission
mechanism.

Why did you choose to work on this project topic :


Here is a
wonderful mechanism that carries force through a 90bent rod. Transmitting
rotational motion around an axis usually involves gears, which can quickly
become complicated, inflexible and clumsy-looking, often ugly. So, instead of
using gears, this technology elegantly converts rotational motion using a set of
cylindrical bars, bent to 90, in a clever, simple and smooth process that
translates strong rotational force even in restricted spaces.A gearless
transmission is provided for transmitting rotational velocity from an input
connected to three bent links. Both the input shaft and the housing have
rotational axes. The rotational axis of the input shaft is disposed at an angle of
90 degree with respect to the rotational axis of the housing. As a result, rotation
of the input shaft results in a processional motion of the axis of the bent link.
The rotary and reciprocating motion of bent link transmit rotation of prime
mover to 90 degree without any gear system to an output shaft.
GOVERNMENT POLYTECHNIC PUNE 5

ELBOW MECHANISM

CHAPTER NO.1

INTRODUCTION

GOVERNMENT POLYTECHNIC PUNE 6

ELBOW MECHANISM
PROJECT TITLE : ELBOW MECHANISM

INTRODUCTION

The word TRANSMISSION on which the project is based upon means the
whole of the mechanism that transmits the power from the engine crankshaft to
the rear wheels. However the transmission is also being used very commonly
in the literature for a mechanism, which provides us with suitable variation of
the engine torque at the road wheels, whenever required. This may be a
gearbox (also called manual transmission) or an automatic transmission.

FUNCTIONS OF TRANSMISSION

The main functions that are performed by the transmission are:

1)The torque or the tractive effort produced by the engine varies with speed
only within narrow limits. But the practical consideration for the running of
automobile under different conditions demands a large variation of torque
available at the wheels. The main purpose of the transmission is to provide
means to vary the leverage or the torque ratio between the engine and the road
wheels as required.
2)The transmission also provides a neutral position so that the engine and the
road wheels are disconnected even with the clutch in the engaged position.
3)A mean to back the car by reversing the direction of rotation of the drive is
also provided by the transmission.

GOVERNMENT POLYTECHNIC PUNE 7

ELBOW MECHANISM
TYPES OF TRANSMISSION
The transmissions may be classified into the manual and the automatic
types. The manual transmissions are conventionally called gearboxes. Their
mechanical efficiency in direct drive is about 98%, whereas in reduction gears,
it is slightly greater than 90%. As most of the time the driving is done in direct
drive, friction losses in manual transmissions are very small. That coupled with
simplicity and lower initial cost, is the reason these are still popular particularly
in fuel-efficient automobiles. On the other hand the operation of engaging and
disengaging the clutch along with changing gears while driving over a crowded
highway means a lot of fatigue to the driver. Therefore, in luxury vehicles
automatic transmissions are employed which simplify the driving operation
considerably.
NEED FOR PROJECT:
The conventional transmission system used in auto rickshaw is as shown in the
figure. The transmission train comprises of the engine as the power plant , and
the clutch gear box and differential arrangement as the traction device. The
power is available at the differential end as two outputs , which is supplied to
the wheels individually by means of double hookes joint as the engine is at a
higher level as compared to the wheels.
The double hookes joint has certain disadvantages that, it does not
transmit constant angular velocity, so also the efficiency of transmission is
low(65%).More over this efficiency further drops with the increase in angular
velocity ie speed output from the engine. The drive is subjected to inherent
vibrations and considerable axial and radial forces are encountered during
power transmission.
Actually the situation is simple that the power from the differential has
to be transmitted at right angles to the wheels, and even if the wheels move
over a bump on the road this right angle is not disturbed.

GOVERNMENT POLYTECHNIC PUNE 8

ELBOW MECHANISM

Universal System Used in 3-Wheeler

GOVERNMENT POLYTECHNIC PUNE 9

ELBOW MECHANISM
SOLUTION

ELBOW MECHANISM (ORBITAL TRANSMISSION SYSTEM.)


The orbital transmission system is an adaptation of the original
mechanism named Elbow mechanism developed by LEO -NARDO-DAVINCI. This Elbow mechanism is capable of transmitting heavy torque at high
speeds between two shafts at right angles. This mechanism comprises of two
shafts drilled with three holes each on the same pitch circle diameter on each
shaft and a set of three bent pins that are made of steel and bent at exactly 900.
This mechanism is capable of transmitting high speeds (12000 rpm).
The drive is compact and can be made into hermetically sealed units filled with
lubricating oil in order to increase the life of the drive. This drive has an
efficiency as high as 93%.
In the project we are getting the two inputs to the transmission system
from the one shaft through simple gear train . gears used over here are of same
diameter and having same number of teeth on its periphery. One variable speed
motor drives the main propeller shaft through belt and pully. Pully is fitted
rigidly on it. The single shaft can be driven by both manually as well as using
motor drive.
This transmission system is extremely compact and will improve the
efficiency of power transmission of the vehicle and thereby the mileage of the
vehicle.

GOVERNMENT POLYTECHNIC PUNE 10

ELBOW MECHANISM

Chapter No.:- 2

CONSTRUCTION AND
WORKING

GOVERNMENT POLYTECHNIC PUNE 11

ELBOW MECHANISM

CONSTRUCTION

1. ELECTRIC MOTOR:Electric motor of following specifications is used


Single phase Ac Motor
230 volt,0.5 AMP.
50 Hz
Power = 100 watt
Speed = 0 to 6000 rpm
TEFC CONSTRUCTION
COMMUTATOR MOTOR
2. PULLEY:pulley is v-belt pulley of 40 degree groove angle and 6mm A
section .This reduction pulley gives an speed reduction ratio of 4.68
.This reduction pulley is mounted at the bearing end of the propeller
shaft.
3. LH&RH INPUT SHAFT:Input shaft is an steel construction where in main shaft is an high
grade steel (EN 24) Input shaft supports the reduction pulley at
lower end and the horizontal places at the upper end .The horizontal
plates are drilled with three holes of equal pitch, these holes receive
the bent pins.
4. BENT PINS:Pins are made form high carbon steel; in three sets of 90 ,120,140
degree respectively pins are bent to the desired angle in a special
fixture such that the bend is not sharp but slightly filleted to avoid
stress concentration.

GOVERNMENT POLYTECHNIC PUNE 12

ELBOW MECHANISM

5.

CENTRAL BEARING HOUSING:The central bearing housing houses two ball bearings 6201 zz in
which the input shafts are mounted .The central bearing housing is
welded to the base fame.
5. LH BEARING HOUSING:The LH bearing housing houses ball bearing 6201 zz in which the
LH_ output shafts are mounted .The LH bearing housing is welded
to the base fame.
6. RH BEARING HOUSING:The RH bearing housing houses ball bearing 6201 zz in which the
RH_ output shafts are mounted .The LH bearing housing is welded
to the base fame
7. PROPELLER SHAFT
Pulley is mounted on propeller shaft. Pulley is driven by motor shaft
and then it drives propeller shaft. Propeller shaft is also manually
driven by hand wheel which is located at other end of shaft, which is
fixed.
8. GEARS
4 Gears are used for power transmission from propeller shaft to the
both wheels through Input and output shaft mechanism.
9. WHEELS
The wheels are of nylon that are fitted at the output shaft ends

GOVERNMENT POLYTECHNIC PUNE 13

ELBOW MECHANISM
WORKING:
Electric motors supply power to the Propeller shafts of the orbital
transmission system by means of belt and pulley arrangement. Then, drive is
given to the two input shaft through simple gear train mechanism. Gear used
over here are spur type and of same diameter. Therefore, there will be no
variation in speed of two wheels. The input shaft rotate to move the pins about
the central axis, this motion causes the pins to slide to and fro inside the output
shaft holes which in turn results into rotary motion of the output shaft.
Thus the rotary input from the motors is transferred to the output wheel
shafts that cause the wheels to rotate.

ADVATAGES OF ELBOW MECHANISM


1. Better transmission efficiency (90%) as compared to conventional
double hook es joint ( 60 to 65 %)
2. Better efficiency of system results in better fuel economy.
3. Radial speed of input and output shaft is same , hence no phase shift.
4. No vibrations in drive.
5. Efficiency remains almost constant even with increase in transmission
speed.
6. Compact as compared to double hookes joint.
7. Lower manufacturing cost.
8. Lower maintenance required.
DISADVANTAGES :
1. Slightly high cost of manufacture.
2. Special machines like jig boring is required for manufacture.
3. Conventional Transmission system needs to be modified to
incorporate the above system/.

GOVERNMENT POLYTECHNIC PUNE 14

ELBOW MECHANISM
Simple Gear TrainIn simple gear train, each shaft carries one wheel only and there no relative
motion between the axis of the shafts.
Gear used over here are of same diameter and having same number of teeth.
one gear is driving and two gears are driven type. One idler gear is used in
intermediate to one driving and driven shaft.
Let,
N1 and T1 is speed and no. of teeth of Driving gear which is fixed on propeller
shaft and rotated.
N2,T2 and N3 T3 are speed and no. of teeth of driven gear 1 and driven gear 2
respectively.
And let say, N4 and T4 is the speed and No. of teeth of Idler gear which is
intermediate between driving shaft and driven gear 1.
Since the driving wheel drives driven gear 2,
N3 x T3 = N1 x T1
......(1)
As well as driving gear drives Idler gear,
N4 x T4 = N1 x T1
........(2)
Since Idler gear drives Driven gear 1,
N2 x T2 = N4 x T4
........(3)
Gear used are of same diameter and same no. of teeth so there is no speed
reduction take place.
NO OF TEETH OF ALL GEARS = T1 = T1 = T3 = T4
................. (4)
From Equation 1,2,3,4,
N1 = N2 = N3 = N4........................( hence proved)
So we can say that same power is given to driven shafts without any speed
reduction.
If the input and output gears are exactly the same size, they will turn at the
same speed.
In many simple gear trains there are several gears between the input gear and
the output gear.
These middle gears are called idler gears. Idler gears do not affect the speed
of the output gear.

GOVERNMENT POLYTECHNIC PUNE 15

ELBOW MECHANISM

Chapter No.:-3

Design

GOVERNMENT POLYTECHNIC PUNE 16

ELBOW MECHANISM

DESIGN
Design consists of application of scientific principles , technical
information and imagination for development of new or improvised machine or
mechanism to perform a specific function with maximum economy and
efficiency.

Hence an careful design approach has to be adopted. The total design


work, has been split up into two parts;

SYSTEM DESIGN

MECHANICAL DESIGN

GOVERNMENT POLYTECHNIC PUNE 17

ELBOW MECHANISM
SYSTEM DESIGN

System design mainly concerns with various physical constrains,


deciding basic working principle, space requirements, arrangements of various
components etc.

Following parameters are looked upon in system design.


a) Selection of system based on physical constraints. The mechanical
design has direct norms with the system design hence system is
designed such that distinctions and dimensions thus obtained in
mechanical design can be well fitted in to it.
b) Arrangement of various components made simple to utilize every
possible space.
c) Ease of maintenance and servicing achieved by means of simplified
layout that enables quick decision assembly of components.
d) Scope of future improvement.

GOVERNMENT POLYTECHNIC PUNE 18

ELBOW MECHANISM
MECHANICAL DESIGN
In mechanical design the components are listed down and stored on the
basis of their procurement in two categories,
Design parts
Parts to be purchased.

For designed parts detailed design is done and dimensions there


obtained are compared to next dimensions which are already available in
market. This simplifies the assembly as well as the post production and
maintenance work. The various tolerances on work are specified .The process
charts are prepared and passed to manufacturing stage.
The parts to be purchased directly are selected from various catalogues
and are specified so as to have case of procurement .
In mechanical design at the first stage selection of appropriate material
for the part to be designed for specific application is done.
This selection is based on standard catalogues or data books;
eg:- (PSG DESIGN DATA BOOKS )
(SKF BEARING CATALOGUE ) etc.

APPROACH TO MECHANICAL DESIGN OF PLANETARY SPEED


REDUCER
In design the parts of planetary speed reducer we shall adopt the
following approach ;
a) Selection of appropriate material .
b) Assuming an appropriate dimension as per system design.
c) Design check for failure of component under any possible system of

forces.

GOVERNMENT POLYTECHNIC PUNE 19

ELBOW MECHANISM
INPUT DATA
1) MOTOR DETAILS:
SINGLE PHASE AC MOTOR
230 VOLT, 50Hz , 0.5 Amp
POWER = 100 WATT
SPEED = 200 TO 4500 rpm
TEFC CONSTRUCTION MOTOR.
2) DIAMETER OF PLATES =45mm
3) PCD OF HOLES ON DISC = 32mm
4) THICKNESS OF PLATES =8mm
5) DIAMETER OF PINS (3Nos)=4mm
6) DIAMETER OF INPUT SHAFT=10mm
7) DIAMETER OF OUTPUT SHAFT=10mm
8) DIAMETER OF DRIVER PULLEY = 16mm
9) DIAMETER OF DRIVEN PULLEY = 75mm
10)SPEED REDUCTION RATIO = 75/16 =4.688
11)SPEED OF MECHANISM (MAX)=1200rpm
(MIN)=0 rpm
12)MAX OUTPUT TORQUE AT 850 rpm = 0.08 kg.m
13) DIAMETER OF PROPELLER SHAFT =
14) NO. OF GEARS = 4
15) PCD OF ALL GEARS = 26mm

GOVERNMENT POLYTECHNIC PUNE 20

ELBOW MECHANISM
DESIGN OF INPUT SHAFT:-

Torque calculation:Max Input Power = 100 watt at 6000 rpm.


At motor shaft
9
60

I/P power =

2NT
60

2 x x 6000 x T
60

60 x 100

T=

= 0.1592 N-m

2 x x 6000

Assuming 100 % efficiency of transmission between motor shaft & Mechanism I/P
shaft .

2 N T motor O/p

60
T mech i/p = 4.688 x 0.1592

2 NT mech i/p
60

= 0.7463 N-m

Assuming 100% overload;


factor of safety

=2

Tdesign

= 2 Tmech i/p

Tdesign

=2x0.7463
=1.4926 N.m

Tdesign

= 1.4926 x 103 N.m

MATERIAL SELECTION
Designation

EN 24

Ultimate Tensile strength

Yield strength

N/mm2

N/mm2

800

600

GOVERNMENT POLYTECHNIC PUNE 21

ELBOW MECHANISM
ASME CODE OR DESIGN OF PROPELLER SHAFT:Since the shaft is subjected to variable load at different speed condition sit is
necessary to make proper allowance for harmful effects of load fluctuation
Propeller shaft is supported between two bearings and pulley is rigidly
mounted on it and the weight of pulley is neglected and cyclic fluctuations occurs
while rotating.
According to ASME code permissible value of shear stress may be calculated
for various relations.
fs max = 0.18 fult
=0.18 x 800
= 144 N/mm2
or
fs max = 0.3 x 600
= 180 N/ mm2

Considering minimum of the above values.


fs max = 144 N/mm2

This is allowable valves of shear stress induced in input shaft of or safe operation .
Shaft is provided a hole for rivet which reduces its strength ;
Reducing above value by 25%

fs max = 0.75 x 144


= 100 N/mm2
Diameter of input shaft =6mm
Check for torsional failure of shaft:-

T= /16 fs act

GOVERNMENT POLYTECHNIC PUNE 22

ELBOW MECHANISM
fs ac t =

16 x T
d 3

16 x 1.4926 x 103
=

x 10 3

fs act = 35.19 N/mm2

As fs act < fs all

Shaft is safe under torsional load.

GOVERNMENT POLYTECHNIC PUNE 23

ELBOW MECHANISM

Spur Gear Design :1. Outside Diameter = 22mm


2. No. Of Teeth = 19
3. Root Diameter = 18mm
4. Addendum = A = 1mm
5. Dedendum = D = 1mm
6. Pressure Angle = = 20 degree ( Standard )
7. Base Circle Diameter = 18mm
8. Pitch Circle Diameter = 20mm
9. Circular Pitch = M = 4mm
10. Module = 1.05mm
11. Circular Tooth Thickness = M = 2mm
2
12. Whole Depth Of Teeth = 2mm

GOVERNMENT POLYTECHNIC PUNE 24

ELBOW MECHANISM

DESIGN OF INPUT SHAFT:Power and Torque is transmitted to both input shaft through simple gear train
mechanism and subjected to twisting moment only.
According to ASME code permissible value of shear stress may be calculated
for various relations.
fs max = 0.18 fult
=0.18 x 800
= 144 N/mm2
or
fs max = 0.3 x 600
= 180 N/ mm2

Considering minimum of the above values.


fs max = 144 N/mm2

This is allowable valves of shear stress induced in input shaft of or safe operation .
Shaft is provided a hole for rivet which reduces its strength ;
Reducing above value by 25%

fs max = 0.75 x 144


= 100 N/mm2
Diameter of input shaft =6mm
Check for torsional failure of shaft:-

T= /16 fs act

GOVERNMENT POLYTECHNIC PUNE 25

ELBOW MECHANISM

fs ac t =

16 x T
d 3

16 x 1.4926 x 103
=

x 10 3

fs act = 35.19 N/mm2

As fs act < fs all

Shaft is safe under torsional load.

GOVERNMENT POLYTECHNIC PUNE 26

ELBOW MECHANISM

Design of out put shaft:Material selection


Designation

Ultimate Tensile strength


N/mm

EN24

800

Yield strength
N/mm2
600

Design check for Torsional Failure


T=/16 fs act d3

Diameter of output shaft = 6mm


fs act =

16 x T
x 63

fs act

= 35.19 N.mmd

shaft is safe under torsional load.

GOVERNMENT POLYTECHNIC PUNE 27

ELBOW MECHANISM

Design check for bending failure of o/p shaft:O/p shaft supports the weight of the bent pins ,discs etc and is held at one end in bush
bearing which weigh approx. 0.75 kg
Assuming factor of safety = 2
Bending Load =2 x 0.75
=1.5kg
=15N
fb act = M
Z

fb act =

32 M
d3
32 x15 x 130

fb act =

x (10)

= 19.86 N/mm2

As fb act < fb all

shaft is safe in bending .

GOVERNMENT POLYTECHNIC PUNE 28

ELBOW MECHANISM

Design of Bearing bush


Material selection
Designation

Ultimate Tensile strength


N/mm

C30/EN8K

Bearing pressure

N/mm2

620

pb

Yield strength

400

load

Project area
(Pb)

W
lxd

Where ;
pb = Average bearing pressure N/mm2
P= Radial load on journal (N)
l = Length of journal in contact(mm)
d= Diameter of journal (mm)
Here ; d= 10mm
l = 22 mm & Average bearing pressure for steel combination 12.6 N/mm2
Pb act = 12.6 N/mm2
Radial load
Torque = w x r
W = 1.4926 x 10 3 =497.53 N
PB = 497.53/22 x 10 =2.26
As Pb act < Pb all
Bearing brush is safe.

GOVERNMENT POLYTECHNIC PUNE 29

ELBOW MECHANISM

Design of Bent Pins:Bent pins are torque transmitting elements similar to bolts in ease of flange coupling .
Material Selection

Designation

Tensile strength

Yield strength

N/mm2

N/mm2

520

350

EN9

a) Design check for shear failure of Pins.


d= diameter of pins = 4
n = no . of pins =3

T=

x d 2 x fs b x n x

1.4926 x 103 =
4

dP
2

x (4)2 x fsb act x 3 x 36


2

fsb act = 2.199 N/mm2


As ; fsb act < fsb all
Pins are safe in shear (Torsional)

b) Design check for crushing failure:-

T = n x d x t f x f c b act x dp
2
3

1.4926 x 10 = 3 x 4 x 7 x f cb act x 36
2
fcb act = 0.98716 N/mm2

As fcb act < fcb all

GOVERNMENT POLYTECHNIC PUNE 30

ELBOW MECHANISM

Chapter No: 4

Process Sheet

GOVERNMENT POLYTECHNIC PUNE 31

ELBOW MECHANISM

PART NO : OTS - 03
PART NAME : PULLEY

MATERIAL SPECIFICATION : EN 9
RAW MATERIAL SIZE: 80X 30
QUANTITY :- 01 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

20

20

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning diameter 75
through 23.5 mm
length
4. Turning 30
through 14.5 mm
length

----

----

Turning tool

----

10

15

----

----

----

----

30

30

5. Turning groove
50 mm ;3mm deep

----

----

Grooving
tool

----

10

15

6. Chamfer 6 x 45
degree on face

----

----

Crank facing
tool

----

10

13

7. Roughing V groove

----

----

Parting tool

----

10

10

20

8. Finish V groove

----

----

V- tool

15

25

40

9. Centre drill

----

----

Centre drill

Angle
protractor
----

10. Drilling 14.5 hole


through 40 mm

----

----

Twist drill
6mm

----

11. Reaming 15 hole


through 40 mm

----

----

Reaming 6

----

12. Parting off to 24mm


Length

----

----

Parting tool

----

12

13. Facing other side to


23.5 mm length

----

----

Facing tool

----

GOVERNMENT POLYTECHNIC PUNE 32

ELBOW MECHANISM

PART NO : OTS - 07
PART NAME :LH_ OUTPUT SHAFT

MATERIAL SPECIFICATION : EN24


RAW MATERIAL SIZE: 55 x 145
QUANTITY :- 0 4 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

10

10

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning outer
diameter to 48mm
through length
4. Center drilling

----

----

Turning tool

----

13

18

----

----

Center drill

----

----

----

Twist drill

----

----

----

Turning tool

----

----

----

Turning tool

----

12

17

----

----

Turning tool

----

12

17

----

----

Turning tool

----

10

15

----

----

----

12

17

----

----

Threading
tool
Reamer

----

12

17

----

----

Parting tool

----

13. Facing other side

----

----

Facing tool

----

14. Clam job on m/c


vice

3jaw chuck

----

30

30

15. Drilling 3.85 holes


through thickness 3
Nos

----

DRO
milling
m/c
----

Twist drill

----

5. Turning
15mmthrough 101
length
6. Turning
15mmthrough 86
length
7. Turning
12mmthrough 57
length
8. Turning
10mmthrough 45
length
9. Turning
8mmthrough 15
length
10. Threading M8
threads
11. Turning
12mmthrough
length
12. Grooving as per
profile

GOVERNMENT POLYTECHNIC PUNE 33

ELBOW MECHANISM
16. Reaming 4 holes
thro thickness 3
Nos
17. Chamfer 0.5 x 45
degree B/s of each
hole

----

----

Reamer

----

10

----

----

Twist drill

----

12

17

GOVERNMENT POLYTECHNIC PUNE 34

ELBOW MECHANISM

PART NO : OTS - 08
PART NAME :RH_ OUTPUT SHAFT

MATERIAL SPECIFICATION : EN24


RAW MATERIAL SIZE: 55 x 145
QUANTITY :- 0 4 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

10

10

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning outer
diameter to 48mm
through length
4. Center drilling

----

----

Turning tool

----

13

18

----

----

Center drill

----

----

----

Twist drill

----

----

----

Turning tool

----

----

----

Turning tool

----

12

17

----

----

Turning tool

----

12

17

----

----

Turning tool

----

10

15

----

----

Threading
tool

----

12

17

11. Turning
12mmthrough
length
12. Grooving as per
profile

----

----

Reamer

----

12

17

----

----

Parting tool

----

13. Facing other side

----

----

Facing tool

----

14. Clam job on m/c


vice

3jaw chuck

----

30

30

15. Drilling 3.85 holes


through thickness 3
Nos

----

DRO
milling
m/c
----

Twist drill

----

5. Turning
15mmthrough 101
length
6. Turning
15mmthrough 86
length
7. Turning
12mmthrough 57
length
8. Turning
10mmthrough 45
length
9. Turning
8mmthrough 15
length
10. Threading M8
threads

GOVERNMENT POLYTECHNIC PUNE 35

ELBOW MECHANISM
16. Reaming 4 holes
thro thickness 3
Nos
17. Chamfer 0.5 x 45
degree B/s of each
hole

----

----

Reamer

----

10

----

----

Twist drill

----

12

17

GOVERNMENT POLYTECHNIC PUNE 36

ELBOW MECHANISM

PART NO : OTS - 06
PART NAME :RH_ INPUT SHAFT

MATERIAL SPECIFICATION : EN24


RAW MATERIAL SIZE: 55 x 120
QUANTITY :- 0 4 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

10

10

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning outer
diameter to 48mm
through length
4. Center drilling

----

----

Turning tool

----

13

18

----

----

Center drill

----

5. Turning
15mmthrough 76
length
6. Turning
12mmthrough
12length
7. Grooving as per
profile

----

----

Twist drill

----

----

----

Turning tool

----

12

17

----

----

Parting tool

----

8. Facing other side

----

----

Facing tool

----

9. Clam job on m/c


vice

3jaw chuck

----

30

30

10. Drilling 3.85 holes


through thickness 3
Nos
11. Reaming 4 holes
thro thickness 3
Nos
12. Chamfer 0.5 x 45
degree B/s of each
hole

----

DRO
milling
m/c
----

Twist drill

----

----

----

Reamer

----

10

----

----

Twist drill

----

12

17

GOVERNMENT POLYTECHNIC PUNE 37

ELBOW MECHANISM

PART NO : OTS - 05
PART NAME :LH_ INPUT SHAFT

MATERIAL SPECIFICATION : EN24


RAW MATERIAL SIZE: 55 x 120
QUANTITY :- 0 4 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

10

10

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning outer
diameter to 48mm
through length
4. Center drilling

----

----

Turning tool

----

13

18

----

----

Center drill

----

5. Turning
15mmthrough 76
length
6. Turning
12mmthrough
12length
7. Grooving as per
profile

----

----

Twist drill

----

----

----

Turning tool

----

12

17

----

----

Parting tool

----

8. Facing other side

----

----

Facing tool

----

9. Clam job on m/c


vice

3jaw chuck

----

30

30

10. Drilling 3.85 holes


through thickness 3
Nos
11. Reaming 4 holes
thro thickness 3
Nos
12. Chamfer 0.5 x 45
degree B/s of each
hole

----

DRO
milling
m/c
----

Twist drill

----

----

----

Reamer

----

10

----

----

Twist drill

----

12

17

GOVERNMENT POLYTECHNIC PUNE 38

ELBOW MECHANISM

PART NO : OTS - 10
PART NAME : LH_BRG_HSG

Sr.
No

MATERIAL SPECIFICATION: EN 9
RAWMATERIAL SIZE: 50X20X60
QUANTITY: - 01 NOS.

Description of
Operation

Tools
Jigs
Fixture

& M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

Milling

15

15

14

19

1.

Clamp stock

2.

Facing All Sides ---Sq. to total


length 40x12x50
mm
Clamp stock on 4 jaw chuck
lathe

----

Facing cutter

Vernier

Lathe

25

Drilling 18.5 ---through


thickness
Boring 25 ---through
thickness
Counter Boring --- 32 through
10 thickness

----

Twist drill

Vernier

15

10

25

----

Boring tool

Vernier

15

10

25

----

Boring tool

Vernier

15

10

25

3.
4.
5.
6.

M/C Vice

Time in minutes

25

GOVERNMENT POLYTECHNIC PUNE 39

ELBOW MECHANISM
PART NO : OTS - 11
PART NAME : RH_BRG_HSG

Sr.
No

MATERIAL SPECIFICATION: EN 9
RAWMATERIAL SIZE: 50X20X60
QUANTITY: - 01 NOS.

Description of
Operation

Tools
Jigs
Fixture

& M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

Milling

15

15

14

19

1.

Clamp stock

2.

Facing All Sides ---Sq. to total


length 40x12x50
mm
Clamp stock on 4 jaw chuck
lathe

----

Facing cutter

Vernier

Lathe

25

Drilling 18.5 ---through


thickness
Boring 25 ---through
thickness
Counter Boring --- 32 through
10 thickness

----

Twist drill

Vernier

15

10

25

----

Boring tool

Vernier

15

10

25

----

Boring tool

Vernier

15

10

25

3.
4.
5.
6.

M/C Vice

Time in minutes

25

GOVERNMENT POLYTECHNIC PUNE 40

ELBOW MECHANISM
PART NO : OTS - 9
PART NAME : CENTRAL_BRG_HSG

Sr.
No

Description of
Operation

MATERIAL SPECIFICATION: EN 9
RAWMATERIAL SIZE: 140X20X50
QUANTITY: - 01 NOS.
Tools

Jigs
Fixture

& M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

Milling

15

15

14

19

1.

Clamp stock

2.

Facing All Sides ---Sq. to total


length
135x12x40 mm
Clamp stock on 4 jaw chuck
lathe

----

Facing cutter

Vernier

Lathe

25

Drilling 18.5
through
thickness
Boring 25
through
thickness
Counter Boring
32 through
10 thickness
Drilling 18.5
through
thickness
Boring 25
through
thickness
Counter Boring
32 through
10 thickness

----

----

Twist drill

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Twist drill

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

3.
4.
5.
6.
7.
8.
9.

M/C Vice

Time in minutes

25

GOVERNMENT POLYTECHNIC PUNE 41

ELBOW MECHANISM

PART NO : OTS - 17
PART NAME :COVER RING

MATERIAL SPECIFICATION : EN9


RAW MATERIAL SIZE: 60 x 50
QUANTITY :- 0 4 NOS.
Tools

Sr.
No

Description of
Operation

Jigs &
Fixture

Time in minutes

M/c
Tools

Cutting
Tools

Measuring
Instrument

Setting
Time

M/c
Time

Total
Time

1. Clamp stock

3 Jaw chuck

Lathe

10

10

2. Facing one sides

----

----

Facing tool

Vernier

3. Turning outer
diameter to
54mm through
length
4. Center drilling

----

----

Turning tool

----

13

18

----

----

Center drill

----

----

----

Twist drill

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Boring tool

Vernier

15

10

25

----

----

Facing tool

----

3jaw chuck

DRO
milling
m/c
----

----

30

30

Twist drill

----

----

Reamer

----

10

5. Drilling 18.5
through
thickness
6. Boring 41
through
thickness
7. Counter Boring
45 through
40 thickness
8. Counter Boring
47 through 8
thickness
9. Threading M48
Threads
through 8mm
length
10. Facing other
side
11. Clam job on
m/c vice

12. Drilling 3.85


---holes through
thickness 3 Nos
13. Reaming 4
---holes thro
thickness 3 Nos

GOVERNMENT POLYTECHNIC PUNE 42

ELBOW MECHANISM
14. Chamfer 0.5 x
45 degree B/s
of each hole

----

----

Twist drill

----

12

GOVERNMENT POLYTECHNIC PUNE 43

17

ELBOW MECHANISM

Chapter No.:-5

TEST & TRIAL ON ELBOW


MECHANISM

GOVERNMENT POLYTECHNIC PUNE 44

ELBOW MECHANISM

TEST & TRIAL ON ELBOW MECHANISM


AIM: To conduct trial on Orbital Mechanism to determine
a) TORQUE Vs SPEED CHARACTERISTICS
b) POWER Vs SPEED CHARACTERISTICS
In order to conduct trial , an dynobrake pulley cord, weight pan are provided
on the output shaft.

INPUT DATA:A) Drive Motor


AC230 Volt
0.5 Amp, 100 watt
50 Hz, 200 to 4500 rpm
TEFC COMMUTATOR MOTOR
B) Diameter (Effective ) of Dynobrake pulley = 25 mm.

PROCEDURE:1) Start motor by turning electronic speed variator knob.


2) Let mechanism run & stabilize at certain speed (say 1300 rpm)
3) Place the pulley cord on dynobrake pulley and add 100 gm weight
into , the pan , note down the out put speed for this load by means
of tachometer.
4) Add another 100 gm cut & take reading .
5) Tabulate the readings in the observation table
6) Plot Torque Vs speed characteristic
Power Vs speed characteristic

GOVERNMENT POLYTECHNIC PUNE 45

ELBOW MECHANISM

Chapter No.:-6

OBSERVATION TABLE

GOVERNMENT POLYTECHNIC PUNE 46

ELBOW MECHANISM

OBSERVATION TABLE
SR
NO

LOADING

UNLODING

WEIGHT
(gm)
1. 100

SPEED
rpm
1300

WEIGHT (gm)

2. 150

MEAN
SPEED

100

SPEED
rpm
1300

1300

1250

150

1240

1245

3. 200

1200

200

1100

1190

4. 250

1100

250

1080

1090

5. 300

1000

300

1040

1020

6. 350

970

350

930

950

7. 500

880

500

890

885

8. 600

850

600

850

850

9. 700

700

700

690

695

10. 800

650

800

640

645

11. 1000

600

1000

610

605

GOVERNMENT POLYTECHNIC PUNE 47

ELBOW MECHANISM
SAMPLE CALCULATIONS:- (AT 0.6 kg Load)
1) Average Speed :N=

( N1 + N2 )

( 650 + 650 )
=

= 650 rpm
2

2) Output Torque:Tdp = Weight in pan x Radius of Dynobrake Pulley


= (0.6 x 9.81) x 12.5
=73.575 N.mm
=0.0737575 N.mm

Tdp

3) Input Power:- (Pi/p)


Pi/p

=
=

2 N Ti/p
60
2 x x 650 x 0.08
60

Pi/p =5.44 watt

4)OutPut Power:-(Po/p)
Po/p =

2 NTo/p
60
=

2 x x 650 x 0.0737575
60

Po/p = 5.02 watt

4) Efficiency:
= Out put power
GOVERNMENT POLYTECHNIC PUNE 48

ELBOW MECHANISM
Input power
=

5.02 x 100
5.44

= 92.28 %

Efficiency of transmission of orbital mechanism at 90 degree =


92.28%

GOVERNMENT POLYTECHNIC PUNE 49

ELBOW MECHANISM

Chapter No.:- 7

Result Table

GOVERNMENT POLYTECHNIC PUNE 50

ELBOW MECHANISM
RESULT TABLE

LOAD (gms)

SPEED
(rpm)

TORQUE
(N.M)

POWER
(watt)

1.

100

1300

0.01226

1.66

2.

150

1245

0.01839

2.39

3.

200

1190

0.0245

3.053

4.

250

1090

0.0306

3.49

5.

300

1020

0.0368

0.93

6.

350

950

0.0429

4.26

7.

500

885

0.0613

5.68

8.

600

850

0.073575

6.54

9.

700

695

0.086

6.25

10. 800

560

0.098

5.75

11. 1000

440

0.1226

5.52

SR
NO

GOVERNMENT POLYTECHNIC PUNE 51

ELBOW MECHANISM

Chapter No.:- 8

Cost Analysis

GOVERNMENT POLYTECHNIC PUNE 52

ELBOW MECHANISM
BILL OF MATERIALS
SR

PART

NO.

CODE

1.

EM-1

2.

DESCRIPTION

QTY

MATERIAL

MOTOR

01

STD

EM -2

PULLEY

01

EN9

3.

EM -3

MAIN SHAFT

01

EN24

4.

EM -4

MAIN SHAFT BRG HSG

01

EN9

5.

EM -5

LH_ IP_SHAFT

01

EN24

6.

EM -6

RH_ IP_SHAFT

01

EN24

7.

EM -7

LH_ OP_SHAFT

01

EN24

8.

EM -8

RH_ OP_SHAFT

01

EN24

9.

EM -9

CENTRAL BRG HSG

01

EN9

10.

EM 10

LH_BRG_HSG

01

EN9

11.

EM 11

RH_BRG_HSG

01

EN9

12.

EM 12

BASE FRAME

01

MS

13.

EM -13

BRG6201ZZ

04

STD

14.

EM -14

WHEELS

03

STD

15.

EM -15

BENT PINS

03

EN9

16.

EM -16

JACK BOLTS

03

STD

17.

EM-17

COVER RING

04

EN9

18.

EM-18

PROPELLER SHAFT

EN24

19.

EM-19

GEAR

04

N8

RAW MATERIAL COST


GOVERNMENT POLYTECHNIC PUNE 53

ELBOW MECHANISM
The total raw material cost as per the individual materials and their corresponding
rates per kg is as follows,

Total raw material cost = Rs 4450/-

MACHINING COST
OPERATION

RATE

TOTAL TIME

TOTAL

Rs /HR

HRS

LATHE

80

16

1280

MILLING

95

855

DRILLING

50

3.6

180

TAPPING

Rs 3 /- per hole

16

48

TOTAL

COST Rs/-

2363

TOTAL MACHINING COST = Rs 2363 /MISCELLANEOUS COSTS


OPERATION

COST(Rs)

Sawing

160

Gas cutting

80

Bench Work

40

Total

280

GOVERNMENT POLYTECHNIC PUNE 54

ELBOW MECHANISM

COST OF PURCHASED PARTS


SR

DESCRIPTION

QTY

COST

1.

Vee Belt

01

75

2.

Bolts

35

3.

Electric Motor

01

1200

4.

Wheels

03

360

5.

Electronic Speed Variater

01

180

6.

Bearings

07

400

NO.

The cost of purchase parts = Rs 2180 /TOTAL COST


TOTAL COST = Raw Material Cost +Machine Cost + Miscellaneous Cost

+ cost of Purchased Parts +Overheads


= Rs 9273/Hence the total cost of machine = Rs 9273/-

GOVERNMENT POLYTECHNIC PUNE 55

ELBOW MECHANISM

Chapter No: 09

Conclusion and Future scope

GOVERNMENT POLYTECHNIC PUNE 56

ELBOW MECHANISM

CONCLUSION AND FUTURE SCOPE


Some successful mechanical devices function smoothly however poor fly they
Are made while other does this only by virtue of a accurate construction &
fitting of their moving parts.
This projects which looks very simple & easy to construct was actually
Very difficult to conceive & imagine without seeing an actual one in practice.
It
is an event a fact in the creative mental process nit the forces, which
predominate among the schemes of the active tinkers. Motions demands to be
studied first &we have done that very thing.
We find that while acceptable analysis for existing mechanism can often be
Made quite easily we cannot without insight & imagination make effective
synthesis of new mechanism hence we are mould to present this our project
gear
less transmission at 90*(El-bow mechanism) which we have managed to
successfully device after long & hard input in conceiving its working principle.

GOVERNMENT POLYTECHNIC PUNE 57

ELBOW MECHANISM

Chapter No.:-10

BIBLIOGRAPHY

GOVERNMENT POLYTECHNIC PUNE 58

ELBOW MECHANISM

BIBLIOGRAPHY

A.G.Erdman& G.N. Sandor


-Mechanism Design ,

Newell Harton
-Ingenious Mechanism
For Designers & Inventors

PSG - DESIGN DATA HAND BOOK(1998)

V.B.BHANDARI

Design of Machine Elements,


Tata Mc Graw Hill Publication (1999)

R.S.KHURMI & J.K.GUPTA

A Text Book of Machine Design.


Eurasia Publication (1990)

GOVERNMENT POLYTECHNIC PUNE 59

Das könnte Ihnen auch gefallen