Sie sind auf Seite 1von 3

SITE ACTIVITIES

RISK ASSESSMENT PLANT


SN
1

HAZARDS
FALL OF MATERIAL
WHEN LIFTING LOAD

ACTIVITY/CA
USE
General

AFFECTED
PERSON

ABNORMAL

ABNORMAL

Use of
improper or
damaged
lifting
equipment

ABNORMAL

Strong wind,
improper
field of vision

4
5

People
standing
under the
uplifted load

Lifting
load/by cargo

Movement of excessive or
unbalanced load or for
long distance

Manual lifting
of load

Manual carriage of load at


height or on improper
floor
Irregular or overloaded
cargo when handling cargo
by forklift and transpallet,
etc.

Manual lifting
of load

Getting affected from


accumulation of toxic gases
in the confined area

NORMAL

People on site

Unknown
load weight

CRANE OVERTURNING

RISKS

R
6

D
C

Injury / Death
Unauthorized
and improper
use

NORMAL/ABNORMAL/EM
ERGENCY CASE

Cargo
handling by
handling
vehicles;
material
stowage
Welding
conditions

(Collective)
Injury / Death

ABNORMAL

15

20

20

People on site

ABNORMAL

ABNORMAL

Injury / Death

Injury / Death

Personnel
involved

ABNORMAL

Personnel
involved

Injury,
Muscular
Skeleton
System
Problems

NORMAL

Injury/Death

ABNORMAL

Death / Injury
Material
Damage

ABNORMAL

Intoxication

People on site

People on site

Inspection of slings supporting the


material, chain hoists, lifting eyes and
hooks. Use of the lifting equipment
by experienced personnel. Building
stronger communication between the
workers and crane operator (wireless
and similar communication means).
Updated test reports.
Certificate of competency (Periodical
Inspection Report) for the crane
taken from the Turkey Union of
Chambers of Architects and
Engineers.; Use of the machine by
competent crane operator holding
certificate of operation. Crane will be
checked once 3 month.
Inspection of slings supporting the
material, chain hoists, lifting eyes and
hooks.

Visual inspection, operator will be


made monthly.
5

10

10

16

Injury / Death

People standing
under the load

CURRENT PRECAUTION

16

12

Suspension of the lifting operation in


case of strong wind, restrictive sight
distance, and adverse weather
conditions. If wind speed limits are
over 15m/s, work will be suspended.
If the visibility is low during rainy
weather, work will be suspended.

Security barrier for the area involved


with hazard when lifting load.
All outriggers shall be fully opened
and mudsills to be used at all times
even ground looks stable. Building
stronger communication between the
workers and crane operator (wireless
and similar communication means).
Updated test reports.
Making the load balanced and easy to
hold; e.g. handle, lifting eye to grasp,
etc.
Making the load balanced and easy to
hold; e.g. handle, lifting eye to grasp,
etc.
Cleaning the floor on which the load
shall be carried.

Observation of the maximum cargo


signs indicated on the vehicles.

In case of welding in any confined


space, necessary ventilation and
presence of minimum 1 lookout
man outside All welding activities
inside the confined spaces shall be
done with continues gas
monitoring.

INSPECTION/PRECAUTIONS TO BE
TAKEN

DOCUMENT NO.
PUBLICATION DATE:
REVISION NO.
PAGE NO.

LEGAL REQUIREMENTS

1
1

MOS

Regulation on Health and


security in the Construction
Works

Warning against use of the crane by


any person other than the operator,
and suspension of the work Sign FOR
USE BY OPERATOR ONLY

Regulation on Health and


security in the Construction
Works; Regulation on Security
and health signs

Determination of the weight of the


load, if not known beforehand, and
selection of appropriate crane, sling
and lifting method accordingly - MOS

Regulation on Health and


security in the Construction
Works

MOS MARKING TO INDICATE IT IS


OUT OF ORDER

Regulation on Health and


security in the Construction
Works

Daily Site Controls

Regulation on Health and


security in the Construction
Works

Warning sites DO NOT STAND


UNDER THE UPLIFTED LOAD

Regulation on Health and


security in the Construction
Works, Regulation on Security
and health signs

Warning sign DO NOT APPROACH THE


CRANE MOS

Use of transpallet
Giving on-the-job training

Regulation on Health and


security in the Construction
Works

Regulation on Manual
Handling

MOS, if heavy material is carried


manually, the work is suspended and
use of equipment is ensured.
Giving on-the-job training USE OF
APPROPRIATE EQUIPMENT FOR THE
CARGO

MoS

Regulation on Heavy and


Dangerous Works

RESPONSIBLE PERSONNEL

TERM

KESR MH. LABOR SAFETY OFFICER MECHANICAL WORKS


SUPERVISOR

DURING THE PROJECT

KESR MH

DURING THE PROJECT

KESR MH

DURING THE PROJECT

KESR MH. LABOR SAFETY OFFICER

PERMANENTLY

KESR MH

DURING THE PROJECT

KESR MH

PERMANENTLY

KESR MH. FOREMAN, MECHANICAL WORKS SUPERVISOR

28/09/10

KESR MH. LABOR SAFETY OFFICER

DURING THE PROJECT

KESR MH

PERMANENTLY

KESR MH.

PERMANENT

KESIR MH.

WHEN IT IS USED

KESR MH. LABOR SAFETY OFFICER MECHANICAL FOREMAN

DURING THE PROJECT

SITE ACTIVITIES
RISK ASSESSMENT PLAN
SN
7

HAZARDS

Collision when
handling
cargo by
equipment
such as
transpallet,
etc.
Collision when
handling
cargo by
forklifts

Explosion of
pressurized
cylinders

ACTIVITY/CAUSE

AFFECTED PERSON

NORMAL / ABNORMAL/EMERGENCY
CASE

RISKS

Cargo handling by handling


vehicles; material stowage

People on site

NORMAL

Injury

Cargo handling by handling


vehicles; material stowage

People on site

NORMAL

Injury

Unauthorized and incompetent


use of forklift, transpallet and
similar vehicles

People on site

ABNORMAL

Injury

Welding works

People on site

NORMAL

Injury, death

ABNORMAL

10
11

12
13

14

Stroke of
Lightning

CURRENT PRECAUTION

INSPECTION/PRECAUTIONS TO
BE TAKEN
-

INDICATING SPEED LIMIT ON THE


VEHICLE

Use of the vehicle according to


the suppliers instructions.
Periodical control of it.
Use of it only by the competent
personnel.
Operation of the warning
lights when the forklift in
move.

Handling of the cylinders not


by their valves or protectors,
but by using cylinder carrier
even for short distance and
binding them with chain.

15

CYLINDER GASES SAFETY


MANUAL - Handling of the
cylinders not by their valves or
protectors, but by using
cylinder carrier even for short
distance and binding them
with chain.
Emergency Case Plan,
Lightning Arrester

STOP OF THE WORK DURING


DAILY CONTROLS
Warning sign Keep the cylinders
bound

Obtaining medical reports

STOP OF THE WORK DURING


DAILY CONTROLS

Use of the vehicle according to


the suppliers instructions.
Periodical control of it.
Use of it only by the competent
personnel.

Use of it only by those holding


drivers license

Natural Disaster

People on site

IN EMERGENCY

Injury, death

Supervising services

People on site

NORMAL

Injury

Site applications

People on site

Site applications

People on site

Current lighting

Fire/Explosio
n

Welding operations, electric short


circuit, spark

Oil Spillage

Aux. Transformers Erection

Flammable materials around


the welding location should be
definitely removed. If any
flammable/explosive materials
around are not removed, the
welding location is covered by
fire blanket. Obtaining permit
to work with fire. Safety
instructions regarding to
welding. Provide fire
extinguisher.

Communicatio
n problems;
Lack of
Information
Accidents due
to insufficient
lighting

ABNORMAL
ABNORMAL

Injury/Death/
Occupational
Disease
Injury

People on site

EMERGENCY CASE

Injury / Death

People on site and construction

Normal

Injury/Enviro
nmental
pollution

Making available a employee


speaking the same language.

Canvas, pan etc. will be put


under the bin. Spill kit close to
the wore place. Contaminated
material will be stored in the
hazardous waste store.

DURING DAILY CONTROLS,


PREVENTION OF OPERATION BY
THOSE HOLDING NO DRIVERS
LICENSE ON-THE-JOB TRAININGS;
WARNING SIGN
Training on risks and precautions
related to the gas resource and
ON-THE-JOB TRAINING, USE OF
CHECK VALFE

Inspection of the site and


reinforcement of lighting at the
areas which are poorly
illuminated.
MOS

DOCUMENT NO.
PUBLICATION DATE:
REVISION NO.
PAGE NO.

LEGAL REQUIREMENTS

1
2

Regulation on the health


and safety requirements in
the use of work
equipment.

RESPONSIBLE PERSONNEL
KESR MH.

TERM

PERMANENT

WHEN IT IS USED

Guidelines on Precautions
to be taken in the
workplaces and jobs
where flammable,
explosive, dangerous and
harmful materials are
used; Regulation on Safety
and Health Signs.

KESR MH.

Regulation on Health and


Safety in the Construction
Works.
Regulation on Heavy and
Dangerous Works

KESR MH.

DURING THE PROJECT

KESR MH.

PERMANENT

KESR MH.

PERMANENT

Regulation on Heavy and


Dangerous Works

KESR MH.

PERMANENT

Regulation on Health and


Safety in the Construction
Works.

KESR MH.

WHEN IT IS USED

Regulation on Health and


Safety in the Construction
Works.
Regulation on Health and
Safety in the Construction
Works.

KESR MH.

KESR MH.

PERMANENT

SITE ACTIVITIES
RISK ASSESSMENT PLAN
SN
15

HAZARDS
Fall

ACTIVITY/CAUSE

AFFECTED PERSON

NORMAL / ABNORMAL/EMERGENCY
CASE

RSKLER

Working at Height; Use of Ladder


and moving scaffold

Personnel involved

NORMAL

Injury / Death

Sliding off and fall from vehicles


such as Man-Basket, Man-Lift

Personnel involved

NORMAL

Injury

All kinds of objects that may cause


to stumble and slippery floor

People on site

ABNORMAL

Working at height

People on site

NORMAL

Personnel involved

NORMAL

Burn / Death

Personnel involved

NORMAL

Injury

People on site

NORMAL

Injury

16

Fall of
materials and
small hand
tools

17

Electric
shock

Use of electric hand tools and


working in areas with voltage
overhead

18

Contact with
the cutting
parts
(grinding
motor, etc.)

Use of hand tools

19

Flying parts

20

Collapse of
temporary
scaffold and
similar
construction

21

Use of the grinding machine

Injury

Injury / Death

12

D
B

12

CURRENT PRECAUTION

Inspection of the scaffold or


ladder before use.
Correct installation of the
fixing and supporting
members of the lifting
equipment.
Training on working at height
Implementation of Life line
application

INSPECTION/PRECAUTIONS TO
BE TAKEN
MOS
Work is discontinued

Inspection of Man basket, man


lift before use.

MOS,
Working at Height; On-the-job
trainings

Regular inspection and


cleaning of the site
Required personnel protective
equipment.
Fixing, if possible, the material.
On-the-job trainings.
Life Line application (Ref.
Instruction on working at
height)
Earthing the electric
equipment having bare metal
part;
Use of necessary personal
protective equipment
Elevation of the electric cables
off the ground
Personnel using the machine
should have at least minimum
knowledge on use of the
equipment, use of the
equipment with the protective
armor on.

The warning sign Slippery floor

MOS, Instructions on working with


scaffold

Use of personal protective


equipment such as goggles, full
face shields.

MOS,
Daily Site Inspections

MOS,
Periodical control of the electricity
installation,
On-the-job trainings,
Posting warning signs on the lines
of high voltage

PERMANENT

WHEN REQUIRED

Regulation on Heavy and


Dangerous Works

KESR MH.

WHEN REQUIRED

Blowout Procedure.
Warning sign Noisy Area. Use ear
protective

Regulation on Heavy and


Dangerous Works

KESR MH.

WHEN REQUIRED

KESR MH.

WHEN REQUIRED

Regulation on Heavy and


Dangerous Works

KESR MH.

WHEN IT IS USED

22

Slag jump

Welding conditions

Personnel involved

NORMAL

Injury / eye or
body damage

23

Exposure to
high noise

Blowout

Personnel involved

ABNORMAL

Occupational
disease, lack
of hearing

Protective mask and clothing

Daily Site Controls

Injury, death

Must be worn protective


clothing, safety mask

MOS

Lack of
Working areas of supplier
People on site
ABNORMAL
Injury / Death
3
4
12
marking
R (Risk Degree) : 0x
D (Risk Level)
C= 1 R.D. < 6. Acceptable Risk; B= 8 R.D. < 12: Significant Risk; A= 15 R.D. < 25: Non-acceptable
O (Possibility) 1 point (very low); 2 points (low); 3 points (possible); 4 points (high), 5 points (very high); ( Severity): 1 point (insignificant); 2 points (very small); 3 points (severe); 4 points (vital); 5 points (disaster)
PREPARED BY:

Supplier Specifications
INTEGRATED SYSTEM APPROVAL:

KESR MH.

PERMANENT

KESR MH.

26

Guidelines of Health and


Safety At Work

Communiqu on
Occupational Training of
the Workers to be
Employed in Heavy and
Dangerous Works

Regulation on Heavy and


Hazardous Works.

ABNORMAL

PERMANENT

KESR MH.

PERMANENT

Burn / Death

People on site

KESR MN.

KESR MH.

NORMAL

Welding conditions

Regulation on Safety and


Health Signs

PERMANENT

Personnel involved

Direct
compressed
air or other
gases toward
the body.

KES. MH. LABOR SAFETY


OFFICER, FOREMAN

KESR MH.

Welding operations

25

PERMANENT

Regulation on Use of the


Personal Protective
Equipment

Injury

Respiratory
distress,
Itching;
allergy

KESR MH.

Warning sign Use Goggles; Risk of


Burrs; on-the-jobm training

Injury /Death

NORMAL

TERM

WHEN REQUIRED

ABNORMAL

Personnel involved

Communiqu on
Occupational Training of
the Workers to be
Employed in Heavy and
Dangerous Works

RESPONSIBLE PERSONNEL

KESR MH.

People on site

Installation of isolation

1
3

Regulation on Health and


Safety Conditions in the
Use o Work Equipment

Use of ladder and moving scaffold

Allergy and
breathing
problems

LEGAL REQUIREMENTS

On-the-job trainings; Distribution


of all operating instructions to all
operators

Inspection of the scaffold or


ladder before use.
Correct installation of the
fixing and supporting
members of the lifting
equipment. Scaffolds shall be
tagged, ladders shall be color
coded. Ladder shall not be
accepted as working platform.
Site scaffold foreman shall
check
Covering of the welding area
by means of fireproof blanket;
Safety instructions related to
welding
Use of goggles; use of welders
protective clothing made of
leather, use of full face shields
made of leather. Safety
instructions related to
welding.
Operating by use of silencer.

24

DOCUMENT NO.
PUBLICATION DATE:
REVISION NO.
PAGE NO.

MOS,
On-the-job trainings
Daily Site Controls

Daily Site Controls

Regulation on Health and


Safety in the Construction
Works

Regulation on Use of
Personal Protective
Equipment at Work

Regulation on Health and


Safety Signs

KESR MH.
UPPER MANAGEMENT APPROVAL

PERMANENT

Das könnte Ihnen auch gefallen