Inspection & Test Plan for Khabat PP

132kV Switchyard Lightning Arrester


Installation Works
PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

DOCUMENT NO.

: KP-00+++-CQ712-B7360

TITLE

: Inspection&Test Plan for Khabat PP


132kV Switchyard Lightning Arrester Installation
Works

OWNER

TOTAL 3 PAGES
(Including Cover)

Purpose
For Information
For Review
For Approval
For Construction

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

As-Built

23.02.2015

For Construction

DE

AY

16.02.2015

First Issue

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

Rev.
No.

DATE

DESCRIPTION

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection & Test Plan


for LIGHTNING ARRESTER INSTALLATION WORKS

Item Name

Lightning Arrester

No.

Inspection & Test


Activity

Inspection & Test


Description

Application
Document/Code/Spec.
Supplier/
No.

KP-00+++-CQ712-B7360

Rev. No.

Page

1/1

Document Submittal

Remarks

Inspection Status

Subcontractor

GAMA

3rd Party POSCO


/ AI
E&C

Owner

1.1

Receiving
Inspection

Visually checking of the


busbar for and physical
damage.

Drawings and Technical


Specifications

Check List for Lightning Arrester Erection Item 1

1.2

Release of Steel
Structure

Checking release of steel


structure for equipment
installation

Drawings and Technical


Specifications

Check List for Lightning Arrester Erection Item 2

1.3

Package List

Checking of package list

Assembly Catalog

Check List for Lightning Arrester Erection Item 3

1.4

Assembly and
fixing

Checking assembly and


fixing of disconnecting and
earthing switches

Drawings and Technical


Specifications

Check List for Lightning Arrester Erection Item 4

1.5

Screw Torques

Checking of Screw toques

Drawings and Technical


Specifications

Check List for Lightning Arrester Erection Item 5

1.6

Erection of
connectors

Checking of connector
erection

Drawings and Technical


Specifications

Check List for Lightning Arrester Erection Item 6

1.7

Site Construction
Dossier

Document preparation and


review

Drawings and Technical


Specifications

Site Construction Dossier

Notes) #1 CL (Check List) form of Lightning Arrester Erection is submitted as attachment of this ITP.
Legend

SIEMENS

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

CHECK LIST of Lightning


Arrester Erection

KHABAT THERMAL POWER PLANT UNITS


1 & 2 PROJECT 132kV AIR INSULATED
SWITCHGEAR
Rev: 0
Page No:1 of 1
Job No:
Signature

Num

Identification

Visual check of the equipment

Checking Erection release of steel support

Checking of Package list

Assembly and fixing


a.

Reviewing and checking of lifting plan

b.

Controlling of Insulator type according to


voltage level

Checking of Screw torques

Checking of Connector erection

Accept

Reject

N/A

Comments

Subcontracto
r

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

GAMA

Employer

Das könnte Ihnen auch gefallen