Calculation of wetted perimetre and area under HFL of KAJAL NALLA

onNAGARI-JABBARA ROAD
X-Section at 500.00 M U/S
CH IN H.F.L. IN
M.
M.

GL

DEPTH
OF
WATER

AV.
DEPTH
(D)
5

DIFF. IN
BED
LENGTH
LEVEL
(X)
6

(Y)
7

AREA

PERIMETER
IN M.

A=DxY
8

P= /(X+Y)
9

2
3
4
NAGARI SIDE
130
98.300 98.300
0.000
0.000
0.000
0
0.000
0.000
120
98.300 97.120
1.180
0.590
1.180
10
5.900
10.069
100
98.300 96.885
1.415
1.298
0.235
20
25.950
20.001
80
98.300 96.210
2.090
1.753
0.675
20
35.050
20.011
60
98.300 95.770
2.530
2.310
0.440
20
46.200
20.005
40
98.300 95.720
2.580
2.555
0.050
20
51.100
20.000
20
98.300 95.640
2.660
2.620
0.080
20
52.400
20.000
0
98.300 95.430
2.870
2.765
0.210
20
55.300
20.001
20
98.300 95.650
2.650
2.760
0.220
20
55.200
20.001
40
98.300 95.925
2.375
2.513
0.275
20
50.250
20.002
60
98.300 96.765
1.535
1.955
0.840
20
39.100
20.018
80
98.300 97.010
1.290
1.413
0.245
20
28.250
20.002
100
98.300 97.225
1.075
1.183
0.215
20
23.650
20.001
120
98.300 97.425
0.875
0.975
0.200
20
19.500
20.001
140
98.300 97.555
0.745
0.810
0.130
20
16.200
20.000
160
98.300 97.750
0.550
0.647
0.195
20
12.950
20.001
180
98.300 97.835
0.465
0.508
0.085
20
10.150
20.000
200
98.300 97.855
0.445
0.455
0.020
20
9.100
20.000
220
98.300 98.300
0.000
0.222
0.445
20
4.450
20.005
JABBARA SIDE
540.700
350.119
Hydraulic mean depth(R)= A/P =
1.54 M
(R)/x(S)
V =
1.478
M/sec.
n
The velocity in M per sec. considered uniform throughout the
V =
1.478 M/sec
cross section
R = The hydraulic mean depth (A/P)
1.54
M
The energy slope which may be taken equal to the bed slope
S =
measured over a reasonable long reach
=
0.0015
n = The rugosity coefficient
0.035
Q=
Ax V
799.394
Cumec
SUB ENGINEER
SUB DIVISIONAL OFFICER
P.W.D BRIDGE CONSTRUCTION
SUBDIVISION DHAMTARI

EXECUTIVE ENGINEER
P.W.D BRIDGE CONSTRUCTION
DIVISION RAIPUR

Calculation of wetted perimetre and area under HFL of KAJAL NALLA


onNAGARI-JABBARA ROAD
AT PROPOSED SITE

CH IN H.F.L. IN
M.
M.

GL

DEPTH
OF
WATER

AV.
DEPTH
(D)

2
3
NAGARI SIDE
130
98.000 98.000
120
98.000 97.210
100
98.000 97.010
80
98.000 96.850
60
98.000 95.680
40
98.000 95.250
20
98.000 95.250
0
98.000 94.550
20
98.000 94.850
40
98.000 95.850
60
98.000 96.150
80
98.000 96.590
100
98.000 96.780
120
98.000 97.310
140
98.000 97.010
160
98.000 96.910
180
98.000 97.020
200
98.000 97.965
220
98.000 98.000
JABBARA SIDE

V
R
S
n

DIFF. IN
LENGTH
BED
LEVEL
(X)
(Y)

AREA

PERIMETER
IN M.

A=DxY

P= /(X+Y)

0.000
0.790
0.990
1.150
2.320
2.750
2.750
3.450
3.150
2.150
1.850
1.410
1.220
0.690
0.990
1.090
0.980
0.035
0.000

0.000
0.395
0.890
1.070
1.735
2.535
2.750
3.100
3.300
2.650
2.000
1.630
1.315
0.955
0.840
1.040
1.035
0.508
0.017

0.000
0.790
0.200
0.160
1.170
0.430
0.000
0.700
0.300
1.000
0.300
0.440
0.190
0.530
0.300
0.100
0.110
0.945
0.035

0
10
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.000
3.950
17.800
21.400
34.700
50.700
55.000
62.000
66.000
53.000
40.000
32.600
26.300
19.100
16.800
20.800
20.700
10.150
0.350
551.350

0.000
10.031
20.001
20.001
20.034
20.005
20.000
20.012
20.002
20.025
20.002
20.005
20.001
20.007
20.002
20.000
20.000
20.022
20.000
350.151

Hydraulic mean depth(R)= A/P =


1.57 M
(R)/x(S)
V =
1.498
M/sec.
n
The velocity in M per sec. considered uniform throughout the
=
1.498
cross section
= The hydraulic mean depth (A/P)
1.57
The energy slope which may be taken equal to the bed slope
=
measured over a reasonable long reach
=
0.0015
= The rugosity coefficient
0.035
Q=
Ax V
825.758
Cumec

M/sec
M

SUB ENGINEER
SUB DIVISIONAL OFFICER
P.W.D BRIDGE CONSTRUCTION
SUBDIVISION DHAMTARI

EXECUTIVE ENGINEER
P.W.D BRIDGE CONSTRUCTION
DIVISION RAIPUR

Calculation of wetted perimetre and area under HFL of KAJAL NALLA on


NAGARI-JABBARA ROAD
X-Section at 500.00 M D/S

CH IN H.F.L. IN
M.
M.

GL

2
3
NAGARI SIDE
140
97.700 97.700
120
97.700 97.345
100
97.700 96.200
80
97.700 95.450
60
97.700 95.110
40
97.700 94.870
20
97.700 94.100
0
97.700 93.930
20
97.700 94.850
40
97.700 95.100
60
97.700 95.655
80
97.700 96.010
100
97.700 96.210
120
97.700 96.325
140
97.700 96.455
160
97.700 96.570
180
97.700 96.855
200
97.700 97.200
220
97.700 97.340
240
97.700 97.465
260
97.700 97.700
JABBARA SIDE

V
R
S
n

DEPTH
OF
WATER

AV.
DEPTH

DIFF. IN
BED
LENGTH
LEVEL

AREA

PERIMETER
IN M.

(D)

(X)

(Y)

A=DxY

P= /(X+Y)

0.000
0.355
1.500
2.250
2.590
2.830
3.600
3.770
2.850
2.600
2.045
1.690
1.490
1.375
1.245
1.130
0.845
0.500
0.360
0.235
0.000

0.000
0.178
0.928
1.875
2.420
2.710
3.215
3.685
3.310
2.725
2.323
1.868
1.590
1.433
1.310
1.188
0.988
0.673
0.430
0.298
0.118

0.000
0.355
1.145
0.750
0.340
0.240
0.770
0.170
0.920
0.250
0.555
0.355
0.200
0.115
0.130
0.115
0.285
0.345
0.140
0.125
0.235

0
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20
20

0.000
3.550
18.550
37.500
48.400
54.200
64.300
73.700
66.200
54.500
46.450
37.350
31.800
28.650
26.200
23.750
19.750
13.450
8.600
5.950
2.350
656.900

0.000
20.003
20.033
20.014
20.003
20.001
20.015
20.001
20.021
20.002
20.008
20.003
20.001
20.000
20.000
20.000
20.002
20.003
20.000
20.000
20.001
360.111

Hydraulic mean depth(R)= A/P =


1.82 M
(R)/x(S)
V =
1.652
M/sec.
n
The velocity in M per sec. considered uniform throughout the
=
1.652
cross section
= The hydraulic mean depth (A/P)
1.82
The energy slope which may be taken equal to the bed slope
=
measured over a reasonable long reach
=
0.0015
= The rugosity coefficient
0.035
Q=
Ax V
1085.223
Cumec

SUB DIVISIONAL OFFICER


P.W.D BRIDGE CONSTRUCTION
SUBDIVISION DHAMTARI

M/sec
M

EXECUTIVE ENGINEER
P.W.D BRIDGE CONSTRUCTION
DIVISION RAIPUR