Sie sind auf Seite 1von 17

Straits of Mackinac Structural

Integrity Support Span Repair Log


Enbridge Project #
W,IPJ-19972-10

Contractor

Enbridge Project Manager

Enbridge on-site Rep

TOM -V I 0-J

Scvvie

Contractor Project Number

Contract supervisor

'Walla ES Spec_ Serv. 4902595.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Time Shutdown
Product In Line
If flowing, flow rate

CAPA%1

Survey Geodetic Parameters


Grid
SP (NAD 83)
Zone
BM Central 2112
Survey Units
Ellipsoid

%Ave/

GPS Correction
Qty of Satellites
RTK Fix

NA
it/A
Dwain,

2.010 tiPc)

Tins System for Tone Shutdown

Span Information
Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span #

S -- ) \ 2.
S0 Li
5 4
I(- -1
?_,- k, 1 %

Anchor Positions
Digital File Name or DVD #

Current Year Span Length

Number of Dives to Complete

Length of Extension(s)
Drilling issues?

Pq

Previous Year Span Length

Previous Span #(s)


Addit. Extensions Used?

...m

Date(s) of Dive(s)

c1, 60L-

on.

(V.110- sAle-

Dive number(s) for current campaign

Ili

Drilling Issues: Include torque spec not met. modified sieves, modieed assembly, etc...

South End
Tape Counter
LinkQuest Northing
LinkQuest Easting
Digital File Filename
Digital File Time
Display Time,
Bottom Type at Repair.
Highest Span Height

1:11
citt 6.1:3 6
1 5 sl 41,i Ito

irtyci
11--0
sc,) 1 cKNI
9.

North End

1; 1-1i,
ct 1,_ en 14
ic1sloi3/0,)1.

1114
pm
Ss vg) icAcy
DI
'

Repair

1:19
cok aw. 101

101,51 Li 1,?.\., xi,

1--1,,6
)-016

sv,,) I cic, v fiktr


``

TD O'clock Positions,
Span Repair Sketch: Include North and South natural TD's, previously Installed repairs, repair numbers, debrisItresh, natural outaaps, and Medina diver's measurements,

Notes:

Am.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge on.sife Rep

Enbridge Project Manager


Enbridge Project #
!W.W.I-19972-18
Cuj
Contractor Project Number
Contractor
IVeolia ES Spec. Serv. 1498259S.10.071
I

Pipeline Operation information


Is leg shutdown?
If so, date shutdown
Time Shutdown
Product In Line
If flowing, flow rate

Survey Geodetic Parameters


!Grid
SP NAD 83
Zone
MI Central 2112
!Survey Units
Ellipsoid

S c, VII

'7" QiNvN

Contract supervisor

GPS Correction
Qty of Satellites
RTK Fix

Al. A
Density
lime System for lime Shutdown

Span information
Anchor Positions

Date Surveyed
Tape Number

5-

Direction Flown

fV

Digital File Name or DVD #

ao

Water Depth

c)1A-4,

Current Year Span #

Current Year Span Length


Previous Year Span Length

Previous Span #(s)


Length of Extension(s)

Date(s) of Dive(s)

9,1x,1c)

Drilling Issues?

ICO

Number of Dives to Complete

Add.. Extensions Used?

ct

11

Dive number(s) for current campaign

Drilling Issues: include torque spec not net, modified SCTIN.S. madded assembly, etc...

South End
Tape Countsr
UnkQuest Northing
LinkQuest Easting

Digital File Filenam

Digital File Time


Display Time
Bottom Type at Repair

"):3
'\v1-1(;Ik, x)
)c)sfss- G'..o.,--it
._..
IS:1Jo
( S.. I-
GNy

North End

11 P2.wilco), M1
IC TKolo;, ail
IT'. I
)Cott
0141

Highest Span Height


TD O'clock Positions
Span Repair Sketch:

Notes:

Repair

'

ti s's
st1g 4-1i5
_I qc- <S-c-)L-) g, 1 q
_
_

Ic- 11
)S, tl
c-liy
X"

Include North and South natural M's, previously installed repairs. repair numbers, debrienresh, natural outcrops, and hardline diver's measurements.

w
Straits of Mackinac Structural
Integrity Support Span Repair Log
Enbrldge on-site Rep

Enbridge Project Manager

Enbridge Project #

pic,A)
Contractor Project Number

IWJPJ-19972-10
Contractor

Contract supervisor
c v/sr s 13 yv

IVeolia ES Spec. Serv. 14902598.10.071


Pipeline Operation Information
Ili 0
Is leg shutdown?
If so, date shutdown
NA
lime Shutdown
Product In Line
C.
If flowing, flow rate

NO,-

Span Information
Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span #
Previous Span #(s)
Addit. Extensions Used?
Length of Extension(s)
Drilling Issues?

Survey Geodetic Parameters


'Grid
Zone
MI Central 2112
'Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

Density
lime System for Time Shutdown

Anchor Positions

0 4-)
s.-,,,i
1 o
,A)- \-1
to --aL)
'it.

Digital File Name or DVD


Current Year Span Length
Previous Year Span Length
Number of Dives to Complete
Date(s) of Dive(s)
Dive number(s) for current campaign

Ai 0

10

Drilling Issues: include torque spec not nest, modified screws. rnodined assembly, etc...

South End
Tape Countsr
LinkQuest Northing
LinkQuest Easting .
Digital File Filename
Digital File Time
Display lime
Bottom Type at Repair
Highest Span Height
TD O'clock Positions
Span Repair Sketch:

Notes:

1110
9C,-)41e), --1,).
t (-1 cgiqo, c./
rd,od
1)-1z)1
Cte,y / Ss 1 ()
2 '

North End
NI oo

9o -7c-17'1,3-7
c/I 75'((nA,1
i2'Il
lAfii
C-J y ii '?
'iC

Repair
3---!Rk-I_
90 -7 i 6C

II
1,-) SI.,)ii-i- , lik
_....--id!oh
v.). :pic.

ci ci j / .r et Cr
2

include North and South natural TM. previously installed repairs. repair numbers, debris/trash, natural outcrops, and hardline diver's measurements.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge Project #

IMP...19972-10

COvkl

Contractor

Enbrldge on-site Rep


i
Contract supervisor

Enbridge Project Manager

DOI-)

Contractor Project Number

Veolia ES Spec. Serv. [4902595.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Time Shutdown
Product In line

Al
NA
Al A
C

Survey Geodetic Parameters


IGrid
Zone
MI Central 2112
Survey Units
Ellipsoid
WS Correction
Qty of Satellites
RTIC Fix

Density

if flowing, flow rate

Time System for lime Shutdown

Span Information

q- ;-1?,

Date Surveyed

Anchor Positions

Tape Number
Direction Flown

Digital Ale Name or DVD #

Water Depth
Current Year Span #

1 Ro
-

Previous Span #(s)

A
A

Current Year Span Length

Addit. Extensions Used?

Number of Dives to Complete

Length of Extension(s)

Date(s) of Dive(s)

N ovv,

Drilling Issues?

99

Previous Year Span Length

Dive number(s) for current campaign

) 4.41_

rifling Issues: include torque spec not met, modified screws, modMad assembly. etc...

South End
Tape Countsr
UnkQuest Northing
LlnkQuest Fasting

\Y7
q 09'73 g, 35
) 5 51 '19 ). 'I 9

North End

01--)1 3k,
c;k 10036. 5c, c'S I/0041, 0 5

,3-7
9 Os c) 57. 4,1
19 ssIcaa L

Digital File Filenam


Digital File Time

NP.1

v3! --7

s--ys-

Display Time
Bottom Type at Repair
Highest Span Height

C-I el
1

CI 4 y
1

Cl cy

C> t 5- `

TD O'clock Positions
Span Repair Sketch: Include North and South natural TD's, previously installed repairs, repair numbers, dehriertrash, natural outcrops, and hardline diver's measurements.

,63
:9

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge Project Manager
7-caw) r
Contractor Project Number

Enbridge Project #
'MINI-19972-10

Contractor

Enbridge on-site Rep


Stye C._
Contract supervisor
Che,'s fR,c.,jv

Veolia ES Spec. Serv. 14902595.10.071


Pipeline Operation Information
Is leg shutdown?
A)c,
If so, date shutdown

Survey Geodetic Parameters


Grid
Zone
Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

NA

Time Shutdown
Product In Line
If flowing, flow rale

Density
Time System for Tons Shutdown

Span Information
Date Surveyed

q-id--1.

Tape Number

St 5

Direction Flown

Anchor Positions
Digital File Name or DVD #

- Al

Water Depth
Current Year Span #
Previous Span #(s)
Addit. Extensions Used?
Length of Extension(s)

.aac)
kli-5i
uo-s-cib
It.. 1,.. . P-,
. \ .......1

Current Year Span Length


Previous Year Span Length
Number of Dives to Complete
Date(s) of Dive(s)

.tor it-tehet..\

Drilling Issues?

Id '-/
)(PI
0-

Dive number(s) for current campaign

19 )5-

Issues: Include torque spec not oval, modified screws, manned assembly, etc...

South End
Tape Countsr
LinkQuest Northing
LinkQuest Easting

Go:'-V

117.n...I, 1
is-.55 -5k5S. i5

North End

Re air

et ,ot..)

ck t::, ak.i, IC
if S-% 3 WEPT

3 'A 0

cm 15-14, (1-7
1'151S Li 1, st.

_
-

Digital File Filenam


Digital File Time
Display Time
Bottom Type at Repair
Highest Span Height
TD O'clock Positions
Span Repair Sketch:

Notes:

0 ',5,01.

6- p1(.)
3'
....

lc'l !tl

sc0
1\

I )-, -5.1

Sci0
1"

Include North arid South natural ID's. previously installed repairs. repair numbers. debris/t ash. natural outcrops, and hardline diver's measurements.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge on-site Rep

Enbridge Project Manager

Enbridge Project#

IWJPJ-19972-10 I Ibvil Vvel,)

Contractor

Contract supervisor

Contractor Project Number

Veolia ES Spec. Serv. 14902595.10.071


Pipeline Operation Information
Is leg shutdown?
A)0
If so, date shutdown

Survey Geodetic Parameters


(Grid
SP (NAD 83
Zone
MI Central 2112
Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

c,
1

CVS

1St th~

VA

Time Shutdown
Product In Line
If flowing, flow rate

Cr o+10-

Density
lime System foribrie Shutdown

Span Information
Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span #
Previous Span it(s)
Ada Extensions Used?
Length of Extension(s)
Drilling Issues?

GI- io-1)-s0 C
S -A/
los
S--'-U-,
C--- 4,1D'3' --,. 1`
NO

Anchor Positions
""

Digital File Name or DVD #


Current Year Span Length
Previous Year Span Length
Number of Dives to Complete
Date(s) of Dive(s)
Dive number(s) for current campaign

q 0.'1'1

Drilling Issues: include torquespeo not met, modified screws, modified assembly, etc-.

South End

North End

Repair

Tape Counter
LinkQuest Northing
LinkQuest Easting
Digital File Filename
Digital File lime
Display Time
Bottom Type at Repair

cic)I515gc V.)
19 c-o6c(A:tfi 6 _
.
11',v5s
v4'-'4%
CI., -t

cto$91 6, 5Th
1.6-V3-rtS. -ll
l.r.oici
t5C. 0 6
C-14 0../

a)(31,n, LIci
19 5g 3-7 .z', e.`
\cG 5 0
x`6", 5 0
Ciro(

Highest Span Height


TD O'clock Positions
Span Repair Sketch:

Notes:

include North and South natural TD'S, previously installed repairs. repair numbers. debit/trash, natural outcrops, and hardline divers measurements.

_
_
_

w-sC1A
Straits of Mackinac Structural
Integrity Support Span Repair Log
Enbridge on-site Rep
aqS
64iatviv..144
Contract supervisor

Enbridge Project Manager

Enbridge Project #

--c-o41 9 )

IWJP.1-19972-10

Contractor Project Number

Contractor

Veolia ES Spec. Senn. 14902595.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Al
Time Shutdown
Al
Product In Line
If flowing, flow rate

i;i

Survey Geodetic Parameters


Grid
SP (NAD 83)
Zone
Ml Central 2112
Survey Units
U.S. Feet
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

%NJ

Density
Time System for Time Shutdown

Span information

- 1S-- 1),
SD 5S - A/
.Q,Ao
L.) 5; -A

Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span #

Anchor Positions{
Digital File Name or DVD #
Current Year Span Length

R1
S1

Previous Year Span Length

Previous Span #(s)


Addit. Extensions Used?

Length of F.xtension(s)

.1 X

Number of Dives to Complete


Date(s) of Dive(s)

N4

Drilling Issues?

Dive number(s) for current campaign

c,?_,

Drilling iSSUSIY. irIclude torque spec not met, mcdi5ed scram, modified assembly, etc._

South End
Tape Counter
UnkQuest Northing
UnkQuest Easting
Digital File Filenam
Digital File Time
Display lime
Bottom Type at Repair

NA
cWt..+ - 5.a-)
kck S'IrW L ,ilo

North End

AM

AM
ClAy

AA
ntliCO, 0
i 1_,,--53 b9i, 0 6
_

/k//4

NA

cf..-1

414
cr.,7

To O'clock Positions

Notes:

/114

Highest Span Height

Span Repair Sketch:

as A3

Repair

OV A
c-,1:-Y51, b-)
15 5.10,Gt_5, )1

include North and South natural ID's, previously installed rapers, repair numbers. debriallrash. natural +=lames, and hardline divers measurements.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbrtdge Project #
!MN-19972-10
Contractor

Enbridge Project Manager


1;:Nian, WW.)
Contractor Project Number

Veolia ES Spec. Serv. 1400259S.10.071


Pipeline Operation information
Is leg shutdown?
Al 6
If so, date shutdown
AlA
lime Shutdown
CA!
,t'4
j Q
Product In Line
If flowing, flow rate

Enbrldge on-site Rep


Contract supervisor

C.Vr%

Survey Geodetic Parameters


jGrid
Zone
1Sunrey Units
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

Density
lime System for lime Shutdown

Span Information
Anchor Positions

Date Surveyed

Tape Number

S -A/

Direction Flown

Digital File Name or DVD #

Water Depth
- 13,

Current Year Span Length

kni )..

Previous Year Span Length

Current Year Span #


Previous Span #(s)
Addit. Extensions Used?

9
9

Number of Dives to Complete

Length of Extension(s)

.1'

Drilling Issues?

/VOAL

Date(s) of Dive(s)

-1T-tx

Dive number(s) for current campaign

Drilling issues: Include torque spec not mat. modified screws. modMed assembly, etc...

South End
Tape Countsr_J'.
UnkQuest Northing
LinkQuest Easting
Digital File Filenam
Digital File Time
Display Time
Bottom Type at Repair

0 ()ic/03.(c

`g1551, 0,

m,--1--)
i0,"1--)
6 tiO

North End

t...v 3 -)_
ff0 tl 71, 02-

/c1511,010,71

) 0'. 50
/0; 5-0
5 .E)

Repair

1'..ti

9 O V-1,..)1, qs
II. ScZ1 Z 4.4, (A
lo..9`?
icv,1-1(1
s ipoo

Highest Span Height


TD O'clock Positions
Span Repair Sketch:

Notes:

include North and South natural ID's, previously Metalled repairs, repair numbers, debris/Sash, natural outcrops, and hardline diver's measurements.

_
..
.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbrldge Project #
Enbridge Project Manager
(WJP.1-19972-14
er
TC)ol
Contractor
Contractor Project Number
490259S.10.071
Veolia ES Spec. Serv.
Pipeline Operation information
Is leg shutdown?
Otto
If so, date shutdown
Time Shutdown
Ai4
Product In Line
trot
If flowing, flow rate

Enbrldge on-site Rep

Survey Geodetic Parameters


Grid
Zone
MI Central 2112

Sc, e

Contract supervisor

Survey Units
U.S. Feet
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix
Density
Time System for Time Shutdown

Span Information

q-a\

Date Surveyed

Anchor Positions

505-

Tape Number

Digital File Name or DVD #

Direction Flown

KA'

Water Depth

(,9
L.)' ol
10

Current Year Span #


Previous Span #(s)
Addit. Extensions Used?

Previous Year Span Length


Number of Dives to Complete

Length of Extension(s)

Date(s) of Dive(s)

11,f) ilsk)ck

Drilling Issues?

90 '

Current Year Span Length

3
-2I-)a

Dive number(s) for current campaign

Drilling Issues include torque spec not met, modified screws, modified assembly, etc...

South End

Tape Counte

UnkQuest Northing
UnkQuest Easting

A/ A11cAci .gt)
les'Vlial.119_

Digital File Filenam

North End

/114

cu.5-3 17, rs

le)

.ter

Repair

IcSci
9 r5 ATo. fao
1 oisiao) ati.:1,

Digital File Time


Display Time
Bottom Type at Repair
Highest Span Height

NA.
NA.
ckv

3-'

N-4-

Cisy

T-

i 5-..fir
Os y

' /'

TD O'clock Positions
Span Repair Sketch:

Notes:

Include North and South natural TD's, previously installed repairs, repair numbers, debrisfErash, natural outcrops, and hardline diver's measurements.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbrtd eon-site Rep

Enbridge Project Manager

Enbridge Project #

IWJP.1-19972-10

Contractor

Grid
Zone

Contract supervisor

COntractor Project Number

Veolia ES Spec. Serv. 14902598.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Time Shutdown
A1A
Product In Line
If flowing, flow rate

Survey Geodetic Parameters

st y.

PveL,d

SP (NAD 83)
Ml Central 2112

'Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
R11( Fix

No
NA

Dens4
Moe System for Time Shutdown

Span information
Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span #
Previous Span #(s)
Addit. Extensions Used?
Length of Extension(s)
Drilling Issues?

9 -a b-- )?--.s 0
s- Ad
..- 5.--k--)-- ---/a. 4
1,o-11A
'.,
\-3''-c' \ - -I'

Anchor Positions
Digital File Name or DVD #
Current Year Span Length
Previous Year Span Length

105
/ (DO

Number of Dives to Complete


Date(s) of Dive(s)
Dive number(s) for current campaign ,2

A)0

Drilling Issues: include torque spec not rnel, maned acme% mast/ assembly, atm..

South End
Tape Counts
UnkQuest Northing
UnkQuest Easting

North End

G\L..' 13
9-laa3(4, t,0

1c1 5S 3'3 n,-7iJ

yaAa
ck1.3,15- 5'7
1

7V11 ti R. 1Jo

Repair

,pYie

9i gd.c 7 A of
lc./ 5fc33 3 OA,

Digital File Filenam


Digital File Time

I irs ti

I LI', vs

Display Time

14 . 1e1

ik,l'.'"

Bottom Type at Repair


Highest Span Height

C.-{e/
-IN

Cis y
1'

19:Ai
1(4' Al
C I coi
a%

TD O'clock Positions
Span Repair Sketch:

Notes:

Include North and South natural T6'5, previously installed repairs, repair numbers, debrisAresh, naturist outcrops, and Nudgee divers measurements.

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge Project #
1WJR1-19972-10
Contractor

Entrildge Project Manager

Enbridge onsite Rep

Survey Geodetic Parameters


Grid
SP (NAD 83
Zone
MI Central 2112

Tom PretJ
Contractor Project Number

Veolia ES Spec. Serv. 14902595.10.071


Pipeline Operation Information
Is leg shutdown?
0
If so, date shutdown
Time Shutdown
Product In Line
If flowing, flow rate

Coneact supervisor

L'..1.1eL %q v,/

Survey Units
Ellipsoid

4)
NA

U.S. Feet

GPS Correction
Qty of Satellites
RTK Fix
Density
Time System for Tone Shutdown

Span Information
Anchor Positions

Date Surveyed
Tape Number
Direction Flown
Water Depth

si)
Digital Fite Name or DVD #

SO

Current Year Span #

Current Year Span Length

Previous Span #(s)

Previous Year Span Length

Addit. Extensions Used?

Number of Dives to Complete

Length of Extension(s)
Drilling Issues?

9'3
cg)

Date(s) of Dive(s)

/1)0

Dive number(s) for current campaign

-A

30

Drilling Issues: include torque spec not met, modified screws, MOW assembly,

South End
Tape Counter
LinkQuest Northing
LinkQuest Fasting

OOoO
cloboycl, lci
1a! 515a '35,`71

North End

`V 3. .)
co0 90,g7
1CFSM64, DI

Digital File Filename


Digital File Time
Display Time
Bottom Type at Repair

iq:osk

icoa,
544.6 ic-kv

IV;oe
ig,ot,
4',.;;,,(..)

A-Ay

Repair

1 , 3,
iobilk),(-10 .
Ic?5-grAct cc S ES
_
mom
_
1F-09
,v,20,) , ( cpy-t,

Highest Span Height


TD O'clock Positions.
Span Repair Sketch: Include North and South naturallD's, previously instated repairs, repair numbers, debristbash, natural outcrops, and hardline divers measurements.

Notes:

\-u
Straits of Mackinac Structural
Integrity Support Span Repair Log
Enbridge Project Manager

Enbridge Pmject#
1WJPJ-19972-10
Contractor

I Tow% efe0
Contractor Project Number

Enbridge on-site Rep


,ccoeettI
Contract supervisor

Survey Geodetic Parameters


'Grid
Zone
MI Central 2112
Survey Units

Veolla ES Spec. Serv. 14902595.10.071


Pipeline Operation information

Ellipsoid

No

is leg shutdown?
If so, date shutdown
Time Shutdown
Product In Line
If flowing, flow rate

GPS Correction
City of Satellites
RTK Fix

/VA
ivA
Density
Time System for Time Shutdown

Span Information

-6),1- )PspG

Date Surveyed
Tape Number

Anchor Positions

s- V

Direction Flown

Digital File Name or DVD #

0 S-0

Water Depth

/00

Current Year Span Length

Current Year Span #

vi) --PoiS

Previous Span #(s)

Previous Year Span Length

-a-pr- \

Date(s) of Dive(s)

Length of Extension(s)

No

Drilling Issues?

Number of Dives to Complete

Addit. Extensions Used?

Dive number(s) for current campaign

"S

Drilling Issues: include torque spec not reel, modified screws, modified assembly, etc...

North End

South End
Tape Countsr
UnkQuest Northing
LirikQuest t=asting
Digital File Filenam
Digital File Time
Display lime
Bottom Type at Repair
Highest Span Height

0c)., tsc
S ,P1.- 1 , I .
1 tt CI 11 t,i 41,
.......
v3:.)
1 l',4Y),

itod i l

`t

o3: as
I1"..,t.i..\ \, ;A
) 5 551"Al, 0.1
,,,..i 3:6113:01

`1.0.,,,A)

S.

Repair

O( ..% 0.
01\ .--A') ,.T , -I
1 el 5-,'1-3sS, c) vi
,
v"3: ts 5
0; ts ,

lq

e;,,o0
\,

TD O'clock Positions
Span Repair Sketch:

Notes:

Include North end South natural TM, previously installed repairs. repair numbers. debris/Sash, natural outcrops, and hardline diver's measurements.

"Er

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge Project #
(V11,112.149972-10
Contractor

Enbridge OThade Rep

Enbridge Project Manager

"c4S Al C1/40
Contractor Project Number

S'cume,
Contract supervisor

Veolia ES Spec. Serv. 1490259S.10.071


Pipeline Operation information
Is leg shutdown?
If so, date shutdown
Time Shutdown
Product In Line

Density

If flowing, flow rate

Time System for 'rime Shutdown

"(Survey

Units
Ellipsoid

GPS Correction
Qty of Satellites
RIK Fix

Span Information

- xx

Date Surveyed
Tape Number

Direction Flown

5-

Water Depth
Current Year Span it
Previous Span it(s)
Addit. Extensions Used?

Survey Geodetic Parameters


(Grid
SP (NAD 83
Zone
MI Central 2112

Anchor Positions
Digital File Name or DVD #

e la A
E-

Current Year Span Length

IFA

Number of Dives to Complete

Length of Exiension(s)
Drilling Issues?

cla

Previous Year Span Length


Date(s) of Dive(s)

Ala

Dive number(s) for current campaign

Drilling Issues: nude torque spec not met modified mews, modified assembly.

South End

Tape Countsr

cr.t,6,

North End

Re ir

itiolit5- vo.).

o vA 1

UnkQuest Northing
UnkQuest Easting
Digital File Filenam
Digital File Time
Display Time
Bottom Type at Repelr

I 'IV' woo to ,' ,.q

\, or)
\VII
tott)

I 15%1;44, 't
.....ik, IT
ISItir
S' ,Vic)

......

;tv',15
1%015
SA 0

UoNTST314,40

Highest Span Height


TO O'clock Positions
Span Repair Sketch: Include North and South natural TD's, previously installed repairs. repair numbers, debris/bash, natural outcrops. and hardline diver's measurements.

Notes:

- lot c
Straits of Mackinac Structural
IntegriV Support Span Re air Log
Enbridge Pro ect Manager

Enbridge Project #

IWJR.I-19972-10

Enbridge on-site Rep


S
Contract supervisor

TO h1 PreA--)

Contractor

Contractor Project Number

Veolia ES Spec. Serv. 1490259S.10.071


Pipeline Operation Infommflon
Is leg shutdown?
If so, date shutdown
lime Shutdown
Product In Line
If flowing, flow rate

Survey Geodetic Parameters


Grid
SP (NAD 83)
Zone
MI Central 2112
Survey Units
Ellipsoid
GPS Correction

ut/

1110

AiA

Qty of Satellites
FOX Fix
Density
Time System for Tam Shutdown

Span information
Date Surveyed
Tape Number
Direction Flown
Water Depth
Current Year Span It
Previous Span #(s)
Adrift. Extensions Used?
Length of Extension(s)
Drilling Issues?

-D_I -a
St--)
s_,)
if-is-..--(s1
c
.,
F...-0 c
1
:---1 ,
A/o

Anchor Positions
Digital File Name or DVD #
Current Year Span Length
Previous Year Span Length

91'
65-

Number of Dives to Complete

1)-

Date(s) of Dive(s)
Dive number(s) for current campaign

`5 5-

Drilling Issues: include torque spec not met, modified screws, modified assembly, etc...

South End

Tape Counter
UnkQuest Northing
LinkQuest Easting
Digital File Filename
Digital File Time
Display lime
Bottom Type at Repair'
Highest Span Height
TD O'clock Positions
Span Repair Sketch:

Notes:

o!oo

9 L 1?-10, I o
fcc-1,-; ->3-5-1,
____-1 cY 'Y'.
/c):"F" ,
C-1c1

North End

q'/
co ,--ls---(.., ba_
I 9 5-55 t.111, 7b
_
16:5 FS
to:145
CI el

d`

Repair

I.. -s 5-01 3aC.c3


)9 5-v-i -3f.s-.%t

_
.

in.35/ C :', 5'..Cl. ; Y

Include North end South natural nes, previously Installed repairs, repair numbers, dobrisArash, natural outcrops, and hardline diver's measurements,

Straits of Mackinac Structural


Integrity Support Span Repair Log
Enbridge on-site Rep

Enbridge Project Manager

Enbridge Project*

Contract supervisor

Contractor Project Number

Contractor

Veal's' ES Spec. Serv. 1490259S.10.071


Pipeline Operation Information
Is leg shutdown?
No
If so, date shutdown
N4
lime Shutdown
ALA
Product In Una
If flowing, flow rate

Survey Geodetic Parameters


(Grid
Zone
MI Central 2112
Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
RTK Fix

C5 rrle

I Tun POLO

It/Mt-19972-10

Oar,' 4 "gqi)of

Density
Erna System far Erne Shutdown

Span information

9,--a- \I-,
SO t
5-N
1a-c-

Date Surveyed
Tape Number
Direction Flown
Water Depth

Anchor Positions
Digital File Name or DVD #
Current Year Span Length

Current Year Span #


Previous Span Ws)
Addit. Extensions Used?
Length of Extension(s)

Previous Year Span Length

`1 t1

Number of Dives to Complete

13'. i 1-1'

Date(s) of Dive(s)
Dive number(s) for current campaign

Drilling Issues?

16
.
1,
1
\
9-a$'11
6

Drilling Issues: Include torque spec not wet, modided screws, muddied assembly. etc...

South End
Tape Counter
LinkQuest Northing
UnkOuest Easting
Digital File Filename
Digital File Time
Display Time
Bottom Type at Repair
Highest Span Height.

13:a3
cil of-rib, 'D)
te% 5-5v--)36, 'al
I'Y 5'Ll
15: 51
C44 'i
ON,

North End

Repair

1 6'.os..)-,
q io4 ci, 5-'t
).cir51414),

11,', 51
r3 51
CA kf
ic:D

1 11'.v
`1t'1 K,-74
1
5 C''?q i's?.. daP.
--1-3S5
tbtV5
Cis Y
1,

TD O'clock Positions
Span Repair Sketch:

Notes:

Include North and South natural ID's, previously installed repairs. repair numbers, debris/1mb, natural outcrops, and hardline diver's measurements.

..
.

-160 3
Straits of Mackinac Structural
Integrity Support Span Repair Log
Enbridge Project #
1WJPJ-19972-10

Enbridge Project Manager


I

Tam prt41

Contractor Project Number

Contractor

Enbridge on-site Rep


Scill 4-Contract supervisor

Survey Geodetic Parameters


Grid
Zone
'Survey Units
Ellipsoid
GPS Correction
Qty of Satellites
FOX Fix

1Veolia ES Spec. Serv. 14902595.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Time Shutdown
Product In Line
If flowing, flow rate

Are
414
A/
Density
Time System for Time Shutdown

Span Information
Anchor Positions

Date Surveyed
Tape Number

so 5

-N

Direction Flown
Water Depth
Current Year Span #
Previous Span #(s)
Adrift. Extensions Used?
Length of Extension(s)
Drilling Issues?

Digital File Name or DVD #

) s5-

k_AJ - (-,, 0_5

ct

Current Year Span Length

--606
ti-c_3
)--S
1-I`
00
,3

Previous Year Span Length


Number of Dives to Complete
Date(s) of Dive(s)
Dive number(s) for current campaign

'17

OdhTln Issues: include torque spec not met, modified screws, modified assembly. etc...

South End
Tape Counts
Linkauest Northing
UnkQuest Easling

North End

,,

G4 - R10-1,
1 ci t Z-3-1

-'ll (.16 6(6101


LI,

i c leVit la,a),

60

Digital File Fitenam

Re air
\ 61 Cr1), 1 l)

19S-5.180,,1`)
.....-

Digital File Time


Display Time
Bottom Type at Repair
Highest Span Height

1 9 '11
clky
1,

15' ir
ctcv
c,` '

1 yn
(1,1
a

TD O'clock Positions
Span Repair Sketch: Include North and South natural T6 s, prevfously installed repairs, repair numbers. debris/Ma. natural outcroes, and hanlline divers MeaSUrernents.

Notes:

-HA

Straits of Mackinac Structural


Inte rity Support Span Repair Log
Enbridge Project #

Enbridge Project Manager

Enbridge on-site Rep

Contractor Project Number

Contract supervisor

Survey Geodetic Parameters


Grid
SP (NAD 83
Zone
MI Central 2112
Survey Units
U.S. Feet
Ellipsoid

WJP.1-19972-10

Contractor

C kee- s

Veolia ES Spec. Serv. 14902598.10.071


Pipeline Operation Information
Is leg shutdown?
If so, date shutdown
Ai
0
Time Shutdown
Product In Line

ot,/

IA-

GPS Correction
Qty of Satellites
RTK Fix
Density

If towing, flow rate

Time System for Tone Shutdown

Span Information
Date Surveyed
Tape Number
Direction Flown

ci -01
s

Anchor Positions

Digital File Name or DVD #

Water Depth
Current Year Span #

Lam.)

Previous Span #(s)


Addit. Extensions Used?
Length of Extension(s)
Drilling Issues?

A
trii 4

Current Year Span Length

C4 a.

Previous Year Span Length

Ss

Number of Dives to Complete

Ye--1
1-2k
NO

1),

Date(s) of Dive(s)
Dive number(s) for current campaign

3c

Drilling Issues: include torque spec not mat, modified screws, modified assembly, elm..

South End

North End

Renal

Tape Counts
UnkQuest Northing

16(4-11, VT"

LinkQuest Easting

I c 7 V.1-1 VJi c.

Display lime
Bottom Type at Repair

0,;;Y`c,Ilo

0 i gtl, C;15

% 4K41. In

is 51.4,a1
1
1
). )L..)

.....,

Digital File Filenam


Digital File Time

01\

1 eN

.
1111
%
11:11

ci /

\ In' q
11.111

cle,y

fllw....
.I l'.1?)
/1'4

cic y

Highest Span Height


TD O'clock Positions
Span Repair Sketch: Include North and South natural ID's, previously Installed repairs, repair numbers. debris/Hash, natural outcrops, and hardline diver's measurements.

Notes:

Das könnte Ihnen auch gefallen