Sie sind auf Seite 1von 5

DOCUMENT REVIEW AND COVER SHEET

Construction Contractor:

Company:

Engineering Contractor:

Engineering and Technical Services:

Review:

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Gasprom Neftehim Salavat Acrylic Acid / Acrylates


Plant (RSAE) Project Bashkortostan, Russian
Federation

PROJECT
CONTRACT NO
DOCUMENT TITLE

ITP for LV BUS DUCT

DOCUMENT NUMBER
DOCUMENT
DESCRIPTION
Status

RSA
- IT - QA E
P
Inspection and Test Plan (ITP)

Status

Code Description

Code

Revieved
Engineer:

REV.

APPROVED WITHOUT COMMENT


REVISE AND RESUBMIT. WORK MAY PROCEED SUBJECT TO
INCORPORATON OF CHANGES INDICATED.
REJECTED. TO BE REVISED B: RESUBMITTED. WORK MAY
NOT PROCEED
INFORMATION ONLY. REVIEW NOT REQUIRED. WORK MAY
PROCEED
CANCELLED/SUPERSEDED

NAME

SIGN

DATE

Remarks or Comments:

A1

Issued for Approval


Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Rev.

Amendment

Prepared

Checked

Approved

Date

Company:

Construction Contractor:

Engineering Contractor:

Engineering and Technical Services:

Project Title:

Gasprom Neftehim Salavat


Acrylic Acid / Acrylates Plant (RSAE) Project
Bashkortostan, Russian Federation
Document Title:

Inspection and Test Plan


LV BUS DUCT

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

REVISION SHEET
Revisio
n
A1

Description of changes

Page

First Issued For approval

Revision
:

Document Number:

RSAE

ITP

QA

PROJECT CODE

DEPARTMENT
CODE

DOCUMENT
TYPE

DICIPLINE CODE

SEQUENCE
NUMBER

Gasprom Neftehim Salavat Acrylic Acid / Acrylates Plant (RSAE) Project

Inspection and Test Plan


LV BUS DUCT
Issue
Date:

No

Revisio
n:

Doc. Number:

DESCRIPTION OF ACTIVITY

CONTROL
DOCUMENT

ACCEPTANCE
CRITERIA

VERIFICATION
DOCUMENT

Page:

1 of 1

INVOLVEMENTS
OWN
RC MHI
ER

Installation Check
1- Inspect panel assembly for
1.1

2345-

alignment, level, tightness of


bolts
Inspect bus duct connection
(Torque check and marking)
Check frame earthing
Inspect termination
Check bus duct supports

1.2

Check phase connection

1.3

Insulation resistance measurement

DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201

Correct Installation

Correct phase connection

500 VDC, 1 Min


>10MOhm

RSAE-FRM-216

RSAE-FRM-216

RSAE-FRM-216

Attachment
1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT
LEGEND
RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, OWNER: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check),

Das könnte Ihnen auch gefallen