Inspection and Test Plan (ITP)
Status
Code Description
Code
Revieved
Engineer:
REV.
NAME
SIGN
DATE
Remarks or Comments:
A1
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
Rev.
Amendment
Prepared
Checked
Approved
Date
Company:
Construction Contractor:
Engineering Contractor:
Project Title:
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
REVISION SHEET
Revisio
n
A1
Description of changes
Page
Revision
:
Document Number:
RSAE
ITP
QA
PROJECT CODE
DEPARTMENT
CODE
DOCUMENT
TYPE
DICIPLINE CODE
SEQUENCE
NUMBER
No
Revisio
n:
Doc. Number:
DESCRIPTION OF ACTIVITY
CONTROL
DOCUMENT
ACCEPTANCE
CRITERIA
VERIFICATION
DOCUMENT
Page:
1 of 1
INVOLVEMENTS
OWN
RC MHI
ER
Installation Check
1- Inspect panel assembly for
1.1
2345-
1.2
1.3
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
DWG:
1. LV Busduct: 3935 E323-00100
2. Transformer: 3935 E322-00600
3. LV SWGR/MCC: 3935 E32300200
Instruction manual :
1. LV Busduct: 3935 E423-00100
2. Transformer: 3935 E422-00600
3. LV SWGR/MCC: 3935 E42300200 & 201
Correct Installation
RSAE-FRM-216
RSAE-FRM-216
RSAE-FRM-216
Attachment
1- RSAE-FRM-216 INSPECTION CHECK LIST LV BUS DUCT
LEGEND
RC: Renaissance Construction, MHI: Mitsubishi Heavy Industries, OWNER: Gasprom Neftekhim Salavat, W: Witness, R: Review, H: Mandatory Hold Point, S: Surveillance (Random Check),