DO CU ME NT N O. IPS -M B D 14 063 - H V -2 59
CONTROL PHILOSOPHY
FOR
PRIMARY VARIABLE
PUMPING SYSTEM
R0
Rev
ATP
Description
SPT
Made by Chkd by
KP
App by
This document has been prepared for the above project or named part thereof and should not be relied upon or used for any other project without prior written consent
from IPS-Mehtalia Pvt. Ltd. IPS-Mehtalia Pvt. Ltd. accepts no responsibility or liability for the consequence of this document being used for a purpose other than the
purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to
confirm his agreement to indemnify IPS-Mehtalia Pvt. Ltd for all loss or damage resulting there from IPS-Mehtalia Pvt. Ltd. accepts no responsibility or liability for this
document to any party other than the person by whom it was commissioned.
Client
Glenmark
Project No
MBD14063
Made / App
Rev
Page
ATP /KP
0
2 of 4
Document Title
Document No.
Date
Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015
Index
1.0
2.0
3.0
4.0
IPS-M
Purpose of document................................................................................................................ 3
Components involved .............................................................................................................. 3
Control philosophy................................................................................................................... 3
Sequence of operation.............................................................................................................. 4
Client
Glenmark
Project No
MBD14063
Made / App
Rev
Page
ATP /KP
0
3 of 4
Document Title
Document No.
Date
1.0
Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015
Purpose of document
To explain the control philosophy and sequence of operation for primary variable chilled
water pumping system.
2.0
3.0
IPS-M
Components involved
1.
2.
VFD- Variable frequency drive for pumps shall be with adequate quantities of I/O points
and with inbuilt PID controller. VFDs with pre-programmed HVAC applications are
preferred. Or alternatively standard VFD and separate preprogrammed variable
pumping controller can be considered.
3.
DPT - Differential pressure transmitter shall be of desired range suitable for installing
across chilled water Supply & return main headers.
4.
Flow meter - Flow meter shall be installed in chilled water supply header after bypass
line and in the main line catering to load. It shall have inbuilt transmitter to generate
proportional analog signal.
5.
Control philosophy
1.
Based on the load variation the Differential pressure shall vary across supply and return
headers. This variation shall be sensed by DPT and it shall transmit the corresponding
signal to VFD controller. To maintain the set Differential pressure the VFD shall be
ramped up/down. In present case the minimum flow shall correspond to 375 GPM. i.e.
Minimum flow required chilled water flow rate for chiller.
2.
Being primary variable pumping system, VFD shall not be ramped down below its set
minimum RPM. This set RPM is dependent on the minimum flow requirement. IN NO
CASE the VFD shall be allowed to ramp down the set minimum RPM despite of any
further load reduction.
3.
Flow meter shall sense the actual chilled water flow to the building. As the chilled water
flow catering the load goes below the minimum Flow requirement of chiller, the
motorized valve on bypass line shall begin to open up proportionately and vice versa.
Client
Glenmark
Project No
MBD14063
Made / App
Rev
Page
ATP /KP
0
4 of 4
Document Title
Document No.
Date
4.0
Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015
Sequence of operation
Below shall be sequence of operation.
Sr. No.
IPS-M
Function Logic
Action
Remark
VFD shall not ramp down
further once it reaches the
minimum set speed.
Ramp up VFD