IPS-MEHTALIA PVT. LTD.

Consulting Engineer, Construction Management & Interior Design


Unit B101-109, Kailash Vaibhav Industrial Estate, Vikhroli (W), Mumbai - 79

DO CU ME NT N O. IPS -M B D 14 063 - H V -2 59

CONTROL PHILOSOPHY
FOR

PRIMARY VARIABLE
PUMPING SYSTEM

OSD Facility in Monroe, NC-USA

R0
Rev

ATP

Aug 11, 15 For Enquiry


Date
Entire Specification
Issued this Revision
Revised Pages Only
Issued this Revision

Description

SPT

Made by Chkd by

KP
App by

SPECIFICATION ISSUED FOR


In-house Review and replies
Purchase
Client Approval
Construction
Enquiry
Engineering

This document has been prepared for the above project or named part thereof and should not be relied upon or used for any other project without prior written consent
from IPS-Mehtalia Pvt. Ltd. IPS-Mehtalia Pvt. Ltd. accepts no responsibility or liability for the consequence of this document being used for a purpose other than the
purposes for which it was commissioned. Any person using or relying on the document for such other purpose agrees, and will by such use or reliance be taken to
confirm his agreement to indemnify IPS-Mehtalia Pvt. Ltd for all loss or damage resulting there from IPS-Mehtalia Pvt. Ltd. accepts no responsibility or liability for this
document to any party other than the person by whom it was commissioned.

IPS-MEHTALIA PVT. LTD.

Client

Glenmark

Consulting Engineer, Construction Management & Interior Design


B101-109, Kailash Vaibhav Ind. Estate, Vikhroli (W), Mumbai 400 079

Project No

MBD14063

Made / App
Rev
Page

ATP /KP
0
2 of 4

Document Title
Document No.
Date

Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015

Index
1.0
2.0
3.0
4.0

IPS-M

Purpose of document................................................................................................................ 3
Components involved .............................................................................................................. 3
Control philosophy................................................................................................................... 3
Sequence of operation.............................................................................................................. 4

Doc 259 - Control Philosophy for Primary variable pumps - R0

IPS-MEHTALIA PVT. LTD.

Client

Glenmark

Consulting Engineer, Construction Management & Interior Design


B101-109, Kailash Vaibhav Ind. Estate, Vikhroli (W), Mumbai 400 079

Project No

MBD14063

Made / App
Rev
Page

ATP /KP
0
3 of 4

Document Title
Document No.
Date

1.0

Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015

Purpose of document
To explain the control philosophy and sequence of operation for primary variable chilled
water pumping system.

2.0

3.0

IPS-M

Components involved
1.

Pumps - Vertical inline type

2.

VFD- Variable frequency drive for pumps shall be with adequate quantities of I/O points
and with inbuilt PID controller. VFDs with pre-programmed HVAC applications are
preferred. Or alternatively standard VFD and separate preprogrammed variable
pumping controller can be considered.

3.

DPT - Differential pressure transmitter shall be of desired range suitable for installing
across chilled water Supply & return main headers.

4.

Flow meter - Flow meter shall be installed in chilled water supply header after bypass
line and in the main line catering to load. It shall have inbuilt transmitter to generate
proportional analog signal.

5.

Bypass Valve - Bypass valve shall be with modulating type actuator.

Control philosophy
1.

Based on the load variation the Differential pressure shall vary across supply and return
headers. This variation shall be sensed by DPT and it shall transmit the corresponding
signal to VFD controller. To maintain the set Differential pressure the VFD shall be
ramped up/down. In present case the minimum flow shall correspond to 375 GPM. i.e.
Minimum flow required chilled water flow rate for chiller.

2.

Being primary variable pumping system, VFD shall not be ramped down below its set
minimum RPM. This set RPM is dependent on the minimum flow requirement. IN NO
CASE the VFD shall be allowed to ramp down the set minimum RPM despite of any
further load reduction.

3.

Flow meter shall sense the actual chilled water flow to the building. As the chilled water
flow catering the load goes below the minimum Flow requirement of chiller, the
motorized valve on bypass line shall begin to open up proportionately and vice versa.

Doc 259 - Control Philosophy for Primary variable pumps - R0

IPS-MEHTALIA PVT. LTD.

Client

Glenmark

Consulting Engineer, Construction Management & Interior Design


B101-109, Kailash Vaibhav Ind. Estate, Vikhroli (W), Mumbai 400 079

Project No

MBD14063

Made / App
Rev
Page

ATP /KP
0
4 of 4

Document Title
Document No.
Date

4.0

Control Philosophy
IPS-MBD14063-HV-259
Aug 11, 2015

Sequence of operation
Below shall be sequence of operation.
Sr. No.

IPS-M

Function Logic

Action

Remark
VFD shall not ramp down
further once it reaches the
minimum set speed.

DPT >Set point

Ramp down VFD

DPT <Set point

Ramp up VFD

Flow minimum set


flow

Open the motorized


bypass valve
proportionately

Flow >Minimum set


flow

Keep the motorized


bypass valve in full closed
condition

Flow meter and bypass valve


shall communicate in order to
maintain the minimum flow
requirement across chiller
evaporator.

Doc 259 - Control Philosophy for Primary variable pumps - R0