Beruflich Dokumente
Kultur Dokumente
iPASOLINK 100/200
SECTION I INSTALLATION
CONTENTS
1
OVERVIEW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
CARDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
4.2
4.3
5.2
5.3
5.4
6
5.1.2
5.1.3
5.1.4
5.2.2
5.2.3
5.3.2
6.2
6.3
WATERPROOFING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
10
Installation
NWD-107460-07E
May 2012
- 2/END -
NWD-107460-07E
Installation
OVERVIEW
1-1
1. OVERVIEW
The standard installation is summarized in this section. Included herein is
information on typical installation work flow and guides for IDU installation, ODU
installation, Antenna (ANT) installation, waveguide connection and coaxial cable
connections. The installation flow diagram is shown below.
This product is a part of radio link system, and is intended to be connected with a
external antenna.
This product will be installed and operated by professional.
After installation, the professional person shall make sure that the system shall
comply with the relevant limits for general public exposure specified as basic
restrictions or reference levels in the council Recommendation 1999/519/EC.
Unpacking of IDU
(see para 3.)
Unpacking of ODU
(see para 3.)
IDU Mounting
(see para 4.)
ODU Mounting
(see para 5.)
Cable Termination
(see para 6.)
Frame Grounding
(see para 8.)
Waterproof
Protection
(see para 9.)
Antenna
Orientation
(see para 11.)
Installation
NWD-107460-07E
1-2/END
OVERVIEW
NWD-107460-07E
Installation
CARDS
2-1
2. CARDS
Each unpacked component of the [ ] GHz [ ] MB digital radio system must be
checked as shown below.
Contens List
Installation
Drawing No.
Figure 2-1
Mounting Bracket
Figure 2-2
Installation Kit
NWD-107460-07E
2-2
CARDS
1
3
(*1)
(6-11 GHz)
(13-42 GHz)
iPASOLINK 200
iPASOLINK 200
FUSE(250V/12.5AH)
iPASOLINK 100
FUSE(250V/12.5AH)
Description
MDP-400MB-1B (IDU)
Power Connector (Housing (AMP: 1-178288-4 (x1 ea)) or DK-3100S-04R (x1 ea) and
Socket contacts (AMP: 1-175218-2 (x4 ea)))
Notes
*1. One more ODU and additional software-key are provided for
HS / Twinpath / 2+0 / 2way configuration. (iPASOLINK 200)
*2.
NWD-107460-07E
Installation
CARDS
2-3
No.
Description
Pole Mounting Bracket for Coaxial Cable (6/7/8 GHz)/Waveguide Connection Type
Installation
NWD-107460-07E
CARDS
Installation
D-Sub Connector
AUX-S
MSE-S
MDR Connector
ODU (6-11 GHz)
N-P Connector
Lug (FG)
Lug (FG)
16E1-S
STM1-S
Lug (FG)
MDR Connector
USB Connector
Modular Connector
FAN Unit
(Replaceable)
Power Supply
Connector
2-4
NWD-107460-07E
Figure 2-3 Installation Kit Packing List of IDU and ODU for 1+0 System
2-5
NWD-107460-07E
D-Sub Connector
AUX-S
MSE-S
MDR Connector
ODU (6-11 GHz)
N-P Connector
Lug (FG)
Lug (FG)
16E1-S
STM1-S
SFP Module Connector
TNCP Connector
Lug (FG)
PS-S
Modular
USB Connector Connector
SFP Module
Connector
D-Sub Connector
(Female)
MDR Connector
TNCP
Connector
FAN Unit
(Replaceable)
Power Supply
Connector
Lug (FG)
N-P Connector
Figure 2-4 Installation Kit Packing List of IDU and ODU for 1+1 System
CARDS
Installation
N-P Connector
2-6/END
CARDS
NWD-107460-07E
Installation
3-1
Procedure 3-1
ODU:
Procedure 3-2
Note
Procedure 3-1
When conveying the IDU or ODU to another place, the original packing
should be used to avoid damage.
Recycle Mark
Packing label
Care Mark
Installation
NWD-107460-07E
3-2
NWD-107460-07E
Take out the accessories, IDU wrapped in the poly sheet and cushioning
materials (pads),
Installation
Procedure 3-2
3-3
Care Mark
Package Label
or
Recycle Mark
Package Label
Care Mark
Installation
NWD-107460-07E
3-4/END
Take out the ODU, cushioning materials (pads) and poly sheet,
TOP PAD
POLY SHEET
BOTTOM PAD
NWD-107460-07E
Installation
MOUNTING IDU
4-1
4. MOUNTING IDU
The installation procedure for the IDU explains in Procedure 4-1. The IDU should be
installed in the radio station.
Procedure 4-1
Front
position
position
iPASOLINK 200
iPASOLINK 100
Side view
Side view
Spring washer
Screw
Flat washer
Spring washer
Screw
Installation
Flat washer
NWD-107460-07E
4-2
MOUNTING IDU
Fix each side of the IDU to the 19-inch rack with the two screws,
IDU
To mount the IDU in a 19-inch rack, space for heat dissipation is not required for
the top, bottom, and rear of the equipment because built-in forced air cooling fan
is provided.
Wall
NWD-107460-07E
Installation
MOUNTING IDU
4-3
Single Mode Fiber (SMF): This SFP complies with GbE along with SDH and
Fiber Channel. The SFP operates with 1310 nm laser transmitter and has a
duplex LC connector.
2)
Multi Mode Fiber (MMF): This SFP complies with 1.25 Gbps 1000 Base-SX
Gigabit Ethernet. The SFP operates with 850 nm laser transmitter and has a
duplex LC connector.
3)
Electrical SFP
The SFP modules also accept LC fiber connectors with Polished Connector (LC-PC)
or Ultra Polished Connector (LC-UPC).
The SFP modules purchasing from NEC are recommendable to use.
Note:
Installation
NWD-107460-07E
4-4
MOUNTING IDU
Procedure 4-2
Step 2
Step 2
NWD-107460-07E
Installation
MOUNTING IDU
4-5
Step 3
Step 3
Step 4
Note
Installation
A distinct detent click will be heard when the SFP is fully and properly
inserted.
NWD-107460-07E
4-6
MOUNTING IDU
2.
In the case FAN alarm occurred, replace the FAN unit immediately.
3.
Step 1
Step 1
NWD-107460-07E
Installation
MOUNTING IDU
4-7
Step 2
Step 2
Step 3
Step 3
Step 4
Installation
NWD-107460-07E
4-8/END
MOUNTING IDU
Fuse cap
Power supply
connector
3.
4.
5.
6.
7.
8.
9.
10.
11.
NWD-107460-07E
Installation
MOUNTING ODU
5-1
5. MOUNTING ODU
The procedures for mounting and demounting the ODU are described here. There are
two types of mounting for the Antenna Direct Mounting type and Feeder Connecting
type. The ODU should be installed in the radio station.
The tools for installation are listed in Table 5-1.
Table 5-1 Tools
Tools
Wrench or Monkey Wrench
Screwdriver
Torque Wrench
Caution.
1. How to use small and large O-rings are shown in following table. Two
(small and large) O-rings are attached in 18 to 42 GHz band Andrew/RFS
direct mount antenna. 11/13/15 GHz band antenna does not have small Oring (Small O-ring is not used for Andrew/RFS direct mount antenna). If the
small O-ring is used for ODU direct mount installation, a gap may occur
between ODU and antenna for RF interface. Therefore it may happen
transmit or receive level down.
2. Do not apply silicon grease at O-ring.
System
1+0
Attachenent Position of
O-Ring (Between:)
O-Ring
Remarks
Small Size
Large Size
ANT ODU
Not used
Used
ANT WG/ODU
Used
Not used
Waveguide connection
ANT Hybrid/Coupler
Not used
Used
ANT WG/Hybrid/Coupler
Used
Not used
Waveguide connection
Note
Installation
11/13/15 GHz antenna for direct mount is not possible to connect the
ordinary waveguide flanges.
NWD-107460-07E
5-2
MOUNTING ODU
Position of
Large size
O-ring
Position of
Small size
O-ring
Position of
Small size
O-ring
2.
35
m
4 mm
4 mm
4 mm
40
32
m
m
m
1.
.8
10
1.8 mm
15
.
1.8 mm
6m
m
m
NWD-107460-07E
Installation
MOUNTING ODU
5-3
Installation of Bracket
1
Lock washer
Clamp Bracket
Washer
Protective cap
Nut*
Washer
Lock washer
Nut
Three(3) screws*
(Apply screwtight to threads
before fitting to antenna)
Installation
NWD-107460-07E
5-4
MOUNTING ODU
NWD-107460-07E
Installation
MOUNTING ODU
5-5
Note
The values in the following table are valid for screws and bolts which
have been greased according to the installation instructions.
M5
Nm
M6
Nm
M8
17
Nm
M10
35
Nm
M12
50
Nm
M10
20
Nm
M8
Nm
M10
10
Nm
M12
17
Nm
M3
0.2
Nm
M4
0.4
Nm
M8 x 30
Nm
Exceptions
Fixing screw of the azimuth fine adjustment spindle
M12 x 55 17
Nm
B4.2
Nm
Installation
NWD-107460-07E
5-6
MOUNTING ODU
NWD-107460-07E
Installation
MOUNTING ODU
5-7
Installation
NWD-107460-07E
5-8
MOUNTING ODU
Fix the ODU to the bracket by tightening the M6 screws (four locations),
Notes
1.
2.
3.
4.
O-ring
ODU(7-11 GHz)
ODU(13-42 GHz)
NWD-107460-07E
Installation
MOUNTING ODU
5-9
O-ring
Note
O-ring
Notes
Installation
1.
2.
3.
NWD-107460-07E
5-10
MOUNTING ODU
Insert guide pin on the hole of bracket to set the position of screws,
Guide pin
Caution: Align flanges on antenna and ODU correctly, and fix the ODU with
four screws.
ODU flange
Antenna flange
ODU
Antenna
Screws
Screws
Screws
Screws
NWD-107460-07E
Installation
MOUNTING ODU
5-11
No.1 ODU
Member of tower
Member of tower
ODU
Pole
Pole
No.1 ODU
Pole
(S)
1+0 System
ODU (7-11 GHz)
Member of tower
No.2 ODU
(S)
ODU
No.2 ODU
Pole
Member of tower
ODU (13-42 GHz)
1+1 SD System
Note
Installation
1+0 System
ODU (13-42 GHz)
NWD-107460-07E
5-12
MOUNTING ODU
Procedure 5-1
2.
If you change to H polarization, loosen the four screws with the Allen key
wrench and then rotate the Transition hub of feed, keeping the antenna stand
horizontal.
Transition hub
2 Screws
2 Screws
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-13
Check that the aperture part of the Transition hub is rotated 90 degrees, then fix it
with the screws that were loosened in step 2,
Top
Top
Polarization
V
Polarization
H
Check that the aperture part of the Transition hub is rotated 90 degrees, then fix it
with the screws that were loosened in step 2
Note
When a large and a small gasket are included in the antenna package.
Please use the large one. (The small gasket is not used in antenna
mount.)
2.
Loosen six screws with Allen wrench until transition can rotate freely,
Notes
Installation
1.
2.
NWD-107460-07E
5-14
MOUNTING ODU
Rotate the transition hub 90 degrees until timing pin locates in timing concavity,
Transition hub
Transition hub
Transition Hub
Timing Pin
Vertical Polarized Application
Tighten six screws when transition hub is located. (Tightening torque is 5.0 Nm
10%.)
(3)) ODU Direct Mounting Type Antenna (RFS example)
Notes
1.
2.
Drain plug
RFS C-Mount
RFS SB1
1.
2.
3.
4.
NWD-107460-07E
1.
2.
3.
4.
Installation
MOUNTING ODU
5-15
Antenna top
Vertical
Horizontal
4 screws (M3)
Polarization V
Installation
Polarization H
NWD-107460-07E
5-16
MOUNTING ODU
Procedure 5-2
When horizontal polarization is required, remove the guide pin fixed on the plate
marked with V.
Screw in the guide pin removed in step 2 to the screw hole of the plate marked
with H.
Guide pin
2.
UP
UP
RX LEV
MON
IFL
RX LEV
MON
IFL
FG
FG
H Polarization
V Polarization
NWD-107460-07E
Installation
MOUNTING ODU
5-17
Guide pin
UP
I -R
V Polarization
Plate marked with H
Guide pin
UP
I -R
H Polarization
13-42 GHz ODU
V/H Polarization Conversion
Installation
NWD-107460-07E
5-18
MOUNTING ODU
5.1.2
With Hybrid/Coupler
This section explains the antenna direct mounting type ODU installation with
Hybrid/Coupler.
Mounting
Note
O-ring
Note
O-ring
O-ring
NWD-107460-07E
Note
Installation
MOUNTING ODU
5-19
PUSH
Handle
Bracket
Hybrid/Coupler
Note
.
Flat washer
Guide pin
M6 Screw
ANT
Short Plate
ODU Port
O-ring
Hybrid/Coupler
O-ring
Notes
1. Be careful not to damage the O-ring.
2. Tightening torque is 4.0 Nm 10%.
Installation
NWD-107460-07E
5-20
MOUNTING ODU
Install the two ODUs with hex screws (four locations) using the Allen key
wrench.
Note
O-ring
ODU
O-ring
ODU
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-21
O-ring
ODU
O-ring
ODU
ODU
ODU
Note
Installation
NWD-107460-07E
5-22
MOUNTING ODU
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-23
If you change the polarization from V to H, loosen two screws, rotate the
transition hub and put it to the Hybrid/Coupler.
Note
There are two types Hybrid/Coupler. One uses two pieces transition
hubs and another uses one piece.
Guide pin
Cross-recessed
head machine screw
M2.6 (2ea)
Transition
Hub
V Polarization
H Polarization
Hybrid/Coupler
V Polarization
Cross-recessed
head machine screw
M2.6 (2ea)
H Polarization
V Polarization
One Piece Transition Hub Type
Installation
Then fix it with the two screws that were loosened in step 1.
NWD-107460-07E
5-24
MOUNTING ODU
Hybrid assembly
Hexagon Socket
Head Cap Screw
M5 x 14 (8ea.)
Hybrid
Support
Note
Cross-Recessed
Head Machine Screw
M2.6 (2ea.)
V Polarization
(Shipment condition)
NWD-107460-07E
H Polarization
Installation
MOUNTING ODU
5-25
Installation to antenna
Antenna
Short Plate
In case of removing ODU,
attach this short plate t
the ODU port.
O-Ring
Hybrid
Packing (Supplied by Antenna.)
Attachment of Short Plate
Note
NEC ODU
(Main ODU)
O-Ring (Paking)
O-Ring
(Packing)
Top View
Note
Installation
NWD-107460-07E
5-26
MOUNTING ODU
NEC ODU
(Main ODU)
O-Ring
(Packing)
NEC ODU
(Standby ODU)
Top View
Parts Name
Qty
Hybrid
Support
O-Ring
NWD-107460-07E
Installation
MOUNTING ODU
5-27
Coupler assembly
Coupler
Support
Note
Cross-Recessed
Head Machine Screw
M2.6 (2ea.)
V Polarization
(Shipment condition)
Installation
H Polarization
NWD-107460-07E
5-28
MOUNTING ODU
Installation to antenna
Antenna
Short Plate
In case of removing ODU,
attach this short plate t
the ODU port.
Coupler
O-Ring
Note
NEC ODU
(Main ODU)
O-Ring (Paking)
O-Ring
(Packing)
Top View
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-29
NEC ODU
(Main ODU)
O-Ring
(Packing)
NEC ODU
(Standby ODU)
Top View
Parts Name
Qty
Coupler
Support
O-Ring
Installation
NWD-107460-07E
5-30
MOUNTING ODU
Hybrid/Coupler assembly
Hexagon Socket
Head Cap Screw
M5 x 12 (8ea.)
Hybrid/Coupler
Support
Note
Cross-Recessed
Head Machine Screw
M2.6 (2ea.)
V Polarization
NWD-107460-07E
H Polarization
Installation
MOUNTING ODU
5-31
Installation to antenna
Antenna
Hexagon Socket
Head Cap Screw
M6 x 20 (4ea.)
Short Plate
In case of removing ODU,
attach this short plate t
the ODU port.
O-Ring
Hybrid/Coupler
Packing (Supplied by Antenna)
Attachment of Short Plate
Note
Hexagon Socket
Head Cap Screw M6
(Supplied by NEC
with ODU)
O-Ring
(Packing)
O-Ring
(Packing)
Top View
Note
Installation
NWD-107460-07E
5-32
MOUNTING ODU
NEC ODU
(Main ODU)
O-Ring
(Packing)
NEC ODU
(Standby ODU)
Parts Name
Qty
Hybrid/Coupler
Support
O-Ring
NWD-107460-07E
Installation
MOUNTING ODU
5-33
Hybrid assembly
Hexagon Socket
Head Cap Screw
M5 x 12 (8ea.)
Hybrid
Support
Note
Cross-Recessed
Head Machine Screw
M2.6 (2ea.)
V Polarization
Installation
H Polarization
NWD-107460-07E
5-34
MOUNTING ODU
Installation to antenna
Flat Washer M6 (4ea.)
Spring Washer M6 (4ea.)
Antenna
Hexagon Socket
Head Cap Screw
M6 x 20 (4ea.)
Short Plate
In case of removing ODU,
attach this short plate t
the ODU port.
O-ring
Hybrid
Packing (Supplied by Antenna)
Attachment of Short Plate
Note
Hexagon Socket
Head Cap Screw M6
(Supplied by NEC
with ODU)
O-ring (Packing)
O-Ring
(Packing)
Top View
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-35
Top View
O-Ring
(Packing)
NEC ODU
(Standby ODU)
Parts Name
Qty
Hybrid
Support
O-Ring
Installation
NWD-107460-07E
5-36
MOUNTING ODU
5.1.3
Check the polarization of the antenna connection unit of the TX ATT (Refer to
"Change of Polarization of TX ATT" to be hereinafter described.).
TX ATT
Antenna connection unit
Fix the TX ATT to the antenna by tightening the M6 screws (four locations),
Installation to Antenna
Flat washer M6 (4ea)
Guide pin
Hexagon socket
head cap screw
M6 x 30 (4ea)
Antenna
Tighten the each
screw equally and
carefully by wrench
at diagonal position.
TX ATT
Packing (Supplied by antenna)
Note Tightening torque (M6) is 4.0 Nm 10%.
42A
Fix the ODU with hex screws (four locations) using the Allen key wrench.
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-37
Attachment of ODU
ODU should be attached
by turning V up.
Hexagon socket
head cap screw M6
(Supplied by NEC with ODU)
ODU
O-ring
TX ATT
(Packing)
Top view
TOP
Antenna
TX ATT
O-ring
(Packing)
38A
ODU
Installation
NWD-107460-07E
5-38
MOUNTING ODU
If you change to H polarization, loosen two screws, rotate the antenna connection
unit and put the TX ATT horizontally,
Guide pin
TX ATT
Antenna
connection unit
V Polarization
2
Check that aperture of the connection unit is rotated as shown below, then fix it
with the two screws that were loosened in step 1.
Cross-recessed
Head machine screw
M2.6 (2ea)
Plate-1
Plate-2
V Polarization
H Polarization
NWD-107460-07E
Installation
MOUNTING ODU
5.1.4
5-39
m
35
4 mm
4 mm
4 mm
32
40
m
m
m
m
Note
.8
10
1.8 mm
15
.
1.8 mm
6m
m
m
Installation
NWD-107460-07E
5-40
MOUNTING ODU
For the antenna direct mounting of the ODU, following OMT is used.
Frequency
Band
Frequency
Range (GHz)
Interface WG Inner
Dia. (mm)
(ANT Side)
11 G
18.0
13 G
15.0
15 G
13.5
18 G
10.5
23 G
9.0
26 G
8.0
28 G
7.0
32 G
6.5
42 G
4.8
Interface
(ODU Side)
NEC Original
Cautions:
1. For connecting the OMT to the antenna, the circular type waveguide flange
of the antenna is applied to the system. When the V/H flange is mounted to
the antenna, it must be changed to a circular type.
2. When mounting the ODU to the OMT, confirm the polarization for Main
Master and SUB Master ODU. The installation of the corresponding ODUs
in the opposite station must have the same polarization in order to make
into line Main Master and SUB Master MODEMs.
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-41
Fix the OMT to the antenna by tightening them with M6 screws (four locations),
Guide pin
M6 Screw
Flat washer M6
ANT
Short plate
ODU Port
O-ring
O-ring
Notes
1. Be careful not to damage the O-ring.
2. Tightening torque is 4.0 Nm 10%.
Loosen the two screws and move the short plate if it is fixed to the ODU port.
(see figure in step 9),
Set the two ODUs to vertical polarization for OMT mounting. If the guide pin
behind the plate marked H is mounted, remove the guide pin,
Note
Insert the guide pin removed in step 4 behind the plate marked V,
Note
Installation
NWD-107460-07E
5-42
MOUNTING ODU
RX LEV
MON
IFL
RX LEV
MON
FG
Main Master
IFL
FG
Sub Master
Sub Master
Insert the O-rings to the two ODU ports of the OMT (see figure in step 9.),
Insert the guide pin into the hole of the OMT and set the position of screws,
Guide pin
NWD-107460-07E
Installation
MOUNTING ODU
5-43
Fix the two ODUs with hex screws (four locations) using the allen key wrench.
Note
Hex screw
H Polarization side
ODU
ODU
O-ring
O-ring
ODU
V Polarization side
H Polarization side
ODU
Hex screw
ODU
O-ring
O-ring
V Polarization side
ODU
Installation
Hex screw
NWD-107460-07E
5-44
MOUNTING ODU
Cautions:
1. Tighten all screws with lighter torque at first, then full torque as specified.
2. When either ODU is demounting for ODU replacing or other reasons, fix the
attached short plate to the demounted port of the OMT to avoid leaking of
RF power from the OMT and for waterproof.
3. To avoid occurrence of bit errors due to microphonic properties, when
installing the SUB Master ODU, protect the Main Master ODU from
mechanical knocks.
Short plate
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-45
Mounting Bracket
Table 5-6 Mounting Bracket Prts List
Item
Description
Qty
Bracket
Holder-2
20
10
Cap
11
Installation
NWD-107460-07E
5-46
MOUNTING ODU
Standard Installation
Reverse Installation
A nut is assembled to a stud bolt until a nut has come to a complete stop,
Assembly of the Holder-1 (2 sets)
Stud bolt M8
Hexagon nut M8
Holder-1
Hexagon nut M8 (4 ea)
Note
Tightening torque is
11 Nm 10%.
NWD-107460-07E
Fixed nut
Approx. 56 mm
Installation
MOUNTING ODU
5-47
Bracket
Flat washer M6 (4 ea)
Spring lock washer M6 (4 ea)
Hexagon socket head screw M616 (4 ea)
Note
Tightening torque is
4 Nm 10%.
Mount the Bracket to the pole, point to the opposite station and tighten it with
four Stud bolts,
Holder-2 (2 ea)
A=B
Note
Tightening torque is
11 Nm 10%.
Holder
Bolt end
Cap (4 ea)
Note
Installation
Since a bolt projects from a Holder when a pole diameter is small, please
attach the Cap to a bolt end.
NWD-107460-07E
5-48
MOUNTING ODU
Mount the ODU on to the Bracket and tighten four bolts (M6) at upper and lower
parts of the ODU,
Attachment of the ODU
Hexagon socket head screw M6
Note
Top view
Tightening torque is
4 Nm 10%.
Pole
N-type connector
Antenna
Band
ODU
Coaxial cable
Coaxial
cable
Install the Coaxial cables between the antenna and the ODU.
Notes
NWD-107460-07E
1.
Fix the Coaxial cable to the pole or member with Band (cable ties) after
antenna orientation has been completed.
2.
Wrap the Coaxial cable connection points with a self-bonding tape for
waterproof. (The self-bonding tape shall be prepared by customer.)
Installation
MOUNTING ODU
5.2.2
5-49
Mounting Bracket
Table 5-7 Mounting Bracket Parts List
Item
Description
Qty
Holder-2
20
10
Cap
11
12
13
for 13/15 GHz M412 Hexagon Head Screw with Washer (SS)
Installation
NWD-107460-07E
5-50
MOUNTING ODU
Standard Installation
Reverse Installation
A nut is assembled to a stud bolt until a nut has come to a complete stop,
Assembly of the Holder-1 (2 sets)
Stud Bolt M8
Hexagon Nut M8
Note
Holder-1
Tightening torque is
12 Nm 10%.
NWD-107460-07E
2 Taps M6
Fixed Nut
Approx. 56 mm
Installation
MOUNTING ODU
5-51
Note
Tightening torque is
4 Nm 10%.
Mount the Bracket to the pole, point to the opposite station and tighten it with
four Stud bolts,
Installation to the Pole
Note
Tightening torque is
12 Nm 10%.
Holder-2 (2 ea)
A
A=B
Holder
Bolt end
Cap (4 ea)
Installation
NWD-107460-07E
5-52
MOUNTING ODU
Note
Since a bolt projects from a Holder when a pole diameter is small, please
attach the Cap to a bolt end.
Mount the ODU on to the Bracket and tighten four bolts (M6) at upper and lower
parts of the ODU. Please equip the terminal area of ODU and Adapter with Oring, and join together after that,
Attachment of the ODU
Hexagon Socket Head Screw M6
Note
Adapter
Tightening torque is
4 Nm 10%.
Adapter
ODU
Right angle side
Top view
O-ring (for ODU)
When the attachment screw of the ODU is hard, please loosen the fixed four
screw of adapter once,
Loosen the fixed four screws
Adapter
Bracket
NWD-107460-07E
Please adjust the position of adapter to compensate for attachment of ODU. Then
tighten four bolts (M6) of the ODU,
Installation
MOUNTING ODU
5-53
Flexible waveguide
Antenna
ODU
Flexible waveguide
Flexible waveguide
Screw of waveguide
connecting
Installation
Adapter
Waveguide
10/11 GHz
PDR100
PDR100
13 GHz
PBR120
UBR120
13/15 GHz
PBR140
UBR140
18/23 GHz
PBR220
UBR220
26 GHz
PBR260
UBR260
28/32/42 GHz
PBR320
UBR320
NWD-107460-07E
5-54
5.2.3
MOUNTING ODU
M3
0.6 Nm 10%
M5
3.0 Nm 10%
M6
4.0 Nm 10%
Hybrid assembly,
PUSH
Handle
Hexagon socket
head cap screw
M5 12 (10 ea)
Bracket
Hybrid
NWD-107460-07E
Installation
MOUNTING ODU
5-55
Note
Flat washer M6
(4 ea)*
O-ring
Pole mount
Hybrid
O-ring I/D 32
(Packing)
O-ring I/D 32
(Packing)
Pole mount
Top view
Installation
NWD-107460-07E
5-56
MOUNTING ODU
Pole mount
O-ring I/D 32
(Packing)
Top view
Connection of waveguide,
Hybrid
Pole mount
Do not Remove
*
O-ring I/D 32
(Packing)
Waveguide flange
Flange type PBR220
Caution*:
NWD-107460-07E
Hybrid
Flexible waveguide
Flange type UBR220
Installation
MOUNTING ODU
5-57
Parts Name
Qty
Bracket
Handle
Mounting bracket
Short Plate
In case you remove ODU,
Please attach this Short
plate to the ODU port.
O-ring
Installation
NWD-107460-07E
5-58
MOUNTING ODU
O-ring I/D 32
(Packing)
Mounting bracket
O-ring I/D 32
(Packing)
Top view
O-ring I/D 32
(Packing)
Mounting bracket
Top view
NWD-107460-07E
Installation
MOUNTING ODU
5-59
Connection of waveguide,
Mounting bracket
Hybrid
O-ring I/D 15.6
(Packing)
Do not remove.
*
Waveguide flange
Flange type PBR220
Caution*:
Parts Name
Qty
Bracket
Handle
Installation
NWD-107460-07E
5-60
MOUNTING ODU
Wall Mounting
For the antenna direct mounting type ODU, wall mounting installation is explained in
following procedure.
1
Using a center punch and hammer, mark the drilling holes for the ODU wall
mount bracket. Dimensions are shown below.
Wall
2
Unit: mm
L
D
L
Change the concrete drill to enlarge the holes and drill the anchor bolt holes,
L
NWD-107460-07E
Installation
MOUNTING ODU
5-61
Remove debris from the specified hole and insert a plug-bolt into it,
Anchor bolt
Bolt
Washer
Installation
NWD-107460-07E
5-62
MOUNTING ODU
Fix the ODU wall mounting bracket to the wall with the six bolts (M6) of the
anchor volt,
Flat washer*
Spring washer*
Flange adaptor
Bolt*
Note
The BOLT, FLAT WASHER and SPRING WASHER are of the Anchor
bolt.
Mount the ODU onto the bracket and fix the ODU using the four bolts (M6) on
the ODU,
Guide pin
(V)
Transducer
Transducer
Guide pin
(V)
NWD-107460-07E
Installation
MOUNTING ODU
5-63
Waveguide
O-ring
A
ODU 10/11 GHz)
Bolt (M4)
Spring washer
Washer
Notes
1.
2.
Waveguide
O-ring
Bolt(M4)
Spring washer
Details of A
Installation
NWD-107460-07E
5-64
5.3.2
MOUNTING ODU
Rack Mounting
For the antenna direct mounting type ODU, rack mounting installation is explained in
following procedure.
1
Fix the ODU rack mounting bracket into the 19-inch rack using the six fixing
bolts,
ODU mounting bracket
Flat washer
Spring washer
19-inch rack
Bolt
Flange adaptor
Mount the ODU onto the bracket and tighten the four fixing bolts (M6) on the
ODU,
Guide pin
ODU
Note
NWD-107460-07E
Installation
MOUNTING ODU
5-65
ODU
Waveguide
A
O-ring
Bolt*
Spring washer
Washer
Notes
*
M4: Up to 15 GHz.
M3: 18 GHz or higher.
1.
2.
Details of A
Installation
NWD-107460-07E
5-66/END
MOUNTING ODU
Rotate counter
clockwise 90
degrees.
To ODU
To ODU
WG Flange
NWD-107460-07E
Installation
TERMINATING CABLES
6-1
6. TERMINATING CABLES
In this section, list of tools, materials and the method for cable termination are
described. The list of applicable cable is shown in Table 6-1.
Table 6-1 List of Applicable Cable
Applicable Cable
5D Coaxial
Cable
8D Coaxial
Cable
Other Cables
Connector Type
Model#
Procedure#
for IDU
TNC-P
L-angle
TNC150(R0)
Procedure 6-1
for IDU
TNC-P
L-angle
300PTR-C-NC
Procedure 6-2
for IDU
TNC-P
L-angle
TNC156(R0)
Procedure 6-3
for ODU
N-P
L-angle
300PNR-C-NC
Procedure 6-4
for ODU
N-P
Straight
300PNM-C-NC
Procedure 6-5
for ODU
N-P
Straight
N435(R0)
Procedure 6-6
for IDU
TNC-P
L-angle
TNC141(R0)
Procedure 6-7
for ODU
N-P
L-angle
N-LP-8DFB(B)
Procedure 6-8
for ODU
N-P
Straight
N416(R0)
Procedure 6-9
AMP
Housing &
socket contacts
D-sub
Crimping
---
Procedure 6-11
D-sub
High Density
---
Procedure 6-12
Notes
Installation
In 1+1 system, the difference between the No.1 channel IF cable length
and the No.2 channel IF cable length should be within 100 m.
(differential absolute delay time: within 500 ns)
NWD-107460-07E
6-2
TERMINATING CABLES
Name
Remarks
Knife
Measure/Ruler
Cutter
Nipper
File
Clearance gauge
Comb
10
Tweezers
11
Scissors
91558-1
12
TC-CD-111
TC-CD-112
09 88 999 0596
NWD-107460-07E
Installation
TERMINATING CABLES
6-3
Aluminum tape
Connector body
Clamp
Clamp nut
Center conductor
Braided wire
Insulator
Tools
Clamp nut
Note
Installation
(8 mm)
NWD-107460-07E
6-4
TERMINATING CABLES
Tools
knife
cutter
measure, etc.
Insertion of parts.
(1) The clamp is inserted as shown.
(2)
Braided wire
Aluminum tape
Center Conductor
Insulator
Defective example
NWD-107460-07E
Installation
TERMINATING CABLES
6-5
Aluminum tape
Insulator
Center conductor
Note
Installation
NWD-107460-07E
6-6
TERMINATING CABLES
Flange
Aluminum tape
1)
Braided wire
2)
1)
Center conductor
Flange
Tools
NWD-107460-07E
cutter
nipper
Installation
TERMINATING CABLES
6-7
6 mm 1
Center conductor
Tools
Note
Installation
nipper
file, etc.
NWD-107460-07E
6-8
TERMINATING CABLES
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers.
Connector body
Clamp nut
(a)
NWD-107460-07E
Installation
TERMINATING CABLES
6-9
(b)
Installation
(c)
(d)
Hold of cable
NWD-107460-07E
6-10
TERMINATING CABLES
(e)
Holding only
14mm
9-11 Nm
14mm
Notes
1
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
Tools
NWD-107460-07E
Installation
TERMINATING CABLES
6-11
Procedure 6-2
Braided wire
Aluminum tape
Center conductor
Insulator
Tools
Connector body
Parts A
Parts B
Note
Tools
knife
cutter
measure, etc.
Installation
NWD-107460-07E
6-12
TERMINATING CABLES
Note
Tools
cutter
measure etc.,
Insertion of parts
Make the braided wire small and sharp at the front;
Install parts B and parts A revolving as onto cable without damaging the braided
wire.
NWD-107460-07E
Installation
TERMINATING CABLES
6-13
Tools
scissors
nipper
tweezers
45
5.0 mm
Note
Tools
Installation
cutter
measure
file, etc.
NWD-107460-07E
6-14
TERMINATING CABLES
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers. Tighten
the connection to the torque value of 60 to 80 lb-in (6.8 to 9.0 Nm).
60-80 lb-in
(6.8-9.0 Nm)
(2) The gap of the connector body and clamp nut is confirmed.
Gap: 0 to 0.5 mm
0 to 0.5 mm
Notes
1
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
Tools
NWD-107460-07E
Installation
TERMINATING CABLES
6-15
Procedure 6-3
Connector body
Aluminum tape
Clamp
Clamp nut
Center conductor
Braided wire
Insulator
Tools
Clamp nut
Note
Tools
Installation
knife
cutter
measure, etc.
NWD-107460-07E
6-16
TERMINATING CABLES
Insertion of parts.
(1) The clamp is inserted as shown.
(2)
Braided wire
Aluminum tape
Center Conductor
Insulator
Defective example
NWD-107460-07E
Installation
TERMINATING CABLES
6-17
Note
Center conductor
Aluminum tape
1)
Braided wire
Tools
Installation
cutter
nipper
NWD-107460-07E
6-18
TERMINATING CABLES
5 mm 1
Tools
Note
Center conductor
nipper
file, etc.
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers.
Connector body
NWD-107460-07E
Installation
TERMINATING CABLES
6-19
Clamp nut
12mm
10 Nm
16mm
Notes
1
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
Tools
Installation
NWD-107460-07E
6-20
TERMINATING CABLES
Procedure 6-4
Aluminum tape
(Connector body)
(Parts A)
(Parts B)
Clamp nut
Center conductor
A
Insulator
Braided wire
Tools
6.5 mm
Note
Tools
knife
cutter
measure, etc.
NWD-107460-07E
Installation
TERMINATING CABLES
6-21
Tools
cutter
measure etc.,
Insertion of parts
Make the braided wire small and sharp at the front;
Install parts B and parts A revolving as onto cable without damaging the braided
wire.
Installation
NWD-107460-07E
6-22
TERMINATING CABLES
Tools
scissors
nipper
tweezers
45
5.0 mm
Tools
NWD-107460-07E
cutter
measure
file, etc.
Installation
TERMINATING CABLES
6-23
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers. Tighten
the connection to the torque value of 60 to 80 lb-in (6.8 to 9.0 Nm).
60-80 lb-in
(6.8-9.0 Nm)
(2) The gap of the connector body and clamp nut is confirmed.
Gap: 0 to 0.5 mm
0 - 0.5 mm
Notes
1
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body
Tools
Installation
NWD-107460-07E
6-24
TERMINATING CABLES
Procedure 6-5
Parts A
Aluminum tape
Center conductor
Braided wire
insulator
Tools
6.5 mm
Note
Tools
knife
cutter
measure, etc.
NWD-107460-07E
Installation
TERMINATING CABLES
6-25
Tools
cutter
measure etc.,
Insertion of parts
Make the braided wire small and sharp at the front;
Install parts B and parts A revolving as onto cable without damaging the braided
wire.
Installation
NWD-107460-07E
6-26
TERMINATING CABLES
Tools
scissors
nipper
tweezers
45
5.0 mm
Note
NWD-107460-07E
Installation
TERMINATING CABLES
6-27
Tools
cutter
measure
file, etc.
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers. Tighten
the connection to the torque value of 60 to 80 lb-in (6.8 to 9.0 Nm).
60-80 lb-in
(6.8-9.0 Nm)
(2) The gap of the connector body and clamp nut is confirmed.
Gap: 0 to 0.5 mm
0 to 0.5 mm
Notes
1.
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body
2.
Tools
Installation
NWD-107460-07E
6-28
TERMINATING CABLES
Procedure 6-6
Braided wire
Washer
Aluminum tape
Center conductor
Insulator
Tools
Gasket
Clamp2
Connector body
Clamp nut
Insertion of parts
The clamp nut, the washer and the gasket are inserted in the cable.
Cable
Washer
Clamp nut
Clamp1
Gasket
13 mm
(Clamp1)
Note
Tools
NWD-107460-07E
knife
cutter
measure, etc.
Installation
TERMINATING CABLES
6-29
(2) Remove of insulator and aluminum tape as shown without damaging the center
conductor.
0 to 0.5 mm
6 mm 1
Tools
cutter
nipper
1 mm
Note
Tool
Installation
file
NWD-107460-07E
6-30
TERMINATING CABLES
Connector assembly
(1) The clamp2 is inserted between the aluminum tape and the braided wire.
Clamp2
(2) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers. Tighten
the connection to the torque value of 9 to 11 Nm.
Connector body
16 mm 9-11 Nm
16 mm
Notes
NWD-107460-07E
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
Installation
TERMINATING CABLES
6-31
(3) The gap of the connector body and clamp nut is confirmed.
(*) Gap: 2.2 to 2.7 mm
Tools
Note
Installation
NWD-107460-07E
6-32
TERMINATING CABLES
Procedure 6-7
Cable jacket
Connector body
Spacer
Washer
Insulator
Center conductor
Contact
Braided wire
cord tube
Clamp nut
Clamp
Tools
Cable jacket
A: 11 mm
B: 10 mm
Clamp nut
Tools
Note
NWD-107460-07E
9-10 mm
knife
cutter
measure, etc.
Installation
TERMINATING CABLES
6-33
Insertion of parts.
(1) The clamp are inserted in the cable.
(2) The braided wire is expanded a little. The cord tube is inserted between the
aluminum tape and the braided wire.
Aluminum tape
Clamp
Braided wire
cord tube
Tool
tweezers
cord tube
End face
Chamfering
6 - 7 mm
Tools
Installation
cutter
nipper
file
NWD-107460-07E
6-34
TERMINATING CABLES
Notes
1. Do not damage the braided wire.
2. Do not damage the center conductor. (brr etc.,)
Insertion of contact.
(1) A spacer is inserted in a central conductor and contact is inserted.
Spacer
Contact
Gap "0"
Note
During the contact, the spacer and the insulator there is no gap.
Refer to [common procedure] cable type A & type B for the next procedure.
13 -14 mm
Clamp nut
Note
Tools
NWD-107460-07E
knife
cutter
measure, etc.
Installation
TERMINATING CABLES
6-35
Insertion of parts.
(1) The clamp are inserted in the cable.
(2) The braided wire is expanded a little. The cord tube is inserted between the
aluminum tape and the braided wire.
Refer to the position of the cord tube by step 3.
Aluminum tape
Clamp
Braided wire
cord tube
Tool
tweezers
End face
Cord tube
Chamfering
6 - 7 mm
Tools
Installation
cutter
nipper
file
NWD-107460-07E
6-36
TERMINATING CABLES
Notes
1. Please note the position of the cord tube.
2. Do not damage the braided wire.
3. Do not damage the center conductor (burr etc.).
Insertion of contact.
(1) The clamp is moved to the cord tube side.
(2) Cut off the braided wire which comes out of the flange.
Clamp
6-7 mm
Contact
Gap "0"
Note There must be no gap between the contact, the spacer and the cord tube.
Refer to [common procedure] cable type A & type B for the next procedure.
Connector assembly.
(1) Insert it until the cable assembly bumps inner connector.
Connector body
NWD-107460-07E
Installation
TERMINATING CABLES
6-37
(2) The washer and clamp nut are moved to the connector side, and it tightens. The
tightening torque of the clamp nut is 8 to13 Nm.
Washer
Clamp nut
16 mm 8-13 Nm
16 mm
Notes
1.
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
2.
(3) The gap of the connector body and clamp nut is confirmed.
* Gap: 2.1 ~ 2.45 mm (reference)
Tools
Note
Installation
NWD-107460-07E
6-38
TERMINATING CABLES
Procedure 6-8
First fit the tying metal, washer and gasket on the cable,
[Applicable cable: 8D-FB-E]
Gasket
Cable
Washer
Tying Metal
Strip back the cable sheath, taking care not to damage the braided shield, and fit
the clamp,
Clamp
9 mm
Fold back the braided shield (separating the strands of the braid) and trim it,
Note
Ferrule
Bush
NWD-107460-07E
Installation
TERMINATING CABLES
6-39
Cut the aluminum foil and inner insulator away along the bushing and retain the
inner conductor,
Taper the edge of the center conductor using a file as shown in the enlarged view
below,
Note
Mount the contact onto the center conductor and mount the insulator onto the
contact,
Insulator
Installation
Contact
NWD-107460-07E
6-40
TERMINATING CABLES
10 Tighten the tying metal by wrench using the wrench points (Tighten with torque
of 4 to 10 Nm).
Less than 0.1 mm
(Usually no gaps)
Wrench point
NWD-107460-07E
Installation
TERMINATING CABLES
6-41
Procedure 6-9
Outlines of parts
Cable jacket
Aluminum tape
Washer
Braided wire
Center conductor
Insulator
Clamp nut
Tools
Gasket
Clamp1
Connector body
Insertion of parts
The clamp nut, the washer and the gasket are inserted in the cable.
Cable
Washer
Clamp nut
Gasket
11 mm
(Clamp1)
Note
Tools
Installation
knife
cutter
measure, etc.
NWD-107460-07E
6-42
TERMINATING CABLES
(2) Remove of insulator and aluminum tape as shown without damaging the center
conductor.
1 to 2 mm
6 mm 1
Tools
cutter
nipper
1 mm
Note
Tool
NWD-107460-07E
file
Installation
TERMINATING CABLES
6-43
Connector assembly
(1) The cable center conductor must be straight and aligned with the connector
inner contact. Insert the cable into the connector body until stopped; the center
conductor must be inserted into the connector inner contact fingers. Tighten
the connection to the torque value of 9 to 11 Nm.
Connector body
16 mm 9-11 Nm
16 mm
Notes
1.
When inserting, do not put the chip which is braided wire inside the
central conductor and the connector body.
2.
(2) The gap of the connector body and clamp nut is confirmed.
(*) Gap: 0 mm
Tools
Note
Installation
NWD-107460-07E
6-44
TERMINATING CABLES
2 3
4
Power connector
Socket contact
3.0 to 3.5 mm
Power supply cable
for 48 V
( 91558-1
(Tyco Electronics) )
NWD-107460-07E
Installation
TERMINATING CABLES
6-45
Squeeze the handle of the hand crimping tool, insert cable into socket contact,
The cable should fit, so insulation and bare wire are arranged as shown,
Squeeze the handle of the hand crimping tool until the ratchet is released,
Insulation barrel
Wire barrel
Insert the socket contacts into the power connector until they lock.
48 V
GND
Installation
Power connector
NWD-107460-07E
6-46
TERMINATING CABLES
Procedure 6-11
Height
2.
Use D-sub 44-pin connector for the CTRL of less than 57 mm in width as
illustrated below.
D-sub 44-pin connector for the CTRL
Width
Strip back the cable sheath, taking care not to damage the braided shield,
50 mm
Cable
Note
Fold back the braided shield (do not separate the strands) and trim it as shown,
Wire
NWD-107460-07E
Installation
TERMINATING CABLES
6-47
4 mm
Wire
Wire
Socket contact
The cable should be fitted so that insulation and bare wire are arranged as shown,
Installation
NWD-107460-07E
6-48
TERMINATING CABLES
Recheck that the wire position is as shown in step 5 before crimping the socket
contact (see illustration below),
Wire side
Socket contact
Wire
Set the cable into the plug case as shown in figure below. Then, fix the cable
using the cable clamper and two screws,
Cable clamper
Plug case
NWD-107460-07E
Installation
TERMINATING CABLES
6-49
11 Referring to circle B, insert each wire to the specified position (Refer Interface
Terminals and Jacks for IDU in Section II OPERATING EQUIPMENT.). Insert
the socket contacts into the upper and lower row positions while taking care that
the socket contacts are inserted the right way,
Circle A
Screw
Drain wire
Circle B
Installation
NWD-107460-07E
6-50
TERMINATING CABLES
12 Fix the plug case with two screws, as shown in the figure.
Screw
Plug case
Procedure 6-12
The following explains how to assemble high density crimp contacts used for
HARTING hand crimp tool as an example.
Crimping/inserting contacts process
1
NWD-107460-07E
Strip the jacket for 2.5 0/+0.5 mm as shown left and check if stranded wire is
not damaged,
Installation
TERMINATING CABLES
6-51
Stranded wire
Jacket
2.5 0/+0.5 mm
Crimp Tool
(09 88 999 0596)
Note: When the handles are in close position, squeeze handles completely until
safety ratchet is released.
Installation
Squeeze the handles together completely until the safety ratchet clicks to open,
NWD-107460-07E
6-52/END
TERMINATING CABLES
Take out the crimped contacts from the chamber. Check if it should not be
scratched or transformed,
After crimping the stranded wire to the contact using a hand tool, insert the
contact into the contact chamber with the tool, working from the wiring side,
10 Check if they are securely in place with giving the wire a gentle pull.
Removing crimp contacts
1
Position the tool from the wiring side as shown left and insert into the contact
chamber. The contact can then easily be removed from the wiring side together
with itself and reinserted in a different chamber.
Contact chamber
Wire
[Removal]
Contact can be removed
together with wire.
[Insertion]
Contact can be inserted
together with wire.
Position the
Insertion and removal tool
Connector
Note
D-sub connector
Height
Note
Use D-sub 44-pin connector for the CTRL of less than 57 mm in width as
illustrated below.
Width
NWD-107460-07E
Installation
7-1
Connect cables for, signal interface, power supply, IF IN/OUT and ground to the
proper connector of the IDU.
(1) Connect ground cable to the ground terminal.
(2) Connect IF cable to IF IN/OUT connector.
(3) Connect power supply cable to SELV connector.
(4) Connect 16/32/48E1, STM-1, Aux. signal cables to proper connector.
Note
Fix the cables using cable binder to the rack as like as indicated position.
Notes
1.
Do not cross the cables on front of indicators and power switch used for
maintenance.
2.
3.
Installation
5D-FB
8D-FB
TNC(P) - TNC(J)
NWD-107460-07E
7-2
Straight Type
Caution
ODU
IF cable
L-Angle type
ODU
IF cable
L Angle type
ODU
IF cable
NWD-107460-07E
Installation
7-3
Straight Type
Caution
IDU
IF cable
L-Angle Type (*)
IDU
IF cable
IDU
IF cable
Installation
NWD-107460-07E
7-4
Precaution for connecting the IF cable with a L-angle connector to the IDU
(a) Wrapping connector and cable by vinyl tape for protection.
After terminating the IF cable with a L-angle connector.
It is strongly recommended to wrap between connector and cable with vinyl tape to protect them
as follows.
1) From the starting point as shown in photograph,
wrap the tape 1 to 1.5 times carefully around the joint
where the cable and connector body are connected.
Connector body
starting
point
Note
Cable
Tape width of 20 mm
is recommended.
slightly
above
L/2
20 mm
NWD-107460-07E
Installation
7-5
Interface point of
Cable side connector
Interface point of
(c) Matching those interface points between the IF cable and the IDU.
IDU side connector
Installation
NWD-107460-07E
7-6/END
Cable Binder
NWD-107460-07E
Installation
8-1
Connect the Frame Ground (FG) terminal on the IDU to the mounting
rack with the earth cable. In addition, connect the mounting rack to the
indoor earth terminal with the earth cable and connect the FG terminal
on the ODU to the ground (refer to Figure 8-2).
IDU
RX LEV
MON
IFL
FG
FG
FG
Installation
NWD-107460-07E
8-2
Lighting rod
Protect area
Outdoor earth ground terminal
(Existing or customer supplied)
Earth line
ODU
Coaxial cable
Rack
IDU
Earth line
Cautions:
1. Install the ODU within the area protected by lightning rod.
2. To avoid surge currents caused by lightning circulating in the equipment
earth system, connect the equipment earth system (frame ground) to
ground of the lightning rod at ground level.
Note
NWD-107460-07E
Installation
8-3
Tower
Lighting rod
ODU
Earth line
Coaxial cable
Earth line
isolated from tower
(Grounding-resistance:
less than 10 ohms)
(Grounding-resistance
of tower: less than
10 ohms)
FG
Grounding cable for ODU should be
connected to the nearest EP of the tower.
EP
Earth line*
(Grounding-resistance:
less than 10 ohms)
The coaxial cable lets through the inside of the steel tower.
The earth between ODU-IDU lets through the inside of the
steel tower.
Use a copper grounding conductor to ground the rack.
The grounding conductor to the CO GND be connected to
the rack.
Coaxial cable
INDOOR EARTH
LINE
IDU
This is the buried earth
wire.
This type of wire is not an
insulated winding wire and
recommends to make a
naked wire.
GROUND
LEVEL
Notes
*
EP
FG
Installation
NWD-107460-07E
8-4/END
NWD-107460-07E
Installation
WATERPROOFING
9-1
9. WATERPROOFING
After cable connection, the following parts should be wrapped by self-bonding tape
for waterproof (see Figure 9-1).
Caution
Before connecting the IF cable between the IDU and ODU, using the circuit
tester, check that the resistance of the I/F cable between center conductor
and insulation is more than 100 M
Pole
ANT
ANT
Pole
HYB/Coupler
ODU
ODU
Note A
Note A
ODU
Self-bonding
tape
Note A
Stretch
ODU
Twice
Installation
NWD-107460-07E
9-2/END
WATERPROOFING
ODU
IFL connector
Caution: Before connecting the IF cable between the IDU and ODU,
using the circuit tester, check that the resistance of the I/F
cable between center conductor and insulation is more than
100 M
IF cable
ODU
Self-bonding tape
Self-bonding tape
ODU
Self-bonding
tape
ODU
IF cable
Note
In case of Langle
NWD-107460-07E
Installation
10-1
2.
Do not disconnect the IF cable between the IDU and the ODU in
operating condition, to avoid damaging the equipment, turn the IDU
power OFF before connecting/disconnecting the IF cable.
3.
Do not allow open or short circuit of ODU TX output with the TX power
on conditions. Perform the TX ODU PWR control in the Maintenance
mode or turn the PWR switch off at the IDU before disconnecting cable
or feeder from the ODU TX output.
4.
Caution:
Installation
1.
Be careful top surface above MODEM of the IDU and the ODU are hot in
operation.
2.
NWD-107460-07E
10-2
Procedure
Note:
Check that the IF cable between the IDU and the ODU is firmly connected,
CHeck the ODU PWR switches (Sys. #1 and #2*) off (lower position) at the
IDU,
Before connecting the power cable connector to the IDU, check the input voltage
is 48 V (allowable range; within 40.5 to 57 V) with the digital multi meter,
Turn the ODU PWR switches (Sys. #1 and #2*) on (upper position) at the IDU.
Note:
10.2 Shut-down
The shut-down procedures for the equipment is shown as followings.
Warning:
After turning ON the equipment, wait at least 1 minute before turning it
OFF again. Repeatedly turning the power ON and OFF with in a short
interval may cause the IDU/ODU to fail.
Procedure
NWD-107460-07E
Turn off the ODU PWR switches (Sys. #1 and #2) at the IDU.
Installation
10-3
Installation
Check the ODU PWR switch (Sys #2) off at the IDU,
Check that the IF cable between the IDU and the ODU is firmly connected,.
NWD-107460-07E
10-4/END
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-1
Connect the PC to the LCT port on the iPASOLINK IDU using LAN cable (see
Operation manual),
Click and select for the following control items in Maintenance Control,
Notes
Installation
1.
2.
When the TX power control mode is set to ATPC, set it to MTPC and
required level for the PASOLINK link on the Equipment Setup and
Provisioning.
TX SW Manual Control:
RX SW Manual Control:
TX Power Control:
(at opposite site)
NWD-107460-07E
11-2
ORIENTING ANTENNA
At each station, adjust the azimuth and elevation angle of the antenna alternately
so that the measured voltage becomes maximum,
Note
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
-80
-70
-60
-50
-40
-30
-20
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-3
PASOLINK MONITOR
0
DIGITAL MULTIMETER
OW
RX LEV MON
RX LEV
MON
RX LEV/OW IN
IFL
FG
RX LEV MON
Notes
1.
2.
Note
Installation
The fixed bolts and nuts to be used for the antenna orientation differ with
antenna bracket types, refer to antenna bracket shown in Figure 11-4 to
Figure 11-8.
NWD-107460-07E
11-4
ORIENTING ANTENNA
10
2
10
K
Power density S mW cm = --------------------------------2
40 R
Where:
P = Output power of ODU (dBm),
G = Antenna Gain (dBi),
(in consideration of the angle from antenna)
K = Reflection factor = 2.56 (given),
R = Distance between Human and Antenna (m)
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-5
Installation
NWD-107460-07E
11-6
ORIENTING ANTENNA
A-2
A-3
A-5
A-6
4. Adjust elevation
2. Adjust azimuth
Figure 11-3 Location of Adjusting Nuts and Bolts (ANDREW VHLP type bracket)
NWD-107460-07E
B-1
B-2
B-3
Installation
ORIENTING ANTENNA
11-7
B-5
B-6
B-7
2. Adjust azimuth
1. Loosen for adjusting azimuth
4. Adjust elevation
0.3 m Antenna
Figure 11-4 Location of Adjusting Nuts and Bolts (RFS SB1 type bracket)
C-2
C-3
Installation
C-4
C-5
C-6
NWD-107460-07E
11-8
ORIENTING ANTENNA
2. Adjust azimuth.
0.6 m Antenna
Figure 11-5 Location of Adjusting Nuts and Bolts (RFS C-Mount type bracket)
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-9
At each station, restore the MAINT Mode to off position using the LCT,
Installation
Loosen three screws (SCREW1, 2 and 3 in Figure 11-6) and rotate antenna
(connected OMT/ODU) so that the RX LEVEL MON indicates the maximum
value at the ODU of the Main Master and Sub Master channels,
At opposite station, turns the ODU of the Sub Master channel power OFF (for
both No.1 and No.2 Sub Master channels in 1+1 system),
In this conditions, check the RX LEVEL MON indication value for XPD at the
ODU of the Sub Master channel,
Confirm that the XPD is more than 25 dB, if not, repeat Azimuth Angle,
Elevation Angle and XPD Adjustment,
At opposite station, turns the ODU of the Sub Master channel power ON,
NWD-107460-07E
11-10
ORIENTING ANTENNA
Rotation
indicator
Screw 2
Screw 1
Pole
Screw 3
Figure 11-6 Location of Adjusting Nuts and Bolts (RFS C-Mount type bracket)
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-11
Take care that the flexible waveguide is not forcedly twisted by rotating
the antenna.
When the HS/SD system is configured, alternately switchover the transmitter to the
other channel (No.1 or No.2) at the opposite station and repeat adjustment of
elevation and azimuth to obtain satisfactory results in both No.1 and No.2 CH.
1
Loosen jam nuts and rotate turnbuckle-1 in Figure 11-7 so that the RX LEVEL
MON voltage obtains the maximum value,
Carefully, tighten turnbuckle-1 jam nuts and bolts indicated by arrows in Figure
11-7 to hold the adjustment.
Strut
Torn bucle-1
ANDREW VHLP4 type bracket
Installation
NWD-107460-07E
11-12
ORIENTING ANTENNA
Loosen jam nuts and rotate turnbuckle-2 in Figure 11-8 so that the RX LEVEL
MON voltage obtains the maximum value,
Carefully, tighten turnbuckle-2 jam nuts and bolts indicated by arrows in Figure
11-8.
Torn bucle-2
B. Elevation Adjustment
ANDREW VHLP4 type bracket
NWD-107460-07E
Installation
ORIENTING ANTENNA
11-13
At opposite station, turns the ODU of the Sub Master channel power OFF (for
both No.1 and No.2 Sub Master channels in 1+1 system),
In this conditions, check the RX LEVEL MON indication value for XPD at the
ODU of the Sub Master channel,
Confirm that the XPD is more than 25 dB, if it is not obtained, repeat Azimuth
Angle, Elevation Angle for the XPD Adjustment,
Tighten all strut attachment hardware, turnbackle jam nuts and bolts indicated by
arrows in Figure 11-7 and Figure 11-8,
At opposite station, turns the ODU of the Sub Master channel power ON (for
both No.1 and No.2 slave channels in 1+1 system),
At each station, disconnect the digital multimeter or OW/RX LEV Monitor from
the RX LEV MON connector,
At the Main Master station, when the TX power control is operated in ATPC,
restore the TX Power Control item of System Configuration changed in step 1 to
ATPC using the LCT,
At the Main Master, when the TX power control is operated in MTPC, restore
MTPC TX PWR item of Provisioning Data changed in step 2 to original
setting value using the LCT,
Installation
NWD-107460-07E
11-14/END
ORIENTING ANTENNA
NWD-107460-07E
Installation