Sie sind auf Seite 1von 8

DR

IVING E
Q
UI

Shanghai ZhenLi Equipment Company


American Piledriving Equipment Inc.
J&M Official Manufacturer

NC

ER

P M E N T,
I

IC A N PILE

2011

Steel Pipe Piles


Driving / Extracting
-Bridge Construction
-Dock Construction
-Offshore Oil / Templates
-High Speed Rail
-Road and Highway
-Structual Buildings
-Power Grids
-Cummunication Towers

Shanghai
Office Phone: 021-56771221

233
www.apevibro.cn

-Earthquake proofing
-Tunnels
-Land Reclimation
-Temporary Foundation
-Permanant Foundation
-Airport Runways
-Subway Construction
-Underwater Foundation

AM

A.P.E. Vibratory Hammers


We know its not everyday you are going to need to drive a 22m
diameter pile. These special government projects push the limits of hydraulic vibratory hammer technology, but you too can
benifit from the hundreds of hours and millions of dollars spent
on research and development from these projects. When you
buy APE products you get all the advantages of APE technology
which have made APE products so important for the Chinese
and U.S. governments. Whether your driving a 22m diameter
pile or a 200mm diameter pile we are looking forward to working with you today!

Introducing the APE 200 Series Vibro


The APE 200 Series are our most popular vibratory hammer
models due to their high power and good price. The APE 200
series vibro can drive or extract pipe piles from 600mm to 3
meters in diameter. The 200 Series vibros are produced in
Shanghai, China, which means big price savings for anybody
in the Asia/Pacific region looking to use one. All fabrication,
machining, and assembly are done in our facility by trained
APE personnel. The APE 200 series have a 15-year history of
success worldwide and many happy customers are still using
the 200 line today. Visit us on the web at www.apevibro.cn for
more details and videos!

High power, light weight


Model 200 driving 2.4m diameter piles

SPECIAL FEATURES
High power, light weight - Light weight allows crane operators
to reach farther and do more work without moving the crane.
Moving the crane eats time, the more work you can do without
moving it the more profit you can make.
Two Stage Suppressor - A feature unique ONLY to APE and
internationally patented, allows the startup and shutdown of the
hammer to be extremely soft on the crane. APE uses super large
rubber elastomers that make startup so soft that an APE 200-6
can by vibrated from a 12-ton forklift or hydraulic spotter crane
with no problem. APE patented rubber elastomers have an average life of 15 years. Many competitors have tried to copy them,
but 20 years of experience making elastomers is difficult to copy.
See our website at www.apevibro.cn for more details and video
demonstrations!

1st
Stage

2nd
Stage

During Startup and Shutdown only the first


stage is used; protecting your crane and crew
Model 200-6 driving 600mm diameter piles

First Harbor Marine


Engineering Groups
team inspects the pile
prior to driving.

DRIVING INNOVATION
PROJECT: HONGKONG ZHUHAI-MACAU BRIDGE 2011
In cooperation with the China Construction Bureau and Tianjins First Harbor Engineer Group, the Octa-Kong project, started on April 20th 2011 to create two manmade islands in the South China Sea for the HZM Bridge. The project required the
largest piles in the world made by ZPMC in Shanghai. Using 8x APE 600s linked
together, APE created the Octa-Kong, which is by far the largest vibro in the world.
PILE DIAMETER: 22 meters
PILE HEIGHT: 40-60 meters
PILE WEIGHT: 450-600 metric tons
HAMMER TYPE: 8x APE 600s linked together
HAMMER WEIGHT: 502 metric tons
DRIVE FORCE: 4,450 metric tons
POWER UNIT: 9,600 Horse Power

The Octa-Kong

HIGHEST QUALITY
#1 Quality - There is no doubt that when you buy APE equipment you can rest assure you are buying the highest quality
product in the market. When large projects like the Hong Kong Zhuhai-Macau bridge happen, the Chinese government
doesnt even consider using anything less than the best, and nor should you. Dont be fooled by those selling cheap products, because when those products break down and take months to service they will no longer be cheap. My first suggestion
to any company that has not experienced using a high quality hammer is to try renting one for a month and see the difference. For even more examples of how our machines are built visit our website at www.apevibro.cn or visit our Shanghai
branch today!
At APE we have a saying:

IMPORTED PARTS LIST

Always buy the best


because the best is
barely good enough.
-Pat Hughes

High quality parts imported from


USA, Germany and Australia.

Small elastomers (Stage 2)


Large elastomers (Stage 1)
Underwater seal kit
Gun drilled top-plate
Hydraulic motors
Over-sized bearings
Drive gears
Clamp seal kit
Clamp Jaws
Safety check valves
More details on www.apevibro.cn

APE 200-6 driving 1m diameter piles with cross beam

When we buy tools to work


on our hammers we buy
the best. When we use
seals to put in our clamps
we use the best. We do this
because we know that even
the best parts the world
markets have to offer will
still eventually break or
wear out. No man-made
tool is going to last forever,
therefore our philosophy is
that if we are going to build
something, lets use the best
available parts to create a
truly outstanding product
that will last as long as possible and break down as
little as possible.

DESIGNED TO RENT
Renting hammers is APEs primary business. At any given time APE has about 350+ hydraulic vibratory hammers on rent
around the world. When hammers go on rent they often take a lot more abuse compared to when customers buy them.
Often they are overworked, loaded on trucks improperly, gear oils are not checked, diesel fuel used is the lowest quality,
hoses are run over with trucks, and sometimes hammers are dropped. Whats amazing is that of all these 350+ hammers,
only 20 service men and women cover them all. If APE had to service every hammer when it goes on a job we would go out
of business, especially in the United States where a single hour of labor can cost 1,500 RMB. APE hammers are designed to
take a high amount of abuse. That is why APE uses an over designed cooling system, extra hydraulic oil filter system, added
fuel filters, install gear pumps which still work even with extremely dirty oil, and more.
For even more info and videos about APE rental quality go to www.apevibro.cn!

ADVANCED FEATURES
Underwater Driving - Unique ONLY to APE is underwater technology that allows all APE equipment to go 100m underwater without modification. In certain special cases for the Oil industry APE
equipment has gone as far as 400m underwater. Due to special
custom FAG bearings, high quality seals, helically cut gears, and
highly accurate machining, have no fear to take your APE hammer
underwater on your next job! See our website for more info on
underwater technology at www.apevibro.cn.
Multiple Linked Vibro System (MLVS) - Invented by APE in
1995, two or more APE hammers can be linked together for difficult driving conditions. APE hammers can be connected together
for difficult jobs, then separated again for easier jobs. As you can
see in the main photo, APE leads the industry in MLVS technology.
See more at www.apevibro.cn.
Underwater pile extraction

2x APE hammers linked together (MLVS)


Double the power when you need it.

Gun Drilled Top Plate - Unique ONLY to APE is a special


imported cover plate on top of the gearbox that has been gundrilled to allow hydraulic oil to flow to all motors and clamp ports
without hoses. This reduces parts by 10%, increases hammer life,
and increases cooling capacity. For more on gun-drilled top plate
advantages see our website at www.apevibro.cn.
SHOWN LEFT: Hydraulic oil
flows through the top plate instead of hoses that get tangled
and broken. All APE equipment
uses this advanced technology for
increased life of the machine and
less chance of down time.

Single piece eccentrics - Unique ONLY to APE are our special


eccentrics inside the gearbox that are casted and machined as one
piece. This advanced casting and machining process allows the
gearbox to be free of any bolts. All other vibros on the market use
bolts in the gearbox, and WHEN they break, not IF, it will destroy
the entire gearbox. Many have decided to buy APE machines on
this single feature alone, because when contractors are down for 3
months fixing a gearbox the dollars adds up. See our website for
more information at www.apevibro.cn.

APE 200 driving electrical grid piles

No bolts, one piece

Features and benefits to choosing A.P.E. :

1.

PRICE

2.

RELIABILITY

3.

Import quality, domestic price. APE controls about 70% of the U.S. market for hydraulic vibratory hammers. This means that U.S. customers have enjoyed great prices due to large volume production. Since
1999 A.P.E. has made about 40% of its vibratory hammer components in China, so in 2008 when APE
Shanghai (ZhenLi) opened we already had years of experience producing high-end components for our
machines. Now customers in China can enjoy these same benefits and prices. Currently in China, about
65% of APE hammers are made in Shanghai; the other 35% is imported from the USA. The imported
parts include key components like bearings, electrical systems, motors, pumps, manifolds, and seal kits.
When you buy A.P.E. you get an import quality product at a domestic price. Call us for a quote today!

The biggest time waster on a jobsite is broken down equipment. You need a product that is going to
work with as little downtime as possible. APE hydraulic vibratory hammers use 30% less parts than any
of our competitors, can run for 24 hours per day, use extra large cooling system for hot weather, have
oversized bearings for better heat protection, and is backed by a 1 year warranty on all parts. The average lifetime of an A.P.E. hammer and power unit is about 15+ years. Dont be fooled, not every import
hammer is the same, go with a brand that has proven itself in the market for more than 20 years. We
invite you to see our shop or local jobsite with APE equipment today!

VIP 24 HOUR SERVICE.

Time is money. You want a company that is going to answer the phone when you need help. Service
is not to be underestimated. On jobsites things happen, equipment is dropped, tools are run over by
trucks, wires get tangled up and broken, and occasionally a part is going to need replacing. APEs Shanghai facility has trained service personnel and spare parts for any sized hammer. We hope to have the opportunity to work with you soon. Come experience why so many have chosen A.P.E. equipment today!

VibraTory Driver/extractor Specifications


Model

15

20

50

100

150

150T

200

200T

200-6

200-6T

300

400

600

Eccentric Moment

600 in-lb
6.9 kg-m

900 in-lb
10.3 kg-m

1,300 in-lb
15 kg-m

2,200 in-lb
25 kg-m

2,200 in-lb
25 kg-m

2,600 in-lb
30 kg-m

4,400 in-lb
50.80 kg-m

5,200 in-lb
60 kg-m

6,600 in-lb
76 kg-m

7,800 in-lb
89.9 kg-m

6,500 in-lb
74.8 kg-m

13,000 in-lb
150 kg-m

20,000 in-lb
230 kg-m

Drive Force

29 tons
259 kN

43 tons
382 kN

50 tons
445 kN

88 tons
783 kN

102 tons
907 kN

120 tons
1,067 kN

170 tons
1,512 kN

201 tons
1,788 kN

255 tons
2,268 kN

301 tons
2,677 kN

180 tons
1,601 kN

360 tons
3,203 kN

556 tons
4,952 kN

Frequency (vpm)

0-1,850

0-1,850

0-1,650

400-1,650

400 - 1,800

400-1,800

0-1,650

0 - 1,650

0-1,650

0-1650

400-1,400

400-1,400

400-1,400

Max Line Pull

30 tons
266 kN

30 tons
266 kN

60 tons
534 kN

60 tons
534kN

80 tons
711 kN

80 tons
711 kN

150 tons
1,335 kN

150 tons
1,335 kN

200 tons
1,779 kN

200 tons
1,779 kN

200 tons
1,779 kN

250 tons
2,224 kN

250 tons
2,224 kN

Suspended Weight

2,900 lbs
1,315 kg

3,500 lbs
1,587 kg

4,500 lbs
2,812 kg

7,900 lbs
3583 kg

8,800 lbs
3,900 kg

8,800 lbs
3,990 kg

16,500 lbs
7,483 kg

16,500 lbs
7,483 kN

22,000 lbs
9,977 kg

22,000 lbs
9,977 kg

22,000 lbs
9,977 kg

32,000 lbs
14,512 kg

38,000 lbs
17,236 kg

Throat Width

75 in
191 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

14 in
35.5 cm

26 in
66 cm

36 in
91.4 cm

Length

75 in
191 cm

42 in
106.6 cm

52 in
132 cm

88 in
223 cm

88 in
223 cm

88 in
223 cm

101 in
256 cm

101 in
256 cm

139 in
353 cm

139 in
353 cm

106 in
269 cm

120 in
305 cm

170 in
432 cm

Height w/o clamp

50 in
127 cm

64 in
157 cm

64 in
157 cm

68 in
173 cm

72 in
183 cm

72 in
183 cm

89 in
226 cm

89 in
226 cm

89 in
226 cm

89 in
226 cm

92 in
269 cm

101 in
256 cm

102 in
259 cm

STANDARD BEAMS
Length

Weight

8 Ft
2.43 m

3,300 lbs
1496 kg

98 in
2.48 m

84 in
2.13 m

12 in
305 mm

6 in
152 mm

13.75 in
349 mm

12 in
305 mm

12 in
305 mm

3 in
76 mm

5 in
127 mm

3.31 in
84 mm

2.75 in
70 mm

5.5 in
140 mm

6.5 in
165 mm

6 in
152 mm

8 in
203 mm

11 Ft
3.35 m

4,500 lbs
2,041 kg

132.5 in
3.4 m

120 in
3.04 m

12 in
305 mm

6 in
152 mm

13.41 in
340 mm

12 in
305 mm

12 in
305 mm

3 in
76 mm

5 in
127 mm

3.31 in
84 mm

2.75 in
70 mm

5.5 in
140 mm

6.5 in
165 mm

6 in
152 mm

8 in
203 mm

9 in
229 mm

3.35m Beam (11ft)

2.43m Beam (11ft)

CROSS BEAMS (QUAD BEAMS) FOR 200-6, 400, AND 600


3 pc. Quad
Beam

Weight

11 ft
3.35 m

9,500 lbs
4,309 kg

134 in
340 cm

136 in
345 cm

53 in
134.6 cm

31 in
78.7 cm

30 in
76.2 cm

6 in
152 mm

15 ft
3.93 m

13,000 lbs
5896 kg

180 in
457.2 cm

184 in
467.3 cm

75 in
190.5 mm

31 in
78.7 cm

41 in
104 cm

6 in
152 mm

17 ft
5.18 m

15,000 lbs
6803 kg

206 in
523.2 cm

208 in
528.3 cm

89 in
226 cm

31 in
78.7 cm

41
104 cm

6 in
152 mm

Cross (Quad) Beam

STANDARD PIPE CLAMPS


Model

Weight

Piston
Dia.

Piston
Stroke

Cyl. Force

Clamp
Force

100

1,500 lbs
680 kg

8 in
203 mm

2.25 in
57 mm

226 kips
1,005 kN

452 kips
2,010 kN

25.63 in
651 mm

200

2,000 lbs
907 kg

8 in
203 mm

2.25 in
57 mm

226 kips
1,005 kN

452 kips
2,010 kN

28.56 in
725 kN

11 in
279 mm

18.63 in
473 mm

6 in
152 mm

6.63 in
168 mm

6.25 in
159 mm

1.5 in
38 mm

14 in
355 mm

10.63 in
270 mm

11 in
279 mm

23.38 in
594 mm

11 in
279 mm

22.56 in
573 mm

10.81 in
274 mm

6.63 in
168 mm

7.25 in
184 mm

1.5 in
38 mm

14 in
355 mm

11 in
270 mm

11
279 mm

23.25 in
590 mm

Shown Left:
8 foot beam
Model 200 Cassion clamps

Let A.P.E. help your company make more profit on your


next pipe pile job. When you buy APE equipment you
team with a crew of the most experienced pile drivers on
the planet. We dont just sell equipment, we work with
you to find solutions for your project and provide training to your crew. We look forward to working with you
on your next project. Call, E-mail, or text us today.

Dear Customer,

David J. White
Managing Director
Language: English or Chinese
Mobile China: +86-15800836528
Mobile USA: +1-206-422-2475
E-mail: davidw@apevibro.com

Steve Gough
International Sales Manager
Language: English or Chinese
Mobile USA: +1-206-669-5977
Mobile China: +86-13718668682
E-mail: steveg@apevibro.com

Mr. Yang
Domestic Sales and Service
Special Projects Engineer

Since 1990 I have watched APE grow from 0% market


share to 70% market share in the United States. I believe
this was done due to a combination of great innovation
and customer relationships. I believe that as APE opens
its products to the China market a great responsibility
is laid on our shoulders, not only to represent APE but
to also represent an American company in China. After
living in China for 11 years I realize more than ever the
importance of good communication and mutual respect
for each other. Many of our loyalist customers started
out with competitor equipment that failed to have service
and quality. Around the world there are many people
out there to take your money, and since APE is the largest vibratory hammer company you can be sure there
are many fake APE hammers and parts in the market. I
encourage you to call me direct at anytime if you think
you have purchased fake equipment, or received a questionable quote for APE goods and services. SEMW is
our ONLY distributor in China. I encourage and invite
you to come to Shanghai to meet our staff and see our
clean facility where we make these products. Im looking
forward to meeting you soon. Please call, text, or e-mail
me at anytime.

Language: Chinese or Written English


Mobile China: +86-13597997954
E-mail: yang@apevibro.com

Thank you,
David J. White

Managing Director APE China

Das könnte Ihnen auch gefallen