QC Patrol
Inspection Date
After receiving comment
PD
Project Name
EPPI F3 PROJECT
No.
Photo
Potential Risk
Remedial Measure
Loadings on column
may not be properly
distributed to the
structural concrete
which can cause
failure on steel post.
May affect
transmission of
loadings from one
member to another.
Can damage steel
structural members.
Bolted connection
should be initialy
tightened and after
that for final tightening
loadings on column
directly transfer to
Steel column not yet
the anchor bolts that
grouted
can cause failure of
the anchor bolts
Should be grouted
immediately after final
tightening of
anchorbolt
Person in
charge /
Target date
May affect
transmission of
loadings from one
member to another.
Can damage
structural members.
May affect
transmission of
loadings from one complete installation of
member to another. bolts.
Can damage
structural members.
Damaged, Buckled
Can affect the next
purlins, alignment activities which is the
and levelness need to
installation of
rectify
roofings.
No minimum thread
protruding beyond
face of the Nut of pre
assembled purlins
May affect
transmission of
loadings
1/2
Cause of
occurrence
03/22/16
Completion
16
After rectification
PD
PM
PM
Inspector
MR. RENATO SALAZAR
Preventive Measure
Result
Photo
Confirmed
Person / Date
No.
Photo
Comment
10
11
12
Potential Risk
Remedial Measure
Person in
charge /
Target date
GL 10
13
Allignment and
elevation of steel
truss need to rectify
14
Removal of falling
objects that may
cause accident.
15
16
2/2
Cause of
occurrence
Preventive Measure
Result
Photo
Confirmed
Person / Date