Sie sind auf Seite 1von 17

FORMWORK TIME

CALCULATION

ANDREAS LVKSSON
7th semester, autumn 2004

COMPANY STRUCTURE
AND GOALS

Snave construction
38 Grace Avenue
Mt. Maunganui
New Zealand

When I had divided the concrete word down to cycles I had to calculate the time of each
cycle, both for formwork and the pouring time.
First I calculated if this project was big enough to use a crane and big forms. As the
calculation shows it will not pay up to use a crane. We will there for use DOKA aluframax
in the sizes that can be handled with out a crane.
Following calculations show the time used for erection of formwork, time of each pour of
concrete, time of vibration and time of pump for each cycle.
When calculating the time for erection of the formwork I compared many different
numbers. I got numbers form the V&S price book, Rawlins price book, Opmlerforeningen
and from the Agent for DOKA forms in Iceland. When compairing those figurs I had they
where all very different. I decided to go with the figures I got from the DOKA dealer in
Iceland at Formaco where he said that a group of 3 men could erect upto 800 m2 a week
with a crane and in big shutters 2.400*2.700 mm and upto 500 m2 a week without a crane
and in smaller shutters.

01/11/2004

2 of 3

Andreas Lvksson
7th semester, autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK WITH/WITHOUT A CRANE

Cycle 1 with crane


Facts

For DOKA Framax 3 men can install up to 700 m2 of formwork during 1 week
with a crane and most form in the size of 2400x2700 mm. As this is a small job
I will calculate that they will install 500 m2 during the week. If using 40 hours a
week that is 4,1 m2/hour

Work force for formwork


Thickness of wall
Length of wall
Height of wall

3
0.2
31.2
2.7

people
mtrs
mtrs
mtrs

Formwork
Quant unit
224
0.0
0
224
0.0
224
0

m2
mtrs
pcs
m2
mtrs
m2
m2

Description

Time/h

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.2
0.1
2
0.1
0.2
0.1
0.04

44.8
0.0
0.0
22.4
0.0
22.4
0.0

Salories

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,475.26
$0.00
$0.00
$737.63
$0.00
$760.03
$0.00
$2,972.93

Total time of this pour

Total
hours

Installation of formwork

89.6

Men used Hours used

Crane use if needed


Crane needs to arrive and go 3 times * 1 hour each time
Total usage of crane
Need 10 ton crane from Mcloed
Cost for formwork
Total cost for installing formwork

01/11/2004

$85 h

Unit

29.9

22.4
3

h
h

25.4

$2,159
$2,973

$5,132

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK WITH/WITHOUT A CRANE

Cycle 1 without a crane


Facts

For DOKA ALU Framax 3 men can install up to 500 m2 of formwork during 1
week without a crane and most form in the size of 600x2700 mm. As this is a
small job I will calculate that they will install 400 m2 during the week. If using
40 hours a week that is 3.33 m2/hour

Work force for formwork


Thickness of wall
Length of wall
Height of wall

3
0.2
31.2
2.7

people
mtrs
mtrs
mtrs

Formwork
Quant unit
224
0.0
0
224
0.0
224
0

m2
mtrs
pcs
m2
mtrs
m2
m2

Description

Time/h

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.1
2
0.15
0.2
0.1
0.04

56.0
0.0
0.0
33.6
0.0
22.4
0.0

Salories

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,844.08
$0.00
$0.00
$1,106.45
$0.00
$760.03
$0.00
$3,710.56

Total time of this pour

Total
hours

Installation of formwork

112.0

Men used Hours used

Crane use if needed


Crane needs to arrive and go 3 times 1 hour each time
Total usage of crane
Need 10 ton crane from Mcloed
Cost for formwork
Total cost for installing formwork

01/11/2004

$85 h

Unit

37.3

0.0
0

h
h

0.0

$0
$3,711

$3,711

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


Foundation under swimming pool
Facts

1.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.5
123.0
0.15
90.0
0.50
1.0
0.8
154
154

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
36.9
0.0
0
36.9
0.0
36.9
36.9

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.65
0.2
2
0.15
0.2
0.16
0.04

Salories

24.0
0.0
0.0
5.5
0.0
5.9
1.5

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$789.83
$0.00
$0.00
$182.27
$0.00
$200.32
$51.56

36.90

$1,223.97

Placement of Concrete & reo


Quant

unit

9.2 m3
830 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.013
0.045
2.0

Salories

9.3
37.4
2.0

Total

32.93
32.93
33.93

$307.73
$1,230.31
$67.86
$1,605.89

Vibration
Quant

unit

153.8 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.6

Total

32.93

$21.10

Total price for labor $2,850.96

$77.26 per m2 of formwork


$309.05 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

35.4
9.3
0.6

3
4
1

11.8
2.3
0.6

h
h
h

2.3
10.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


Foundation & slab in swimming pool
Facts

1.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
8
0.5
123.0
0.15
90.0
0.50
1.0
0.8
154
154

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
18.45
0.0
0
18.45
0.0
18.45
18.45

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.65
0.2
2
0.15
0.2
0.16
0.04

Salories

12.0
0.0
0.0
2.8
0.0
3.0
0.7

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$394.91
$0.00
$0.00
$91.13
$0.00
$100.16
$25.78

18

$611.99

Placement of Concrete & reo


Quant

unit

78.1 m3
7,029 kg
5 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.013
0.045
2.0

Salories

79.1
316.3
10.0

Total

32.93
32.93
33.93

$2,605.27
$10,415.92
$339.30
$13,360.49

Vibration
Quant

unit

153.8 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.6

Total

32.93

$21.10

Total price for labor $13,993.57

$758.46 per m2 of formwork


$179.18 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

17.7
79.1
0.6

3
8
1

5.9
9.9
0.6

h
h
h

9.9
5.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


Foundation in main building
Facts

1.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.8
23.0
0.50
90.0
0.50
1.0
0.8
29
29

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
23.00
0.0
0
23
0.0
23
23

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.65
0.2
2
0.15
0.2
0.16
0.04

Salories

15.0
0.0
0.0
3.5
0.0
3.7
0.9

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$492.30
$0.00
$0.00
$113.61
$0.00
$124.86
$32.14

23.00

$762.91

Placement of Concrete & reo


Quant

unit

9.2 m3
828 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.013
0.045
2.0

Salories

9.3
37.3
2.0

Total

32.93
32.93
33.93

$306.89
$1,226.97
$67.86
$1,601.73

Vibration
Quant

unit

28.8 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.1

Total

32.93

$3.94

Total price for labor $2,368.58

$102.98 per m2 of formwork


$257.45 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

22.1
9.3
0.1

3
4
1

7.4
2.3
0.1

h
h
h

2.3
6.2

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

CONCRETE SLABS
Slabs and concrete floors
Facts
Work force for formwork
Work force for concrete
Thickness of slab
Size of slab
Length of foundations
Height of foundation
Concrete per mtr of foundation
Reo
Height of each layer
Distance between vibration
Amount of dip-ins

unit

Description

Time/h

m2
mtrs
m2
mtrs
m2
m2

Formwork installation 3/5


Formwork around edges
Shoring and fastening
scaffolding and safety
Formwork removal 2/5
Transportation of formwork

3
16
0.20
1,180.0

90.0
0.15
0.8
1,475

people
people
mtrs
m2
mtrs
mtrs
m3
kg. pr/m3
mtrs
mtr
pcs

Formwork
Quant
132
0.0
132
0.0
132
132

H/total

1.1
0.2
0.23
0.2
0.532
0.04

Salories

145.2
0.0
30.4
0.0
70.2
5.3

Total

32.93
33.93
32.93
32.93
33.93
34.93

$4,781.44
$0.00
$999.75
$0.00
$2,382.70
$184.43

251.1 h

$8,348.32

Placement of Concrete & reo


Quant

unit

245.85 m3
22,127 kg
5 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

0.82
0.045
2.0

Salories

202.3
995.7
10.0

Total

32.93
32.93
33.93

$6,662.88
$32,788.15
$339.30

1,208.0

$39,790.33

Vibration
Quant

unit

1,475.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
6.1

Total

32.93

$202.38

Total price for labor $48,341.03

$366.22 per m2 of formwork


$196.63 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Placement of concrete
Vibration

202.3
6.1

16
1

12.6
6.1

h
h

12.6
73.6

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


CYCLE no 1
Facts

9.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.2
39.8
2.7
90.0
0.30
9.0
0.3
133
1,194

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
223.9
39.8
0
223.9
39.8
223.9
223.9

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.2
2
0.15
0.2
0.1
0.04

Salories

56.0
8.0
0.0
33.6
8.0
22.4
9.0

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,843.26
$270.08
$0.00
$1,105.95
$262.12
$759.69
$312.83

114.4

$4,553.94

Placement of Concrete & reo


Quant

unit

21.5 m3
1,934 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories

21.8
87.0
2.0

Total

32.93
32.93
33.93

$716.93
$2,866.31
$67.86
$3,651.10

Vibration
Quant

unit

1,194.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
5.0

Total

32.93

$163.83

Total price for labor $8,368.87

$37.38 per m2 of formwork


$389.39 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

119.9
21.8
5.0

3
4
1

40.0
5.4
5.0

h
h
h

5.4
28.8

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


CYCLE no 2
Facts

9.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.2
37.0
2.7
90.0
0.30
9.0
0.3
123
1,110

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
199.0
37.0
6
198.96
37.0
198.96
198.96

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.2
2
0.15
0.2
0.1
0.04

Salories

49.7
7.4
12.0
29.8
7.4
19.9
8.0

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,637.94
$251.08
$395.16
$982.76
$243.68
$675.07
$277.99

134

$4,463.68

Placement of Concrete & reo


Quant

unit

19.98 m3
1,798 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories

20.2
80.9
2.0

Total

32.93
32.93
33.93

$666.49
$2,664.66
$67.86
$3,399.02

Vibration
Quant

unit

1,110.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
4.6

Total

32.93

$152.30

Total price for labor $8,015.00

$40.28 per m2 of formwork


$401.15 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

118.9
20.2
4.6

3
4
1

39.6
5.1
4.6

h
h
h

5.1
29.7

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


CYCLE no 3
Facts

9.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.2
33.7
2.7
90.0
0.30
9.0
0.3
112
1,011

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
223.9
33.7
0
223.9
33.7
223.9
223.9

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.2
2
0.15
0.2
0.1
0.04

Salories

56.0
6.7
0.0
33.6
6.7
22.4
9.0

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,843.26
$228.69
$0.00
$1,105.95
$221.95
$759.69
$312.83

134.4

$4,472.37

Placement of Concrete & reo


Quant

unit

18.198 m3
1,638 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories

18.4
73.7
2.0

Total

32.93
32.93
33.93

$607.05
$2,427.00
$67.86
$3,101.91

Vibration
Quant

unit

1,011.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
4.2

Total

32.93

$138.72

Total price for labor $7,713.00

$34.45 per m2 of formwork


$423.84 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

118.7
18.4
4.2

3
4
1

39.6
4.6
4.2

h
h
h

4.6
28.4

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


CYCLE no 4
Facts

9.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.2
34.8
2.7
90.0
0.30
9.0
0.3
116
1,044

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
198.5
34.8
1
198.45
34.8
198.45
198.45

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.2
2
0.15
0.2
0.1
0.04

Salories

49.6
7.0
2.0
29.8
7.0
19.8
7.9

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,633.74
$236.15
$65.86
$980.24
$229.19
$673.34
$277.27

123.1

$4,095.80

Placement of Concrete & reo


Quant

unit

18.792 m3
1,691 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories

19.0
76.1
2.0

Total

32.93
32.93
33.93

$626.87
$2,506.22
$67.86
$3,200.95

Vibration
Quant

unit

1,044.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
4.4

Total

32.93

$143.25

Total price for labor $7,440.00

$37.49 per m2 of formwork


$395.91 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

108.2
19.0
4.4

3
4
1

36.1
4.8
4.4

h
h
h

4.8
26.1

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


CYCLE no 5
Facts

9.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Length of wall
Height of wall
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
4
0.2
24.5
2.7
90.0
0.30
9.0
0.3
82
735

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
140.1
24.5
3
140.13
24.5
140.13
140.13

unit

Description

Time/h

m2
mtrs
pcs
m2
mtrs
m2
m2

Formwork installation 4/5


Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

0.25
0.2
2
0.15
0.2
0.1
0.04

Salories

35.0
4.9
6.0
21.0
4.9
14.0
5.6

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,153.62
$166.26
$197.58
$692.17
$161.36
$475.46
$195.79

91.5

$3,042.24

Placement of Concrete & reo


Quant

unit

13.23 m3
1,191 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories

13.4
53.6
2.0

Total

32.93
32.93
33.93

$441.33
$1,764.44
$67.86
$2,273.63

Vibration
Quant

unit

735.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
3.1

Total

32.93

$100.85

Total price for labor $5,416.71

$38.65 per m2 of formwork


$409.43 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

81.0
13.4
3.1

3
4
1

27.0
3.4
3.1

h
h
h

3.4
20.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


ELEMENT CONNCECTIONS
Facts

10.0 layers

Work force for formwork


Work force for concrete
Thickness of wall
Amaount of forms
Height of wall ( averige)
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

2
3
0.15
40.0
3.0
45.0
0.30
10.0
1
40
400

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
40.0
0.0
0
40
40.0
40
40

unit

Description

Time/h

pcs
mtrs
pcs
pcs
mtrs
m2
m2

Formwork installation
Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal
Transportation of formwork

H/total

1
0.2
2
1
1
0.5
0.04

Salories

40.0
0.0
0.0
40.0
40.0
20.0
1.6

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$1,317.20
$0.00
$0.00
$1,317.20
$1,317.20
$678.60
$55.89

121.6

$4,686.09

Placement of Concrete & reo


Quant

unit

3.7 m3
165 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
2.0

Salories
3.7
7.4
2.0

Total

32.93
32.93
33.93

$122.09
$244.06
$67.86
$434.01

Vibration
Quant

unit

400.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
1.7

Total

32.93

$54.88

Total price for labor $5,174.98

$129.37 per pcs of formwork


$1,413.93 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

140.0
3.7
1.7

2
3
1

70.0
1.2
1.7

h
h
h

1.2
50.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


PILE FOUNDATION
Facts

11.0 layers

Work force for formwork


Work force for concrete
Diameter of pile
Length of piles
Height of each pile
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

2
2
0.6
62.7
3.3
90.0
0.30
11.0
1
11
209

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Boring for piles


Quant

unit

Description

Time/h

H/total

Salories
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00

0.0

$0.00

Placement of Concrete & reo


Quant

unit

17.7 m3
1,593 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.30
0.045
2.0

Salories

23.0
71.7
2.0

Total

32.93
32.93
33.93

$756.55
$2,360.59
$67.86
$3,185.00

Vibration
Quant

unit

209.0 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.9

Total

32.93

$28.68

Total price for labor $3,213.68

$169.14 per m2 of formwork


$181.56 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

0.0
23.0
0.9

2
2
1

0.0
11.5
0.9

h
h
h

11.5
0.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

FORMWORK and CONCRETE


COLUMNS
Facts

13.3 layers

Work force for formwork


Work force for concrete
Diameter fo columns
Length of columns
Height of columns
Reo
Height of each layer
Number of layers
Distance between vibration
Amount of dip-in per round
Amount of rounds

3
2
0.3
76.0
4.0
90.0
0.30
13.3
1
13
178

people
people
mtrs
mtrs
mtrs
kg. pr/m3
mtrs
pcs
mtr
pcs
pcs

Formwork
Quant
19.0
0.0
0
19
19.0
19
19

unit

Description

Time/h

pcs
mtrs
pcs
mtrs
pcs
pcs
pcs

Formwork installation
Rebates
Formwork door openings
Shoring and fastening
Formwork scaffolding
Formwork removal 1/5
Transportation of formwork

H/total

1
0.2
2
1
1
1
0.04

Salories

19.0
0.0
0.0
19.0
19.0
19.0
0.8

Total

32.93
33.93
32.93
32.93
32.93
33.93
34.93

$625.67
$0.00
$0.00
$625.67
$625.67
$644.67
$26.55

57.8

$2,548.23

Placement of Concrete & reo


Quant

unit

7.6 m3
684 kg
19 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

1.01
0.045
0.2

Salories

7.7
30.8
3.8

Total

32.93
32.93
33.93

$253.52
$1,013.59
$128.93
$1,396.04

Vibration
Quant

unit

177.8 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.7

Total

32.93

$24.39

Total price for labor $3,968.66

$208.88 per m2 of formwork


$522.19 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Installation of formwork
Placement of concrete
Vibration

76.0
7.7
0.7

3
2
1

25.3
3.8
0.7

h
h
h

3.8
19.0

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Snave construction
39 Grace Avenue
Mt. Maunganui
New Zealand

CONCRETE SLABS
Concrete Slab over changing rooms
Facts
Work force for formwork
Work force for concrete
Thickness of slab
Size of slab
Length of foundations
Height of foundation
Concrete per mtr of foundation
Reo
Height of each layer
Distance between vibration
Amount of dip-ins

3
8
0.20
171.3
15.0
0.8
0.4
90.0
0.20
0.8
214

people
people
mtrs
m2
mtrs
mtrs
m3
kg. pr/m3
mtrs
mtr
pcs

Formwork
Quant
171.3
2.4
171.3
15.0
171.3
171.3

unit

Description

Time/h

m2
mtrs
m2
mtrs
m2
m2

Formwork installation 3/5


Formwork around edges
Shoring and fastening
scaffolding and safety
Formwork removal 2/5
Transportation of formwork

H/total

1.1
0.2
0.23
0.2
0.532
0.04

Salories

188.4
0.5
39.4
3.0
91.1
6.9

Total

32.93
33.93
32.93
32.93
33.93
34.93

$6,205.00
$16.29
$1,297.41
$98.79
$3,092.10
$239.34

329.3 h

$10,948.92

Placement of Concrete & reo


Quant

unit

34.26 m3
3,083 kg
1 pcs

description
Concrete
Reo
Cleaning

Time/h
V&S 04.10.31,05
V&S 04.10.27,01

H/total

0.82
0.045
2.0

Salories

28.2
138.8
2.0

Total

32.93
32.93
33.93

$928.49
$4,569.14
$67.86

168.9

$5,565.49

Vibration
Quant

unit

214.1 pcs

description

Time/sec H/total

Dip ins for vibration

15

Salories
0.9

Total

32.93

$29.38

Total price for labor $16,543.79

$96.58 per m2 of formwork


$482.89 per m3 of concrete

Total time of this pour

Total
hours

Men used

Hours
used

Placement of concrete
Vibration

28.2
0.9

8
1

3.5
0.9

h
h

3.5
96.6

h
h

Concrete pump if needed


Crane use if needed

01/11/2004

Unit

Andreas Lviksson
7th semester,autumn 2004

Das könnte Ihnen auch gefallen