Sie sind auf Seite 1von 152

AN ISO 9001-2000 CERTIFIED COMPANY

FOR

PROUDLY AN ISO 9001:2000


CERTIFIED COMPANY

For The Kind Attention Of:

Ms. Wang Xiuchun


CMEC COMTRANS

1781206
01063445388
01063268182
13701200568
Wang Xiuchun
CMEC COMTRANS INTERNATIONAL CO., LTD
No.178 Guanganmenwai Street, Xuanwu District,
Beijing, China
Tel: 8610-63445388
Fax: 8610-63268182
Mobile: 86-13701200568

COMPANIES PROFILE
FIRMS NAME

M/s S.M.Asghar (Pvt) Limited

An ISO 9001:2000 Certified Company


COMPLETE ADDRESS

908-910, 9th Floor, Chapal


Plaza, Hasrat Mohani Road
Off I.I.Chundrigar Road
Karachi.

CORPORATE STATUS OF FIRM

PRIVATE LIMITED.

TELEPHONE NO

00+ 92+21+32468091 -5

FAX NO

00+92+21+32468090.

FIRMS CUSTOM HOUSE LICENCE NO

714. (Copy Enclosed).

DATE OF REGISTRATION WITH


CUSTOMS

30-03-1980.

E- MAIL ADDRESS

smasghar@cyber.net.pk

E- MAIL ADDRESS

info@smasghar.com.pk

Web- Page

http://www.smasghar.com.pk

DATE OF ISSUE OF LICENCE

30-03-1980.

NUMBER OF STAFF EMPLOYED

20.

YEAR OF ESTABLISHMENT

1980.

SYED KHALID JAMAL

CHIEF EXECUTIVE

SYED SAJID JAMAL

DIRECTOR PROJECTS & COMM DIVISION

SYED MOHAMMAD ALI KHALID

GENNERAL MANAGER

PEOPLE BEHIND THE COMPANY


SYED KHALID JAMAL
SYED SAJID JAMAL

:
:

SYED MOHAMMAD ALI KHALID

DIRECTOR PROJECTS & COMM DIV


GENERAL MANAGER

MOHAMMAD ANWER

HEAD OF PORT OPERATIONS.

MOHAMMAD FAYYAZ KHAN

INCHARGE EXPORT DIVISION

MOHD SHARIF KHAN

HEAD OF CUSTOMS DIVISION.

S.IMDAD ALI.ZAIDI

HEAD OF PORT QASIM DIV.

MOHD SALEEM

ASST PORT OPERATIONS.

MOHAMMAD TARIQ

ASST. PORT OPERATIONS

MOHD JAVED

ASST PORT OPERATIONS.

QAZI KHURSHID AHMED

HEAD OF AIRPORT DIV.

SALEEM NOOR

ASST. AIRPORT OPERATIONS

AFTAB AHMED

CO-ORDINATOR SHIPPING COMPANY

SAEED KHAN

HEAD OF COMPUTER DIVISION

DILSHAD A. SIDDIQUI.

MANAGER FINANCE

ASIF KHAN

ASST. MANAGER FINANCE

ATIA FASIAL

ASST. OFFICE CO-ORDINATOR

MOHAMMAD SAMI

INCHARGE GD PREPARATION (BY AIR)

ASAD ABBAS

ASST.BILLINGS & ACCOUNTS

MOHSIN KHAN

FIELD OFFICER.

SADDAM HUSSAIN

FIELD OFFICER.

SULEMAN
USMAN GHANI

:
:

OFFICE PEON.
OFFICE PEON.

CHIEF EXECUTIVE.

SECTION 1

INTRODUCTION

SECTION 2

SCOPE OF WORK

SECTION 3

DOCUMENTATION
REQUIREMENTS

SECTION 4

PROJECT REFERENCES

SECTION 5

PICUTRE GALLARY

privilage

1)

2)
3)
4)
5)
6)
7)
8)

US $ 12
SRO

/ S.M.Asghar

/
..

Sajid

Cell: +92-302-8269260
Cell: +92-314-2000073

We are pleased to inform you that by the Grace of All mighty


Allah, currently we are Handling Projects for valuing more or
less US $ 1.2 Billion Dollars.
You will appreciates that in all of the Projects mentioned below
we have taken various Exemptions & benefits of various SROs
from Customer to Customer & on Project to Project Basis.
With our background experience, M/s. S.M.Asghar (Pvt) Limited
has successfully completed all the major & Prestigious
Projects
of
National
Importance
as
well
as
International Importance.

We on merit got the benefit of various Concessionary


SROs & Exemptions to our valued Customer to their
Entire satisfaction & without any problems and difficulty.
Our team of professionals sits with the Customer prior
to the start of the Project/Projects & developed systems
and a general flexibility of approach tailored to our
Clients most Complex of requirements.
We believe that our Professional approach
Client is unparalleled by any competitors.

to

our

Few of the recent Projects & Customer References


are given below, for whom we have claimed the various SROs
& Exemptions to our valued Customer to their entire
satisfaction.

MOL MAKORI GAS FIELD

SRO: 678(I)/2004, DT: 07-08-2004

GHAMBAT SOUTH GAS PROCESSING FACILITY (GPF II)


PROJECT OF PAKISTAN PETROLEUM LIMITED (PPL)

SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Ravi

SRO: 678(I)/2004, DT: 07-08-2004

SHELL GAS

SRO: 678(I)/2004, DT: 07-08-2004

SHV ENERGY PAKISTAN


Various Equipments & Material Including Break Bulk LPG Mixture

SRO: 678(I)/2004, DT: 07-08-2004

Expansion of Plant: RAVI GAS

SRO: 678(I)/2004, DT: 07-08-2004

WEATHERFORD DRILLING

SRO: 678(I)/2004, DT: 07-08-2004

Petrosin Engineering

(One of the Largest Private Sector Project for OGDCL US $ 135 Million Dollars)

SRO: 678(I)/2004, DT: 07-08-2004

TRANSASIA REFINERY LTD

(Re-Location)

(One of the Largest Private Sector Project US $ 700 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

INDUS REFINERY LTD


(Re-Location)
(Another Largest Private Sector Project US $ 650 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESALINATION & POWER PROJECT at DHA Karachi


(Total Cost of the Project US $ 160 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

KARACHI INTERNATIONAL CONTAINER TERMINAL LIMITED (KICTL) at Karachi

EXPANSION PROJECT & NEW GANTRY CRANE

(Total Cost of the Project US $ 400 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MIRANI HYDRO POWER DAM PROJECT


(The Project Cost US $ 80 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

SATPARA HYDRO POWER DAM PROJECT

(The Project Cost US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

MANGLA RAISING HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

GOMAL ZAM HYDRO POWER DAM PROJECT

(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DUBER KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

KHAN KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I

(The Project Cost US $ 45 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II

(The Project Cost US $ 20 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

PROGAS LPG STORAGE & HANDLING TERMIANAL

(Private Sector Project US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES

(The Second Expansion Phase Project US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

PETROSIN ENGINEERING (Pvt) LTD


QADIRPUR 600 MMSOFD EXPANSION PROJECT

(The Project Cost US $ 6 Million Dollars)

SRO: 678(I)/2004, DT: 07-08-2004

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED


PACKAGE 8C-1, ATC COMPLEX AND FCR BUILDING FOR NEW BENAZIR
BHUTTO INTERNATIONAL AIRPORT PROJECT, ISLAMABAD

(The Project Cost US $ 14 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

CHINA XINJIANG BEIXIN ROAD & BRIDGE CONSTRUCTION CO.,LIMITED


PACKAGE 01 OF AZAD JAMMU & KASHMIR URBAN DEVELOPMENT
PROGRAM FOR ERRA

(The Project Cost US $ 300 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED


FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

(The Project Cost US $ 20 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

ALSTOM PAKISTAN LIMITED


ZHORLU WIND POWER ( Heavy Transformers)
SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR.

SRO: 575(I)/2006, DT: 05-06-2006

FUAJI FERTILIZER COMPANY ENERGY LIMITED (FFCEL)


SETTING UP OF COMPLETE GRID STATION FOR FIRST WIND ENERGY
FARM PROJECT OF 49.5 MW CAPACITY AT JHAMPIR IN PAKISTAN.

(The Project Cost US $ 50 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 1
(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING
SETTING UP OF NEW WIND ENERGY FARM FOR FOUNDATION ENERGY 2
(The Project Cost US $ 130 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

DESCON ENGINEERING
SETTING UP OF COMPLETE NEW ASPHALT BUILT UNIT (ABU)
(The Project Cost US $ 30 Million Dollars)

SRO: 575(I)/2006, DT: 05-06-2006

VARIOUS PORTS AT KARACHI

Qasim International Container Limited (QICT)

Karachi Port Trust Head office (KPT)

Pakistan International Container Limited (PICT) Karachi International Container Limited (KICT)

S.M.ASGHAR (PVT) LIMITED

908-910, 9th Floor, Chapal Plaza, Hasrat Mohani


Road, Off I.I Chundrigar Road, KARACH I

We have a pleasure to give a brief introduction of our Company


M/s. S.M.Asghar (Pvt) Limited, a name famous for its credibility,
reliability & commitment in this part of world.

We are proudly an ISO 9001-2000 Certified Company.


We are among the few & pioneer company who got the
Certification in Custom Clearance in Pakistan.

ISO

With our background experience, M/s. S.M.Asghar (Pvt) Limited


has been able to developed systems and a general flexibility of
approach tailored & personalized solutions to our Clients most Complex
Requirements that we believe is unparalleled by any competitors.
Most important our customers are able to deal with an International
Network
who
can
arrange
the
movement
and
supervision
of
cargo
from
Europe,
and
beyond,
whilst
they
only
instruct
one
control
office.
This
International
Strength
and wealth of experience combined with a genuinely personal
approach we feel makes us a formidable contender.
Our Credentials our Enthusiasm and our Track Record speak for themselves.
For over the last 15 Years, M/s. S.M.Asghar (Pvt) Limited
have
developed
&
specializes
and
simultaneously
Transform
itself into a PROJECT CLEARANCE SPECIALIST.
If one can give a brief look at the Pakistans Most Advanced
Important Industrial Estate PORT BIN QASIM,
&
the
by the Grace Of All Mighty Allah it is an Honor for
M/s. S.M.Asghar (Pvt) Limited to perform the Complete Custom
Clearance & the Logistics Support in the form of Local Transportation to these
Prestigious Projects.

Privilege To Handle The Prestigious Projects At

Port Bin Qasim Few Are Listed below


PARCO WHITE OIL PIPE LINE PROJECT BY CHINA PETROLEUM
(The Contractor for PARCO Project Cost US $ 300 Million Dollars)

ICI PTA T-11


(The Largest Private Sector Project US $ 480 Million Dollars)

Engro Vopak Terminal Ltd (VCM Tank Farm)


Engro Vopak Terminal Ltd (MEG Tank Farm)
Engro Vopak Terminal Ltd (LPG Tank Farm)
Engro Vopak Terminal Ltd

(PARAXYLENE Tank Farm)

(Total Investment by Single Largest Group in the Private Sector over US $ 30 Million Dollars)

PROGAS LPG STORAGE & HANDLING TERMINAL


(Private Sector Project US $ 50 Million Dollars)

INDUS REFINERY LIMITED


(Another Largest Private Sector Project US $ 750 Million Dollars)

TRANASIA REFINERY LIMITED


(Another Largest Private Sector Project US $ 800 Million Dollars)

FUAJI OIL TERMINAL & HANDLING JETTY FAICILITIES (FOTCO)


(The Second Expansion Phase Project US $ 30 Million Dollars)

CHINA HARBOR ENGINEERING


(The Contractor for EVTL for the EVTL JETTY Private Sector Project US
$ 4 Million Dollars)

ENGRO ASAHI POLYEMR & CHEMICALS

(Another One of the Largest Private Sector Project US $ 80 Million Dollars)

FAUJI FERTILIZER BIN QASIM LTD


(Handling of Break Bulk Phosphoric Acid)

LPG BREAK BULK SHIPMENT


(Handling of 90% of Pakistan Break Bulk LPG Shipments at EVTL& SSGC Terminal)

VCM BREAK BULK SHIPMENT


(Handling of 100% of Break Bulk VCM Shipments at EVTL)

ETHYLENE BREAK BULK SHIPMENT


(Handling of 100% of Break Bulk ETHELYNE Shipments at EVTL)
Karachi International Container Terminal Phase II Expansion PROJECT
Total Cost of the Project US $ 400 Million Dollars

Hydro Power Sector

Privilege to Handle the Major Hydropower Power & Dam Projects of


National Importance, among these Projects of National Importance are:

MIRANI HYDRO POWER DAM PROJECT


(The Project Cost US $ 80 Million Dollars)

SATPARA HYDRO POWER DAM PROJECT


(The Project Cost US $ 30 Million Dollars)

MANGLA RAISING HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

GOMAL ZAM HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

DUBER KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

KHAN KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

ALAI KHWAR HYDRO POWER DAM PROJECT


(The Project Cost US $ 100 Million Dollars)

DHA DESALINATION PLANT 3 MIGD


& 94 MW POWER PLANT KARACHI

Project Name

DHA DESALINATION & POWER PLANT


PAKISTAN FIRST EVER SEA DESALINATION
& POWER PLANT

Location:

DHA, PHASE VIII. KARACHI

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 130 million

CLIENT

DHA COGEN LIMITED (DCL)

Completion:

UNDER CONSTRUCTION

This is the first ever desalination plant in history of Pakistan. It has a


capacity to Desal, 3 MGD (Million Gallons Per Day) of Water, beside to
Produce & Generate Electricity of a Capacity 95 MW
TOTAL VALUE OF L/C ESTABLISHED:
Siemens AG Germany $ 41,400,000 $ 33,120,000
Siemens AG Germany 6,550,000 5,240,000
Alfa Laval AS Copenhagen 15,165,300 12,132,241
Lincas Electro Vertibas 295,500 236,390

JAMSHORO JOINT VENTURE LIMITED


SINGLE LARGEST LPG EXTRACTION PLANT
Project Name

JAMSHORO JOINT VENTURE LIMITED

Location:

JAMSHORO, SINDH

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 80 million

CLIENT

ASSOCIATED GROUP

Completion:

2005

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE I


(The Project Cost US $ 80 Million Dollars)
M/s. S.M.Asghar (Pvt) Limited was awarded the President of Pakistan
Award by the President General Pervez Musharraf for successfully and
timely performance in Clearance and Logistics of JJVL Phase I Project
JJVL
is
Pakistans
single
largest
producer
of
Liquefied
Petroleum
Gas. Situated
in
Dei
Shah
Bukhari,
District
Hyderabad, JJVLs Extraction Plant has a daily output of about
500 metric tons of LPG and 150 metric tons of NGL/Naphtha.
JJVL accounts for about one-third of the total local LPG production of
the country.

JAMSHORO JOINT VENTURE LIMITED (JJVL) PAHSE II


(The Project Cost US $ 20 Million Dollars)

PARCO White Oil Pipeline Project


By China Petroleum & Consortium
M/s S.M.Asghar (Pvt Limited also have a privilege of Handling
02 chartered flights carrying main booster pumps weighing
over 100 Tons by Air for

ICI T11 PTA Plant


Project Name

ICI PTA T11 PLANT

Location:

EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 480 million

CLIENT

TRANSCAR PROJECTS UK/ FOOSTER WHEELER UK

Completion:

1998

We also have a privilege of handling one of the Heaviest and Length Wise
Piece in History of Pakistan which Weights 265 M/tons and Length
Approx.76 Meters.

REQUIRED FOR CUSTOM CLEARANCE

SCOPE OF WORK

BENEFIT OF VAVARIOUS
CONCESSIONARY
SROs & EXEMPTIONS

PREPARATION BEFORE ARRIVAL


OF VESSEL
Upon receipt of the written instruction from the
Importer /
Representatives of the Importer, we will be in close contact with the
shipping Company in order to ascertain the expected arrival date
( ETA ) of the Ocean going Vessel at the Un-loading Port of the
Country.

CONFIRMATION OF THE ARRIVAL


OF VESSEL:-

We shall inform the arrival and the berthing date of the vessel to
the Importer / Representatives of the Importer in order to keep a close
Loop for the berthing of the vessel.

CUSTOM CLEARANCE:
We shall collect in full advance all the necessary
documents for the onward Custom Clearance
from the Importer / Representatives of the
Importer when intimated and will prepare GD
and all the required documents and formalities to
be submitted to the related Custom Authority
and Will Complete the preparation of the GD (Goods Declaration) as per
Invoice, Packing List & Bill Of Lading depending on weather the Vessel has
arrived and also subject to the Lodging Of Manifestation of IGM (Import
General Manifest) by the Shipping Company / Shipping Agent.

OBTAINING THE DELIVERY ORDER:

We shall complete all the formalities required by the relative Shipping Agent / Main Carrier
Agent/ relevant Port Authority and will obtain the Delivery Order from the Shipping
Company/ OR their Agent against the presentation/ submission of Original Bill of Lading.
The delivery Order's are generally issued after filing of IGM in order to ascertain the goods
have not been Transshipped.

NECESSARY ASSISTANCE:
We shall provide all necessary Assistance and
Consultancy Services Concerning Custom Clearance to
the Importer / Representatives of the Importer.

AIR CARGOES:

We shall also perform the Works Related to the Air Cargo As per request of
Importer / Representatives of the Importer
DELIVERY AT / TO THE PLANT SITE

We shall safely Transport the Cargo by the Trucks, Trailers, Multi Axle, Low
Bed OR as per the requirement & Nature of Cargo to the Warehouse or the
open storage area as per the instruction of Importer / Representatives of the
Importer.

CUSTOM DUTIES TAXES


SROs AND NECESSARY PERMITS

All the Plant, Machinery, Equipment and Parts/Spares which are imported into
Pakistan shall be subject to Custom Duties and Taxes Prevailing at the time of
Import.

The Duties and Taxes concerns with the Custom Authorities as per
Pakistan Custom Tariff includes:Custom Duty/Duties

From 5% Minimum

Sales Tax/Taxes

17 %

Income Tax/Taxes

5.5%

To 20% Maximum

The Taxes Concerns with the Port Authorities:Port Wharfage


Port Demurrage
Weighment Charges (If any) (for Products like Pipes of Iron/Steel/Coil-Bar)

There Are Two Major Ports in Karachi Namely as below:


Karachi Port
Port Bin Qasim
Karachi Port is Further Divided into 02 Parts, namely;
1)

EAST WHARF:

a)

Pakistan Container

b)

KPT owns few Berths such as Berth No 1 Open, Shed No 02, Shed No
03, Berth No 04 Open, Berth 10, 11, 12,13,14,15,16 And 17.

c)

Ghass Bunder, For Launches, Steamer and Boats

2)

WEST WHARF:

a)

Karachi International Container Terminal Ltd (KICT)

b)

KPT owns few Berths such as Berth Namely 18, 19, 20, 21, 22, 23, 24
And 25

c)

Berth Number 25 is for Heavy Lift Cargo that has On Shore Heavy
Crane for capacity 50 M/Tons.

Terminal (PICT)

Private

Terminal

For Containerized Cargo the various Yards/Ports are charging different


Handling Charges/Lifting Charges/Examination Charges/RD/Seal Breaking
Charges/Yard Storage Charges.
Please note that for all the above mentioned charges the relevant
Port /Yard will issue Receipts for the relevant charges.
Excise Taxes @ 1.0-1.05% on Import Value/Assessed Value/
Appraise Value by the Customs or any other Charges / Taxes prevailing at
the time of Import shall be Paid by the I m p o r t e r immediately before
the Clearance of the Consignments from the Port.
Further the completion of GDs (Bill of Entry) and other Custom formalities are
subject to the Final Assessment / Valuation / Any SRO Benefits / PCT
confirmation and also the Container / Marks & Number.
Any discrepancy or mistake or dispute arising due to Invoice/ Packing List /
Bill of Lading OR any other relevant documents submitted by the Importer,
will may render in delay to clear the consignment.

SUBMITTAL OF SHIPPING GUARANTEE


BOND IN ABSENCE OF ORIGINAL BILL OF LADING

If there is a delay in the arrival of the Original Bill of Lading, can cause a
delay in getting the Goods/ Cargo release of the from the Port
premises/Yard. A Shipping Guarantee Letter/Bond for the said Bill of Lading
would be therefore required by the shipping company in order to issue the
Delivery Order. It shall be discussed and settle before arrival of the vessel.
We will provide all necessary assistance and advice for the Shipping
Guarantee to the Importer / Representatives of the Importer.

During the Unloading of the Break Bulk/ loose Cargo from the vessel
There are chances of getting the goods Damage OR in case we find any
Loss of Goods and or the Goods already Damage on or after its receiving
We shall report to the Importer / Representatives of the Importer or
Arrange a joint survey as soon as possible. Marine/Transit insurance
Shall be arranged by Importer / Representatives of the Importer,
from Place of Origin up to the Plant Site

METHOD STATEMENT
Newly Implemented Web-Based
One Customs WeBoc) SYSTEM
At the present there are 02 procedures for Custom Clearance:-

WEB BASED ONE CUSTOM (WeBOC)


Under this newly implemented procedure if the Vessel is berthed
at any of the below Ports i.e.
Karachi Port Trust
Karachi International Container Terminal
Pakistan International Container Terminal
Qasim International Container Terminal
Air Freight Unit
FCL/LCL/Loose/Break Bulk

(KPT)
(KICTL)
(PICTL)
(QICTL Port Qasim)
(AFU)

Goods Declaration (GD) is prepared on Line Under the New WeBOC System
(Via Electronic Mail Data Transfer System).
The G.D (Goods Declaration) is prepared in accordance with the declaration
of the Importer and the documents provided by the Importer
i.e.
Commercial Invoice, Bill of Landing and the Packing List. Thereafter the G.D
is submitted to the Custom for Assessment on Line.

The amount of Custom Duties & Taxes and the Sindh Infra Structure
Fee (CESS) has to be paid in advance as per the Importer declaration.

If the assessment by the WeBOC is done as per the declaration of


Importer, than the G.D is processed and the Importer can take the
delivery of the goods, after the payment of all the necessary Port Dues &
Excise Tax.

In case the goods have been processed under WeBOC SYSTEM does not
accept the Importer Declaration, than the Importer may asked for additional
Duties & Taxes or If the Importer wants to Contest with the views of the
Customs than they can go for appeal & meet the Senior Custom Officials
along with the relevant Documents & Proof to justify their claims.

The Custom Authorities may differ in three basic ways:


1)

Disagreement in the PCT OR HS Code Classification.

2)

Not Extending the Benefit of the Claimed Benefit/SRO.

3)

Disagreement with the Valuation.


The GD is Prepared and filed Online (Via Electronic Filling),
as per declaration of the Importer.
If Customs satisfy with all the 03 criterias mentioned above i.e.

PCT
SRO
Valuation
The GD is than completed by the Concerned Group. The Importer has to
than pay the Applicable Duties & Taxes after that the GD is forwarded to
the Port side for Examination after which the Importer can take the
Delivery of the goods after the payment necessary Port Dues.

If Customs do not satisfy with all the 03 Criterias mentioned

above i.e.

PCT
SRO
Valuation
Than the GD is forwarded to the Port Side for Physical Examination to
check the goods are in conformity to the declaration of the Importer &
under the light of Examination Report GD will be completed by the
concerned Group in the Custom House.

The following documents are required generally by the customs for processing
the B/E for the Cargo arriving at Sea Port.
I

Original Invoice showing complete description of the goods with value of


the each individual item

II

Detail Packing List showing complete Description, Quantity


Wt, Net Wt, Ullage Certificate.

III

Original Bill of Lading duly endorsed at the backside in our Favor.

IV

Certificate of Origin

All Govt. Sanctions, Authorization from Government Agencies if any

VII

Original Letter of Credit

VIII

Sales Tax Registration Certificate

IX

Import Registration

National Tax No Certificate Copy

XI

WeBOC Registration (User ID & Pass Word)

Gross

Any other document that may be requested by the Custom to verify the
declaration of Importer

The following documents are required generally by the customs for processing
the B/E for the Cargo arriving at Air Port.
I

Original Invoice showing complete description of the goods with


value of the each individual item

II

Detail Packing List showing complete Description, Quantity, Numbers of


Packages, Gross Wt, Net Wt. and Size of the Packages in Cu Meter

III

Original Airway Bill

IV

Certificate of Origin

Complete Catalogue/Drawing for Machinery & Equipment.

VI

All Govt.
if any

VII

Original Letter of Credit

VII

WeBOC Registration (User ID & Pass Word)

Sanctions,

Authorization

from

Government

Agencies

Any other document that may be requested by the Custom to verify the
declaration of Importer

POSSBLE
DELAYS

Further to the above there may be delays in Clearance due to following


reasons:I

Non availability of the Original Documents, such as BL

II

Delay in meeting Custom Queries.

III

Strikes / Weather, Act of God, Force Major Etc

IV

Delays due to Non-availability of concerned officers.

Delays in receipts of payments

VI

Delays due to the Non-fulfillment of Shipping Companies

VII

Delays due to Non-availability of Trucks / Trailer

PREVIOUS
PROJECTS
HANDLED
.

CLIENTS

PROJECTS

M/S ICI PAKISTAN LTD.


C/o TRANSCAR PROJECTS LTD
ICI PTA PROJECT PORT QASIM

M/S ENGRO PAKTANK TERMINAL.


CHEMICAL STORAGE TERMINAL

M/S NOEL LGA (GERMANY)


LPG EXPANSION & MARKETING

M/S ENGRO ASAHI POLYMER & CHEMICALS.

ENGRO PVC PLANT PROJECT

M/s TEKSER INSAAT SAANAYI


CHASMA RIGHT BANK C-65

M/S FMC. (MARINE LOADING ARM)


FOTCO OIL TERMINAL BIN QASIM

M/S SECA PAKISTAN.


KHI - HYDERABAD BY PASS

M/S TRANSCAR PROJECTS LTD.


DHABEJI PUMPING STATION W-19

M/S TRANSCAR PROJECTS LTD.


NORTH EAST KARACHI STATION W-18

CLIENTS

PROJECTS

M/S CHINA GUANGXI CORPORATION


PATFEEDER CANAL PROJECT

M/S CHINA DONGFANG CORPORATION


SEWERAGE TREATMENT PROJECT

M/S CHINA PETROLEUM


KORANGI SEWERAGE TREATMENT

M/S CHINA YUNNAN CORPORATION


KPT JINNAH BRIDGE PHASE II

M/S CHINA NATIONAL ELECTRIC WIRE & CABLES


QUEENS ROAD POWER STATION

M/S CHINA HARBOR ENGINEERING


JETTY FOR ENGRO PAKTANK

M/S IJM / IGI JOINT VENTURE.


LBOD SANGHAR PROJECTS

M/S LIFE LINE (Pvt) LTD.


DHURNAL LPG GAS EXPANSION PROJECT

M/S ENGRO PAKTANK TERMINAL.


LPG TERMINAL AT BIN QASIM
CLIENTS

PROJECTS

M/S ENGRO PAKTANK TERMINAL


VCM TERMINAL HANDLING PROJECT

M/S HYUNDAI CORP KHI OFFICE.


K.E.S.C HIGH TENSION CABLE PROJ.

M/S HYDERABAD DEVELOPMENT AUTHORITY.

MACHINERY UNDER SPANISH GRANT

M/S CHINA YUNNAN CORPORATION.


MALDIVE SPARLIAMENT BUILDING

M/S CHINA NATIONAL CHEM ENGG CORP.


SUB CONTRACTOR FOR DONGFANG
S2 PROJECT

ENGRO ASAHI TRADING (PVT) LTD


EXPORT OF PVC WORLD WIDE

CLIENTS

PROJECTS

M/S DESCON ENGINEERING WORKED FOR NUMBER OF PROJECTS

1)

EPTL FOR LPG TERMINAL

2)

EPTL FOR VCM PROJECT

3)

EVTL FOR MEG PROJECT

4)

FOR PARCO MID COUNTRY REFINERY

5)

LASMO OIL BHIT GAS FIELD PROJECT


US $ 6.5 Million Dollars

M/S BI - WATER INTERNATIONAL KARACHI WATER & SEWERAGE BOARD

HUB & PIPRI PROJECT FUNDED BY ADB


15.8 Million Sterling

M/S HYUNDAI HIDCO HAKAS JV


EXPORT OF HEAVY DREDGING MACHINERY
US $ 2.5 Million Dollars

M/S AL - NOOR SUGAR MILLS LTD


MDF BOARD FIBRE BUILDING BOARD PLANT
(LASSANI)
CLIENTS

PROJECTS

PROCTER & GAMMBLE PAKISTAN

SOAP CAPACITY EXPANSION PLANT.

US $ 4.5 Million Dollars


M/S ENGRO PAKTANK TERMINAL.
CHEMICAL STORAGE TERMINAL
US $ 5.5 Million Dollars

M/S SHV ENERGY PAKISTAN

GAS EXPANSION PROJECT


US & 1.5 Million Dollars

M/S TEKSER INSAAT SANAYI VE TICCARRET

CHASMA RIGHT BANK CANNAL PROJECT C65 US $ 260 Million Dollars

BREAK BULK
LIQUID CHEMICALS &
PETROCHEMICALS HANDLING
PROJECTS IN HAND

SHV ENERGY LIMITED


LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

JAMSHORO JOINT VENTURE LIMITED


LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

AFTAB TRADERS
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

CRESS LPG

LIQUIFIED PETROLEUM GAS (LPG)


IN BULK OF VARIOUS PARCELS

RELIANCE CONSULTANCY
LIQUIFIED PETROLEUM GAS (LPG)
IN BULK OF VARIOUS PARCELS

ENGRO POLYMER & CHEMICAL LIMITED


VINYL CHLORIDE (VCM)
IN BULK OF VARIOUS PARCELS
EDC IN BULK OF VARIOUS PARCELS
CAUSTIC SODA IN BULK ETHELYNE
IN BULK OF VARIOUS PARCELS

UNDER GOING
PROJECTS
IN HAND

M/S ENGRO FOODS LIMITED


1)

LAUNCHING & SETTING UP A COMPLETE STATE OF AN ART


OF O'MORE ICE CREAM PLANT

2)

BRAND NEW STATE


PAR BOILING PLANT

3)

EXPANSION OF EXISTING DAIRY MILK PLANT.

OF

AN

ART

ENGRO

RICE

&

(OLPER'S MILK)

M/s. FOUNDATION ENERGY LIMITED-1


SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

M/s. FOUNDATION ENERGY LIMITED-II


SETTING UP A STATE OF AN ART WIND POWER PROJECT OF A
CAPACITY 49.50 MW AT JHAMPIR, SINDH PROVINCE

M/S. PAK ARAB REFINERY LIMITED


SETTING UP A COMPLETE BRAND NEW ASPHALT BUILT UNIT
(ABU UNIT)

ENGRO POLYMER TRADING LIMITED


EXPORT OF PVC RESIN (SABZ BRAND) WORLD WIDE
APPROXIMATE EXPORT IN M/TONS 2500 PER MONTH

M/s. CIVIL AVIATION AUTHORITY


SETTING
UP
A
BRAND
NEW
BENAZIR
BHUTTO
INTERNATIONAL AIRPORT, ISLAMABAD, and PACKAGE 06
REFUEL HYDRANT SYSTEM.

KARKEY PAKISTAN
POWER SHIP & OIL SUPPLY TANKER

VARIOUS OTHER PROJECTS


OF NATIONAL IMPORTANCE INCLUDING
HYDRO, SEWERAGE WATER
TREATMENT, DAMS CHEMICAL
INDUSTRY OIL & GAS SECTOR

M/S CHINA SINOHYDRO CORPORATION

1)

GOMAL ZAM DAM HYDRO POWER

2)

DUBAR KHAWAR DAM HYDRO POWER

3)

KHAN KHAWAR DAM

4)

KWSB K-III

M/S. INDUS REFINERY LIMITED.


HI-TECH 100,000 BPSD OIL REFINERY
ON RELOCATION BASIS

M/S. JAMSHORO JOINT VENTURE

LPG EXTRACTION PLANT

M/S. PETROSIN RAVI ENGINEERING

OIL & GAS PROJECTS LTD.

M/S. SHELL GAS LPG PAKISTAN LTD

LPG PROJECTS / LPG GAS

M/S. BI-WATER INTERNATIONAL


KARACHI WATER & SEWERAGE
BOARD HUB & PIPRI PUMPING
STATION PROJECT

M/S. DESCON ENGINEERING LTD (HYDRO POWER PROJECTS)

1)

SATPARA DAM PROJECT

2)

MIRANI DAM PROJECT

3)

MANGLA RAISING PROJECT

4)

TUNSA BARRAGE PROJECT

5)

HYDERABAD WATER
TREATMENT PROJECT.

M/S. FAUJI FERTILIZER BIN QASIM LTD

BREAK BULK HANDLING OF


PHOSPHORIC ACID

M/S. ENGRO ASAHI POLYMER AND

CHEMICAL LTD.

V.C.M / MACHINERY &


EQUIPMENT / EXPORT

M/S. DHA COGEN LTD.

DESALINATION / POWER
PROJECT

M/S. BAHRIA TOWN HOUSING & INFRASTRUCTURE P

ROJECT

RE-LOCATION OF PLANT &


MACHINERY FOR PREFABRICATING HOUSING

AREVA T&D PAKISTAN (PVT) LTD.

132 KV GRID STATION AT


CREEK CITY, DHA

KHALID RAUF & CO., (PVT) LTD.


INFRASTRUCTURE PROJECTS
LAHORE RING ROAD

HYDROPOWER PROJECTS
From our background experience, strength & experiences from
industrial

development

projects,

S.M.Asghar

(Pvt)

Limited

has rapidly established itself as a key player in infrastructure


projects.

We

successfully

did

the

Custom

Clearance

&

In-land

Transportation jobs of large-scale projects like dams, barrages,


highways and housing complexes.

We hold the distinction of being the first ever local company to do


the 07 Major Hydropower Projects Simultaneously of National
Importance in Pakistan

HYDROPOWER
PROJECT

Location:

Taunsa Barrage Rehabilitation


And Modernization
Taunsa Pakistan

Year Of Project

March 2006-2007

Cost Of Project

US $ 140 Million Dollars

Completion :

May 2008

HYDROPOWER
PROJECT

MANGLA DAM RAISING


PROJECT

LOCATION

Mangla

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION

COST OF PROJECT

US $ 140 Million Dollars

Expected
Completion Date:

September 20 2007

HYDROPOWER
PROJECT.

LOCATION
NATURE OF JOB
COST OF
PROJECT
Completion :

SATPARA DAM
HYDROPOWER PROJECT
PAKISTAN
CUSTOM CLERANCE & INLAND TRANSPORTATION.
US $ 140 Million Dollars

March 2007

Project Name

Kachhi Canal Project


Contract # KC-03

Location:

Taunsa Barrage Kot Addu

NATURE OF JOB

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF
PROJECT

US $ 65 MILLION DOLLARS

Completion:

January 2009

Project Name

GOMAL ZAM
HYDROPOWER PROJECT

CLIENT

CHINA SIOHYDRO CORPORATION

NATURE OF
JOB

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF
PROJECT

US $ 220 MILLION DOLLARS

Completion:

4 YEARS

Project Name

Location:

Duber Khwar
The project located on river Duber Khwar, right
bank tributary of Indus river near Patan in NWFP
at a distance 265 Km from Islamabad.

NATURE OF JOB

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF PROJECT

US$ 109 million

Completion:

4 YEARS

Location:

Allai Khwar
Hydropower Plant
The Project is located on Allai
Khwar River, Left Tributary of
River Indus near Besham in
NWFP, 245 km from Islamabad.

NATURE OF JOB

COST OF PROJECT

Completion:

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.
US$ 110 million

4 YEARS

Project Name

MIRANI DAM

Location:

In the Dasht River Basin about 30 miles (48 km)


West of Turbat Town in Makran Div of
Baluchistan.

NATURE OF JOB

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF
PROJECT

US$ 120 million

Completion:

4 YEARS

LPG Storage & Handling Facilities


Project Name

ENGRO PAKTANK
LPG TERMINAL

Location:

EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB

CUSTOM CLEARANCE & INLAND


TRANSPORTATION.

COST OF PROJECT

US$ 10 million

CAPACITY

4,500 METRIC TONES OF LPG

LPG BULLETS

10 LPG bullets

Completion:

1997 -98

Integrated Bulk Liquid Chemical


Terminal Storage & Handling Facilities
Terminal Information
Item

Description

Port

Port Muhammad Bin Qasim

Port Entrance

Phitti Creek Fairway Buoy 24o33.1,N, 67o02.9,E

Tide Table

PHB - 2, Pakistan Tide Tables

Local Time

GMT + 5 Hrs

Berth Type

Jetty

Commissioning

25th November 1997

Depth Alongside

11.0 m

Max LOA

225 m

Max Beam

33 m

Max Deadweight

75,000 tons

Current Operations

Unloading and Storage (Chemicals and LPG)


Truck Loading and Pipeline Transfer

Products Handled /
Stored

Paraxylene (PX), Acetic Acid (AA), Vinyl Chloride


Monomer
(VCM), Acylonitrile (ACN), Phosphoric Acid, Mono
Ethylene Glycol (MEG), Liquefied Petroleum Gas
(LPG) and Ethylene

Services

Heating, Chilling, Weighing and Nitrogen Blanketing,


Water

Storage Capacity

82,400 cubic meters

Number of Tanks

21

Total Area

102 Acres

Access

Sea / Road / Pipeline

Investment

Over USD 100 million

Project Name

ENGRO PAKTANK VCM


TERMINAL

Location:

EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

CAPACITY

41,000 CUBIC METER STORAGE FACILITY

SPHERICAL TANK

2 SPHERICAL TANK

Completion:

1997 -98

EVTL Bulk liquid Chemical and Storage Terminal the first phase comprised
construction of 41,000 cubic meter of storage facility the cost of first phase of the
Project was US $ 60 million the tank farm is situated on reclaimed land in the PQA.

PARAXYLENE
ACETIC ACID
PHOSPHORIC ACID (HANDLING ONLY)
VINYL CHLORIDE MONOMER
ACRYLONITRILE
LIQUEFIED PETROLEUM GAS
MONO ETHYLENE GLYCOL

Project Name

ENGRO ASAHI POLYMER


& CHEMICALS LIMITED

Location:

EASTERN INDUSTRIAL ESTATE PORT QASIM

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 80 million

CAPACITY

100,000 (TPA) PVC MANUFACTURING PLANT

CLIENT

ENGRO ASAHI POLYMER & CHEMICALS LTD

Completion:

1999-2000

Engro Asahi Polymer & Chemicals Limited (EAPCL or the company) is a joint
Venture between Engro Chemical Pakistan Ltd. (ECPL) and Mitsubishi
Corporation (Japan), each with an 80% and 20% shareholding, respectively
EAPCL is the only PVC manufacturer in Pakistan with a Capacity
Of 100,000tons per annum (TPA) and its operations are located at Port Qasim

PARCO Mid Country Refinery (100, 000 BPD)

Project Name

PAK ARAB REFINERY COMPANY

Location:

MULTAN, PAKISTAN

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 80 million

CLIENT

DESCON ENGINEERING

Completion:

1998

INDUS REFINERY LIMITED


PAKISTAN SECOND LARGEST REFINERY
Project Name

IRL is a 100,000 bpd or 4.95 million metric tons per


annum complex fuels refinery. It will be the sixth
petroleum refinery in Pakistan and the countrys
largest refinery.

Location:

PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 700 million

CLIENT

INDUS REFINERY LIMITED

Completion:

UNDER CONSTRUCTION

RELOCATION OF 100,000 BARRELS CAPACITY REFINERY

PETRO CANADA REFINERY TO PAKISTAN PORT QASIM

Gambat South Gas Processing Facility


(GPF-||) Project
Project

PROJECT NATURE

Gambat South Gas Processing Facility

50 MMSCFD Gas Processing


LPG 11 MTPD, Condensate 1050 BPD

Location: Distt. Sanghar, Sindh-Pakistan


Capacity: 50 MMSCFD Gas Processing
LPG 11 MTPD, Condensate 1050 BPD
Scope: EPCC of Complete Facility
Major Equipment

Wellhead Air Cooler


Inlet Separation
Feed Gas Compressor
Amine Purification Unit (MDEA Type)
HCDP Control Unit (Propane based Refrigeration
Compressor Package)

Condensate Stabilization Unit


LPG Recovery Unit
Recycle Gas Compressor
Sales Gas Compressing & Metering
LPG Storage & Metering
Chemical Injection Packages

TRANSASIA REFINERY LIMITED


PAKISTAN SECOND LARGEST REFINERY
Project Name

TRL is a 100,000 bpd or 4.00 million metric tons per


annum complex fuels refinery. It will be the state of an
Art petroleum refinery in Pakistan and will be one of
the countrys largest refinery.

Location:

PORT QASIM INDUSTRIAL ESTATE

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 700 million

CLIENT

TRANSASIA REFINERY LIMITED

Completion:

UNDER CONSTRUCTION

TRANASIA REFINERY LIMITED

WIND POWER
PROJECTS

FAUJI FERTILIZER ENERGY COMPNAY


LIMITED (FFCEL) 49.5 MW WIND ENERGY
PROJECT AT JHAMPIR, KARACHI

Project Name

FFCEL WIND ENERGY PROJECT OF CAPACITY 49.5 MW

Location:

JHAMPIR, NEAR THATTA

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 110 million

CLIENT

DESCON ENGINEERING LIMITED

Completion:

ALREADY COMPLETED

Project Name

ASPHALT BUILT UNIT PROJECT (ABU)


FOR PARCO

Location:

PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 30 Million

Completion:

DECEMBER 2012

Project Name

49.5 MW FOUNDATION WIND ENERGY-1 PROJECT

Location:

JHAMPIR, KARACHI

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 130 Million

Completion:

SEPTEMBER 2014

Project Name

49.5 MW FOUNDATION WIND ENERGY-II (Pvt) Ltd.


PROJECT

Location:

JHAMPIR, KARACHI

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 130 Million

Completion:

SEPTEMBER 2014

Project Name

NEW KHANKI BARRAGE HYDROPOWER PROJECT

Location:

RIVER CHENAB, DISTT GUJRANWALA

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 70 Million

Completion:

SEPTEMBER 2016

Project Name

ASPHALT BUILT UNIT PROJECT (ABU)


FOR PARCO

Location:

PARCO MID COUNTRY REFINERY, MULTAN

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 30 Million

Completion:

DECEMBER 2012

Project Name

METRO HABIB CASH & CARRY PAKISTAN (PVT) LTD

Location:

HEAD OFFICE THOKAR NIAZ BAIG, MULTAN RD, LHR.

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 3.4

Completion:

STILL UNDERGOING

KARACHI INTERNATIONAL CONTAINER


TERMINAL (KICTL) KARACHI
Project Name

KARACHI INTERNATIONAL CONTAINER


TERMINAL (KICTL)
PHASE III EXPANSION PROJECT

Location:

WEST WHARF ROAD, KARACHI

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 400 million

CLIENT

KICTL PAKISTAN

Completion:

UNDER CONSTRUCTION

BAHRIA TOWN (PVT) LIMITED


RAWALPINDI
Project Name

BAHRIA TOWN (Pvt) LIMITED


AWAMI VILLAS PROJECT.
TOTAL # OF VILLAS 8000

Location:

RAWALPINDI, PAKISTAN

NATURE OF JOB

CUSTOM CLEARANCE & INLAND TRANSPORTATION.

COST OF PROJECT

US$ 120 million

CLIENT

BAHRIA TOWN (Pvt) LIMITED

Completion:

UNDER CONSTRUCTION/ PROGRESS

HEALTH, SAFETY AND ENVIRONMENT

S.M.Asghar (Pvt) Limited believes that


ACCIDENTS
DONT JUST happen, theyre caused, and it is the duty of the Company
to remove and minimize all possible causes of Accidents.
We at S.M.Asghar (Pvt) Limited takes preliminary guide to the
recognition of potential hazards to the following.

MOST-SAFE-PLACES
M

MACHINERY

Sources of Mechanical Power

OPENINGS

Pits, Sumps, Ducts & Drains

STACKS

Stores Materials, Raw & Process.

TOOLS

All type of Tools.

SAFE-PLACES
S

STRUCTURE

Floors, Walls, Ceilings, Road

ATMOSPHERE

Dust, gases, fumes & Spray.

FIRE

Fire Points & Fire Exits.

ELECTRICITY

Wires, Cables, Switches.

PRESSURE VESSEL :

Boilers & Compressors

LADDERS

Steps, trestles & Scaffolds

ATTIRE

Protective Clothing, Helmets

CRANES

Hoist, Derricks & Ropes / Hooks

EXPLOSIVES

Flammable Liquids, LPG, Radioactive.

For SIGNALS

Warning Light, Telephone Buzzers.

As a Company Policy we take care of our Employee to the best Standards because
Employees are Our Assets.

We provide following safety Equipments to our Port staff such as :

Safety Belts

They are provided to the Staff who


Works On the Ship /Vessel (VCM/LPG)

Emergency Lights

In case of Night Delivery at the Port

Premise/ Highways

Safety Helmets

At time of delivery at the Port Area


During Loading/ Unloading
Heavy Machineries/ Hazardous Cargo

Safety Boots

At the Ship Derricks & the Port Premises

Safety Glasses

They are provided to the Staff who


Work on the Ship /Vessel.

HEAVY & SUPER HEAVY LIFT


TRANSPORTATION EXPERIENCE
WE CALLED THIS AS
ABNORMAL LOADS

Das könnte Ihnen auch gefallen