LARSEN & TOUBRO LTD


ECC DIVISION
Project
Owner

F
Job
Procedur
e
No. LTCD
-SSPLST-CIVILJP-16

: SIDHPUR - SANGANER PIPELINE PROJECT.


: M/S INDIAN OIL CORPORATION LIMITED

False Ceiling

Rev. 0

39
40
41
42
43
44
45
46
47
48
49
50
51
0
52

Rev. No.

53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82

For
review &
23.02.04 Approval
SML
RKS
ANA
Descriptio Prepared Checked Approved
Date
n
by L&T
by L&T
by L&T

Index

Sl. No.
1
2
3
4
5
6
7
8

Descripti
on

Page No.

Purpose
3
Scope
3
Controlling specificati
3
Material
3
Procedure
3
Documentation
3
ITP
LTCD-SSPL-ST-CIVIL-ITP-16
Format
LTCD-SSPL-ST-CIVIL-FM-16

OPK
Reviewed &
approved by IOCL

83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125

2
a)
b)
3

Scope:

This procedure covers the minimum requirements for materials, fabrication, fixing and method of record
Controlling Specifications:
The False Ceiling fabrication and fixing work shall comply to the relevant IS codes and speciication no.
Exhibit drawings

Materials
All Aluminium sections shall be as per of the relavant IS codes and from the approved vendor (Jindal / H
Perforated ceiling tiles shall be of 12 mm thickness manufactured by approved vendor (Nova Teak /Anc
Procedure

The framing grid of false ceiling shall be of 610 mm x 610 mm size made by using 35 mm x 25 mm x 1.

The runners shall be suspended from the roof by means of 1/4" M.S. galvanised rods hooked to adjusta

The ceiling panels shall be of 12 mm thick semi perforated in random pattern ceili

Note:

The false ceiling will accommodate ligjting fixtures, air conditioning grills, retur
Documentation
ITP: LTCD-SSPL-ST-CIVIL-ITP-15
Format: LTCD-SSPL-ST-CIVIL-FM-15
In case of any conflict between this procedure and contract specification, the later shall govern.

ITP16
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

S.No
1
2
3
4
5

B
C
D
E
F
LARSEN & TOUBRO LTD - ECC DIVISION
Inspection & Test Plan for False TPIing and false flooring
Project:- SIDHPUR - SANGANER PIPELINE PROJECT
Client:I.O.C.L.
ContractorL & T, ECC Division

Records
Verificati
to be
Inspectio
on by
Submitte
Activity Description n by L&T
IOCL
d by L&T
Selection of material
W
R
MTC
Checking of grid syst
W
LTCD-SSPL-ST-CIVIL-FM-16
RM
Level alignment
W
RM
-DOPosition of cut outs
W
RM
-DOPanel placing
W
RM
-DO-

W - Witness
RM - Random
R - Review Documents

23.02.04
For review & approval
SML

RKS

OPK

40
Rev. No.
41

Date

Reviewed
&
Descriptio Prepared Checked approved
n
by L&T
by L&T
by IOCL
LTCD-SSPL-ST-CIVIL-ITP-16

FM 16
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

B
C
D
E
F
G
LARSEN & TOUBRO LTD - ECC DIVISION
INSPECTION REPORT FOR FALSE CEILING.
Project:- SIDHPUR - SANGANER PIPELINE PROJECT.
Client:I.O.C.L.
ContractorL & T, ECC Division

REPORT NO:

LOCATION:

DATE:

STRUCTURE:

L&T
1 Grid marking is checked
2 Pedestral base location is checked
3 Supporting grid work is checked
4 Level is checked by adjusting nut
5 Alignment is checked
6 Cut outs are marked and panels cut as per size
7 Panels are placed and level cheked
8 Slope is checked

The work at the above location was checked and found to be in accordance with relevant drawings and
specification of the contract.

35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

FOR L&T
LTCD-SSPL-ST-CIVIL-FM-16

pproved vendor (Jindal / Hindalco).


d vendor (Nova Teak /Anchor / Armstrong).

ater shall govern.

drawings and

IOCL

FOR IOCL

AA

AB

AC

AD

AE

AF

AG

AH

AI

AJ

AK

AL

AM

AN

AO

AP

AQ

AR

AS

AT

AU

AV

AW

AX

AY

AZ

BA

BB

BC

BD

BE

BF

BG

BH

BI

BJ

BK

BL

BM

BN

BO

BP

BQ

BR

BS

BT

BU

BV

BW

BX

Das könnte Ihnen auch gefallen