INSTALLATION INSTRUCTIONS
Grommet Size
L-30N / A
L-30R / AA
L-30RV / B
Body Material:
Horizontal or
Vertical Mount
N or R
L-30N V / F
L-30R / F
L-30RV / F
Grommet
Size
Cable
O.D.
Grommet
Size
Cable
O.D.
A
AA
0.25 in.
0.30 in.
B
C
0.37 in.
0.50 in.
1/2 Flexible
Conduit Fitting
INSTALLATION INSTRUCTIONS
Installation:
The L-30 Liquid Level Switch is supplied with a 1-1/2 or 1-1/4 x 1 bushing threaded in place with 2 to 3 wraps of teflon
tape, which must be intact or renewed if bushing and switch are separated before assembly in tank. Care must be
exercised when threading the bushing into plastic or metal fittings. Apply a minimum of 2 to a maximum of 3 wraps of
teflon tape to threds of bushing - this is especially important if unit is to be used in metal fittings where coarse METAL
THREADS could gall plastic if not lubricated. The plastic bushing CAN BE CRACKED if the main body of the flow switch
is tightened into it FIRST. Cracking will not occur if the bushing is FIRST tightened into the pipe or tank fitting and THEN
the L-30 body is tightened into the bushing.
Thus:
1). Teflon tape thread and tighten plastic bushing into pipe or tank fitting.
2). Teflon tape thread and tighten L-30 switch into PLASTIC bushing by applying wrench to hexagon section.
Repeat steps 1 and 2 until ARROW on body points to UPWARD and threas are leak tight.
Plumbers tools such as pipe wrenches are not recommended. If possible, use a Rigid type wrench where the smooth
jaws closely fit the hexagon section.
Electrical Wiring:
Step 1: Remove gland nut, grommet and switch cover.
Step 2: Strip outer jacket of electrical cord back approximately 1-1/4" inches. Strip insulation from individual
conductors back approximately 1/4 inch.
Step 3: Slip on terminals are supplied with each switch. Remove from switch terminals and crimp on or solder to
electrical leads.
Step 4: Feed electrical cable through gland nut, grommet and switch cover as shown.
Step 5: Apply slip on terminals to appropriate contacts of microswitch. Slide cover down cable and fasten to body of
switch with 4 screws provided. Slide grommet down cable until outer jacket is level with small end of grommet
per illustration page 2.Push grommet into tapered end of cover. Hold cable jacket to prevent rotation and thread
gland nut firmly onto cover.
Fig. 1: Wiring schematic for power applied to
load when liquid level is less than set point
(power to load interrupted when level
increases to above set point).
Micro switch actuation point may be monitored by an audible click or with an OHM meter before connecting line power to
the terminal strip or by monitoring the voltage supplied to the load through the micro switch.
INSTALLATION INSTRUCTIONS
Liquid Level Switch for ORCAIIA - PN 3500103
INSTALLATION INSTRUCTIONS
Liquid Level Switch for ORCAIIA - PN 3500103
No.
Part Name
Qty.
Part No.
No.
Part Name
Qty.
Part No.
60127
12
Washer
311-W
Grommet #A (Optional)
10440
13
Washer
301-W
#AA (Optional)
10441
14
65203
#B (Optional)
10442
65102
#C (Optional)
10443
65204
65205
65103
15
Cover-Male (Optional)
60125
Cover-Female
(Optional)
60126
Screw
109-S
A) Seal Shaft
65104
Microswitch
20103
B) Diaphragm
65105
Brackets
65401
C) Diaphragm Washer
65106
Terminals
706-T
D) Pivot Pin
65107
Screw
133-S
E) Cross Pin
65108
10
Screw
116-S
65208
11
Nut
219-N
65402
65601
16
17
#45% (Optional)
18
19
65602
20
Screw
123-S
21
O-Ring
65110