Purpose
People credited with this unit standard are able to: demonstrate
knowledge of line stringing equipment for installing
transmission conductors; demonstrate knowledge of stringing
transmission network conductors; and tension and terminate
transmission network conductors, in accordance with industry
requirements.
Classification
Available grade
Achieved
Explanatory notes
1
2.
Safety of personnel and plant must be a priority throughout the assessment. If the
safety requirements are not met the assessment must stop.
18025 version 4
Page 2 of 3
Outcome 1
Demonstrate knowledge of the preparation of transmission line stringing equipment for
installing transmission conductors in accordance with industry requirements.
Evidence requirements
1.1
1.2
1.3
1.4
1.5
Outcome 2
Describe stringing of transmission network conductors in accordance with industry
requirements.
Evidence requirements
2.1
2.2
2.3
Outcome 3
Describe tensioning and terminations of transmission network conductors in accordance
with industry requirements.
Evidence requirements
3.1
Infrastructure ITO
SSB Code 101813
18025 version 4
Page 3 of 3
31 December 2020
Status information and last date for assessment for superseded versions
Process
Version
Date
Last Date for Assessment
Registration
27 April 2001
31 December 2018
Revision
10 September 2004
31 December 2018
Review
23 April 2008
31 December 2018
Review
20 August 2015
N/A
0120
Infrastructure ITO
SSB Code 101813