Agenda
Western look ahead: Sound wall construction
La Brea Piling Update
La Brea Decking: Phase l, ll ,lll detours, outreach and communication
Jet Grouting Schedule and Locations
Fairfax Updates: Tree/median removal, sound wall/driveway
construction, traffic reconfiguration, piling
La Cienega look ahead: Advance utility relocation, building demo
Eat Shop Play Wilshire
Question & Answer
Section 2 and 3
Status
Under Construction
Section 1
Forecasted Schedule
Section 2
Section 3
Length
3.92 Miles
2.59 Miles
2.48 Miles
New Stations
Wilshire/La Brea
Wilshire/Fairfax
Wilshire/La Cienega
Wilshire/Rodeo
Century City/
Constellation
Westwood/UCLA
Westwood/VA
Hospital
2015 - 2018
2025 - 2027
Construction
2015 - 2023
2018 - 2026
2027 - 2035
Operations
2024
2026
2035
PLE Section 1
Alignment
Local Streets
Project Policies for Local Streets:
No hauling and no construction vehicles
on residential streets.
No parking on residential streets
outside of permitted closures.
Enforcement:
Training and take-home materials for
craft and sub contractors prior to
starting on the job.
Signage in the yards and on local
streets.
Flaggers strategically placed to avoid
violations.
Stand-down meetings with construction
supervision and craft.
Penalties for companies and employees
that violate policies.
Mitigation signage
commonly seen near
work zones.
Example of mitigation
signage installed in
staging yards.
7
Example of mitigation signage in the La Brea yards.
Mitigation Measures
A flagger at
Wilshire/Detroit
monitoring hauling
during an ongoing
closure.
8 Parking meters
restored on Wilshire
between Detroit and
Cloverdale.
Utility Investigation
Additional activities in Western area include
pot holing and street restoration
M-F, 9am-3:30pm
Sat-Sun, 8am-6pm
10
Wilshire/Manhattan Place staging yard
11
La Brea Station
12
13
La Brea Station
La Brea Staging Yards
Staging Yard Activities and
Equipment
Mitigations
14
La Brea Station
Pile Installation
Orange Dr to Detroit St
Work hours: 7am to 11pm with potential nighttime work
hours from 11pm to 7am.
Will require directional closures on La Brea, Wilshire and
intermittent closures of Orange Dr and Sycamore.
Approved detour routes provided in construction notices
for directional closures.
15
Weekend Directional
Closures for Piling
16
Appendage piles are the ancillary piles for the structures on the sides of the station box.
Located on the north and south side of Wilshire Blvd on La Brea, Sycamore, and Orange.
Appendage structures include:
Vent shafts, exit stairwells, and station entrance at La Brea
Appendage piles are smaller and shorter (40-60ft.) than the station box piles.
Requires closures on La Brea, Sycamore, and Orange.
17
Appendage Piles
Schedule
South side of Wilshire Appendage Piles
Traffic control
18
LA BREA DECKING
19
La Brea Station
Decking Overview
Decking
20
20
La Brea Station
Examples of Decking
21
La Brea Station
Examples of Decking
22
La Brea Station
Example of Decking Completed
23
La Brea Station
Decking Schedule
25
Phase 1 Detour
Wilshire, Detroit to La Brea Closure
Westbound: Northbound
La Brea to Westbound 6th
St. to Southbound Fairfax
Eastbound: Northbound
Fairfax to Eastbound 6th
St. to Southbound La Brea
26
27
29
30
31
32
Phase 3 Detour
Wilshire, La Brea to Highland
Eastbound: Northbound La
Brea to Eastbound 6th to
Southbound Highland to
Eastbound Wilshire
Westbound: Northbound
Highland to Westbound 6th to
Southbound La Brea to
Westbound Wilshire
33
Bus Detours
Wilshire and La Brea
Phase I/II: 720/20, LADOT Dash, AVT
Eastbound/Westbound Wilshire Buses will be temporarily suspended between
Fairfax and La Brea
Nearest bus stop locations will be at Wilshire/Crescent Heights and Wilshire/
Highland.
LADOT Dash Buses will be temporarily suspended on 6th Street between Hauser
and La Brea
Antelope Valley Transit Authority (AVT) buses will also be temporarily suspended
on Wilshire
LADOT Dash and AVT Bus Detours will be coordinated with Metro bus operations.
34
Bus Detours
Phase I: 720/20 Bus Lines
Eastbound: Eastbound Wilshire,
to northbound Fairfax,
eastbound 3rd St, to
southbound La Brea, to
Wilshire.
Westbound: Westbound
Wilshire, northbound La Brea,
westbound 3rd St, southbound
Fairfax to Wilshire
35
Bus Detour
Phase II: 720/20 Bus Lines
Eastbound: Eastbound Wilshire,
northbound Fairfax, eastbound
3rd St, southbound Rossmore to
Wilshire
Westbound: Westbound
Wilshire, northbound Rossmore,
westbound 3rd St, southbound
Fairfax to Wilshire
36
Bus Detours
Phase II: 212/312 Bus Lines (La Brea)
Southbound: Southbound La
Brea, eastbound 3rd St,
southbound Rossmore,
eastbound Wilshire, southbound
Crenshaw, westbound Olympic,
southbound La Brea.
Northbound: Northbound La
Brea, eastbound Olympic,
northbound Crenshaw,
westbound Wilshire, northbound
Rossmore, westbound 3rd St,
northbound La Brea.
37
Bus Detours
Phase III: 720/20 Bus Lines
Eastbound: Eastbound Wilshire,
Southbound La Brea, Eastbound
Olympic, Northbound Crenshaw,
Eastbound Wilshire
Westbound: Westbound Wilshire,
Southbound Wilshire, Westbound
Olympic, Northbound La Brea,
Westbound Wilshire
38
Decking Overview
Detour Maps
Photos/videos
Construction Notice updates
65 Meetings/Briefings
68 Construction Notices
Sent via eblast, posted on website and social media
Community Meeting notices walked to 30,000 residents/businesses
Since 2016
78 Meetings/Briefings
133 Construction Notices
90,000+ flyers distributed
Construction Community Meetings: January 21, March 17, May 19
Wilshire/La Brea Business Meeting: June 2
Email Distribution List: 2,300+, Facebook 5,000+ likes, Twitter: 4,000+
Weekly emails to community leader for NCs, HOAs, Apartments
41
Jet Grouting
Jet grouting is a construction process that uses high-pressure air
1.
2.
3.
4.
5.
6.
7.
8.
9.
43
44
Jet Grouting
Jet grouting will continue behind concrete barriers at Wilshire/Detroit.
45
Deck Openings
What:
When:
How:
46
Deck Openings
Construction Activities
Concrete placement
Station backfilling
47
Fairfax Station
48
Fairfax Station
Schedule
35
Fairfax Station
Advance Utility Relocation
Potholing continues
Work hours:
o
50
Fairfax Station
Activities at Ogden Staging Yard
51
52
Ogden Yard
Safety Measures & Mitigations
.
54
55
58
Fairfax Station
Pile Installation Overview
PHOTO
47
59
La Cienega Station
60
61
La Cienega Station
Advanced Utility Relocation
Water and telecommunication work continues along the alignment on
62
La Cienega Station
Advanced Utility Relocation
Current AUR activities continue during
daytime and evening hours.
Days and Hours*
o
o
o
63
La Cienega Station
Gale Yard
Demolition of buildings on Gale and
Wilshire Summer 2016
Future Gale Staging Yard
64
La Cienega Station
La Cienega Yard
Buildings to be demolished,
anticipated in Summer 2016
65
La Cienega Station
Weekend Work
Weekends, Friday thru Sunday
Detours and turning restrictions will depend on
location of construction.
Wilshire, at least one lane open in each
direction
La Cienega, at least one lane open in each
direction
Days and Hours
o Start: Friday 10pm or 12am*
o End: Sunday by 6pm
Photo
66
edian
logolo
67
68
69
70
71
72
73
Next Meeting
Section 1 Construction Community Meeting
Thursday, July 21, 2016
6:00-8:00pm
Petersen Automotive Museum
6060 Wilshire Blvd, 4th Floor
Los Angeles, CA 90036
Agenda: La Brea decking update
Fairfax piling update
Art Program: Resources Needed!
74
Stay in Touch