Beruflich Dokumente
Kultur Dokumente
and Construction
Edi B. Setyobudi
2016
Conductor
Keeps loose soil / sediments out of hole
Enable drilling fluid circulation and diverter
system
Usually driven into place
Surface Casing
Protects fresh water aquifers
Prevents loss circulation into weak permeable
zones
Supports the weight of all casing strings and a
place to set BOP
Intermediate Casing(s)
Separate normal, transition and over-pressure
zones
Isolate zones that cause problems (heaving,
sloughing shales)
Production Casing
Isolates pay zones
Protects production tubing
Liner
Casing string that does
not extend to surface
Hung onto
Intermediate Casing by
means of Liner Hangers
Tieback Liner
A section of casing
extending from top
of liner to the
surface
Liner
Tieback Liner
Pressure
Temperature
Roller-Cone Bit
Tungsteen
Carbide Insert
(TCI)
Milled-Tooth
Poly-crystalline
Diamond Compact
(PDC)
PDC
TCI
Milled-Tooth
Roller-Cone
Bit Size
17-1/2
12-1/4
8-1/2
20 Conductor
13-3/8 Surface Casing
9-5/8 Intermediate Casing
Connections / joints:
Short thread connection (STC)
Long thread connection (LTC)
Buttress thread connection (BTC)
Depth
(m)
Hole
Size
Mud Weight
(lbs/cft) / ppg
150
26
66 67 / 8.8 8.9
0 - 150
1500
17-1/2
66 67 / 8.8 8.9
0 - 1500
0 - 240
240 - 2610
2610 - 3500
0 - 530
3500
4380
12-1/4
8-1/2
67 70 / 8.9 9.36
Range (m)
530 - 4270
4270 - 4380
Pressure control
Formation Temperature:
BHCT Circulating Temperature - affects thickening time
BHST Static Temperature
Differential top and bottom cement placement
Formation Pressures
Pore Pressure
Fracture Pressure
Wellbore volume
Others:
Sloughing shales / swelling clays
Corrosive gas
Fracture zones
Class
Depth-ft
Notes
0 - 6000
0 - 6000
0 - 6000
High early-strength
0 - 8000
0 - 8000
Accelerators
Shorten thickening time
Retarders
Delay thickening time
Primary Cementing is
outmost importance since
remedial cementing is more
difficult and less chance of
success
After enough time for
Waiting On Cement (WOC)
Pressure Tested
Cement Bond Log a sonic
and density logs to
qualitatively identify poor
cementing zones
Casing Gun
Through Tubing
Gun
Tubing Conveyed
Gun
Acidizing
Carbonate reservoirs injecting acid (HCl) into
reservoir to create channels for fluid flow
Fracturing
Injecting fluid using high pressure pump to break
the rock then insert proppant to retain the fractures
open