Sie sind auf Seite 1von 6

METHOD OF PROCEDURE

(MOP)

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

Page 1 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


MOP HISTORY
MOST RECENT
VERSION

REVISION
DETAIL/S

AUTHOR

APPROVED BY

DATE APPROVED

Edward Carlo
Gaspar

1. DESCRIPTION
To be able to integrate U900 F2 Technology under Project Latitude

2. PURPOSE AND SCOPE


3G Technology U900 F2 Activation under Project Latitude

3. BACKGROUND
3G Technology U900 F2 Activation under Project Latitude

4. PROPONENT
Name
Position
Ericson Blue Sta
Maria
Maria Kristina
Estacio
Karen Garcia

Dept./Div.

Engineer

AEI/RCM

Sr.
Engineer
Manager

AEI/RCM

Signature

Date

AEI/RCM

<Division Head>
Note: Required Signatories
Minor up to Section Head
Major up to Department Head
Critical up to Division Head

5. Target Date and Time of Implementation: May 31 2016,

10:00H-04:00H
6. CHANGE CATEGORY
Minor

Major

Critical

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

METHOD OF PROCEDURE
(MOP)

Page 2 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


7. TYPE OF SERVICES AFFECTED
Service : Non-Service Affecting

Product : HUAWEI

MVNO /IR/Others : Local

8. SITE AND E2E SYSTEM AFFECTED


PLA ID

SITE
NAME

REGION

UBBP

UMPT

UPEU

FANC

POWER
CABLE

NL122

CANDABA

NLZ

NL110

PNIQUIPAM

NLZ

NL1147

ALIAGA

NLZ

NL228

GENTINIO

NLZ

NL236

QUEZONNE

NLZ

NL1430

RICARDONE

NLZ

NL1110

ISIDRONE

NLZ

NL136

LUBAO

NLZ

NL137

NLZ

NLZ

NL105

LUBAO2
STATERESA
1
UB3LUBAO

NLZ

NL87

MARINGIN

NLZ

NL164

STARITPAM

NLZ

NL115

9. E2E SYSTEMS BLOCK DIAGRAM


10. WITH OTHER RELATED ACTIVITY:

YES

NO

Description
SO REF#
MOP REF#
Other Network Element (NE)
Affected

Remarks:

11.

SPECIFIC NODE AFFECTED IN THIS MOP


HARDWARE

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

METHOD OF PROCEDURE
(MOP)

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

Page 3 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


System
Name
RNC
NodeB
System
Name
RNC
NodeB

Product

Version

Remarks

Huawei
BTS3900

V900R015ENGC00SPH536
BTS3900
V100R010C10SPC255
SOFTWARE
Version

Remarks

Product
Huawei
BTS3900

V900R015ENGC00SPH536
BTS3900
V100R010C10SPC255

12.
PEOPLE INVOLVED DURING IMPLEMENTATION OF THE
ACTIVITY
Company

Department

HUAWEI
HUAWEI
HUAWEI

WIRELESS
WIRELESS
WIRELESS

GLOBE

RAN

13.

Name

Role

Contact
Number

Rebo Guardiano
Rizza Alvaro
Sherwin
Magtibay
GT SCC NOC
RAN

Doer
Doer
Doers IS (Escalation
1)
Activity Monitoring

09053698455
09154068645
09159866978
09054169217

SUPPORTING DOCUMENTS
Reference Number

14.

Description

WORK BREAKDOWN SCHEDULE

Start Time

End Time

Activity

09:00H

10:00H

Pre activity checklist

10:00H

02:00H

Actual activity proper

Responsible
HT NOC & GT
NOC
HT NOC

Remarks
No Downtime
No Downtime

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

METHOD OF PROCEDURE
(MOP)

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

Page 4 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


02:00H

03:00H

Post activity checklist

03:00H

04:00H

Revert procedure

HT NOC & GT
NOC
HT NOC

No Downtime
No Downtime

15. KNOWN ISSUES, RISKS AND MITIGATIONS (Preventive)


16. PRE-REQUISITES PRIOR IMPLEMENTATION
Availability of implementor
Core Definition would be done by GT NOC
Core Parameters provided

17.

U900 F2 Technology should be available.

18.

SUCCESS, ABORT AND REVERT BACK CRITERIA

PRE-ACTIVITY PROCEDURES

Export the current configuration of the BSC; through MML commands: EXP CFGMML
Save all existing alarms, before & after the activity.
Advise GT NOC RAN before the start of the activity.

19.

PLANNED ACTIVITY PROCEDURES

For HT NOC Side


1. Load the script for activating the U900 technology.
2. Lock U900 cell after integration.
BLK UCELL

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

METHOD OF PROCEDURE
(MOP)

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

Page 5 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


20.

POST ACTIVITY CHECKING AND VALIDATION

U900 F2 Technology should be available.

21.
REVERT BACK PROCEDURES
For HT NOC Side
1. Load the script for removing U900 technology.
LATEST TIME TO REVERT : 05:00

22.

POST REVERT BACK SUCCESS CRITERIA


Existing Technology should be available without alams.

23. CONTINGENCY (If Revert Procedure Fails)


FO and Vendor Support.
Check all physical and logical connectivity.
Revert Back up config (saved data at pre-activity checklist)

24. MOP REVISION DETAILS (to be filled in by SEI reviewing engr)


REVISION 1 : (indicate reason)

Lack of Mandatory Information


with standard / LLD
Confusing instruction in the procedure
Missing step in procedure
Typing Error

Condfiguration not aligned


Missing Configuration
Wrong Configuration
Incorrect Data

REVISION 2 : (indicate reason based on same list above)

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

METHOD OF PROCEDURE
(MOP)

MOP Ref. #: _VERSION # :


(to be provided by DMSC)
Why from DMSC? DMSC
provide process number
no the MOP number!

Page 6 of 6

MOP for U900 F2 Activation: Non-NCR Project Latitude


REVISION 3 : (indicate reason based on same list above)

Confidential. This document is not to be reproduced without the permission from


Globe Telecom.

Das könnte Ihnen auch gefallen