Sie sind auf Seite 1von 4

SMU MBA SPRING 2016-2017

Dear Students,
SMU MBA SPRING 2016 Assignments are available. For Booking ,Kindly mail us on
kvsude@gmail.com OR call us to +91 9995105420 or S M S your Email ID us in the
following Format On +91 9995105420 we will reach back you with in 24H

DRIVE: SPRING 2016


PROGRAM: MBADS (SEM 4/SEM 6) MBAFLEX/ MBA (SEM 4) PGDPMN (SEM 2)
SUBJECT CODE & NAME: PM 0015 QUANTITATIVE METHODS IN PROJECT MANAGEMENT
BK ID: B2011
CREDIT AND MARKS: 4 CREDITS AND 60 MARKS

Q1. Explain Business Value Models in detail


Balanced scorecard model
The Treacy-Wiersema model
The Kano model
Answer:
The following business models in detail in the following section:
Balanced scorecard model
The balanced scorecard model defines four scoring areas for business value and was first published by Robert
S. Kaplan and David P. Norton in an article, The Balanced Scorecard Measures that Drive Performance.
The model was developed as a replacement for earlier systems; those only included the financial perspective to
measure
Q.2: What is parametric estimating? Explain the steps involved in the development of a parametric model.
(Define parametric estimating (1.25 MARKS)
Describe the 7 steps involved in the development of a parametric model 8.75 (1.25 marks for each step)
Answer:
Define parametric estimating:

Parametric estimating is an estimating technique that uses a statistical relationship between historical data and other
variables, such as square footage in construction and lines of code in software development for calculating an estimate for
activity parameters, such as scope, cost, budget, and duration. Parametric estimating can produce higher levels of accuracy
depending
Q.3: 1. what aspects of capital budgeting must be considered while selecting a project?
2. Suppose an investment requires an initial outlay of $5 million and has expected the cash flow of $1 million, $3.5
million, and $2 million for the first three years.
a. Calculate:

The net present value using a 10% required rate of return

Profitability Index using a 10% required rate of return

b. Also suggest if the project must be accepted.


1. Explain the 4 aspects of capital budgeting that must be considered while selecting a project. 4 (1 mark each)
2. a. calculation of net present value (2 MARKS)
Calculation of profitability index (2 MARKS)
b. Mention if the project must be selected and give reasons why it should be project be selected/not selected (2
MARKS)
Answer:
1. Explain the 4 aspects of capital budgeting that must be considered while selecting a project:
An organisation needs to consider the following aspects of capital budgeting while selecting a project:
Growth of the organisation: This implies that a project should be selected after considering the overall profit and market
share of the
Q.4: Explain the various expense items in a project.
(List the various expense items in a project (1 MARKS)
Describe each expense with suitable examples 9 (3 marks for each expense item)
Answer:
List the various expense items in a project:

Direct and indirect costs

Variable and fixed costs

Actual and standard costs

Describe each expense with suitable examples:

Direct and indirect costs


Direct costs are expenses that directly affect the budget of a project. Expenses that are for the express benefit of the
project, and would not be incurred if not for the project, are usually called "direct expenses." In other words, direct costs
can be identified

Q5. 1. Determine the average amount of bricks laid over a six-month period by 1 bricklayer. Collected
information on the amount of bricks laid per month:
January 21,000
February 23,500
March 22,000
April 24,000
May 26,000
June 25,000
2. Consider the sales figures of the Bricklayer Company over the period of 6 months, as shown in the
table:
Month No of Sales
January 20
February 20
March 16
April 20
May 21
June 27
Determine the average amount of bricks laid over a six-month period by 1 bricklayer.
Consider the sales figures of the Bricklayer.
Answer:
1. Mean = 21,000 + 23,500 + 22,000 + 24,000 + 26,000 + 25,000 = 141500
The total number of mean values = 6
Mean =141500/6 =
Q.6: What are the steps that should be followed to construct a house of quality?
(Explain the 5 steps that should be followed to construct a house of quality) 10
Answer:
Explain the 5 steps that should be followed to construct a house of quality:
The following steps need to be followed to construct a house of quality:
Step-1 Voice of the customer: This step includes determining and identifying the customers needs. The main objective
of this step is to translate the needs of every customer into engineering specifications. Customers buy products that have
the desired

SMU MBA SPRING 2016-2017


Dear Students,
SMU MBA SPRING 2016 Assignments are available. For Booking ,Kindly mail us on
kvsude@gmail.com OR call us to +91 9995105420 or S M S your Email ID us in the
following Format On +91 9995105420 we will reach back you with in 24H

Das könnte Ihnen auch gefallen