MATERIAL MASTER
1. For creating material master the following transaction code is used
a)
md01
b)
mm01
c)
me01
d)
mc01
b.
c.
d.
Stock valuation and the G/L account posting is same as with the
new material type as it was with the earlier material type.
Both material types fall in the same number range group
Material type cannot be changed once the material is created
b) No
31. Can you change the screen sequence for Material Master Record for a
user?
a) Yes
b) No
32. Configurable material check for a material is set in________ view.
a) Work scheduling
b) Variant view
c) Basic data view
d) MRP view
e) Super BOM
33. Units of measure in SAP System in addition to base unit of measure
a) are grouped together under Multiple Units of Measure
b) are grouped together under Alternative measure
c) are grouped together under Alternative unit of measure
d) none of the above.
34. The alternate unit of measure is defined in Material Master in
a)
Basic data 1 view
b)
Additional data screen
c)
Storage view
d)
MRP view
35. The unit in which the stock keeping is done in a company is called
a) Stock unit of measure
b) Base unit of measure
c) unit of issue
d) purchase unit of measure
36. You can group together several units of measure in a
a) Material type
b) Material group
c) Unit of measure group
d) MRP group
e) Alternate group
37. Following can be different units of Material Master
a) Purchasing UOM
b) Sales UOM
c) Base UOM
d) Issue UOM
38. A company has plant in Germany, the material is produced & stored
in lbs. The company wants to sell the same product in UK where it is sold
in kgs. How do you define the UOM in the material master.
a) You should create a separate material master for the same product
according to different locations.
b) You should create one Group UOM in which kgs & lbs are both assigned
for sale you must enter a conversion factor in customizing.
c) You should assign a conversion factor in the basic data view of the
material master.
39. A company uses KG as base unit of measure for one of its material.
They now start supplying this material from UK where they need to supply
this material in pounds. How can they mange this?
a)
Enter pound as sales unit of measure for that country and maintain
conversion formula
b)
No conversion formula is required as system recognizes pound as
a unit of measure for mass
c)
Company needs to sell the material in kg only as other units cannot
be used
d)
Company needs to change the base unit of measure to pound.
e)
Pound to be included in unit of measure table and conversion
formula to be given through additional data in Material Master
40. Material status controls
a) usability of a material for purchase
b) usability of a material for BOM / Routing
c) usability for Production Order Header / Item
d) Usability for MRP
41. Material status can be set at the following organizational levels
a) Plant
b) Client
c) Company code
d) Material type
42. Characteristics of materials is defined in Material Master in
a)
MRP1 view
b)
Work scheduling view
c)
Classification view
d)
None of the above
43. Classification system can be maintained for
a) Materials
b) Routing headers
c) Work centers
d) PRT
e) Documents
44. SAP classification system uses MATCHCODE and mnemonic numbers
a. True
b. False
45. Following are the parts of classification system
a. Characteristics maintenance
b. Class maintenance
c. Classification
d. Find object
46. Functions of classification are
a)
To find an appropriate object
b)
To find similar objects
c)
To establish that no appropriate object exists
47. Object class can contain
a) Classifiable unit
b) Non classifiable unit
c) Both classifiable and not classifiable unit
48. Arrange the following in the best sequence for maintaining class
a. Maintain the objects
b. Maintain the class
c. Define characteristics
d. Find objects
49. Functions of classification are
a)
To find an appropriate object
b)
To find similar objects
c)
To establish that no appropriate object exists
50. Object dependencies are used in the following
a. characteristic maintenance
b. class maintenance
c. classification
d. finding objects
51. Object class can contain
a) Classifiable unit
b) Non classifiable unit
c) Both classifiable and not classifiable unit
52. The level at which classification view in Material Master is defined at
a)
b)
c)
Storage location
Valuation type
Plant & client
d)
e)
MRP view
Client
60. Batch is
a)
same as material code
b)
partial quantity of material managed separately from other quantity of
same material in stock
c)
A non reproducible homogeneous unit with unique specifications
d)
None of above
e)
All of above
61. A company uses produces its own tools which it uses in making other
big assemblies. You are a consultant to recommend correct type of PRT to
assign to this material. What will you choose?
a)
Miscellaneous PRT
b)
Material PRT
c)
Automatic assignment no selection of material type and industry sector.
62. Schedule margin key is specified in __________ and is indicative of
_______ in ______
a)
Material master
b)
Work center
c)
Routings
d)
Opening period, float after production, float before production and release
period.
e)
Queue time, move time and wait time
f)
Planned delivery time
g)
Minutes
h)
Hours
i)
Days
j)
Month
63. At least one plant specific view and accounting/costing views has to
Be maintained to manufacture a produce with procurement type X or E
a)
True
b)
False
64. MRP profile & forecasting profiles are
a.
Essential for maintaining the material master
b.
They are used to fetch MRP & Forecasting data in the material
master which are preset in these profile.
c.
Once the values are copied from the profile the cannot be changed
65. MRP profile allows the user to
a) change MRP data across plant
b) predefine industry sector
BOM
1. A____________________ is a complete formally structured list of the
components that make up a product or assembly.
2. A company wishes to produce a component X. It tells its engineering
department to create a BOM for that. The material is in the product
development stage and hence only client level data is maintained in the
material master. In this context, (S)
a)
The BOM cannot be created as there is no plant specific view.
b)
The BOM created is a group BOM
3. A design engineer created a BOM then he came to know that he did not
define storage location form where the components should be withdrawn
a. BOM can be created without plant, he has to control BOM again
b. A Group BOM will be created with warning message
c. Only group BOM will be created
4. An engineer in the engineering department is assigned the function to
make BOM for a new product being developed. The engineer forgets to
mention the plant. On saving the BOM the following occurs.
a.
Error message is displayed
b.
BOM gets assigned to all the plants in the client
c.
No BOM is created and no message is displayed
d.
Group BOM IS Created
5. BOM that doesnt have any reference to a Plant is called as
a
BOM Group
b.
Invalid Reference
c.
Client Specific BOM
d.
Group BOM
6. For Product A material master is created with MRP and Work Scheduling
data specific to plant 1000. Now, a group BOM is created for product A.
This BOM is not yet been assigned to any plant. But that BOM can be used
for planning in plant 1000.
a) True
b) False
7. Whenever using a Group BOM
a) Changes to the groups leads to changes in all the plants
b) Changes in the plant BOM has to be carried out separately
c) Each plant BOM is separate, so has a different number
d) Each plant BOM is extension of the group, so BOM number is the same
16. BOMS that are created in different plants of the same company code
for same header material have the same BOM number (internally
generated number)
a. True
b. False
17. In SAP R/3 BOMs are always created as
a)
Multi level BOMs
b)
Single level BOMs
c)
3 Tier BOMs
d)
Super BOM
18. The base quantity in the BOM specifies
a)
to which amount of the semi finished product the item quantities refer
b)
to which amount the item quantities required for two or more finished
products
c)
to which amount of the finished product the item quantities refer
d)
to which amount the item quantities are not calculated
19. BOM categories are used to identify a bill of material used within the
SAP system. Please name any three SAP standard BOM categories.
1. _______________.
2. _______________.
3. _______________.
20. Following are valid BOM categories
a) Inspection BOM
b) Materials BOM
c) Equipment BOM
d) Costing BOM
21. BOM is called recursive when
a)
The BOM contains two identical components
b)
The base quantity is unit
c)
The components are non-stick item
d)
The component and header item are same
22. When a BOM header is used as item in the same structure
a. System generates an error message BOM is recursive
b. System will automatically identify the BOM as recursive
c. Respective indicator needs to be set in BOM item to proceed with
recursion
d. System only generates a warning message, so user can continue
creating the recursive BOM
23. BOM items can have following item categories
a)
b)
c)
d)
e)
f)
g)
Stock item
Non stock item
PRT item
Class item
Document item
Intra material
Variable size item
c)
d)
Costing
All the above
c) Variable BOM
d) Super BOM
e) Header BOM
49. Each alternative BOM has a BOM header
a)
True
b)
False
50. The alternative BOM is selected based on
a) Lot size
b) Data
c) Production version
d) All of the above
51. A material with multiple BOMs
a) Has more than one alternative BOMs
b) Has number of variant BOMs
c)
Has a super BOM
d) Can have more than one items
52. Multiple BOMs have the __________ same and differ in ____________.
a) BOM header
b) BOM items
53. Multiple BOM has the following features
a) They can also be variant BOM
b) They have the same BOM number as the original
c) They have the same lot size as the original
d) Changes to one leads to changes in all
54. For Multiple BOMSs
a) Internal BOM number is same
b) Technical type is V for all
c) Header is same for all BOMs
d) About 99 variants are possible
55. Multiple BOM can be converted to variant BOM
a) True
b) False
56. Which of the following statements are true
a) There can be 99 variants and 999 alternatives for one pump p-100.
b) There can either be a maximum of 99 variants or be a maximum of 999
alternatives for pump p-100.
57. Variant configuration is typically used in
a)
b)
c)
d)
66. All variant BOMs are saved under one internal number similarly all
alternatives are saved under one internal no
a)
True
b)
False
67. A variant BOM can only be created for a material for which no BOM
exists.
a)
True
b)
False
68. Material PP-100 has simple BOM. Now you need to create a variant
BOM with header P 100 with different item quantities is it possible to
do so
a)
yes
b)
No
69. Variant configuration and variant BOM are one and the same
a)
True
b)
false
70. Variant configuration
a)
Deals with multi variant products
b)
helps sales and production while dealing with complex configuration of
products
c)
can use a super BOM
d)
Has only variant BOMs
71. Super BOM is used for a product X. Now a sales order is received for
product X for 100 quantities. Since super BOM consists of all BOMs
requirement for all items in all various are calculated automatically when
the Super BOM is exploded
a)
True
b)
False
72. We can get a configured BOM out of a Super BOM with the use of
a) Selection parameter
b) BOM selection profile
c) Object selection procedure
d) Selection dependency
e) Object dependency
73. A variant BOM cannot be converted in to multiple BOM
a)
True
b)
False
Yes
b.
No
92. Where can you find the low level code of a BOM?
a.
b.
c.
d.
e. Materials
f. Documents
99. A where used list specifies
a) Only where the material is used
b) Where the material is used and in what Quantity
c) Where else can the material be used
d) Where the material is used at multi levels also
100. In a complex product manufacturing only one raw material is not
available due to some delay in transportation. Will a where-used list help
in any way in this situation?
a) Yes
b) No
101. Several BOMS and several items can be changed using Mass
Change function
a) True
b) False
102. Class item is used in
a. Non- configurable BOMs
b. Configurable BOMs
103. Item control indicators override the indicators in the material master
a.
Yes
b.
No
104. If it possible to set in such a way that you need to delete a BOM on a
specified future date?
a. Yes
b. No
105. BOM can be deleted entirely in may ways, one such way is to delete
any individual item.
a. True
b. False
106. BOM is not used in determining
a) MRP
b) Operation details of a material
c) Calculating product cost
d) Activity cost
107. Is it possible to delete an item in a BOM without any restriction, which
is assigned to an operation?
a) Yes
b) No
108. While used delete a BOM,
a. System checks for the items with object dependencies
b. System checks for the operation assignments
c. System deletes the BOM without any check
d. System deletes all the related alternative BOMs
109. Item A is maintained as Phantom Assembly I material master .
Is it possible to switch off this phantom assembly using item control
indicator?
a. Yes
b. No
WORK CENTRE
1.
a)
b)
c)
d)
2. Work centres
a) Can have a hierarchical structure
b) Can have a description
c) Can be specific to a location
d) All of the above.
3. Work centres contain
a) Basic data
b) Default values
c) Scheduling data
d) Costing data
e) Available capacities
f) Standard values
4. One work centre can have more than one capacity category. Relevant
for finite scheduling indicator can be set to any of the individual capacity
categories independently.
a) True
b) False, because the indicator can only be set at work centre level.
5. Some of the keys that are defined in Default values tab of the work
centre are
a) Standard value key
b) Control key
c) Standard text key
d) Set up type key
e) All of the above.
6. Which of the following affects the total available capacity (M)?
a)
No.of individual capacities
b)
Shift definition
c)
Shift sequences and Intervals
d)
Work Center formulas
7. Available capacity is assigned in (S)
a)
Routing
b)
Work Center
c)
Operation details screen
d)
Planning table
a.
b.
c.
d.
e.
Control key
Wage type
Standard vale key
Set up type key
Wage group
22. One work center can be assigned to several work center hierarchies
a)
True
b)
False
23. Work center hierarchies are used to aggregate available capacities and
capacity requirements while capacity planning.
a)
True
b)
False
24. Some of the reports that can be generated relating to work center are
a)
Work center lists
b)
cost center assignment
c)
work center capacities
d)
work center usage
e)
change documents related to work centers
25. When you define the maintenance rules for standard value key setup
time
as should be entered and if you dont specify setup time in routing
a)
Warning message occurs
b)
Error message occurs
c)
No alerts generated
d)
user can skip the message without entering the setup time
26. A work center can be created only with Basic data and default value
views This can be used in routing but cannot be used in production
order.
a)
True
b)
False
27. One work center has 3 capacity categories. The start time, finish time,
and length of break in capacity header
a)
Are entered common to all capacity categories
b)
Can vary for each capacity category and hence entered separately
c)
Are entered in routing and not in work center
d)
All of the above are possible
28. The actual move time is the value for the location group of a work
center in an operation with relation to the location group for the work
center in the next operation of a routing
a)
True
b)
False
29. One work center can be assigned to more than one cost center in a
time period
a)
b)
True
False
30. One work center can be assigned to more than one cost centers in
different
time periods
a)
True
b)
False
31. Work centers
a)
can have a hierarchical structure
b)
can have a description
c)
can be specific to a location
d)
all of the above
32. Work centers contain
a)
Basic data
b)
default values
c)
Scheduling data
d)
costing data
e)
available capacities
f)
standard values
33. The field selection settings for a work centre can be released and
transported.
a) True
b) False
34. One work center can have more than one capacity category. Relevant
for finite scheduling indicator can be set to any of the individual
capacity categories independently
a)
True
b)
False
35. Some of the keys that are defined in Default values tab of the WC are
a)
standard value key
b)
standard text key
c)
control key
d)
setup type key
e)
all of the above
36. Activity types are defined in work center in which of the following
views
a)
Basic view
b)
Scheduling view
c)
Activity overview
d)
Costing view
37. The standard value key and formula keys in the work center form the
basis for scheduling capacity planning and costing
a)
True
b)
False
38. Which of the following can be defined capacity categories?
a)
Energy
b)
Machine
c)
Transport
d)
labor
e)
Storage
f)
waste
39. If one capacity is assigned to several work centers it is considered as
a)
super capacity
b)
pooled capacity
c)
multiple capacity
d)
none of the above
40. Pooled capacity
a) can be used by multiple resources
b) is like a set of workers
c) can work simultaneously at multiple work centre
d) can not be used by multiple resources.
41. It is possible to maintain intervals of available capacity using shift
sequences?
a)
True
b)
False
42. Shift sequences and shift definitions are maintained for each capacity
category for maintaining the total available capacity if needed?
a)
True
b)
False
43. Shift sequences and shift definitions are created for grouping key. If
capacity category works in various shifts then
a) Grouping key must be assigned to the capacity category.
b) Shift sequence key within grouping key must be assigned to the capacity
category
c) Shift definition must be assigned to the capacity category.
d) Grouping key is assigned to the work centre and not to the capacity category.
44. The work time minus the length of breaks in the work centre is stored
in the work centre as the
a) Break Duration
b) Operation time
c) Operating time
d) Available capacity
45. The standard available capacity in any work centre is calculated by the
following formula
a) Operating time * capacity utilization in percent * the number of available
Capacities
b) Operating time * capacity utilization in percent / the number of available
capacities.
c) the number of available capacities / operating time * capacity utilization
46. If you have not entered move times in the operation details screen
a)
System takes the default move time as `1 min
b)
System identifies the move times form Move time matrix
c)
It is mandatory to enter move times in the operation details screen
otherwise system will throw an error
47. One work center can be used in one routing and in one standard
network at the same time
a. True
b. False
48. Work center provides the following data for costing
a.
Activity type
b.
Planned activity cost
c.
Formula for calculating activity cost
49. Work centre requires formula for the following
a) Move time matrix
b) Scheduling
c) Capacity requirements
d) Cost estimate using activities
50. Location groups are used to determine the transport time and are
maintained in ___________
a) Work centre master data
b) Routing
c) Activity type
d) Shift definition
e) Transport master
ROUTING
1. Routing is created with reference to an order
a) True
b) False
2. Routings comprise of the following
a) BOM
b) Operations
c) PRTs
d) Material Reservation
3. Routing contains information on the following
a) Material component
b) Operation
c) Capacity for WC
d) Inspection characteristic
4. Routings are identified by
a) Routing Group
b) Routing status
c) Group counter values
d) Routing Group and Group counter values
e) States and use
5. A routing describes the whole production cycle. It also defines where
the work is to be done, how long the work should take, what materials are
needed for each operation and what jigs and fixtures are required for the
operation.
a) True
b) False
6. In routing effectivity dates can be determines for each operation
a) True
b) False
7. Material routing can contain the following
a) A sub-contractor operation
b) An alternate cost centre
c) An external work centre
d) A reference operation set
8. Routing is used in
a) Production and assembly
b) Capacity planning
c) Scheduling
d) Costing
9. A routing is used in which of the following functions?
a) to determine the load on a work centre
b) to determine the availability of a material
c) to determine the required production lot size
d) to determine the dependent requirement of a material
10. The following apply to task lists and routing
a) They are the same and signify only one thing
b) Task list is used only for inspection while routing is generic and can be
used by any.
c) Task list cannot be used by maintenance while a routing can be.
d) Routing is one category of the various task list types that are there.
11. Relationship between material and routing
a) One routing can have more than one material attached to it.
b) One routing can have only one material attached to it.
c) Each routing must have a unique group number.
d) Each routing can be identified by a group number and group counter, it
has all BOM.
12. Material assignment to a routing has the following properties
a) One item can be assigned to multiple operations.
b) One item can be assigned to only one operation.
c) Multiple items can be assigned to the same operation.
d) Multiple items can not be assigned to the same operation.
13. Interoperation times consist of (M)
a)
Queue time
b)
Setup time
c)
Processing Time
d)
Wait time
e)
Move time
14. In the context of sub-operations (S)
a)
Scheduling always takes place at operation level
b)
Scheduling always takes place at sub-operation level
c)
Scheduling does not require any operations
15. The following is possible for sub operation
a) Component assignment
b) PRT assignment
c) Scheduling
d) Costing
e) Capacity requirement calculation
f) Work centre
22. Move time can be defined in
a) BOM
b) Material Master
c)
Operation of routing
d) Work centre
23. Order floats are defined by
a) Standard value key
b) Schedule margin key
c) Standard text key
d) Control key
24. Following are various task list types
a) Routing
b) Rate routing
c)
Master recipe
d) Network
e) Inspection plan
f)
Activity
g) Operations
25. One routing can
a) Be valid for multiple materials
b) Have multiple operations
c)
Have alternate operations
d) Have parallel operations
e) Have more than one reference operation set
26. The following mass change function is possible for routing
a)
Changing PRT
b)
Changing work center
c)
Changing reference operation set
d)
Changing component assignment
27. The following is possible for sub operation
a)
Component assignment
b)
PRT assignment
c)
Scheduling
d)
Costing
e)
Capacity requirement calculation
f)
Standard value assignment
28. A work step in which material required is also defined is
a)
BOM
b)
c)
d)
Routing
Material Master
Work center
36. With control key of the routing you can define if the operation
a) must be subcontracted ( external processing )
b) has component back flushing
c) must have a quality inspection
d) is relevant for costing
e) has relevant data for HR
37. Lead time scheduling takes into account the following
a) Determines the target dates using operation data
b) Determines the target dates using material master data
c) Determines the capacity requirements also
d) Does not generate the capacity requirements
38. Scheduling always takes place at operation level whereas capacity
planning and costing takes place at both operation and sub-operation level
a)
True
b)
False
39. The interoperation time in the material master is calculated from order
float + operation float + wait time + move time
a)
b)
True
False
43. The duration of the move time lies between two operations but is
assigned to the preceding operation
a) True
b) False
44. Operation consists of
a)
Setup time
b)
processing time
c)
process related wait time
d)
Tear down time
e)
Queue time
45. Floats are used for
a) Date shifts
b) Capacity requirements planning
c) Dealing with malfunctions
d) All of the above.
46. The duration of move time lies between two operations but is assigned
to the proceeding operation
a)
b)
True
False
47. Fill in the table based on the options given there under
Time Component
i. Order float
ii. Queue time
iii. Execution time
iv. Wall time
v. Shipment time
Origin
A. Customizing/material master
B. Operation standard values + work center formula
C. work center or operation
D. operation
48. To avoid redundancy and multiple descriptions for same operations
SAP has a facility or maintaining a standard text key as a template
a)
b)
True
False
a)
b)
c)
d)
True
False
56. If the operation is divided into sub-operation and if the sub operation
run in parallel, cumulation of standard values are possible
a)
b)
True
False
d)
72. Standard values for each operation can be found in the work centre
view in routing
a. True
b. False
73. Trigger points assigned to the operations in routing can be used to
trigger certain events in the production order
a) True
b) False
74. Following can be assigned to an operation
a. Material components
b. PRTs
c. Inspection Characteristics
d. Trigger Points
75. A component needs to be assigned in the 2nd operation of a routing
What is the sequence of the steps
a) Create Work center, BOM and Routing. Material is automatically
assigned.
b) Create Routing, Work center and BOM. Assign material in the 2 nd
operation of the routing.
c) BOM, Work centre and Routing, then assign material to the 2 nd operation
of the routing
76. A routing
a. Is a sequence of individual operations in producing a finished
product
b. Determines the the production cycle
c. Provides information on operation specific tools, jigs, and and
fixtures
d. All of the above is true with specific to routing
77. Routing with similar production cycles can be grouped under one
number
a. True
b. False
78. Alternate sequence is used when different work procedures are used
for same product, whereas parallel sequence allows you to process
operation concurrently with others.
a. True
b. False
79. Following are valid task list types
a. Routing
b. Rate Routing
c. Reference operation set
d. Reference Rate routing
e. Master recipe
f. Standard network
g. Inspection Plan
h. Rough cut planning profile
80. A reference operation set created with specific to a material
a. True
b. False
81. If operations 10,20,30,40, are replaced with operations 10,20
a. Parallel sequence
b. Alternate sequence
c. Standard sequence
d. Multiple sequence
82. The following is true for the reduction strategy in scheduling
a. Wait time can be reduced to minimum wait time from standard wait time
b. Move time can be reduced to minimum move time form std move time
c. Processing time can be reduced up to six levels by certain percentage in
each level.
d. Floats can be reduced as per the setting for reduction strategy in scheduling
parameter for order type.
83. The following is true for the reduction strategy in scheduling
a) Wait time can be reduced to minimum wait time from standard wait time
b) Move time can be reduced to minimum move time form std move time
c) Processing time can be reduced up to six level by certain percentage in each
level.
d) Floats can be reduced as per the setting for reduction strategy in scheduling
parameter for order type.
84. You are simulating scheduling for a routing. You discover that the lead
time is too long. Which reduction measures could you see?
a) Reduce the processing time using a reduction factor
b) Reduce the wait time using a reduction factor
a)
b)
c)
d)
Material master
In the storage location at the time of creation of storage location.
In the work centre.
At the time material assignment is done to operation in routing
PRT
1. PRT is assigned at the level of
a) Routing header
b) Routing operation
c)
Component
d) All the above
2. If the PRT used is produced by the company itself, it is better to define
that as
a) Material PRT
b) Equipment PRT
c) Document PRT
3. A PRT is supplied by your customer what can be the PRT category of
this PRT?
a)
Material PRT
b)
Document
c)
PRT master (Miscellaneous)
d)
Equipment PRT
4. PRTs are special items that are consumed during production
a. True
b. False
5. The following can be PRT,s
a. Material
b. Document
c. Equipment
d. NC programs
e. PI sheet
6. Documents that are defined in the DMS can be specified as a component
in a BOM or a PRT specific to an operation
a. True
b. False
SCRAP
1. The following is true about Operation scrap
a)
Maintained in routing
b)
Results in a fall in quantity in the next operation
c)
To be taken to consideration in scheduling and costing.
2. Following are the scrap categories
a)
Assembly scrap
b)
Component scrap
c)
operation scrap
d)
Activity scrap
a)
b)
True
False
9. Only when operation is set as focus object you can have a look at sub
operations PRTs inspection characteristics, and trigger points for that
operation
a)
True
b)
False
10. When you set Routing Header as focus
a)
All routing headers, All sequences and all operations for the routing are
displayed
b)
only one routing will be displayed
c)
Routing header is not a valid focus object
d)
routing is always identified by material number and hence it must be
specified
11. In EWB working areas
a)
Are created in customizing
b)
Are created by the user in the BWB window
c)
cannot be created by the user as there are a set of standard working
areas predefined in SAP
d)
Are nothing but selection areas. They need not be created
12. The work area consists of
a) tool bar, cockpit and overview screen
b) focus and working environment
c) effectivity window and key date
d) copy range and effectivity range
e) selection parameters and effectivity
13. Is it possible to set a default working area for a user
a)
Yes
b)
No
14. The working area in EWB consists of focus and ___________
a)
b)
c)
d)
e)
Work area
Working environment
Work header
Focus item
Focus header
15. You can restrict the item details of an object that had been changed
recently by
a)
b)
c)
d)
Validity date
item filter function
Detailed filter
None of the above.
Operations
Items
Sub operations
PRTs
Trigger Points
Inspection characteristics