Beruflich Dokumente
Kultur Dokumente
Hull
H
System
S
Hull Structure
1. Midship section
2. Profile and Plan
3. Shell expansion
4. Cargo Area
Propulsion
1. ME
2. shafting
3. Propeller
4. Thruster
5. Steering gear
Arrangement drawings
1. main and em'cy elec.
power supply and
distribution
2. electric rotating mach.
3. cable & cable support
4. ex. protection
5.lighting
Monitoring,
Control &
Alarm sys
Finance / Manning
1. Fees
2. Budget
2 3. Manning
Hull Structure
1. Engine Room
2. Aft Body
3. Stern Frame
4. Rudder
5. Fore Body
Pressure vessels
1. boilers
2. pressure vessels
3. thermal oil heaters
4. Incinerators
Power Supply
1. Wiring diagram
2. El calculation
3. Key Distri. Plan
Basic Requirement
1. Docreq, Cert.Req
2. Applicable Rules
3 3. Equipment list
Hull Structure
1. Deckhouse /
Superstructure
2. Engine Casing
3. Funnel
4. Foundation
Hull Equipment
1. Appendices
2. Misc.
Pollution prevention
1. sea water pollution
2. Air Marpol pollution
Contract
1. Pre-contract Documents
2. Class Request
1 3. AOC
4. Change Orders
(Addendum,Appendix,Annex)
5. PIM
Machinery
C
Electrical
E
Instrum.
I/N/T
Safety / GOV
G
Fire Safety
1. Fire protect & Ext.
Stability
B
Misc.
M
Stability
1. Intact stability
2. Damage stability
3. Internal watertight
integrity
Materials
Navigation
Lifesaving Appliances
Bridge Layout 1. Survival craft
Instrumentation 2. Personnel lifesaving appl.
Corrosion
prevention
Lifting Appliance
1. cranes
2. lifts
3. anchoring and
mooring
Radio
Communication
GMDSS
1. Internal
communication
2.External
communication
Others
1. Loading calculation
2. Sounding / Volume
Table
3. Loading computer
Anti-fouling
Closing Appliance
1.doors
2.windows
3.hatches
Procedures
Manual &
Instructions
Working Environment
1. Accomodation,noise,
vibration, ergonomic,
exposure
to chemicals and radiation
2. Accomm. System and
arrangement
1. Safety management
2. Security
1. Load line LL
Certificates
2. External watertight for material
integrity
a. Annex I
b. Annex II
c. Annex IV & V
Meetings / Reporting
1. Pre-Production meetings
a. Internal meeting
5 b. External meeting
Survey Arrangement
1. CMS
2. TMON
3. PMS
Tonnage
1. 69
2. Suez Canal
3. Panama Canal
Aux. Machinery
1.Aux. engines
2. Pumps.
3 .Coolers.
4.Evaporeitors,
5.Purifiers 6.Booster
unit
Certificates
for vessels
2. Quality meeting
3. Progress report
General Inf. With Yard &
Owner
1. Yard general Inf. Corresp.
2. Owner general Inf.
6 Corresp.
Subcontractors List
Tech. Spec.
1. drawing list
7 2. Painting Spec.
3. Miscellaneous
Declaration
1. ILO 92 & 133
2. USCG
Special National Req.