PROPER USE:
1. Please erect cables and connecting wires correctly according to the precautions in the
installation wiring diagram. Installation, commissioning and operation of this equipment can only
be carried out by professional persons.
2. The earthing system must be checked strictly. The floor of plant power grid, the floor of high
voltage control cabinet, the floor of rectifier transformer and the anode of electrostatic precipitator
shall be connected with each other at the same point for earth connection. The shell of control
cabinet, the shell of transformer and the shell of main body must be connected reliably before being
connected with the earthing terminal. The resistance of earthing system must be ensured to be less
than 2.
3. A piece of multi-core copper cable with a cross section not less than 35mm2 must be arranged
for the earthing terminal of each rectifier transformer and directly connected with the earthing
busbar of the corresponding high voltage control cabinet, and the sharing of one piece of earthing
wire on the control cabinet is not allowed for many rectifier transformers. N line must be led into
each high voltage control cabinet, with a cross section not less than 2.5mm2.The secondary signal
feedback wire and oil temperature signal feedback wire must be separately arranged with shielded
wires respectively.
4. Before the no-load test, a megger must be used to carry out the insulation inspection on the
rectifier transformer, and a false load (incandescent lamp) must be used to carry out the power-on
test on the high voltage cabinet.
5. The high voltage safety interlocks, operating procedures and high voltage danger warning
signs must be improved before the equipment is put into operation formally.
6. During the commissioning and repair of equipment, the operation must be carried out in
accordance with the specifications, and the components and parts are strictly forbidden to be pulled
out or inserted when they are live.
7. During the operation of equipment, in order to protect the equipment and personal safety, the
live switch-over of high voltage isolation switch is strictly prohibited.
Copyright statement:
1. All copyrights are the property of our company. Without our explicit written permission, it is
not allowed to reproduce and transmit this manual or part of its contents and the violator must bear
corresponding responsibilities.
2. For the reason of product improvement, the contents in this manual are subject to change
without prior notice. We apologize for the inconvenience it may cause to you, and thank you for
your understanding.
3. We have already verified the conformity between the contents of this manual and the
hardware described. Because it is difficult of avoid errors, we cannot ensure complete conformity. If
you find any unclear matter or error, please do not hesitate to contact us, and we welcome your
valuable opinions. Our company reserves the right of final interpretation of this manual.
4. This product is provided with password activation and management functions. The
consequence caused by system locking due to uncompleted commercial contract shall be borne by
the defaulting party of commercial contract.
We will be with you in the future days. Providing you with top quality products and
services is our perpetual goal Zhicheng Environmental Protection will create a good
business together with you!
Catalog
Chapter I
General....1
Chapter II
Chapter III
Chapter IV
Chapter V
Chapter VI
Chapter VII
Chapter VIII
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Chapter I General
I. Product name, model and executive standard
1. Product name: high voltage rectifier for electrostatic precipitator.
2. The model of this product is defined as follows:
G G Aj
02 (ZC11)
- A / kV -
Silicon rectifier
Derivative code
Design code
3. Executive standard: JB/T9688-2007 Crystal Brake Pipe Controlled High-Voltage Source for
Electric Dust Collector.
II. Product use, scope of application and features
1. Applicable scope of product
The basic function of this product is to transform the power frequency alternating current
power into high voltage direct current power for output. It can be used with proper selected
mechanical devices such as electrode, etc. to form a high voltage electrostatic precipitator, which is
applicable to various applications in the industrial departments such as dedusting, defogging,
dehydration, impurity separation as well as recovery of rare metals and other raw materials, etc. and
is an important piece of equipment for environmental protection, comprehensive development and
utilization. The specific scope of application is as follows:
Sector
Metallurgical
Use
To be used for smelting of black and nonferrous metals, dedusting, recovery
industry
Building
To be used for dedusting and raw material recovery in the cement and
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
Chemical
industry
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
making the voltage of electric field recovered from flashover as fast as possible and
improving the efficiency of dust collection. Its perfect and reliable protective functions
make the electrostatic precipitator able to operate stably and reliably for a long period of
time.
With the photoelectric full isolation technology and switch power technology as well as the
circuit board designed and manufactured by adopting advanced surface mounting
technology (SMT), the product is featured with preeminent quality, high reliability, strong
anti-interference ability, etc. Meanwhile, the controller is mounted on the door plate with
advantages such as compact structure, convenient operation, etc.
The shutdown recording program can record the most recent fault as well as the operating
parameters and time when the fault occurs, which provides great convenience in the
troubleshooting. Meanwhile, the controller implements registration management and green
shade service, thus the user can obtain the best aftersales service.
With strong communication networking function, it can realize seamless communication
with the DCS system of our party or a third party.
a. It adopts the most common RS485 serial communication interface on site and
follows MODBUS communication protocol, thus it can conduct data exchange directly
with the PLC and DCS of any mainstream brand in the world; the operating data and
controlling parameters of each power supply can be uploaded to the host computer of DCS
through MODBUS communication protocol; alternatively, the high voltage data of several
electric fields can first be integrated to the PLC in the low voltage control system and then
be uploaded to the host computer through the communication interface (Ethernet or
MODBUS) on the PLC itself by utilizing the margin list, and the host computer manages,
regulates and controls each high voltage equipment indirectly through PLC.
b. It reserves CAN2.0 communication interface, which can realize the high speed
communication connection between up to 127 sets of high voltage power supplies and a
single PLC or host monitoring computer at the same time, build the required DCS work
station and realize data acquisition and exchange with the highest communication speed up
to 1MB/S (40M) and the maximum communication distance of a single node up to 10KM
(5KB/S). For the user who requires CAN2.0 communication, it only needs to change the
3
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
communication module.
c. Besides being designed with RS485 and CAN2.0 full open communication
interfaces, the HVC-ZC11 intelligent controller for high voltage power supply is also
designed with hard wired communication interfaces, which can build non-open
communication connection conveniently with the DCS of a third party and realize the
function of remote startup and shutdown and voltage regulation of equipment.
Chapter II
Main Technical Properties and Technical Parameters
I. Operating conditions of the product
1. The altitude above sea level shall not exceed 1000m. If the altitude above sea level is
beyond 1000m, corresponding modification shall be conducted according to Annex B of
GB/T3859.2-1993.
2. For the control cabinet, the ambient temperature shall be -10 ~ +40; for the rectifier
transformer, the ambient temperature shall not be higher than +40 and shall not be lower than the
temperature of condensation point specified by the transformer oil.
3. The maximum relative humidity of air is 90% (corresponding to the air temperature of
205).
4. No violent vibration or impact is found, and the vertical inclination shall not be more than
5%.
5. There shall not be any conducting and explosive dust or any gas or steam which can corrode
metal and damage insulation at the operating place.
6. The frequency fluctuation of alternating current power supply shall not be more than 2.
7. The continuous fluctuation range of alternating current sinusoidal voltage amplitude shall
not exceed 10 of rated alternating current sinusoidal voltage.
8. If the high voltage power supply is required to operate in special working conditions, then
the user shall put forward this requirement when placing an order and solve it through consultation
with the manufacturer.
II. Main technical parameters
1. Input and output parameters
For the input and output technical parameters of common series products for GGAj02 (ZC11)
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
Chapter III
Main Structure and Operating Principle
I. Product structure and outline dimensions
The complete set of high voltage rectifier for electrostatic precipitator is commonly composed
of high voltage control cabinet, rectifier transformer and damping resistor. If the user selects the
outdoor type (with the cable exit at the high voltage side) rectifier transformer, the high voltage
isolation switch cabinet can be provided according to the users requirements.
1. High voltage control cabinet
The high voltage control cabinet is of standard cold bent steel frame structure, with uniform
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
outline dimensions of 6006002200. The color of cabinet frame is: GSB05-1426-2001 [light sea
(iron) blue], and the color of door plate is: GSB05-1426-2001 (sea grey). The cable entry mode is
divided into: top entry and bottom entry. If you have any special requirement for the outline
dimensions and colors, please put forward it when placing an order.
For the appearance of high voltage control cabinet, see attached figure (3).
2. Rectifier transformer
The rectifier transformer is an oil-immersed natural cooling type, including such two sections
as of alternating current booster and high voltage silicon bridge rectifier stack. The transformer
adopts the ri-shaped iron core (ri is a Chinese character), which is featured with small loss, low
temperature rise and small volume through computer-aided optimized design. The silicon rectifier
stack adopts avalanche components with long service lifetime, which can be recovered by itself
after instant breakdown and is mounted in the transformer container.
According to the series program recommended by the national standards, the rated output
direct current (average) of rectifier transformer is (unit: A): 0.05, 0.1, 0.2, 0.4, 0.6, 0.7, 0.8, 1.0, 1.2,
1.4, 1.6, 1.8 and 2.0, that is, thirteen grades altogether; and the rated output direct current voltage is
(unit: KV): 40, 50, 60, 66, 72, 80, 90, 100 and 120.
For the rated current and voltage beyond the above series program, we can provide them
according to the users requirements.
The structural type of rectifier transformer is high impedance rectifier transformer, which is
divided into the type of cable exit at the high voltage side (outdoor type) and the type of cable exit
at the top (indoor type).
For the outline drawing of rectifier transformer, see attached figure (4).
3. Damping resistor
The damping resistor is connected in series between the high voltage output end of rectifier
transformer and the cathode line of electrostatic precipitator, which is a protective component in the
electric circuit system of rectifier. It plays an important role in the suppression of flashover impact
current, absorption of higher harmonic wave and protection of control circuit during the operation.
For the outdoor type rectifier transformer (with cable exit at the high voltage side) provided
with high voltage isolation switch cabinet, the damping resistor is commonly mounted in the high
voltage isolation switch cabinet.
7
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
The resistance and power of damping resistor shall be selected according to Parameter List
for Main Components in the Primary Circuit (attached table 2).
4. High voltage isolation switch and switch cabinet
The high voltage isolation switch is used to connect the high voltage incoming terminal in the
electric field of electrostatic precipitator with the high voltage output terminal of rectifier
transformer or the ground so as to ensure the personal safety during the repair of electrostatic
precipitator.
The high voltage isolation switch cabinet is generally used with the outdoor type rectifier
transformer and is placed between the rectifier transformer and temperature holding cabinet. The
flange of high voltage protective cover on the outdoor type rectifier transformer shall be joined to
the inlet flange of switch cabinet. The high voltage inlet and outlet directions of high voltage
isolation switch cabinet as well as the on-off operating direction of high voltage isolation switch
shall be determined by the user according to site arrangement.
II. Operating principle of primary circuit
For the electric schematic diagram, see attached figure (2).
The electric schematic diagram is mainly composed of primary circuit, operating control
circuit and auxiliary circuit (e.g. cooling fan), etc. The single phase alternating current 380V, 50 Hz
power supply is connected with the primary contactor KM1 through fuses FU1 and FU2. After the
control of primary contactor KM1, one output is connected with the input terminal A of transformer
through two silicon controlled rectifiers V1 and V2 in inverse parallel; the other output is connected
with the X1 terminal of transformer through the primary current transformer TA1. The phase-shifted
and voltage-regulated single phase alternating current power supply is output as the negative high
voltage after the voltage boosting and current rectification of transformer, and is supplied to the
electrostatic precipitator through the damping resistor. R7 and R6 are respectively the current
sampling resistor and voltage sampling resistor at the direct current high voltage side. The
secondary current and secondary voltage sampling signals are sent to the controller, which output
the conduction angle of trigger signal controlled thyristor (silicon controlled rectifier) after the
operation and processing of computer system. This automatic control system adopts the dual
closed-loop automatic control system with current inner loop feedback and voltage outer loop
feedback. The functions of other main components in the primary circuit are as follows:
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Alternating current voltmeter PV1: it displays the primary side voltage of rectifier transformer
after the voltage regulation of silicon controlled rectifier.
Alternating current ammeter PA1: it displays the primary side current of rectifier transformer.
Direct current voltmeter PV2: it displays the direct current voltage output by the equipment,
also called the secondary voltage.
Direct current ammeter PA2: it displays the direct current output by the equipment, also called
the secondary current.
R1 and C1 are resistance-capacitance absorption circuits.
Piezoresistors RV1-5: they absorb surge overvoltage.
Damping resistor R5: it buffers the spark discharge current and damps the parasitic oscillation
caused by LC distribution parameter in high voltage output circuit.
Resistor R4: it is a high voltage sampling dropping resistor.
Current transformer TA1: it provides the analog meter and controller with primary current
signal.
The power switch SA1 for control circuit: the on-off control for power supply of control circuit
and selection of local control/central control can be realized through SA1.
Isolation transformer T2: it provides the control circuit and remote control communication
board with AC 220V alternating current power supply after the isolation and voltage transformation
of single phase 380V, 50Hz power supply.
Safety interlock relay KA1: it realizes the safety interlock control of high voltage control
system. The system can be allowed to start up only after each safety interlock link is closed in
position and it is picked up.
Startup/shutdown control relay KA2: it realizes the startup and shutdown control of high
voltage control system. The control auxiliary contactor KM2 is energized after it is picked up, thus
controlling the pick-up of primary contactor KM1; and the control intermediate contactor KM2 and
the primary contactor KM1 are both de-energized and released after it is de-energized.
Fault alarm relay KA3: when any fault trip phenomenon appears in the system, it will act and
send out a sound and light alarm signal.
Primary contactor KM1: it controls the switch-on or cut-off of primary circuit.
Auxiliary contactor KM2: it controls the pick-up or release of primary contactor KM1.
9
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
Chapter IV
Equipment Installation and Use
I. Equipment inspection and installation
1. Installation and inspection of transformer
(1) After the transformer is transported to the installation site, make sure to inspect if the
porcelain bush has any collision injury and if the sealing section has any oil permeation
phenomenon.
(2) The body of transformer is provided with four symmetrical lifting hooks, which are used to
lift or hoist the entire transformer. The lifting eyes on the tank cover are only be used for core lifting
(note: these lifting eyes cannot be used for lifting the entire transformer). During the lifting, the
angle between the transformer body and vertical line shall not exceed 30%. If this condition cannot
be satisfied, a special intermediate crossbeam can be used to lift the transformer.
(3) Insulation inspection
The insulation resistance of rectifier transformer can be checked and measured with a
1000V/2500V megger. Before the inspection, the secondary voltage/current sampling board shall be
dismantled. The readings of insulation resistance are as follows:
Measurement
object
to earth
current sampling
voltage sampling
Resistance (M)
2500
Reverse
Forward
direction
direction
2500
0.5
78
object
earth
terminal
Resistance (M)
2500
1000
2. Installation of transformer
(1) When lifting the transformer, the wire cable with the diameter of 20~25mm shall be used to
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
10
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
hook up the lifting eyes on the transformer tank body for lifting; if the lifting hooks are used for
lifting, then the diameter of lifting hooks shall not be more than 30mm so as to avoid damaging the
radiating fins due to compression. It is strictly forbidden the use the lifting eyes on the tank cover to
lift the entire transformer.
(2) When the high voltage rectifier transformer is installed in the isolation chamber, it shall be
kept more than 1m away from walls.
(3) After the installation and commissioning of high voltage rectifier transformer are finished
in position, the universal wheel shall be fixed at the bottom of transformer with channel steel so as
to prevent the displacement.
3. Installation of high voltage control cabinet
The high voltage control cabinet must be fixed with anchor bolts according to the requirement
of outline drawing.
4. Installation and arrangement of circuit
(1) Conduct wiring according to attached figure 1. Besides providing 380V alternating current
power supply, the power supply incoming line must also provide N line with a cross section not less
than 2.5mm2.
(2) According to relevant provisions of low voltage power distribution, select the specified
copper core cable to connect the power supply, high voltage control cabinet and silicon rectifier
transformer. The current and voltage feedback signal wires shall adopt RVVP41.5mm shielded
cable, and the metal shielded layer shall have single end earthing within the controller or high
voltage control cabinet. When the equipment communicates with the PLC or host computer, it shall
adopt DJYPVP320.5 mm triple twisted pair pairwise shielded cable.
Note: the secondary current and voltage sampling signals and the rectifier transformer oil
temperature sampling signal must be connected with the control cabinet through their respective
shielded cables, which cannot be replaced by common control cables.
(3) The earthing terminals of control cabinet, rectifier transformer and load shell must all be
grounded very reliably, with their earthing resistance not more than 2.0. In order to prevent the
interference, the earthing terminals of high voltage control cabinet, rectifier transformer and load
(e.g. the anode of electrostatic precipitator) shall be connected with each other at the same point for
earth connection
11
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
The detailed arrangement method for earthing wires is as follows: a piece of multi-strand
copper core wire with a cross section not less than 35mm2 shall be directly arranged from the
earthing terminal of each rectifier transformer to the earthing busbar of high voltage control cabinet.
Meanwhile, a piece of multi-strand copper core wire with a cross section not less than 16mm2 shall
be arranged from the earthing terminal of rectifier transformer to the earthing bolt on the
transformer shell, then a piece of multi-strand copper core wire with a cross section not less than
16mm2 shall be arranged from the earthing bolt to the anode of load (i.e. the shell of main body).
(4) The equipment wiring shall comply with relevant provisions of high voltage and low
voltage wiring specified by the country.
(5) In order to prevent the interference, during the cable arrangement, the power cable, signal
cable and communication cable shall be separately arranged so as to avoid mutual cross
interference.
II. Simulation commissioning of equipment
1. False-load test of the high voltage control cabinet
In order to ensure the safe reliability of equipment, before the first operation and reoperation
after the repair of the equipment, two pieces of power primary cables must be disconnected between
the high voltage control cabinet and rectifier transformer; two incandescent lamp bulbs with their
power not less than 100W shall be connected with each other in series and then be connected with
the power outlet terminal of high voltage control cabinet. Do voltage stepup test in manual
operating mode by using normal equipment starting method so as to ensure that the equipment will
be connected with the rectifier transformer to work at load only after the silicon controlled rectifier
can be triggered normally.
2. Fault alarm test of the equipment
(1) Oil temperature alarm: the rectifier transformer shall be equipped with a PT100
temperature sensor. When the transformer oil temperature reaches 85, the controller will send out
a trip signal and give an alarm, and the display screen of controller will display the oil temperature
out-of-tolerance fault of transformer.
(2) High voltage safety interlock: after the installation of transformer, control cabinet and load,
it is necessary to interlock the high voltage output available switch with the startup operation of
control cabinet so as to ensure safe power supply. When the safety interlock is not available, it is not
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
12
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
allowed to start the equipment, and the controller has the prompt for unavailable safety interlock.
(3) Load open-circuit/short-circuit protection: when the high voltage output of transformer is
open-circuited, the controller can trip for open circuit and meanwhile control the secondary voltage
does not exceed the rated value; when the high voltage output of transformer is short-circuited, the
controller can trip for short circuit and meanwhile control the secondary current does not exceed the
rated value.
III. Equipment use
1. Check and adjustment before the first startup
(1) Disconnect the power supply for entering the control cabinet;
(2) Check if the plug of controller is connected reliably;
(3) Check if all wires are correct and reliable;
(4) Check if all fuses are in good conditions and without looseness;
(5) Check the insulation of load (electric field of electrostatic precipitator) with a 2500V
megger, and its resistance value shall be above 100M generally.
(6) Check if the secondary current and voltage sampling resistances comply with the
requirements with a multimeter. For the standard secondary current sampling resistance of the
equipment of various specifications, see attached table (2), and the secondary voltage sampling
resistance is 7.8K.
2. Local startup of the equipment:
Close the circuit breaker QF1 of operating power supply, and the power indicator green lamp
HL1 will be lit. The master switch SA1 will be changed over to local position. The HVC-ZC11
high voltage intelligent controller for power supply will be energized for self-check and be rest by
itself. The display screen will display the salutatory interface, then enter the shutdown recording
interface. After the confirmation key is pressed, the system will enter the initial waiting interface.
At this time, if the automatic key is pressed, then the controller will automatically control the
pick-up of primary contactor KM1. After that, the voltage will be increased slowly until it reaches a
set limit value. Then, it will operate around this value. When the manual key is pressed, it will
enter the manual waiting interface. At this time, the required operation can be selected according to
the menu. After the primary contactor KM1 is picked up, the power indicator green lamp HL1
will be turned out and the system operating red lamp HL2 will be lit, thus the system will enter
13
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
14
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
temperature: 028
Shutdown time: July 16, 2011-15:30:25
Commissioning
Reset
Setting
Confirmation
Reset
Rectifier
continuous
transformer
temperature: 000
15:35:56
Manual
Automatic
Setting
15:36:20
Reset
Return
Startup
Setting
Reset
Prompt: this cabinet is at the automatic voltage step-up state! Voltage limit: 072KV
Initial
continuous
step-up: 40%
step-up: 95%
Voltage
continuous
rapping: 50%
value
of
fast
Peak
value
of
fast
transformer
by
Stop
Step-down
Limit
Up
Reset
Down
Confirmation
Reset
6. Fault trip:
15
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
When the faults such as permanent short circuit, open circuit, primary overload, oil
temperature out-of-tolerance, heavy gas alarm, etc. occur in the electric field, the HVC-ZC11
controller will judge them automatically and output the trip signal. At this time, the startup and
shutdown control relay KA2 will be de-energized, the contacts KM2 and KM1 will be released to
disconnect the primary circuit, the fault alarm relay KA3 will be energized, and the fault alarm
buzzer HA1 will give a sound and light alarm. LCD will display the fault parameters and fault
causes. After the confirmation key is pressed, the fault alarm relay KA3 will be energized, stop
giving an alarm and return to the initial waiting interface.
IV. Precautions for equipment use
1. In order to ensure the equipment and personal safety, it is strictly forbidden to change over
the high voltage isolation switch or switch off the power supply switch directly when the equipment
is at operating state.
2. The current and voltage feedback signal wires between the rectifier transformer and control
cabinet must use metal shielded wires so as to prevent from the interference.
3. In order to ensure the personal safety, it is strictly forbidden to enter the high voltage
isolation chamber during the operation of equipment.
Handling method
phenomenon
1.Fault characteristics of (1) The high voltage isolating knife is (1) Put the high voltage
short circuit: very low grounded.
primary voltage, relatively (2) The high voltage cable is breakdown or field position.
big primary current, nearly the insulation of terminal connector is (2) Handle or replace the
zero secondary voltage and damaged or breakdown, thus causing a cable or terminal connector.
very
current.
big
(3)
Discharge
in
the
ash
the
ash
16
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
(4) The line of electric cathode is broken, (5) Replace the ceramic
thus causing a short circuit.
(7) The metallic foreign matters between insulator, eliminate the ash
different electrodes causes a short circuit.
or
increase
the
Repair
discharging
the
ash
device
and
the
in
ash
the
ash
low
field position.
primary
nearly
current,
zero
very
voltage,
primary (2) The damping resistor at the top of (2) Replace the damping
high electric field is blown out.
resistor.
Adjust
the
rapping
normal primary voltage, is too long, thus causing a serious ash period.
relatively
low
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
current,
relatively
secondary
voltage
obviously
low cathode
and
generating
and obstruction.
rapping system.
secondary current.
(3) The rapping device for the line of down the boiler to handle
electric cathode has a fault.
(4) The flue dust concentration at the inlet (4) Contact the boiler to
of electric field is too high.
characteristics:
lower
primary
voltage, (1) The trigger pulse circuit of silicon (1) Replace the pulse trigger
lower
primary
plate.
lower
current. All of them have short-circuited, thus causing deflected silicon controlled rectifier.
vibration. The high voltage excitation operation.
rectifier
transformer
is
accompanied by abnormal
sound. With the increase of
current,
the
puffing
Fault
characteristics:
normal
current. No display on
the meter of secondary
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
18
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
voltage
or
current,
secondary
but
display
normal
on
the
controller.
6.
Fault
characteristics:
on
is:
Replace
the
fault
the
fault
component.
alarm,
Fault
characteristics:
when the step-up key (1) The primary contactor has a fault or the
is pressed, the primary primary circuit is not formed.
current,
voltage,
Replace
Fault
once
characteristics:
startup,
the
equipment will trip. The (1) One or two silicon controlled rectifiers (1) Replace the fault silicon
controller will display are short-circuited.
controlled rectifier.
19
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
primary
while
the
Chapter VI
Equipment Maintenance and Service
I. Service of high voltage control cabinet
Regularly check if there is any overheating, looseness or damage on the components and parts,
circuits and wires within the high voltage control cabinet; according to the ambient conditions on
the site, regularly clean and wipe the high voltage control cabinet to keep the cleanness in the high
voltage control cabinet and rectifier transformer bushing.
II. Service of rectifier transformer
1. Regularly check if the drying agent of rectifier transformer has any change in color. If any, it
shall be replaced promptly.
2. Regularly check if the oil level and temperature rise of rectifier transformer are normal. If
not, please handle them promptly.
3. Regularly wipe the shell of rectifier transformer and check if the shell has any rusting so as
to ensure the cleanness of rectifier transformer and soundness of protective paint on the shell.
4. The transformer oil test shall be conducted annually, which shall comply with the provisions
of GB/T7595-2000. The breakdown voltage shall not be less than 40KV/2.5mm, otherwise,
the oil shall be filtered again or replaced with new oil. The withstand voltage value of new oil
shall be more than 45KV/2.5mm.
III. Measurement of earth resistance
The earth resistance of system shall be measured annually, and the earth resistance value of
each point shall not be more than 2.0.
IV. Active part inspection for rectifier transformer
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
20
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
1. When it has any doubt about the interior after the rectifier transformer has any collision or
other events during the transportation or it needs to conduct repair after a fault occurs during the
operation, the active part inspection shall be conducted.
2. Active part operation for rectifier transformer
(1) Before the active part is lifted, first loosen the oil drain valve on the lower part of
transformer tank and discharge about 80KGS of transformer oil. Pay attention to ensure that the
discharged oil is contained and sealed in a clean vessel so as to prevent the transformer oil from
being polluted. Meanwhile, its storage time shall be as short as possible for fear of becoming damp
and reducing the dielectric strength.
(2) Remove all connecting bolts on the tank cover and tank body.
(3) Before the active part is lifted, for the outdoor type, first open the small cover plate and
stretch the hand into the oil tank. The lifting can be conducted only when the wires between the
high voltage output and porcelain insulator connecting terminal are released with a wrench. After
the active part inspection is finished, the active part shall be put into the oil tank and then restored to
its original condition.
(4) When the active part is lifted, pay attention to the balance of gravity center on the active
part. Four corners of the oil tank shall be monitored so as to prevent from the collision between the
active part and tank body and cause any damage.
(5) After the active part inspection is finished, put the active part into the oil tank and install
and fasten it in opposite direction. Connect the high voltage output wire and fill in the transformer
oil.
3. Main items in the active part inspection are as follows:
(1) If the coil has any collision injury and if the silicon rectifier stack has any crack;
(2) If the high voltage porcelain insulator has any damage and if all parts and fasteners have
any looseness phenomenon;
(3) The iron core shall be grounded reliably and only grounded at one point; for that with a
core-crossing screw stem, measure the insulation resistance between it and core with a 2500V
megger, and the resistance value must be more than 1000M.
4. Precautions for the active part inspection for transformer:
(1) The lifting of active part shall be conducted in good weather conditions when it is dry
21
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
without dust and moisture (the relative humidity shall not be more than 75%) and at a clean position.
Its lifting time shall be as short as possible so as to avoid from becoming damp or being polluted
and thus reducing the dielectricity. The active part inspection cannot be conducted in rainy days.
(2) When the lifted active part is exposed to the air, its continuous time for contacting with the
air outside shall not exceed the following provisions:
In dry air (the relative humidity of air shall not be more than 65%) 3 hours.
In humid air (the relative humidity of air shall not be more than 75%) 1 hours.
(3) After the rectifier transformer goes through the active part inspection, the power-on test can
be conducted only after the transformer oil is filled back and generally stands for 24 hours for fear
of high voltage discharge in bubbles.
5. Withstand voltage test for transformer oil
If the condition permits, the breakdown voltage shall be measured for transformer oil. The oil
sample shall be taken from the oil drain valve. At this time, the oil temperature shall not be lower
than +5. The transformer oil must go through the withstand voltage test, and the average instant
breakdown voltage value of five tests shall be more than 35KV/2.5mm. If the breakdown voltage of oil
is lower than the required value, it can be used only when the causes are found out and it is handled
accordingly. In addition, if it needs to replenish oil, it is preferable to add the oil of same grade as far as
possible. In case the oil grade is different, then it can be mixed for use only after the chemical analysis is
conducted in advance.
6. Withstand voltage test for transformer
The rectifier transformer has already go through the induced voltage withstand test and applied
high voltage test before leaving the factory. If the high voltage test is required on the site, then it is
necessary to short circuit the high voltage set on the silicon rectifier stack, disassemble the high
voltage measuring resistor and current feedback outlet wire, put them into the oil again and stand
for 24 hours. Then the high voltage porcelain insulator shall go through the withstand voltage test to
earth. Otherwise, the applied high voltage test can not be conducted. For the silicon rectifier
transformer below 72KV, its test voltage shall be more than 1.1 times of rated voltage and less than
1.5 times of rated voltage.
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
22
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Chapter VII
Product Integration and Spare Parts
1. High voltage control cabinet
1 set
1 set
1 piece
4. Damping resistor
1 piece
1 piece
7. Operating instructions
1 copy
1 copy
1 copy
Chapter VIII
Packing, Transportation and Open-package Inspection of Product as well
as Liability and Warranty Period for Equipment Damage
I. The manufacturer must deliver the equipment only after it is well packed according to the
provisions specified by the country. For any equipment damage during the transportation due to
improper packing, the manufacturer shall bear the liability for such damage.
II. After the equipment arrives in the site, the open-package inspection shall be conducted promptly,
and the contents of inspection shall include:
1. Any damage in the appearance and inside component and parts of equipment.
2. Conformity of installation and selection of inside component and parts with the design
requirements.
3. Any looseness or drop-off phenomenon of wire connectors.
4. Conformity of spare components and parts and technical documents with the list provided in
the operating manual.
III. If it is found that the equipment delivered does not conform to the purchase order (shortage in
quantity, incorrect specifications and models), the manufacturer shall quickly replace it
unconditionally.
IV. If the equipment is lost or damaged due to the carelessness of transportation department, the
manufacturer shall first meet the requirements in the production of the user in principle to solve the
23
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
problems of missing and damage. After finding out the causes jointly, the responsible party shall
bear the responsibility and pay the amount dues to the manufacturer.
V. After the equipment arrives in the site, for any missing, damage, etc. of equipment purely due to
improper storage and use, all responsibilities shall be borne by the user itself.
VI. The warranty period of equipment shall be 12 months from the commencement date of
installation and commissioning or 18 months from the delivery date of equipment, whichever is
earlier.
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
24
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Table 1: parameter list of common component and parts for GGAj02-A/KV series high voltage
rectifier for electrostatic precipitator
Position
No.
Name
Model
Remarks
No.
Equipment
1
power ND16-22B/4
HL1
Green
indicator lamp
Equipment
AC380V
operating ND16-22B/4
HL2
Red
indicator lamp
AC220V
NFM1-22/FS
HA1
Yellow
AC220V
PV1
6L2-450V
PV2
6C2-0.1MA-100KV
QF1
Power
switch
for
DZ47-60 C6A/2P
operating circuit
Power switch for inside
7
QF2
DZ47-60 C1A/1P
illumination of cabinet
To be supplied for that
M1/M2
KA-1725HA(1)3
above 1.0A
T2
Isolation transformer
380/220V-60W
10
KA1
HF18FF/024-2Z1D
With frame
11
KA2
HF18FF/024-2Z1D
With frame
HF18FF/024-2Z1D
With frame
Startup/shutdown control
relay
12
KA3
control
KA4
HF18FF/A220-2Z1D
relay
third party
Relay
with
reserved
To be supplied as per the
14
KA5
interface
for
outside HF18FF/A220-2Z1D
users demand
signal
15
RV1
Piezoresistor
MY31-1000V/5KA
25
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
RV2
16
Piezoresistor
MY31-720V/5KA
RV3
Signal sampling board of
17
U1
ZCHB01A
Self-made
HVC-ZC12A
Self-made
transformer
18
U2
19
U3
high
voltage
power HVC-ZC11
Self-made
supply
To be supplied for that with
Remote
20
control
U4
ZCHB02A
communication board
third party
21
X3
IN13SBK-C
22
QS2
YBLX-JW2/11H/W1
23
HR1
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
lamp
26
energy-saving
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Table 2: parameter list of component and parts for GGAj02-A/KV series high voltage rectifier
for electrostatic precipitator
Name &
specification
of
Primary
Silicon
Direct
components
Capacitor
contactor
Common
controlled
Current
Alternating
transformer
current
CJ48B-2
TA1/TA2
ammeter
-500V
BH-0.66
A1 6L2-A
Resistor
and parts
U1~3
KM1
fuse
HDLRTO
rectifier
V1/V2 KP
R1
RX20
series
Current
current
Damping
sampling
ammeter
resistor
resistor
A2 6C2 -
R5 ZG12
R7
0.1MA
RX20
Equipment
model
A
KV
W/
UF
50/5
50
MA
W/K
W/
60
0.1
66
72
80
60
0.2
66
250
20/30
72
80
60
0.3
500/2
75
200
66
72
20/20
0.47
20/20
100/5
100
100
150
80
500
60
0.4
66
72
20/15
125
80
300
0.5
150/5
150
50/20
60
66
200
20/12
1.0
72
80
160
60
0.6
200/5
200
150/5
150
200/5
200
66
72
800
1200/1
20/10
250
500
50/20
200
80
27
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
60
66
0.7
30/8.6
72
80
250/5
250
60
200/5
200
66
0.8
1000
250
30/7.5
300
72
80
250/5
250
300/5
300
400/5
400
300/5
300
500
60
66
1.0
30/6
72
80
315
60
350
66
1.1
30/5.5
72
80
400/5
400
60
300/5
300
1500
66
1.2
72
30/5
400
400
2800/
80
400/5
400
700
60
66
1.4
50/4.3
72
800
80
60
450
2.0
500/5
500
400/5
400
66
1.5
50/4
72
80
60
500
66
1.6
50/3.75
2000
500/5
72
80
500
500
60
66
1.8
50/3.4
72
80
60
66
2.0
550
630
600
500/5
500
600/5
600
3000/
500
1000
2500
72
80
600/5
600
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
28
50/3
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Table 3: capacity list of GGAj02-A/KV series high voltage rectifier for electrostatic precipitator
Alternating
Alternating
Direct
Direct
Direct
current
current
current
output
output
output
voltage
current
power
KVA
KV
KW
Alternating
Equipment
current
current
current
model
input
input
input power
voltage
A
0.1
0.2
0.3
0.4
0.5
0.6
0.7
KV
current
A
60
23
60
66
25
10
66
72
27
10
72
80
30
11
80
150
56
21
150
15
60
45
17
60
12
66
50
19
66
13
72
54
21
72
80
60
23
80
16
150
113
43
150
30
60
68
26
60
18
66
74
28
66
72
81
31
72
22
80
90
34
80
24
60
90
34
60
24
66
99
38
66
72
108
41
72
29
80
121
46
80
32
60
113
43
60
30
66
124
47
66
72
135
51
72
36
80
151
57
80
40
60
135
51
60
36
66
149
57
66
72
163
62
72
43
80
180
68
80
48
60
158
60
60
42
66
174
66
66
72
190
72
72
50
80
211
80
80
56
29
0.2
0.3
0.4
0.5
0.6
0.7
14
20
26
33
40
46
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
2SHUDWLQJ,QVWUXFWLRQVIRU**$M6HULHV+LJK9ROWDJH6LOLFRQ5HFWLILHUIRU(OHFWURVWDWLF3UHFLSLWDWRU
0.8
1.0
1.1
1.2
1.4
60
180
68
60
66
199
76
66
72
217
82
72
58
80
241
92
80
64
60
226
86
60
60
66
248
94
66
72
271
103
72
72
80
301
115
80
80
60
248
94
60
66
66
273
104
66
72
298
113
72
79
80
331
126
80
88
60
271
103
60
72
66
298
113
66
72
325
124
72
86
80
361
137
80
96
60
322
122
60
84
66
351
133
66
378
144
72
101
80
420
160
80
112
60
338
128
60
90
66
372
141
66
72
406
154
72
108
80
451
171
80
120
60
361
137
60
96
66
397
151
66
72
433
165
72
115
80
481
183
80
128
60
406
154
60
108
66
447
170
66
72
487
185
72
130
80
541
206
80
144
60
451
171
60
120
66
496
188
66
72
541
206
72
144
80
602
229
80
160
72
1.5
1.6
1.8
2.0
380/220
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
30
48
0.8
1.0
1.1
1.2
1.4
1.5
1.6
1.8
2.0
53
66
73
79
92
99
106
119
132
2SHUDWLQJ ,QVWUXFWLRQV IRU **$M 6HULHV +LJK 9ROWDJH 6LOLFRQ 5HFWLILHU IRU (OHFWURVWDWLF 3UHFLSLWDWRU
Table 4: cross reference table for type selection of capacity of GGAj02-A/KV series high voltage
rectifier for electrostatic precipitator
Cross section of
Area of
electrostatic
electrode
precipitator
plate
Equipment
No.
specification
Corona wire
Spacing of same
length
electrodes
0.01/100
1.0-2
30-40
60-80
450-550
0.02/100
1.5-2.5
60-80
120-160
450-550
0.03/100
2-3
80-100
160-200
450-550
0.05/100
4-6
120-150
240-300
450-550
0.1/100
6-10
250-300
500-600
450-550
0.1/72
6-10
250-300
500-600
300-400
0.2/72
15-20
500-600
1000-1200
300-400
0.3/72
25-30
750-900
1200-2200
300-400
0.4/72
30-40
1000-1200
2000-2800
300-400
10
0.5/72
40-50
1250-1500
2500-3000
300-400
11
0.6/72
50-60
1500-1800
3000-3600
300-400
12
0.7/72
55-70
1750-2100
3500-4200
300-400
13
0.8/72
60-80
2000-2500
4000-5000
300-400
14
1.0/72
80-100
2500-2800
5000-5600
300-400
15
1.1/72
90-110
2800-3200
5600-6400
300-400
16
1.2/72
105-120
3000-3600
6000-7200
300-400
17
1.5/72
130-150
3800-4200
7500-8300
300-400
18
1.6/72
140-160
4200-5000
8000-10000
300-400
19
1.8/72
150-180
4500-5500
9200-11000
300-400
20
2.0/72
160-200
5000-6000
10000-12000
300-400
Due to difference in the body structure and operation site of equipment, the secondary current
of equipment will vary from each other. For specific type selection, the type selected by the design
institute shall govern, and this table is only for reference
31
)XMLDQ/RQJ\DQ=KLFKHQJ(QYLURQPHQWDO3URWHFWLRQ&R/WG
Scope Of Business
GGAJ02 Series Single-Phase High Voltage Rectifier For Electrostatic Precipitator;
GGAJ06 Series Three-Phase High Voltage Rectifier For Electrostatic Precipitator;
HF Series High Frequency, High Voltage Power Supply For Electrostatic Precipitator;
Low Voltage Control System And Complete Project For Electrostatic Precipitator And
Bag Dust Collector, Desulphurization, Denitrification And Pneumatic Ash Handling.
Industrial Automatic Control System And Complete Project;
Development Of Application Software.