Beruflich Dokumente
Kultur Dokumente
Signature of Owner
Contractor.
Signature of
DESCRIPTION
UNIT
RATE
CORRECTE
D RATE
REMARKS
1.
P.C.C.
SFT
08
05
EXTERNAL
HEIGHT
CONSIDERED
450MM
2.
2a
3.
CFT
CFT
SFT
16
13
20
15
10
15
4.
5.
C.R.S.
R.R. MASONRY(UPTO G.L)
R.C.C. CONCRETE&ROOF
LINTEL, CHAJJA ETC
6 BRICK WALL
6BRICKWALL 14 HIGHT
SFT
SFT
12
16
11
13
6.
SFT
10
10
7.
SINGLECOAT PLASTERING
10 HIGHT
DOUBLE COAT PLASTERING
external 10'
ASBESTOS SHEETING
SFT
15
13
SFT
12
11
SFT
28
28
CELLING PLASTERING
GROVES PROVESING
MAKING
SCREED FLOORING
WATER PATTI
DROP WALL&PLASTERING
KALAI,CEMENT FINISHING
FLORING
ANCHOR BOLT
FIXING&HOLD PAST
DOOR FIXING
SFT
RFT
16
05
14
SFT
RFT
SFT
SFT
12
08
45
15
EACH
15
SFT
50
8.
9.
10.
11.
12.
13.
14.
18.
19.
20.
21.
DESCRIPTION
25.
26.
27.
28.
29.
30.
31.
32.
33.
UNIT
RATE
CORRECTE
D RATE
REMARKS
WITH
DRILLING M/C
Signature of Owner
Contractor
PER DAY
PER DAY
550
400
550
400
PER DAY
350
350
SFT
85
SFT
SFT
SFT
28
2.00
170
0.75
SFT
SFT
3-00
4-00
1.5
2.0
WITH OUT
CENTRING
WITH
CENTRING
Signature of