Sie sind auf Seite 1von 4

AGREEMENT OF WORK (LABOUR)

Agreement made this day of___________________2015/2016 between


Mr._________________________S/o__________________________R/o_________________
____________________________________________________________
Hyderabad, here in after called the Owner of the one part and Civil
Contractor here in after called Contractor of the other part. Where as the
Contractor have agreed with the Owner for the performance of the work
Construction of Building, all external works related to the plot
at________________for Mr.__________________ with following terms & conditions.
The contract shall be an item wise rate contract for all civil works viz., P.C.C.,
R.C.C., brick work, plastering elevation etc. for G.Floor & F.Floor, Second
Floor & Third Floor shall be for rate per slab area.
The rates quoted are for ground floor shall be enhanced by 10% for each
upper floor.
Thecontractor shalbring hisownmen
Tools&Plants(Gampas,Poudas,Buckets,Drums,Ballies
Scaffolding,miller&Vibrator ets) for the same shall be provided by the owner.
The owner shall supply metirial on time and schedule.
The works shall be carried out as per agreed norms, standards & as per
specifications.
The Owner shall supply the power and water required at site free of cost for
labour.
The owner shall appoint a watchman for site security.
Any changes to the agreed specs, any other additions and for items for
which rate not quoted shall be paid separately as per the prevailing market
rates.
Mode of payments a An advance of Rs.______________for mobilization shall be
paid to the contractor, which shall be adjusted in further bills and weekly
payment to be arranged as per muster roll and measurement to be taken.
Remaining running bills as recommended by site concerned.
Enclosure: Item rate quotations.

Signature of Owner
Contractor.

Signature of

QUOTATION FOR LABOUR WORKS


S.N
O

DESCRIPTION

UNIT

RATE

CORRECTE
D RATE

REMARKS

1.

P.C.C.

SFT

08

05

EXTERNAL
HEIGHT
CONSIDERED
450MM

2.
2a
3.

CFT
CFT
SFT

16
13
20

15
10
15

4.
5.

C.R.S.
R.R. MASONRY(UPTO G.L)
R.C.C. CONCRETE&ROOF
LINTEL, CHAJJA ETC
6 BRICK WALL
6BRICKWALL 14 HIGHT

SFT
SFT

12
16

11
13

6.

SINGLE COAT PLASTERING

SFT

10

10

7.

SINGLECOAT PLASTERING
10 HIGHT
DOUBLE COAT PLASTERING
external 10'
ASBESTOS SHEETING

SFT

15

13

SFT

12

11

SFT

28

28

CELLING PLASTERING
GROVES PROVESING
MAKING
SCREED FLOORING
WATER PATTI
DROP WALL&PLASTERING
KALAI,CEMENT FINISHING
FLORING
ANCHOR BOLT
FIXING&HOLD PAST
DOOR FIXING

SFT
RFT

16
05

14

SFT
RFT
SFT
SFT

12
08
45
15

EACH

15

SFT

50

8.
9.
10.
11.
12.
13.
14.
18.
19.
20.
21.

QUOTATION FOR LABOUR WORKS


S.N
O
22.
23.
24.

DESCRIPTION

25.
26.

MASON PER DAY


HELPER PER DAY
GENTS
HELPER PER DAY
LADIES
SLAB AREA LABOUR
CHARGES
AC SHEETS
HACKING
SLAB AREA LABOUR
CHARGES
SCAFFODLING SINGLE
SCAFFODLING DOUBLE

27.
28.
29.
30.
31.
32.
33.

UNIT

RATE

CORRECTE
D RATE

REMARKS

WITH
DRILLING M/C

Signature of Owner
Contractor

PER DAY
PER DAY

550
400

550
400

PER DAY

350

350

SFT

85

SFT
SFT
SFT

28
2.00
170

0.75

SFT
SFT

3-00
4-00

1.5
2.0

WITH OUT
CENTRING
WITH
CENTRING

Signature of