Sie sind auf Seite 1von 1

1

RAMP 1 in 21.4

RAMP 1 in 21.4

STORE
1

10 11 12 13 14 15 16 17 18 19

GENERAL NOTES

BG-038

1.
2.

STAIR B05
BG-039

OUTDOOR PLAY AREA

G01 - CLASSROOM 07

G01 - CLASSROOM 08

3.

BG-020

BG-021

4.

BG-038

5.
6.

7.

This Drawing is not to be scaled.


All dimensions shown are in millimeters and do not take into
account applied finishes unless specifically indicated otherwise.
Any omissions or discrepancies found shall be reported to the
Architect / Engineer immediately.
Levels are given in meters to three decimal places above survey
datum.
This drawing is to be read in conjunction with the relevant section
of the specification and schedules.
The contractor shall submit full shop / setting out drawing for
approval (based on site dimensions) prior to commencement of
any site works, placing of orders, manufacture of fittings, fixtures
and components.
For External Finishes refer to Landscape Drawings and
Specifications.

F
KEY PLAN

RISER

IDF ROOM
BG-016

G01 - CLASSROOM 01

SUPPORT ROOM

G01 - CLASSROOM 02

G01 - CLASSROOM 03

G01 - CLASSROOM 04

G01 - CLASSROOM 05

G01 - CLASSROOM 06

BG-007

BG-008

BG-009

BG-010

BG-011

BG-012

SMDB-0-03

LOBBY

ELEC ROOM

BG-017

BG-018

LOBBY

G02 - CLASSROOM 08

BG-019

BG-029

ZONE-A

ZONE-B

STAIR B02
UP

BG-030

ROAD LVL +7.45M


KS1 LIBRARY
BG-015

FINISH FLOOR LEVEL +0.480 = F.F.L. +8.40 ON SITE

SSL +0.405

REVISIONS

CORRIDOR

ICT BASES

ICT BASES

BG-003A

BG-013

BG-014

RISER
-

FFL +8.40M

No. DATE

DESCRIPTION

C0

CONSTRUCTION ISSUE

15-06-15

BY
DA

FFL +8.22M

FFL +8.38M
LOBBY
BG-031
1.

WC-T05
BG-004

LOBBY
BG-003

SECURITY

CLNR-T04

BG-002

BG-032

FFL. + 8.40M
G02 - CLASSROOM 01

G02 - CLASSROOM 02

G02 - CLASSROOM 03

G02 - CLASSROOM 04

G02 - CLASSROOM 05

G02 - CLASSROOM 06

G02 - CLASSROOM 07

BG-022

BG-023

BG-024

BG-025

BG-026

BG-027

BG-028

LOBBY

BG-033

BG-034

DESIGN ARCHITECTS & MEP ENGINEERS

M WC - T01

STAIR B01

DIS WC-T04

BG-035

Godwin Austen Johnson


Architects

BG-001
UP

STRUCTURAL ENGINEERS

FFL +8.38M
LOBBY
BG-036

SHADED PLAY AREA


F WC - T01

BG-038

BG-037

KS1 / ADMIN ENT


B

OWNER

PRIMARY /
ADMIN
ENTRANCE

LPG RE-FILLING
VALVE ASSEMBLY

FFL +8.18M

FORTES HOLDING
FFL +8.20M

ISSUED FOR

CONSTRUCTION
PROJECT

JVT SCHOOL
Plot No. JVT05SCP001
Jumeirah Village Triangle, Dubai, UAE
DRAWING TITLE

MECHANICAL SERVICES
GROUND FLOOR PART PLAN
GAS LAYOUT

A
ROAD LVL +7.52M

Drawn
Date
Project No.

RT Checked
08.06.2014 Scale
Zone

3350
Authority Dwg. No.

EL Approved

OP

1:100 @ A1

Drawing No.

L54-100

Rev.

C0
Consecutive No.

This drawing, the designs and details shown are the copyright of
GODWIN AUSTEN JOHNSON and shall not be copied or reproduced in
any form without their written consent.

13

A1

14

15

Original Sheet FILE PATH : F:\- PROJECTS CURRENT\3350 - Fortes School\LIVE\ACAD\MEP DEPT\Sheet Files\Mechanical\54-Gas\3350-L54-100.dwg
Size

16

17

18

19

20

21

22

23

T +971 4 3237555 E mail@gaj-uae.ae


F +971 4 3237717 W www.gaj-uae.ae
PO Box 7185 Dubai United Arab Emirates

Das könnte Ihnen auch gefallen