Beruflich Dokumente
Kultur Dokumente
4/5/2011
Table of Contents
1.0 Definitions.........................................................................4
2.0 Site Preliminaries..............................................................5
2.01
Product Storage..................................................................................... 5
2.02
Services................................................................................................. 5
2.03
2.04
2.05
Soil Analysis........................................................................................... 5
Excavation............................................................................................. 6
3.02
Reinforcing Collar................................................................................... 6
3.03
Drainage................................................................................................ 6
3.04
Sub-base Preparation............................................................................. 6
3.05
4.02
Lateral Pipes.......................................................................................... 7
4.03
Vertical Pipes.......................................................................................... 7
4.04
Root/Moisture Barriers............................................................................7
4.05
4.06
Filtergrid Separation/Reinforcement.......................................................8
Reinforcing Collar................................................................................... 9
5.02
5.03
6.0 Materials.........................................................................10
6.01
6.02
6.03
6.04
6.05
6.06
6.07
Aeration Pipes...................................................................................... 13
4/5/2011
6.08
Filler Soils............................................................................................. 13
6.09
7.0 Addendum.......................................................................15
4/5/2011
1.0 Definitions
A. Strata Cell: Patented, load-bearing, engineered plastic module with
vertical and lateral interlocks, for creating void space beneath pavements.
B. Coloured Indicator Triangle:
Coloured insert in top face of Strata Cell
module, used to enable correct alignment of modules. Indicator verifies
module strength.
C. Strata Cell Matrix: Assembled and interconnected volume of Strata Cell
modules
D. Lateral Pipe System:
Perforated pipe system for circulation of air, and
distribution of water and nutrients, connected to surface grating.
E. Vertical Pipe System:
Large diameter plastic pipe system for
inspection, circulation of air, and connection to surface grate.
F. Rootstop Root/Moisture Barriers: Linear membranes to prevent root or
moisture penetration.
G. ReRoot Barrier:
ribs.
H. Filler Soil:
Correctly balanced soil mix to provide optimum growth
conditions for tree root systems within Strata Cell matrix.
I.
J.
4/5/2011
2.02 Services
Installer must obtain accurate service locations from all providers and discuss
potential conflicts with tree pit location prior to commencement. Any
amendments to tree pit numbers, dimensions or location to be approved by the
principal Landscape Architect in writing.
Installer must observe statutory clearance and cover measurements for service
pipes and conduits.
4/5/2011
3.01
Excavation
Installer to excavate the tree pit accurately to the dimensions of the detailed
plans, allowing 200mm (8) additional clearance in length and width. Side walls
of excavated pit to be clean, straight, and within 15 of vertical. Tree pit length,
width and diagonals at base of pit to be measured to ensure that correct
dimensions are being obtained (measurements shown on tree pit detail plus
200mm). Installer to confirm that correct depth has been provided, measuring
from finished pavement level, including any drainage layers. Base of tree pit
should be flat unless there is a drainage layer to be provided, in which case the
subgrade surface must have a grade of 5%.
3.02
Reinforcing Collar
The top perimeter of the tree pit must be further excavated to a depth of 300mm
(12) and to a width of 200mm (10), or a width sufficient to permit a narrow foot
compacting plate (reinforcing collar) to be installed. Sides and base of this
excavation must be clean and straight.
3.03
Drainage
Positive drainage to main storm-water service from base of tree pit is mandatory
if the design incorporates water harvesting and is strongly recommended if the
site soil is not well drained. The base of the tree pit must be graded at 5% to the
perforated collection pipe in trench. This collection pipe is to be wrapped in filter
sock and connected to the storm-water system. A 100mm (4) layer of clean
aggregate is to be placed in base of tree pit and leveled.
4/5/2011
4.01
4.02
Lateral Pipes
As per tree pit design details, perforated aeration pipes should be installed within
the top layer of modules. The pipe must be laid in a complete connected circuit
within 600mm (24) of the outer edge of the matrix. Junctions and risers should
be fitted at spacings of no more than 3.6 metres (12). Riser pipes to be trimmed
Citygreen Strata Cell Specification
4/5/2011
4.03
Vertical Pipes
Where vertical aeration or inspection pipes are specified they should be placed
within the large central opening of the Strata Cell modules, in correct locations.
Pipes should be trimmed to a length of 150mm (6) above finished pavement
level. Open ends of pipes to be sealed with caps or weather-proof tape.
4.04
Root/Moisture Barriers
Where specified in the tree pit plans, a linear Rootstop Barrier should be
installed. Typically this will be placed between the Strata Cell matrix and the side
wall of the pit. Ensure the barrier is inserted to the full depth of the pit and is not
in contact with any sharp debris or stones that may puncture the barrier. Any
joins must have a 150mm (6) overlap and be taped both sides using Rootstop
tape over clean dry surfaces. The top edge of the Rootstop barrier should be
trimmed with a sharp knife to level with the top of the Strata Cell matrix.
4.05
Ensure that all required filler soil testing and certification is complete to the
satisfaction of the Landscape Architect prior to loading into the tree pit.
When matrix is fully assembled, with all specified piping and barriers in place,
the filler soil can be loaded into the matrix. Soil should be placed in the matrix
using an excavator bucket and spread with rakes or shovels until the void spaces
are filled. Ensure the outer trench for the reinforcing collar is kept clean and free
of filler soil. Matrix is to be vibrated using plate vibration or needle vibration
equipment in order to shake soil into all voids.
Continue loading dry soil, raking out and vibrating, until matrix is filled.
Should the filler soil constituents and moisture content not permit the voids to be
fully filled, assemble the Strata Cell modules in layers and progressively fill, layer
by layer.
Note: In some instances an air layer is detailed in the top of the matrix. In this
case soil is loaded, spread and vibrated in smaller amounts, to ensure an even
distribution of soil beneath the air layer.
4.06
Filtergrid Separation/Reinforcement
The outer trench for provision of the reinforcing collar should be cleaned and all
filler soil and debris removed. Place the Filtergrid layer on the top of matrix and
cut to length, ensuring that the material fully covers the top of the matrix, the
upper side walls of the matrix, and the bottom of the adjacent trench for
reinforcing collar. Any material joins must be straight, free of debris and over-
4/5/2011
4/5/2011
5.01
Reinforcing Collar
Load the granular base course material into the base of the collar trench
ensuring the Filtergrid layer is not displaced from the base of the trench.
Compact the granular material in 150mm (6) lifts until the collar is level with the
top of the matrix.
5.02
Confirm the exact required position of the tree pit opening from project details
and with reference to survey markers. Cut Filtergrid layer and fold back to
expose the tree pit opening. Position form-work to provide for poured concrete
system, or other method as specified in project details.
Place ReRoot linear ribbed root barrier within the tree pit opening with vertical
ribs facing inwards. Ensure bottom edge of ReRoot barrier is placed on the Strata
Cell matrix and upper edge is at finished pavement level. Trim to suit with sharp
knife. Ensure any joins are overlapped a minimum of 150mm (6), are clean and
dry and taped both sides with Root Stop tape.
5.03
Load and spread granular base course material onto the Filtergrid layer in an
even depth of 100mm (4). Compact this layer with a vibrating plate compactor
with a mass of 1200kg 1400kg/m of base plate, to specified compaction levels.
Continue building compacted granular layers to required levels including the
reinforcing collar.
10
4/5/2011
6.0 Materials
6.01
6.02
6.03
11
4/5/2011
Ultimate Load Strength 306 kpa (44.38 psi), verified by laboratory crush
tests.
50.8 cm (20 inch) x 50.8cm (20 inch) x 25cm (10 inches) in height
0.0645 m (2.2778 ft) per module
15.3 modules/ m 11.853 modules/ yrd
6.04
Property
Test Method*
Unit
Geogrid
30/30 Q1
151 GRK 3
30/30 Q1
Raw material
EN ISO 9864
EN ISO 10319
g/m
kN/m
Polypropylene (PP),
white
200
30/ 30
EN ISO 10319
8 / 8
EN ISO 10319
kN/m
12 / 12
EN ISO 10319
kN/m
24 / 24
mm x mm
Approx. 32 x 32
Geotextile
151 GRK 3
Raw material
EN ISO 9864
EN ISO 10319
g/m
kN/m
Polypropylene (PP),
white
150
7.5 / 11.0
EN ISO 10319
40 / 30
EN ISO 12236
EN ISO 12236
N
mm
1,670
30
mxm
Yes
4.75 x 100
12
4/5/2011
6.05
ASTM D
UNIT
VALUE
Density
1505
g/cm
0.952
Melt Index
ESCR,F
Condition B
Tensile Yield Strength
1238
1693
g/10 min
h
0.35
50
638 @
50mm/min
638 @
50mm/min
746
790
2240
MPa
27
>600
C
MPa
-
<-90
1310
66
Elongation at Break
Brittleness Temperature
Flexural Modulus
Shore Hardness D
*
6.06
13
4/5/2011
ASTM D
UNIT
VALUE
Density
1505
g/cm
0.952
Melt Index
ESCR,F
Condition B
Tensile Yield Strength
1238
1693
g/10 min
h
0.35
50
638 @
50mm/min
638 @
50mm/min
746
790
2240
MPa
27
>600
C
MPa
-
<-90
1310
66
Elongation at Break
Brittleness Temperature
Flexural Modulus
Shore Hardness D
*
6.07
6.08
Aeration Pipes
Flexible, perforated pipe system for optimizing oxygen exchange within
the tree pit soil. This lateral pipe system is connected to the surface by
means of T-pieces and riser pipes and also forms the means of distribution
for harvested storm water, and supplementary irrigation or nutrient
dosing.
100% High density Polyethylene pipe
Moulded T-Pieces and junctions
Cast aluminum ventilation grilles with tamper-resistant grating.
Filler Soils
Refer addendum: Filler Soil Specification for Strata Cell Tree Pit.docx
14
4/5/2011
6.09
Percent
Passing
100
75-95
40-75
30-60
20-45
15-30
5-15
15
4/5/2011
7.0 Addendum
16
4/5/2011