Sie sind auf Seite 1von 10

Chapter13: QAP's

KUWASIP

1/10

QUALITY ASSURNCE PLAN


QUALITY ASSURANCE PLAN FOR THE MANUFACTURE OF DUCTILE IRON PIPES, INSPECTION & TESTING PLAN
Sl
No
.

Component/
Material

Charcterstics check

Category

Type of
Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

Format
of Record

Agency
B TPI

Remarks

RAW MATERIAL CONTROL


1 BF Liquid Metal or
pig Iron

% C, SI, % MN,
S, % P

% Major

Chemical

1/lot or Batch

Asper
Manufacturers
Standard

Asper
Manufacturers
Standard

MTC

2 Ferrosilicon

% S,% AL

Major

Chemical

1/lot or Batch

Asper
Manufacturers
Standard

Asper
Manufacturers
Standard

MTC

3 Silica San/ River


Sand
4 Magnesium

Sieve Analysis
Compaction
Purity of Mg

Major

Chemical

1/lot or Batch

Chemical

1/lot or Batch

5 Zinc

Purity of Zn

Major

Chemical

1/lot or Batch

As per IS 8329 - MTC


2000
As per IS 8329 - MTC
2000
Asper
MTC
Manufacturers
Standard

Major

As per IS 8329 2000/ IS-383


As per IS 8329 2000
Asper
Manufacturers
Standard

6 Cement

Material conformation Major

Physical &
Chemcial

1/lot or Batch

As per IS 8112

As per IS 8112 MTC

7 Butumen Paint

Specfic Gravity

Specific
grarvity

1/lot or Batch

Major

Asper
Manufacturers
Standard

Asper
Manufacturers
Standard

Asper
Manufacturers
Standard

Asper
Manufacturers
Standard

MTC

Samples could be
drawn from finished
pipes also

PROCESS CONTROL
1 Heating Treatment

Temperature
recording time cycle

Major

Physical

100%

2 Zinc coating

Depsoit of zin

Major

Physical

1 per Batch

______________

CONTRACTOR

Heat
Treatment
Chart

As per IS 8329 - As per IS 8329 - Manufacture


2000
2000
rs Internal
Record

_________
EMPLOYER

Chapter13: QAP's
Sl
No
.

Component/
Material

KUWASIP
Charcterstics check

Category

2/10
Agency
B TPI

Type of
Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

Format
of Record

As per IS 8329 2000


As per IS 8329 2000
As per IS 8329 2000/IS 11606

As per IS 8329 2000


As per IS 8329 2000
As per IS 8329 2000

Manufacture
r Report
Manufacture
r Report
Manufacture
r Report

See Note

See Note

See Note

Remarks

INSPECTION AND TESTING


1 Visual

As per IS 8329-2000 Major

Visual

100%

2 Dimensional

As per IS 8329-2000 Major

Measurement

100%

3 Mechanical Test

As per IS 8329-2000 Major

Physical

As per IS 8329 2000 One test/


Batch

4 Hydrostatic Test

As per IS 8329-2000 Major

Physical

100%, As per IS
8329 - 2000/IS
11606

As per IS 8329 - As per IS 8329 - Manufacture


2000/IS 11606
2000
r Report

See Note

5 Lining Thickness

As per IS 8329-2000 Major

Physical

See Note

Physical

Manufacture
r Report
Manufacture
r Report

As per IS 8329-2000 Major

As per IS 8329 2000/IS 11606


As per IS 8329 2000/IS 11606

6 Bitumen Coating
thickness

As per IS 8329 2000/IS 11606


Random Check

See Note

7 Compression Test of
Cubes

As per IS 8329-2000 Major

Physical

As per IS 8329 2000/IS 11606

As per IS 8329 - As per IS 8329 - Manufacture


2000/IS 11606
2000
r Report

One per lot

8 Gasket fittment &


leak tightness test

As per IS 8329-2000 Major

Physical

As per IS 8329 - As per IS 8329 - Manufacture


2000/IS 11606
2000
r Report

9 Marking on pipes

As per IS 8329-2000 Major

Physical

As per IS 8329 - As per IS 8329 - Manufacture


2000/IS 11606
2000
r Report

One per lot


Random Check

As per IS 8329 2000


As per IS 8329 2000

Legend:T= Testing

M= Manufacturer

V= Verification

B= KUWS&D Board

W= Witness

TPI= Third Party Inspection

Note: -

______________

CONTRACTOR

MTC = Material Test certificate

1. the manufacturer shall carry out 100 % inspection on final product


2. All measuring instruments & test equipments shall be caliberated periodically and record shall be put
to IA for verificatio.
3. Cement used for lining shall conform to IS 8112 or IS 12330 depending on the usuage of pipeline.
4. The rubber gasket shall conform to IS 5382 / 1985.
5. The tolerance shall be brought to the notice of employer beore accepting the pipes.

_________
EMPLOYER

QUALITY ASSURNCE PLAN


PRODUCT NAME: AC PIPES & SPECIALS
Sl
No.

Component/
Material

Charcterstics check Category

Type of Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

Format
of Record

Agency

Remarks

RAW MATERIAL CONTROL


1

Asbestos Fibre

Conformance to
TA(P) Standards

Critical

Physical Tests

One per
consignment

Manufacturers Manufacturers
own Standard own Standard

Test certificate Manufacturer


from supplier
& fiber test
records

Review by IA

2 CEMENT
2.1

Chemical
Composition

Major

Chemical
Analysis

One per
consignment

IS 269-1989 or IS 269-1989
IS:8041/1978
IS:455/1976
IS:1486/1976

Test certificate Manufacturer


from supplier

--do--

2.2

Physical properties

Major

Physical Tests

One per
consignment

IS 269-1989 or IS 269-1989
IS:8041/1978
IS:455/1976
IS:1486/1976

Cement Test
records

2.0 PROCESS CONTROL FOR A.C. PRESSURE PIPES & COUPLINGS


2.1 Milling of Asbestos Moisture Cement
Major
Physical test
Fibre
2.2 Vat & Slurry
Percentage / volume Major
Physical test
consistency
2.3 Sieve filtrate &
Percentage / volume Major
Physical test
cone water colids
2.4 Forming Thickness Measurement
Major
Potentio meter
control
2.5 Felt speed
Control
Major
Speed Control

Once in shilft
4 times per shift
1 times per shift
100%
Round the clock
control
Round the clock
control
100%

2.6 Calendering

Control

Major

Time Control

2.7 Dimen onal check


at Green stage

Measurement by
vernier calippers

Major

Measurement

2.8 Temp control at


Dwell and roller
conveyers

Control

Major

Thermo couple Continuous


sensing

Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
--do--

--do--

Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
Manufacturers
own Standard
--do--

--do--

Lab records

Manufacturer

Lab records
Lab records

Manufacturer

process
records
Lab records

Manufacturer

process
records
--do--

Manufacturer

Lab records

--do--

Manufacturer

--do--

Review by IA

2.9 Curing of green


Recording the QTY
pipes
size and period
Machining
&
testing
of pipes
3.0
3.1 Pipe finishing
Turning, Fac inc &
Chamering
3.2 Visual check for
Uniformity
finish
3.3 Work Hydralic
Pressure tightness
Pressure tightness test as per the class
Test
of pipes

Major

3.4 Hydralic Bursting


Test
3.5 Transverse
Crushing Test
3.6 Longitudinal
Wending Test
(Upto 150mm dia
pipe only)
3.7 Strightness Test
3.8 Internal Regularity
Test
3.9 Other dimensions
like diameter,
length, thickness
etc.,
4.0 A.C. COUPLINGS
Cutting the
required length

Counting the
maturity date

100%

--do--

--do--

curing day
records

--do--

Pipe finishing
report
Inspection
Report
--do--

--do--

Major

Measurement

100%

IS 1592:1989

IS 1592:1989

Major

Visual

100%

IS 1592:1989

IS 1592:1989

Major

Hydralic
pressure test as
per IS 5913/89

--do--

--do--

--do--

Bursting stress

Major

Bursting Test

As per IS 7639/75

--do--

--do--

--do--

--do--

Crushing stress

Major

Chemical Test As per IS 7639/75

--do--

--do--

--do--

--do--

Beding Test

Major

Bending Test

As per IS 7639/75

--do--

--do--

--do--

--do--

Measurement

Major

--do--

--do--

--do--

--do--

Regularity

Major

Physical
As per IS 7639/75
Measurement
Physical
As per IS 7639/75
Measurement
Measurement Samples as per IS
2500 PPI/Level/
AQL 2.5

--do--

--do--

--do--

--do--

--do--

--do--

--do--

--do--

Major

Physical

100%

TA(P)
Standard

TA(P) Standard

PF Section

Manufacturer

Major

Measurement
with calipers

100%

TA(P)
Standard

TA(P) Standard

PF Section

Manufacturer

4.3 Curing of
Couplings

Counting of Qty. size Major


& period

Counting the
maturity period

--do--

--do--

--do--

Lab records

Manufacturer
IA

4.4 Testing of
Couplings

Testing Hydraulically Major


with pipe

Visual check for


any leak

As per IS
7639/1975

--do--

--do--

Lab records

Manufacturer
IA

Measurement

IS:2500 P&J/IL
II/AQL 2:5 Normal

Firms own
design

Firms own
design

Inspection
Report

Manufacturer
IA

4.2 Coring, Grooving &


Chamforing

4.5 Dimensions

Length Measurement Major

Manufacturer Audit check by


IA
IA
--do---do--

Uniformity

Major

4.6 Marking

Marking

Major

Stenciling

100%

--do--

--do--

As per
contract

Manufacturer
IA

IS 5383-1985

IS 5383-1985

Test Report

Manufacturer
IA

--do--

--do--

5.0 RUBBER SEALING RINGS FOR AC COUPLING & CID JOINTS:


5.1 Visual Examination Smooth Finish and
Identification

Visual checking As per IS 53821985

5.2 Dimensions

Measurement

Measurement

5.3 Hardness

Measurement

5.4 Stretch Test

----

Major

Physical

----

----

--do-As per IS 53821985


----

IS 10292-1988 IS 10292-1988
IS 5382-1985

IS 5382-1985

Test Report of
supplier

--do--

----

----

----

--do--

Test Report

Manufacturer
IA

--do--

--do--

--do--

--do--

5.5 Compression set


Test

"Tests will be conducted at any reputed Laboratories of India, on samples drawn by IA"

5.6 Water Immersion


Test

"Tests will be conducted at any reputed Laboratories of India, on samples drawn by IA"

6.0 CID JOINTS


6.1 Visual Examination Free from surface
defects

Major

Visual

6.2 Dimensional
verification

Measuirement

Major

Measurement
with calipers

6.3 Mass of joints

Weightment

Major

6.4 Hydrostatic Test

Hydraulic Test with


respect to class of
joints

6.5 External Coating

As per IS
8794:1988

As per IS
8794:1988

As per IS
8794:1988

--do--

--do--

--do--

Weightment

--do--

--do--

Major

Hydralic
pressure test

--do--

As per IS
8794:1988
and IS 15921989

As per IS
8794:1988 and
IS 1592-1989

--do--

--do--

Coating

Major

Visual check

Random

IS 8794:1988

IS 8794:1988

--do--

--do--

6.6

Tensile Test

Major

UTM

1/Lot

IS 8794:1988

IS 8794:1988

--do--

--do--

6.7 Hardness Test

Hardness

Major

BHN

IS 2500 PE II
IS 8794:1988
Level IV/AQL 2.5

IS 8794:1988

--do--

--do--

7.0 ACCEPTANCE CRITERIA TESTS


Final Inspection/Test for A.C. Pressure Pipes
7.1 Visual Examination Finish and marking

Major

Visual

100% by
Manufacturers

As per IS
As per IS 15921592-1989
1989 and SO
and SO norms norms

Inspection
Report

--do--

7.2 Dimensions and


Tolerances

Measurement

Major

100% by
Manufacturers

Inspection
Report

--do--

--do--

Major

As per IS 15921989

Inspection
Report

--do--

--do--

As per IS
1592-1989
and SO norms
As per IS
1592-1989
and SO norms
--do--

As per IS 15921989

7.3 Strightness Test

measurement
by calipers
instrumentd
Measurement
by strightness
tester
Disc Test

--do--

--do--

--do--

Samples as per
IS:7639/1975

7.4 Internal Regularity Uniformity


Test

Major

7.5 Work Hydralic


Hydraulic pressure
Pressure Tightness as per the class of
Test
pipes

Major

Hydraulic
pressure test

--do--

--do--

--do--

--do--

--do--

7.6 Transverse
Crushing Test

Crushing stress

Major

Physical Test

--do--

--do--

--do--

--do--

--do--

7.7 Hydralic Bursting


Test

Brustiing Stress

Major

Physical Test

--do--

--do--

--do--

--do--

--do--

Major

Physical Test

--do--

--do--

--do--

--do--

--do--

7.8 Longitudinal
Beding stress
Bending Test (Upto
150mm dia pipe
only)
Note: -

1. Internal report shall be submitted to IA for secrutiny before commencement of inspection


2. All measuring instruments & test equipments shall be caliberated regularlyand put put to IA for
scrutiny.
3. Manufacturer shall submit safely as per IS 11769 P&I/1987 to IA for scrutiny

QUALITY ASSURANCE PLAN

PRODUCT NAME: R.C.C. PIPES:


Sl.
No.

Component /
Material

Characteristics
Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

Chemical
Analysis

1 / Lot

IS : 12330 (See
note 2)

IS : 12330 (See
note 2)

Supplier's TC

- do -

By sieve

1 / Lot

- do -

- do -

- do -

- do -

- do -

b. Standard
consistency

- do -

Lab Test

1 / Lot

- do -

- do -

- do -

- do -

- do -

c. Setting Time
consistency

- do -

Lab Test

1 / Lot

- do -

- do -

- do -

- do -

- do -

d. Soundness

- do -

Lab Test

1 / Lot

- do -

- do -

- do -

- do -

- do -

e. Compressive
strength

- do -

- do -

1 / Lot

- do -

- do -

- do -

- do -

- do -

a. Deleterious
materials

Major

Lab Test

1 / Lot

IS : 383

IS : 383

b. Soundness

- do -

- do -

- do -

- do -

- do -

- do -

c. Specific gravity

- do -

- do -

- do -

- do -

- do -

- do -

- do -

d. Grading & size

- do -

- do -

- do -

- do -

- do -

- do -

- do -

Category

Type of Check

1. Chemical

Critical

2. Physical
a. Fineness

Format of Record

Agency

Remarks

1.0 RAW MATERIAL CONTROL


1.1 Cement :

1.2 Aggregatge

a. Supplier's TC
b. Manufacturer's
Register

1.Supplier
2. IA

1.Scrutiny of records
by IA
2. Counter check by
IA on receit at
manufacturers place.

a. Supplier's Scrutiny of records by


TC
IA
b.
Manufacturer'
- do - do s Register
- do 1.Scrutiny of records
by IA
2. Random physical
verification by IA

Sl.
No.

Component /
Material

Characteristics
Check

Category

Type of Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

Format of Record

IS : 456

IS : 456

Govt. Test Lab

Agency

Remarks

1.3 Water

Solubility of Water in
concrete works

Major

- do -

Once in a year

1.4 Reinforcement

a. Chemical

Major

- do -

1 / Lot

IS :432 Pt.I or
IS : 432 Pt.II or
IS : 2862 any
grade (see note
4)

IS :432 Pt.I or
IS : 432 Pt.II or
IS : 2862 any
grade

a. Supplier's TC
b. Manufacturer's
Register

a. Supplier
b. IA

1.Scrutiny of records
by IA
2. Counter check by
IA at manufacturer
place

b. Physical

Major

UTM

1 / Lot

IS :432 Pt.I or
IS : 432 Pt.II or
IS : 2862 any
grade (see note
4)

IS :432 Pt.I or
IS : 432 Pt.II or
IS : 2862 any
grade

a. Supplier's TC
b. Manufacturer's
Register

a. Supplier
b. IA

1.Scrutiny of records
by IA
2. Counter check by
IA at manufacturer
place

c. Dimension

Major

Measuring
Instruments

APL 2.5 DSP/ IL


II IS:2588 PT-1

- do -

1.Scrutiny of reports
by IA
2.Audit check by IA

a. Dimensions

Critical

- do -

- do -

b. Physical Test

Critical

Lab Test

1 / Lot

- do -

- do -

Supplier's TC

1. Supplier
2. IA

1.Scrutiny of TC by IA
2. Counter check by
IA on receipt at
manufacturer place.

c. Polymer
identification

Critical

Lab Test

1 / Lot

- do -

- do -

Supplier's TC

1. Supplier
2. IA

1.Scrutiny of TC by IA
2. Counter check by
IA on receipt at
manufacturer place.

1.5 Rubber Rings

- do -

- do -

- do -

Manufacturer Scrutiny of TC by IA

IS : 5382 Type I, IS : 5382 Type I, Supplier's Report 1.Supplier


Natural or
Natural or
2.
Isporene
Isporene
Manufacturer

d. Corrossion Test

1.Scrutiny of reports
by IA (see note 5)

Details are yet to be


advised

2.0 PROCESS CONTROL


2.1 Concrete or
Mortar

a. Quality of Cement

Critical

Analysis of
concrete

1 / Batch or shift IS: 458


CL 4.5.1

IS: 458
CL 4.5.1

Manufacturer's
register

a.
1.Scrutiny of records
Manufacturer by IA
b. IA
2. Random check IA

Sl.
No.

Component /
Material

2.2 Caging

2.3 Concreting of
pipe

Characteristics
Check

Category

Type of Check

b. Compression
Strength (at 28 days)

Critical

Compression
test

a. Weight of cage

Critical

Quantum of
Check
3 / Batch

Reference
Documents

Acceptance
Norms

Format of Record

Agency

Remarks

IS : 458

IS : 458

Manufacturer's
register

a.
1.Scrutiny of records
Manufacturer by IA
b. IA
2. Random test to IA
(see note 1)

By weighing M/C One per design IS : 458

IS : 458

Manufacturer's
register

a.
1.Scrutiny of records
Manufacturer by IA
b. IA
2. Random test to IA
(see note 1)

b. Dimension

Major

Measuring
Instruments

One each
pipe/mould

IS : 458

IS : 458

Manufacturer's
register

a.
1.Scrutiny of records
Manufacturer by IA
b. IA
2. Random check IA

a. Speed

Major

RPM Indicator

b. Thickness of core

Major

Spike Guage

One each
pipe/mould
One each
pipe/mould

Manufacturers
own std
IS : 458

Manufactuerers Manufacturer's
own std
register
IS : 458
Manufacturer's
register

1.Manufactur
er
1.Manufactur 1)Secrutiny of
er
Register by IA
2. IA
2) Random check by
IA

Major

Visual

100%

IS : 458

IS : 458

Manufacturer's
register and test
report

1.Manufactur 1. Audit check on


er
sample by IA
2. IA

Major

Measuring
instruments &
Guages

100%

IS : 458

IS : 458

Manufacturer's
register and test
report

1.Manufactur 1. Audit check on


er
sample by IA
2. IA

-do-

Gauge

100%

IS : 458

IS : 458

Manufacturer's
register and test
report

1.Manufactur 1. Audit check on


er
sample by IA
2. IA

d. Hydrostatic test

Critical

Pressure test
with pump

2%

IS : 458

IS : 458

Manufacturer's
register and test
report

1.Manufactur See note 6


er
2. IA

e. Absorption test

Critical

As per IS: 3597


on specimen

for each pipe

IS : 458

IS : 458

Manufacturer's
register and test
report

1.Manufactur
er
2. IA

3.0 FINAL INSPECTION & TESTING


3.1 Final Cured
a. Surface cracks,
Pipe
projection in bore etc.
b. Dimension

c. straightness of bore

Sl.
No.

Component /
Material

Characteristics
Check

Quantum of
Check

Reference
Documents

Acceptance
Norms

As per IS: 3597

On samples as
per IS : 458

IS: 3597

IS: 3597

Major

Visual

100%

Major

Visual

100%

Category

Type of Check

f. Three Edge Bearing


test

Critical

g. Marking

IS : 458

IS : 458

Format of Record

Agency

Remarks

Manufacturer's
register and test
report

1.Manufactur See note 7


er
2. IA

Manufacturer's
register and test
report

1.Manufactur
er
2. IA

4.0 STAMPING & SEALING


4.1 Stencilling IA
stamp

Legibility of stamp and


proper location for
easy identification

1.Manufactur
er
2. IA

5.0 PACKING & DESPATCH :- To ensure no damages to pipes during transit, loading & unloading.
NOTE:
1. Proper co-relation must be established by approved agency for cube strength between vibratory and centrifugal process in case pipes are manufactured by
Centrifugal proces. In absence of the same, conversion factor for 28 days compressive strength of cube shall be taken as 1.25 (refer clause 4.5.1 of IS : 458)
2. Only sulphate resisting portland cement to IS:2330/1988 shall be used if the RCC pipes are used for UGD works.
3. Manufacturer should conform the bore-well and co-relate with test certificate. In case new borewells are planned to be added, the water from the same shall be
tested before being used.
4. The manufacturer shall advise in advance the type of polymer proposed to be used for Rubber rings and shall maintain the same polymer for the entire batch.
5. Sample of Rubber Rings procured shall be used for Hydrostatic Test.
6. Pipes used for Three Edge Bearing test shall not be included in the accepted lot. In case no failure occurs during this test, the maximum test load shall be recorded.
The Sl. Nos. of these pipes shall be indicated in Inspection Certificate to ensure that these are not received at site and laid by mistake.
7. Manufacturer shall give a copy of Internal test reports before inspection commenced by IA
8. All measuring insturments and test equipments shall be caliberated periodically and records shall be put upto IA for verification.