Beruflich Dokumente
Kultur Dokumente
The burner flame must be extinguished and fuel supply lines should be shut down.
Oil gun assemblies must be removed from the boiler
Places where gas is used the supply lines must be blanked off
All valves in the boiler must be properly tagged and padlocked
The non-return valve and header locked valve in the boiler must be closed and drain
Cracks
Broken Stays
Erosion
Corrosion
Cracked Fittings
Scale and thin paces in the drums
Greasy and oily spots on the upper half of drums
The interior parts of the tubes must be inspected to detect scale and deposits
Following components must be inspected to find if there perforations are free from deposits
1.
2.
3.
4.
5.
6.
7.
8.
Dry pans
Baffles
Internal Feed Pipes
Chemical Feed Pipes
Scrubbers
Surface Blow Off connections
Surface Blow down Connections
All the interior fittings