Sie sind auf Seite 1von 139

Y

N
VF
NA
AD
insulation

Yes
No
Y/N

grades

VF
I
II
III
NA
Yes - Proceed
No - Proceed then add additional models
First Test
Retest 1
Retest 2
Retest 3
Retest 4

EarthCraft Multifamily New Construction Workbook


EarthCraft Multifamily New Construction Workbook
Project Name:
Architect:

Building Address:

Superintendent:

City, State, Zip:

Phone:

Technical Advisor:

E&S Control Contact:

TA Phone #:

EC Project Manager:

TA Email:

Permit Date:

Pre-Drywall Inspection Date:

Design Review Date:

Final Inspection Date:

ECMF Kick Off Date:

EarthCraft Program Levels:


Point Thresholds:

Project Points
SITE PLANNING (SP)
CONSTRUCTION WASTE MANAGEMENT (CW)
RESOURCE EFFICIENCY (RE)
DURABILITY AND MOISTURE MANAGEMENT (DU)
INDOOR AIR QUALITY (IAQ)
HIGH PERFORMANCE BUILDING ENVELOPE (BE)
ENERGY EFFICIENT SYSTEMS (ES)
WATER EFFICIENCY (WE)
EDUCATION AND OPERATIONS (EO)
INNOVATION (IN)
Totals

EarthCraft Multifamily Level:


**CHOOSE DESIRED LEVEL FROM DROP DOWN**

EarthCraft Multifamily (ECMF) is a builder led certification program that utilizes third-party program verrification. In consideration of EarthC
project will be evaluated based on full compliance with the following:

I. Submission of a field verified worksheet with 100 points (Certified), 150 points (Gold), or 200 points (Platinum) depending on the level o
worksheet requirements achieved specific to the certification tier;

II. Project design and specification:


A. Certified tier projects must comply with a target HERS Index of 80
B. Gold certified projects must fully comply with HERS Target Index of 75
C. Platinum certified projects must fully comply with HERS Target Index of 75
D. Projects at all tiers must exceed all 2009 International Energy Conservation Code minimum requirements and applicable state amendme
E. Projects at all tiers must submit Manual J designs and fresh air ventilation designs reaching current program standards, install heating an
the submitted designs, and achieve all additional EarthCraft Multifamily program requirements;
F. High rise projects will comply with the most current ENERGY STAR Multifamily High Rise Standards.

III. Each project must follow the process as outlined in the EarthCraft Multifamily Manual http://www.earthcraftvirginia.org/wp-content/upl
2013.pdf in order to be eligible for certification completing the following:
A. An initial design review;
B. A construction kick off meeting;
C. All air sealing and final inspection requirements as outlined in the current worksheet and manual;
v5
- 2016
EarthCraft Multifamily
2
D. Submit necessary documentation to confirm program requirements and points tracked in the EarthCraft Multifamily worksheet

B. Gold certified projects must fully comply with HERS Target Index of 75
C. Platinum certified projects must fully comply with HERS Target Index of 75
D. Projects at all tiers must exceed all 2009 International Energy Conservation Code minimum requirements and applicable state amendme
E. Projects at all tiers must submit Manual J designs and fresh air ventilation designs reaching current program standards, install heating an
the submitted designs, and achieve all additional EarthCraft Multifamily program requirements;
F. High rise projects will comply with the most current ENERGY STAR Multifamily High Rise Standards.

EarthCraft Multifamily New Construction Workbook

III. Each project must follow the process as outlined in the EarthCraft Multifamily Manual http://www.earthcraftvirginia.org/wp-content/upl
2013.pdf in order to be eligible for certification completing the following:
A. An initial design review;
B. A construction kick off meeting;
C. All air sealing and final inspection requirements as outlined in the current worksheet and manual;
D. Submit necessary documentation to confirm program requirements and points tracked in the EarthCraft Multifamily worksheet

IV. Any practices or elements outlined as requirements by EarthCraft and/or the 2009 IECC, must be incorporated into non-residential area
stand alone buildings (e.g. clubhouse, stairwells, common areas, corridors, storage areas, etc)

V. Any points tracked within this worksheet must be incorporated into non-residential areas of the project and within any stand alone buildi
ventilation, windows, lighting, water efficient appliances, insulation, combustion zones, etc)

VI. Any discrepancies between code requirements, EarthCraft, or will result in the more stringent requirement being enforced (special cons
code restrictions as approved by EarthCraft)

General Contractor - By accepting the EarthCraft Multifamily certification, I pledge that this project has been constructed to the standards
EarthCraft Worksheet.

General Contractor Signature

Technical Advisor Signature

Owner/Developer Signature

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

orkbook

ilding Address:

y, State, Zip:

chnical Advisor:

e-Drywall Inspection Date:

al Inspection Date:

Certified
100

Gold
150

Platinum
200

***Choose Level Below


Project Score
Planned

Actual

aft Multifamily Level:

Certified

RED LEVEL FROM DROP DOWN**

m verrification. In consideration of EarthCraft Multifamily certification, each

oints (Platinum) depending on the level of certification sought with all

uirements and applicable state amendments;


rent program standards, install heating and air and ventilation matching

rds.

ww.earthcraftvirginia.org/wp-content/uploads/2012/02/ECVA-MF-Manual-

al;
v5 - 2016
arthCraft Multifamily worksheet

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

ct has been constructed to the standards listed within this

date

date

date

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

10

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

11

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

12

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

13

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

14

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

15

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

16

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

17

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

18

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

19

EarthCraft Multifamily New Construction Workbook

Certified
Gold
Platinum

v5 - 2016

EarthCraft Multifamily

20

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

21

EarthCraft Multifamily New Construction Workbook

v5 - 2016

EarthCraft Multifamily

22

Workbook Checklist Instructions


EarthCraft Multifamily Workbook & Inspection Checklist Instructions

The EarthCraft Multifamily Workbook is the primary tool used to track compliance with the EarthCraft Multi
meant to serve as a resource to collect important details related to ECMF program requirements, selected
verification. The most recent version can be downloaded from the EarthCraft Virginia website (www.earthc
completed and submitted before the beginning of inspections on any new project.

Project Team

Blue Tabs =

Program Worksheet

The Worksheet is to be filled out by the project team based on desired certifcation level and design p
1. Choose Certification Level from drop down on Cover Sheet of Workbook and fill out pertinent project information.

2. Make desired and prescriptive point selections based on Certification Level in the 'Planned' Column of t
Column will be filled out by your Technical Advisor on an ongoing basis throughout the project.
Points

Planned

Status

3. Fill out Architect Checklist Tab to the fullest extent allowed by current design stage and update as se

4. Fill out Spec Sheet Tab to the fullest extent allowed by current design stage and update as selections a

Program Verification
The EarthCraft Multifamily Inspection Checklist indicates the status of all required inspection items through
Status
The EarthCraft Technical Advisor will verify which line items have been verified
cheklist using the following designations:
Y
N
VF

Yes when compliant with program standards (cell


Not compliant with program standards (cell turns
Verify at Final (cell turns yellow)*

*This designation may only be used at the Pre-Drywall


N/A
AD

Not applicable (cell stays white)


Additional documentation required (cell turns pur

Insulation Grade
I
II
III

Insulation Grade 1 (cell turns green-pass)


Insulation Grade 2 (cell turns green-pass)
Insulation Grade 3 (cell turns red- fail)

ALT+ENTER allows you to move down a line in the notes section of each tab

v5 - 2016

EarthCraft Multifamily

23 of 139

Workbook Checklist Instructions

t Instructions

o track compliance with the EarthCraft Multifamily Program. The workbook is


d to ECMF program requirements, selected point items, and HERS rating
the EarthCraft Virginia website (www.earthcraftvirginia.org) and should be
n any new project.

n desired certifcation level and design parameters of project.

book and fill out pertinent project information.

tification Level in the 'Planned' Column of the ECMF Worksheet; The 'Status'
oing basis throughout the project.

d by current design stage and update as selections are made.

rent design stage and update as selections are made.

atus of all required inspection items through the following columns:

ll verify which line items have been verified in both the worksheet and inspection
tions:

hen compliant with program standards (cell turns green)


ompliant with program standards (cell turns red)
at Final (cell turns yellow)*

designation may only be used at the Pre-Drywall Inspection

pplicable (cell stays white)


onal documentation required (cell turns purple)

ation Grade 1 (cell turns green-pass)


ation Grade 2 (cell turns green-pass)
ation Grade 3 (cell turns red- fail)

n of each tab

v5 - 2016

EarthCraft Multifamily

24 of 139

Architect Checklist Certification Level:

Certified

Architect Name:

Instructions:
1. Fill out sections labeled 'Location in Drawings / Specifications' below as thoroughly as is allowed by the curre
Example Required Item - Design for or Install Adeditional Dehumidification
Example Location Entry - M205 and/or Specification 7.05.01
A) If the design stage does not allow for entries to be completed, initial to indicate requirements have been r
B) If particular entries are not applicable to design or building type, indicate so.
2. All applicable entries must be complete and submitted to EarthCraft Virginia prior to Design Review

3. The full list of Prescriptive Requirements is accessible below for reference, to access it either click the '1 or 2
'Notes' sections within the collapsable 'Detailed Requirements' section to indicate if any additional items are not

SITE PLANNING (SP)

Erosion Control and Site Planning Measures accounted for in Drawings/Specifications


(SP) Detailed Requirements

CONSTRUCTION WASTE MANAGEMENT (CW)


REQUIRED AT ALL LEVELS
CW 1.0

No construction materials burned or buried on site

CW 1.1

Only state-approved landfills may be utilized

RESOURCE EFFICIENCY (RE)

Advanced Framing Included in Design/Specifications


(RE) Detailed Requirements

DURABILITY AND MOISTURE MANAGEMENT (DU)

Drainage Plane / WRB Details

v5 - 2016

EarthCraft Multifamily

25of139

Flashing Details:
1 Window Flashing
2 Exterior Door Flashing
3 Roof/Wall Intersection
4 Termite Flashing
Design for or Install Additional Dehumidification
Enclosed Crawlspace if Applicable (Required at Gold & Platinum if crawl exists)
(DU) Detailed Requirements

INDOOR AIR QUALITY (IAQ)

Combustion Appliance Guidelines Followed


All ducts/bath fans/HVAC Coils Protected until floor/wall finishing complete
Low VOC Materials Specified
HVAC Filters MERV 6 or better (Required at Platinum & Gold)
(IAQ) Detailed Requirements

HIGH PERFORMANCE BUILDING ENVELOPE (BE)

All Projects must meet Confirmed HERS Index of 80


Vapor Barrier Location/Thickness Called Out
Air Sealing and Blocking at all required locations called out in drawings.
1 Contractor(s) responsible for accomplishing required Air Sealing
Top Plate Sealed to Drywall at Attic Level (Required at Platinum & Gold)
Envelope Leakage Goals (Blower Door Test) incorporated into drawings/specification
documents
1
5 ACH50 - Required At All Levels
Insulation Levels meet Program Minimums for Grade and R-Value
Window & Door U-factors and SHGC meet Program/Certification Level Minimums
(BE) Detailed Requirements

v5 - 2016

EarthCraft Multifamily

26of139

ENERGY EFFICIENT SYSTEMS (ES)

Equipment Sizing Follows Manual J Requirements


Equipment Efficiencies meet minimum requirements per desired certification level
Supply/Return/Ventilation ducts fully ducted, sealed, & insulated per program
guidelines.
Manual D completed for Duct Design (Required at Gold & Platinum)
Entire Duct System located in Conditioned Space (Required at Platinum)
Duct Leakage Testing Requirments incorporated into drawings/specification documents
1
2

5% of Conditioned Floor Area for Leakage to Outside the Thermal Envelope


8% of Conditioned Floor Area for Total Duct Leakage

Pressure imbalance reduced below 5 Pascals between bedroom and return ( 3 at


Platinum & Gold and/or Transfer Grills/Jumper Ducts)
Testing and Balancing of Duct (Required at Platinum & Gold)
Outside Air Ventilation Strategy Determined by design team and incorporated into
drawings/specifications
Exhaust Fans ducted with rigid duct (Required at Platinum)
Water Heaters meet minimum Program/Certification Level Efficiency Requirements and
are direct vent if gas
High Efficacy Lighting in 100% of all Permanent Fixtures (CFL or Better)
Energy Star Appliances Specified (Washer Required at Gold & Platinum)
(ES) Detailed Requirements

WATER EFFICIENCY (WE)

National Energy Policy Act Low Flow Standards for all fixtures/all fixtures meet Platinum
& Gold Level requirements called out in detailed requirement section

v5 - 2016

EarthCraft Multifamily

27of139

Store 0.5 gal of water between water heater and fixture - not applicable to central
systems (Required at Platinum)
(WE) Detailed Requirments

EDUCATION AND OPERATIONS (EO)


EO 1: EDUCATION
REQUIRED AT ALL LEVELS
EO 1.0

Provide property manager with project-specific owner's manual

EO 2: OPERATIONS AND MANAGEMENT


REQUIRED AT ALL LEVELS
EO 2.0

Provide all subcontractors with EarthCraft Multifamily worksheet

***By initialling above, the architect of record or appropriate Project team member is confi
requirements have been reviewed and included in plans or specification documents.

v5 - 2016

EarthCraft Multifamily

28of139

0
0

ughly as is allowed by the current stage of design and initial by each applicable entry.
ditional Dehumidification
n 7.05.01
icate requirements have been reviewed by
Architect of Record.
o.

prior to Design Review

access it either click the '1 or 2' in the top left corner or click the '+ / -' sign . Utilize the
e if any additional items are not applicable and for internal/project team tracking purposes.

v5 - 2016

Location in Drawings / Specifications

Initials

Location in Drawings / Specifications

Initials

Location in Drawings / Specifications

Initials

Location in Drawings / Specifications

Initials

EarthCraft Multifamily

29of139

v5 - 2016

Location in Drawings / Specifications

Initials

Location in Drawings / Specifications

Initials

EarthCraft Multifamily

30of139

v5 - 2016

Location in Drawings / Specifications

Initials

Location in Drawings / Specifications

Initials

EarthCraft Multifamily

31of139

Notes

Notes

ject team member is confirming that all applicable


fication documents.

v5 - 2016

EarthCraft Multifamily

32of139

EarthCraft Multifamily New Construction Worksheet

EarthCraft Multifamily New Construction Worksheet


SITE PLANNING (SP)
SP1: SITE SELECTION
OPTIONAL AT ALL LEVELS
SP 1.0

Type of site:
1.

Brownfield site

2.

Previously developed site

3.

Infill site
A.
B.

SP 1.1

Dwelling units per acre:


1

15 dwelling units per acre

20 dwelling units per acre

3.

25 dwelling units per acre

SP 2: SITE DESIGN
OPTIONAL AT ALL LEVELS
SP 2.0

Connectivity to existing:
1.

Walking distance to bus line (1/4 mile)


A.
B.

2.

Walking distance to rail/rapid transit (1/2 mile)


A.
B.

3.

Biking distance to bike path (1/2 mile)


A.
B.

4.

Walking distance to public openspace or greenspace 3/4 acre in size (1/2 mile)
A.
B.

5.

Walking distance to mixed uses (1/4 mile)


A.
B.

SP 2.1

Shade at least 50% of hardscape within 30' of building

SP 2.2

Reduce light pollution - all exterior lights full cutoff

SP 2.3

Permanent stormwater control:


A.

25% of onsite impervious surface areas

B.

50% of onsite impervious surface areas

C.

75% of onsite impervious surface areas

SP 2.4

Pervious paving for hardscapes and surface parking with appropriate sublayers

SP 2.5

Protect and restore riparian, wetland, and shoreline buffers

SP 2.6

Street Trees are 40' on center at minimum

SP 2.7

Connectivity to adjacent sites:

SP 2.8

v5 - 2016

1.

Vehicular access (2+ connections)

2.

Dedicated pedestrian and bike access

Community Gardens

EarthCraft Multifamily

33of139

EarthCraft Multifamily New Construction Worksheet


SP 2.9

Outdoor Community gathering space

SP 2.10

Install local endangered plant species on site to promote ecological productivity

SP 2.11

Install plant species that serve as pollinators on site for regional wildlife

SP 2.12

Parking reduced below local ordinance (1:1 ratio)

SP 3: SITE PREPARATION AND PRESERVATION MEASURES


REQUIRED AT ALL LEVELS
SP 3.0

Workshop on erosion and sediment control

SP 3.1

Site assessment identifying all greenspace and tree save potential

SP 3.2

Erosion and sedimentation control plan

SP 3.3

Do not install invasive plants on site

SP 3.4

Comply with all federal, state, and local government erosion control and tree protection measures

SP 3.5

Phase I environmental testing and remediation plan (if applicable)

SP 3.6

On-call personnel designated for erosion control during rain events

SP 3.7

Downstream water quality testing (if applicable)

SP 3.8

Label all storm drains or storm inlets to discourage dumping of pollutants

SP 3.9

Road/vehicle cleaning protocols posted and enforced

OPTIONAL AT ALL LEVELS


SP 3.10

Tree preservation and protection measures employed on site

SP 3.11

Leave site undisturbed and protect greenspace from future development (min 25%)

SP 3.12

Mill cleared logs (100%)

SP 3.13

Grind stumps and limbs for mulch (80%)

SP 3.14

Tree planting (12 trees per acre; trees 3" diameter)

SP 4: ALTERNATIVE TRANSPORTATION ACCOMODATIONS


OPTIONAL AT ALL LEVELS
SP 4.0

Bike racks

SP 4.1

Covered bike storage facility

SP 4.2

Tenant access to business center

SP 4.3

Covered bus stop

SITE PLANNING TOTAL


CONSTRUCTION WASTE MANAGEMENT (CW)
REQUIRED AT ALL LEVELS
CW 1.0

No construction materials burned or buried on site

CW 1.1

Only state-approved landfills may be utilized

OPTIONAL AT ALL LEVELS


CW 1.2

Post waste management plan and divert 75% from landfill of:
1.

Wood

2.

Cardboard

3.

Metal (including beverage containers)

4.

Drywall (recycle or grind and spread on site)

5.

Plastic (including beverage containers)

6.

Shingles

CONSTRUCTION WASTE MANAGEMENT TOTAL


RESOURCE EFFICIENCY (RE)
RE 1: RESOURCE EFFICIENT DESIGN

v5 - 2016

EarthCraft Multifamily

34of139

EarthCraft Multifamily New Construction Worksheet


REQUIRED AT ALL LEVELS
RE 1.0

Limit framing at all windows and doors

RE 1.1

Engineered roof framing (90%)

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


RE 1.2

Advanced Framing:
1.

2-stud corners where structurally feasible

2.

Ladder T-walls where structurally feasible

3.

Size headers for loads (non-structural headers in non-load bearing walls)

OPTIONAL AT ALL LEVELS


RE 1.3

Average floor area of unit:


A.

< 800 square feet

B.

800-1100 square feet

RE 1.4

Floor joists are 24" on center (80%)

RE 1.5

Non-load bearing wall studs are 24" on center

RE 2: ADVANCED FRAMING PRODUCTS


OPTIONAL AT ALL LEVELS
RE 2.0

Precast insulated foundation walls (90%)

RE 2.1

Insulated concrete forms or precast autoclaved aerated concrete (90%):


1.

Foundation walls

2.

Exterior walls

RE 2.2

Engineered wall framing (90%)

RE 2.3

Deliver panelized construction or SIPs to the site pre-framed (90%):

RE 2.4

1.

Floors

2.

Exterior walls

3.

Roof

4.

Modular construction

Structural headers are steel or engineered wood (90%)

RE 3: LOCAL, RECYCLED AND/OR NATURAL CONTENT MATERIALS


OPTIONAL AT ALL LEVELS
RE 3.0

Use recycled concrete or alternate material as aggregate in foundation

RE 3.1

Replace 25% of cement in concrete with fly ash or slag:

RE 3.2

1.

Slab and/or foundation walls (100%)

2.

Exterior cladding and trim (75%)

Sustainably harvested, FSC certified:


1.

Lumber (50%)

2.

Lumber/millwork: use no tropical wood

RE 3.3

Use building materials extracted, processed and manufactured 500 miles from site (1 point per product ma

RE 3.4

Reused, recycled, MDF with no added urea-formaldehyde, local species or FSC certified wood in all:
1.

Cabinet faces

2.

Countertops

RE 3.5

Exterior cladding and trim (25% recycled content material on 75% area)

RE 3.6

Insulation (25% recycled content material)

RE 3.7

Flooring:

v5 - 2016

EarthCraft Multifamily

35of139

EarthCraft Multifamily New Construction Worksheet

RE 3.8

RE 3.9

1.

Cork, natural linoleum, sealed concrete or bamboo flooring (20% of total floor area)

2.

Recycled content tiles (30% recycled content material on 100% of tile floor area)

3.

Carpet (50% recycled content material on 50% of all carpeted floor area)

4.

Biodegradable carpet and backing (50% of all carpeted floor area)

Engineered trim:
1.

Interior (80%)

2.

Exterior, including soffit, fascia and trim (75%)

Roofing material (50% recycled content material on 90% area)

RE 4: BUILDING REUSE
RE 4.0

Gut Rehab (project exposing wall cavities or removing exterior cladding) or Adaptive Reuse (for adaptive reu
to worksheet)

RESOURCE EFFICIENCY TOTAL


DURABILITY AND MOISTURE MANAGEMENT (DU)
DU 1: PRODUCTS AND APPLICATIONS
REQUIRED AT ALL LEVELS
DU 1.0

All roof valleys direct water away from walls, dormers, chimneys, etc.

DU 1.1

Install drainage plane per manufacturer's specifications

DU 1.2

Integrate drainage plane with:


1.

Window and door pan flashing at sills and side flashing

2.

Window and door head/top flashing

DU 1.3

Double layer of building paper or housewrap behind cementitious stucco, stone veneer or synthetic stone ven
walls

DU 1.4

Roof gutters discharge water 5' from foundation

DU 1.5

Flashing:
1.

Self-sealing bituminous membrane or equivalent at valleys and roof deck penetrations

2.

Step and kick-out flashing at wall/roof and wall/porch intersections, flashing 4 on wall surface and in
wall and roof/deck/porch drainage planes

DU 1.6

Continuous foundation termite flashing (Required if slab edge is insulated)

DU 1.7

Maintain 2" clearance between wall siding and roof surface

DU 1.8

Install air conditioner condensing unit pad

DU 1.9

Roof drip edge with 1/4" overhang

DU 1.10

Drain pan for water heaters and washing machines

REQUIRED AT PLATINUM, OPTIONAL AT GOLD AND CERTIFIED


DU 1.11

Enclosed crawlspace, if applicable to design

DU 1.12

Moisture-resistant wallboard in bathrooms

OPTIONAL AT ALL LEVELS


DU 1.13

Alternative termite treatment with no soil pretreatment

DU 1.14

Non-toxic pest treatment:


1.

All lumber in contact with foundation (36" above foundation)

2.

All lumber

3.

Mold inhibitor with warranty applied to all lumber

DU 1.15

Vented rain screen behind exterior cladding

DU 1.16

Install termite mesh system

DU 1.17

Exterior cladding (75% facade) with 30-year warranty

DU 1.18

Windows, doors and skylights with 25-year warranty

v5 - 2016

EarthCraft Multifamily

36of139

EarthCraft Multifamily New Construction Worksheet


DU 1.19

Insulate cold water pipes R-2

DU 1.20

All entrance doors have overhang 3' depth

DU 1.21

Roofing warranty:
1.

40-year

2.

50-year

DU 2: MOISTURE MANAGEMENT
REQUIRED AT ALL LEVELS
DU 2.0

Gravel bed (57's, no fines) beneath sub-grade slabs, on grade slabs, or raised slabs

DU 2.1

100% coverage of 6mil vapor barrier beneath all slabs, in all crawlspaces

DU 2.2

Foundation drain on top of sub-grade footing

DU 2.3
DU 2.4

Patio slabs, walks and driveways sloped 1/4 per 1 away from building for 10 or to the edge of the surfac
less
Final site grade sloped 1/2 per 1 away from home for 10 or to the edge of the site, whichever is less

DU 2.5

Do not install wet or water-damaged building materials

DU 2.6

Capillary break between foundation and framing at exterior walls

DU 2.7

Drainage board and damp proofing for below-grade walls

DU 2.8

Design for or install additional dehumidification:


1.

Rough-in electrical plumbing for dehumidifier

2.

Install whole-house ENERGY STAR dehumidifier

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


DU 2.9

Foundation drain at outside perimeter edge of footing surrounded with 6" clean gravel and fabric filter

OPTIONAL AT ALL LEVELS


DU 2.10

Slab and crawlspace vapor barrier 10 mil or reinforced

DU 2.11

Humidistat or thermidistat used with whole-house variable speed cooling system

DU 2.12

Capillary break:
1.

Between ground/footing or footing/foundation

2.

Between foundation and framing for all walls

DURABILITY AND MOISTURE MANAGEMENT TOTAL


INDOOR AIR QUALITY (IAQ)
IAQ 1: COMBUSTION SAFETY
REQUIRED AT ALL LEVELS
IAQ 1.0

No unvented combustion fireplaces, appliances, or space heaters

IAQ 1.1

No atmospherically vented water heaters or furnaces

IAQ 1.2

Sealed-combustion or electric water heater, must be installed in conditioned space

IAQ 1.3

Carbon monoxide detector required if combustion appliances exist (one per bedroom)

IAQ 2: INDOOR POLLUTANT CONTROL


REQUIRED AT ALL LEVELS
IAQ 2.0

Protect all ducts until floor/wall finishing is complete

IAQ 2.1

Filter(s) easily accessible for property maintenance to service

IAQ 2.2

Provide rodent and corrosion proof screens with mesh 0.5" for all openings not fully sealed or caulked

IAQ 2.3

All outdoor supply air crosses filter prior to distribution

IAQ 2.4

All interior paints are 100g/L VOC content

IAQ 2.5

No carpet in below grade units

v5 - 2016

EarthCraft Multifamily

37of139

EarthCraft Multifamily New Construction Worksheet


REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED
IAQ 2.6

Filters are MERV 6

REQUIRED AT PLATINUM, OPTIONAL AT GOLD AND CERTIFIED


IAQ 2.7

IAQ 2.8

Certified low or no VOC materials:


1.

Interior paints

2.

Stains and finishes on wood floors

3.

Sealants and adhesives

4.

Carpet

5.

Carpet pad

6.

Carpet pad adhesive

Protect all bath fans until floor/wall finishing is complete

OPTIONAL AT ALL LEVELS


IAQ 2.10

No added urea-formaldehyde:
1.

Insulation

2.

Subfloor

3.

All cabinets, shelves, and countertops

IAQ 2.11

Seal all particle board surfaces with water-based sealant

IAQ 2.12

No carpet in all units

IAQ 2.13

No carpet in main living area of all units

IAQ 2.14

Permanent walk-off mats installed at each entry

INDOOR AIR QUALITY TOTAL


HIGH PERFORMANCE BUILDING ENVELOPE (BE)
REQUIRED AT ALL LEVELS
BE 0.1

IECC adopted by jurisdiction plus applicable state amendments

BE 0.2

Certified level projects must achieve a confirmed HERS Index 80

BE 0.3

Gold and Platinum level projects must achieve a confirmed HERS Index of of 75

OPTIONAL AT ALL LEVELS


BE 0.4

Confirmed HERS Index of 70

BE 1: AIR SEALING MEASURES


REQUIRED AT ALL LEVELS - DESIGN FOR UNIT COMPARTMENTALIZATION
BE 1.0

Vapor barriers installed under slabs and crawls only and not on any vertical surfaces

BE 1.1

Seal bottom plates to subfloor or foundation for entire unit envelope

BE 1.2

Block and seal joists cavities:


1.

Above supporting walls at cantilevered floors

2.

Under attic kneewalls

BE 1.3

Block stud cavities at change in ceiling height

BE 1.4

Install blocking and baffles in insulated and vented attics

BE 1.5

Seal penetrations through:

v5 - 2016

1.

Foundations and exterior wall assemblies

2.

Top and bottom plates

3.

Band and rim joists

4.

Insulated subfloor

5.

Sheathing

6.

Walls and ceilings in attached garages

7.

All ceilings

EarthCraft Multifamily

38of139

EarthCraft Multifamily New Construction Worksheet


BE 1.6

BE 1.7

BE 1.8

BE 1.9

Seal penetrations around:


1.

Shower, sinks, toilets and tub drains

2.

HVAC supply and return boots sealed to subfloor or drywall (floor, walls, or ceilings)

3.

Window and door rough openings

4.

All drywall penetrations (common walls between attached units included)

5.

Exhaust fans to drywall

6.

Attic pull-down stairs, scuttle holes and kneewall doors

7.

Chases

Seal seams and gaps in:


1.

Band joist sheathing

2.

Exterior wall sheathing

3.

All seams in SIP's

Install rigid air barriers:


1.

Behind tubs and showers on insulated walls

2.

At attic kneewall on attic-side (including skylight shafts)

3.

At chases in contact with the building envelope (including fireplace chases)

4.

Along staircases on insulated walls

5.

Along porch roofs

6.

At dropped ceiling/soffit

7.

At all band joists above unit separation walls

Install weather-stripping at:


1.

All exterior doors (if not included in door assembly)

2.

Attic kneewall doors, scuttle holes and pull down stairs

BE 1.10

All recessed can lights must be air tight, gasketed at all floors and also IC-rated in insulated ceilings; in Clim
insulate exterior surface of fixture to R-10

BE 1.11

Fire rated assemblies that do not use draft block in band areas must comply with Air Tight Drywall approach

BE 1.12

Units adjacent to fire walls or CMU walls with an air gap assembly must follow Air Tight Drywall approach

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


BE 1.13

Seal top plate to drywall at the attic level

OPTIONAL AT ALL LEVELS


BE 1.14

Comply with Air tight drywall approach (required if band area draft blocking is not used)

BE 1.15

Gypcrete on all framed floors separating unit envelopes

BE 1.16

Two pour application of gypcrete to include areas blocked by drywall

BE 1.17

Firewalls/party walls that eliminate air gap (UL 370 or equivalent)

BE 1.18

No recessed can lights installed

BE 2: BLOWER DOOR TEST


REQUIRED AT ALL LEVELS
BE 2.0

Air Changes per Hour 5 ACH50

OPTIONAL AT ALL LEVELS


BE 2.1

Air Changes per Hour 4 ACH50

BE 2.2

Air Changes per Hour 3 ACH50

BE 3: INSULATION
REQUIRED AT ALL LEVELS
BE 3.0

v5 - 2016

Floors:

EarthCraft Multifamily

39of139

EarthCraft Multifamily New Construction Worksheet

BE 3.1

BE 3.2

1.

Framed R-19

2.

Cantilevered R-30

3.

Podium/Elevated Slab R-19

Walls:
1.

Exterior walls and band joists R-15

2.

Elevator walls adjacent to dwelling units R-13

3.

Foundation walls R-10 continuous or R-13 cavity


Climate Zone 2/3 R-5 continuous or R-13 cavity
Climate Zone 4 R-10 continuous or R-13 cavity

Ceilings/Roof:
1.

BE 3.3

BE 3.4

2.

Vented Flat: Climate Zone 4 R-38


Continuous Roof Deck: Climate Zone 4 R-20

3.

Sloped: Climate Zone 4 R-38

Attic/Roof:
1.

Install wind baffles at eaves in every vented bay, or equivalent air barrier at edge of ceiling

2.

Energy heel trusses or raised top plate

3.

Attic platforms allow for full-depth insulation below

Attic kneewall:
1.

Doors R-19

2.

Insulation and attic-side air barrier R-19

BE 3.5

Attic pull-down/ scuttle hole R-38

BE 3.6

When installing loose-fill attic insulation, card and rulers must be installed

BE 3.7

Steel framed buildings require thermal break R-7.5

BE 3.8

Grade II insulation quality at all building envelope locations

BE 3.9

Slab edge insulation R-10

BE 3.10

Exterior band areas have interior air barrier meeting required insulation values

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


BE 3.11

Insulation installation quality (floors, walls and ceilings):


1.

Grade I

2.

Grade II with insulated sheathing R-3 (100%)

BE 3.12

Corners R-6

BE 3.13

Headers R-3

BE 3.14

Fiberglass batts are unfaced/friction fit

OPTIONAL AT ALL LEVELS


BE 3.15

BE 3.16

BE 3.17

v5 - 2016

Insulate with foam applied insulation:


1.

Exterior walls including band area

2.

Floor system over crawlspace or basement

Walls:
1.

Seal and insulate crawlspace walls R-10 continuous

2.

Insulate unfinished basement walls instead of ceiling

3.

Insulate basement walls with continuous insulation

4.

Insulate exterior walls and band joist R-19

5.

Insulate exterior walls and band joist R-20 or R-13 cavity plus R-5 insulated sheathing

Continuous exterior insulation:

EarthCraft Multifamily

40of139

EarthCraft Multifamily New Construction Worksheet

BE 3.18

1.

R-3

2.

R-5

Ceilings:
1.

Flat Vented: Climate Zone 4 R-49

2.

Continuous Roof Deck: Climate Zone 4 R-30

3.

Sloped: Climate Zone 4 R-49

BE 3.19

Attic kneewall insulated R-22

BE 3.20

Insulate roofline R-30

BE 4: WINDOWS
REQUIRED AT ALL LEVELS
BE 4.0

BE 4.1

BE 4.2

BE 4.3

Door U-factors and SHGC:


1.

U-factor 0.35

2.

SHGC 0.30

Window U-factor and SHGC:


1.

U-factor 0.35

2.

SHGC 0.30

Skylight U-factor and SHGC:


1.

U-factor 0.60

2.

SHGC 0.30

NFRC certified doors, windows and skylights with label

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


BE 4.4

BE 4.5

BE 4.6

Door U-factor:
1.

Opaque door: U factor 0.21

2.

Door with 50% glass: U-factor 0.27

3.

Door with > 50% glass: U-factor 0.32

Window U-factor and SHGC:


1.

U-factor 0.32

2.

SHGC 0.27

Skylight U-factor and SHGC:


1.

U-factor 0.55

2.

SHGC 0.27

OPTIONAL AT ALL LEVELS


BE 4.7

BE 4.8

BE 4.9

Window U-factor and SHGC:


1.

U-factor 0.25

2.

SHGC 0.24

Skylight U-factor and SHGC:


1.

U-factor 0.43

2.

SHGC 0.24

Glazing facing:
1.

West 2% of floor area

2.

East 3% of floor area

BE 4.10

1.5' overhangs over 80% of south windows

BE 4.11

Solar shade screens (min all east and west windows)

BE 4.12

Certified passive solar design (25% load reduction)

BE 4.13

Window area is 15% of conditioned floor area (all units)

v5 - 2016

EarthCraft Multifamily

41of139

EarthCraft Multifamily New Construction Worksheet


BE 5: ROOF
OPTIONAL AT ALL LEVELS
BE 5.0

Install green roof system:


1.

20% of roof area

2.

40% of roof area

3.

60% or above

HIGH PERFORMANCE BUILDING ENVELOPE TOTAL


ENERGY EFFICIENT SYSTEMS (ES)
ES 1: HEATING AND COOLING EQUIPMENT
REQUIRED AT ALL LEVELS
ES 1.0

Size and select all HVAC equipment in accordance with ACCA Manuals J and S:
1.

Complete load calculation utilizing ACCA Manual J 8th Edition Software or current ASHRAE based softw
or Carrier HAP) and submit to EarthCraft for review prior to issuing construction drawings. Loads mus
inputs.

2.

Based on worst case unit orientation per unit type

3.

Use 2009 ASHRAE Handbook of Fundamentals Climate Design Information for outdoor design tempera

4.

Indoor temperatures 70 F for heating and 75 for cooling

5.

Base infiltration on project team selected infiltration goal

6.

Use actual area, U-factor and SHGC for windows and doors, actual area and R-values of floors, walls ,

7.

Base mechanical ventilation on ASHRAE 62.2 or BSC-01 standard

8.

Cooling equipment and/or single-stage heat pump between 95%-125%

9.

Provide OEM data for each unique system type

10.

Internal loads that reflect design and occupancy 2400 Btu/h

ES 1.1

If programmable thermostat installed for heat pump, include adaptive recovery technology

ES 1.2

AHRI performance match all indoor/outdoor coils

ES 1.3

Non-CFC and non-HCFC refrigerant

ES 1.4

No electric resistant heat as primary heat source or reheat

ES 1.5

Heat pump efficiency 8.0 HSPF or equivalent COP

ES 1.6

Furnace efficiency 90 AFUE

ES 1.7

Cooling equipment 14 SEER or 11.5 EER

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


ES 1.8

Heating equipment efficiency:


1.

ENERGY STAR qualified furnace(s) 90 AFUE and within 40% of load calculation

2.

ENERGY STAR qualified heat pump(s) 8.5 HSPF and within 25% of load calculation

ES 1.9

Verification of proper refrigerant charge with subcooling deviation 3F or superheat deviation 5F

ES 1.10

ENERGY STAR qualified cooling equipment SEER 14.5

OPTIONAL AT ALL LEVELS


ES 1.11

Variable speed blower

ES 1.12

Ground-source heat pump(s) EER 17

ES 1.13

ENERGY STAR qualified cooling equipment SEER 16

ES 1.14

Heat pump efficiency 9.0 HSPF

ES 1.15

Dual-stage compressors

ES 1.16

Condenser units are spaced 2 feet apart

v5 - 2016

EarthCraft Multifamily

42of139

EarthCraft Multifamily New Construction Worksheet


ES 1.17

Varible Refrigerant/Mini-Split system utilized for primary heating and cooling

ES 2: DUCTWORK / AIR HANDLER


REQUIRED AT ALL LEVELS
ES 2.0

Seal air handlers and duct systems with mastic

ES 2.1

Code approved solid connector for all flex-to-flex connections

ES 2.2

Fully duct all supply and return ducts

ES 2.3

Duct insulation:
1.

R-6: Ducts in conditioned and interstitial spaces (between floors)

2.

R-8: Ducts in unconditioned space

ES 2.4

No ducts in exterior walls or vaulted ceilings and no plenum within 2' of roofline.

ES 2.5

Locate all air handlers within conditioned space

ES 2.6

Indoor coil protected until finished floor installed

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


ES 2.7

Install ducts per ACCA Manual D duct design

ES 2.8

Minimize pressure imbalance within units:


1.

Install jumper ducts, transfer grills, or dedicated return for each room

2.

Measured pressure differential 3pa between bedroom and return

ES 2.9

Install rigid duct work or pull all flex ducts with no pinches and support at intervals 5

ES 2.10

Measure and balance airflow for each duct run (20% of design)

ES 2.11

Verify supply and return duct static pressure

ES 2.12

HVAC system and ductwork is dry and clean

REQUIRED AT PLATINUM, OPTIONAL AT GOLD AND CERTIFIED


ES 2.13

Locate entire duct system within conditioned space

OPTIONAL AT ALL LEVELS


ES 2.14

Duct design and installation:


1.

No duct take-offs within 6" of supply plenum cap

2.

Rigid metal supply trunk line

3.

Space all supply duct take-offs 6 apart

4.

Install rigid circular duct as supply plenum

ES 2.15

Duct insulation in unconditioned spaces R-10

ES 2.16

Return plenum duct take-off free area is 120% of supply plenum duct take-off free area

ES 2.17

Design and construct accessible mechanical closets

ES 3: DUCT LEAKAGE TEST RESULTS


REQUIRED AT ALL LEVELS
ES 3.0

Test duct leakage based on conditioned floor area (CFA):


1.

Leakage to outside 5%

2.

Total leakage 8%

OPTIONAL AT ALL LEVELS


ES 3.1

Test duct leakage based on conditioned floor area (CFA):


1.

Leakage to outside 3%

2.

Total leakage 5%

ES 4: VENTILATION
REQUIRED AT ALL LEVELS
ES 4.0

Install exhaust fans in all bathrooms and duct to outside

ES 4.1

Gas kitchen range vented to exterior 100 cfm fan

v5 - 2016

EarthCraft Multifamily

43of139

EarthCraft Multifamily New Construction Worksheet


ES 4.2

Outside air ventilation strategy complies with ASHRAE 62.2-2007 or BSC-01 and must be conditioned prior to

ES 4.3

When installed to achieve ES 4.1, design and install fresh air intakes:
1.

10' away from exhaust outlets , vehicle idling zones, parking garages

2.

2' above grade

3.

When run to soffit the duct must be extended and affixed through the soffit vent

4.

Fresh air duct may not be run to the roof

5.

Fresh air shutoff may not be controlled by humidistat

6.

Install rigid duct with insulation

7.

All intakes must be ducted to exterior of building

ES 4.4

Seal seams of all intake and exhaust ducts with mastic

ES 4.5

Duct clothes dryers to outside

ES 4.6

No power roof vents

ES 4.7

Back-draft dampers for kitchen and bathroom exhaust

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


ES 4.8

If installed, ceiling fans must be ENERGY STAR qualified (1/bedroom and 1 in living room)

ES 4.9

ENERGY STAR bath fans with properly sized ductwork and measured airflow 50 cfm

ES 4.10

Electric kitchen range vented to exterior 100 cfm fan

ES 4.11

Verify outdoor air supply ventilation airflow test within +/- 20% of design values

ES 4.12

Install and label accessible ventilation controls, with override controls for continuously operating ventilation fa

ES 4.13

Supply/exhaust fans rated at 3 sones (intermittent) and 1 sone (continuous)

REQUIRED AT PLATINUM, OPTIONAL AT GOLD AND CERTIFIED


ES 4.14

Radon resistant construction:


1.

Passive, radon/soil gas vent system labeled on each floor

2.

Radon test of building prior to occupancy

ES 4.15

Exhaust fan wired with light in bathroom

ES 4.16

Duct all exhaust fans with rigid duct

OPTIONAL AT ALL LEVELS


ES 4.17

Automatic (timer and/or humidistat) bathroom exhaust fan controls

ES 4.18

Energy recovery ventilator

ES 4.19

Vent storage room to outside

ES 5: WATER HEATER
REQUIRED AT ALL LEVELS
ES 5.0

If gas, direct vent

ES 5.1

Heat trap on all storage water heaters

ES 5.2

Electric water heaters .93 EF

ES 5.3

Pipe insulation on first 2'

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


ES 5.4

High efficiency water heater Energy Factor (EF):


1.

Storage Gas .67 EF, Electric .95 EF

2.

Tankless: Gas .90 EF

OPTIONAL AT ALL LEVELS


ES 5.5

Type of water heater:


1.

v5 - 2016

Solar domestic (40% annual load based on unit demand)

EarthCraft Multifamily

44of139

EarthCraft Multifamily New Construction Worksheet

ES 5.6

2.

High efficiency tankless water heater ( .92 EF) with insulated buffer tank

3.

ENERGY STAR qualified heat pump hot water heater

Hot water piping insulation R-4 (100%)

ES 6: LIGHTING/APPLIANCES
REQUIRED AT ALL LEVELS
ES 6.0

High-efficacy lighting in 100% of all permenant fixtures

ES 6.1

If installed, ENERGY STAR dishwasher

ES 6.2

If installed, ENERGY STAR refrigerator

REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED


ES 6.3

ENERGY STAR Advanced Lighting Package

OPTIONAL AT ALL LEVELS


ES 6.4

ES 6.5

Control systems:
1.

Automatic indoor lighting controls

2.

Automatic outdoor lighting controls

Fixtures and bulbs:


A.

ENERGY STAR qualified compact fluorescent fixtures or LED bulbs (100%)

B.

Ballasted compact fluorescents or LED bulbs at all recessed light fixtures

C.

Compact fluorescent bulbs (90%)

ES 7: COMMON AREA LIGHTING/APPLIANCES


REQUIRED AT PLATINUM AND GOLD, OPTIONAL AT CERTIFIED
ES 7.0

Ballasted compact fluorescents and/or LED bulbs in all corridor/breezeway and all common spaces

ES 7.1

If installed, ENERGY STAR qualified clothes washer

ES 7.2

If installed, high efficiency clothes dryer with moisture sensor

OPTIONAL AT ALL LEVELS


ES 7.3

ES 7.4

High Efficiency Exterior Lighting:


1.

Design to Reach IES guidelines: Lighting For Exterior Environments

2.

Achieve 50% reduction based on Advanced Energy Design Guide (ASHRAE/IES)

3.

High efficiency exterior lighting using 100% fluorescent and/or LED bulbs

High efficiency elevators

ENERGY EFFICIENT SYSTEMS TOTAL


WATER EFFICIENCY (WE)
WE 1: INDOOR WATER USE
REQUIRED AT ALL LEVELS
WE 1.0

Meet National Energy Policy Act low flow standards for all fixtures

WE 1.1

Detect no leaks at any water-using fixture, appliance or equipment

REQUIRED AT PLATINUM , OPTIONAL AT GOLD AND CERTIFIED


WE 1.2

If installed, water treatment system NSF certified, 85% efficient

WE 1.3

If installed, water softeners certified to NSF/ANSI Standard 44

WE 1.4

Store 0.5 gal of water between water heater and fixture (not applicable to central systems)

WE 1.5

Low-flow fixtures (units and common facilities):

v5 - 2016

1.

WaterSense labeled toilet (1.28 avg. gal/flush)

2.

WaterSense labeled urinal (0.5 gal/flush)

3.

WaterSense lavatory faucet and accessories (1.5 gpm at 60 psi)

4.

WaterSense labeled Showerhead (2.0 gpm)

EarthCraft Multifamily

45of139

EarthCraft Multifamily New Construction Worksheet


OPTIONAL AT ALL LEVELS
WE 1.6

Toilet (1.1 avg. gal/flush)

WE 1.7

Waterless urinals in common areas

WE 1.8

Greywater system for toilet flushing

WE 1.9

Rainwater harvest system for indoor water use

WE 1.10

Hot water demand 0.13 gal of water between loop and fixture and 2 gal of water in loop between water h
fixture (not applicable to central systems)

WE 2: OUTDOOR WATER USE


REQUIRED AT ALL LEVELS
WE 2.0

Cover all exposed soil with 2"-3" mulch layer

WE 2.1

Irrigation system:
1.

Must have rain sensor shutoff switch

2.

Provide operating manual to property management

3.

Provide irrigation system layout to property management

WE 2.2

If installed, ornamental water features must recirculate water and serve beneficial use

WE 2.3

Install plants to maintain distance 2' from home at maturity

REQUIRED AT PLATINUM, OPTIONAL AT GOLD AND CERTIFIED


WE 2.4
WE 2.5

Turf 40% of landscaped area


Vegetate slopes exceeding 4:1

WE 2.6

If installed, irrigation system is:

WE 2.7

(Max 4 points)

1.

Design, install, and audit irrigation system by WaterSense Irrigation Partner with no leaks

2.

Micro-irrigation system (e.g., drip irrigation) includes pressure regulator, filter and flush end assemblie

3.

Distribution uniformity 65% lower quarter

4.

Install sprinklers only on turfgrass, pop-up height 4"

5.

Establish grow-in phase and post landscape seasonal water schedules at irrigation controller

Drought-tolerant/native landscaping turf and plants

WE 2.8

xeriscapeTM guidebook given to property management or owner


OPTIONAL AT ALL LEVELS
WE 2.9

Test and amend soil

WE 2.10

Irrigation: (Max 5 points)

WE 2.11

1.

Greywater irrigation system

2.

Rainwater irrigation system

3.

Zone irrigation system for specific water needs in each planting area

4.

Provide weather station or soil moisture sensor on irrigation system

Timer on exterior water spigots

WATER EFFICIENCY TOTAL


EDUCATION AND OPERATIONS (EO)
EO 1: EDUCATION
REQUIRED AT ALL LEVELS
EO 1.0

Provide property manager with project-specific owner's manual

OPTIONAL AT ALL LEVELS


EO 1.1

Local recycling contact

EO 1.2

Label all storm drain or storm inlets to discourage dumping of pollutants

v5 - 2016

EarthCraft Multifamily

46of139

EarthCraft Multifamily New Construction Worksheet


EO 1.3

Household hazardous waste resources

EO 2: OPERATIONS AND MANAGEMENT


REQUIRED AT ALL LEVELS
EO 2.0

Provide all subcontractors with EarthCraft Multifamily worksheet

OPTIONAL AT ALL LEVELS


EO 2.1

Property Maintenance Staff representative attends design review and/or kick off meeting

EO 2.2

Market EarthCraft Multifamily program

EO 2.3

Provide pre-occupancy briefing for tenant

EO 2.4

Project participates in post occupancy project debriefing

EO 2.5

Environmental management and building maintenance guidelines for staff

EO 2.6

Landscape maintenance guide for maintenance and management personnel

EO 3: THIRD PARTY PROGRAMS


OPTIONAL AT ALL LEVELS
EO 3.0

ENERGY STAR Version 3

EO 3.1

Indoor airPLUS

EO 3.2

Qualify for WaterSense

EO 3.3

EarthCraft Community Certification

EO 3.4

EarthCraft Light Commercial for Community Center

EO 3.5

EarthCraft Light Commercial Ready Spaces

EO 3.6

Building America Builders Challenge

EDUCATION AND OPERATIONS TOTAL


INNOVATION (INV)
OPTIONAL AT ALL LEVELS
IN 1.0

On-site fuel cell or co-generation system

IN 1.1

Solar, micro-hydro or wind electric system

IN 1.2

Solar-ready design

IN 1.3

Solar electric system (10% of project requirements)

IN 1.4

100% of stormwater kept on site and used for development operations

IN 1.5

Common areas use solar electric system (80% of demand)

IN 1.6

Housing Affordability:
1

20% total units

50% total units

IN 1.7

Developer contracts for at least 12 months post construction energy monitoring

IN 1.8

Project specific innovation points: builder submits specifications for innovative products or design features to
to construction completion

INNOVATION TOTAL
WORKSHEET TOTAL

v5 - 2016

EarthCraft Multifamily

47of139

EarthCraft Multifamily New Construction Worksheet

Multifamily New Construction Worksheet

ALL LEVELS
Brownfield site
Previously developed site
Infill site
>50%
>75%

welling units per acre:


15 dwelling units per acre
20 dwelling units per acre
25 dwelling units per acre

ALL LEVELS

onnectivity to existing:
Walking distance to bus line (1/4 mile)
Existing
Planned
Walking distance to rail/rapid transit (1/2 mile)
Existing
Planned
Biking distance to bike path (1/2 mile)
Existing
Planned
Walking distance to public openspace or greenspace 3/4 acre in size (1/2 mile)
Existing
Planned
Walking distance to mixed uses (1/4 mile)
6 or more mixed uses
4 or more mixed uses

hade at least 50% of hardscape within 30' of building

educe light pollution - all exterior lights full cutoff

rmanent stormwater control:


25% of onsite impervious surface areas
50% of onsite impervious surface areas
75% of onsite impervious surface areas

rvious paving for hardscapes and surface parking with appropriate sublayers

otect and restore riparian, wetland, and shoreline buffers

reet Trees are 40' on center at minimum

onnectivity to adjacent sites:


Vehicular access (2+ connections)
Dedicated pedestrian and bike access

ommunity Gardens

v5 - 2016

EarthCraft Multifamily

48of139

EarthCraft Multifamily New Construction Worksheet

utdoor Community gathering space

stall local endangered plant species on site to promote ecological productivity

stall plant species that serve as pollinators on site for regional wildlife

arking reduced below local ordinance (1:1 ratio)

PARATION AND PRESERVATION MEASURES

ALL LEVELS

orkshop on erosion and sediment control

te assessment identifying all greenspace and tree save potential

osion and sedimentation control plan

o not install invasive plants on site

omply with all federal, state, and local government erosion control and tree protection measures

hase I environmental testing and remediation plan (if applicable)

n-call personnel designated for erosion control during rain events

ownstream water quality testing (if applicable)

bel all storm drains or storm inlets to discourage dumping of pollutants

oad/vehicle cleaning protocols posted and enforced

ALL LEVELS

ee preservation and protection measures employed on site

ave site undisturbed and protect greenspace from future development (min 25%)

ll cleared logs (100%)

rind stumps and limbs for mulch (80%)

ee planting (12 trees per acre; trees 3" diameter)

TIVE TRANSPORTATION ACCOMODATIONS

ALL LEVELS

overed bike storage facility

nant access to business center

overed bus stop

N WASTE MANAGEMENT (CW)

ALL LEVELS

o construction materials burned or buried on site

nly state-approved landfills may be utilized

ALL LEVELS

ost waste management plan and divert 75% from landfill of:
Cardboard
Metal (including beverage containers)
Drywall (recycle or grind and spread on site)
Plastic (including beverage containers)
Shingles

WASTE MANAGEMENT TOTAL

ICIENCY (RE)

E EFFICIENT DESIGN

v5 - 2016

EarthCraft Multifamily

49of139

EarthCraft Multifamily New Construction Worksheet

ALL LEVELS

mit framing at all windows and doors

ngineered roof framing (90%)

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

dvanced Framing:
2-stud corners where structurally feasible
Ladder T-walls where structurally feasible
Size headers for loads (non-structural headers in non-load bearing walls)

ALL LEVELS

verage floor area of unit:


< 800 square feet
800-1100 square feet

oor joists are 24" on center (80%)

on-load bearing wall studs are 24" on center

D FRAMING PRODUCTS

ALL LEVELS

ecast insulated foundation walls (90%)

sulated concrete forms or precast autoclaved aerated concrete (90%):


Foundation walls
Exterior walls

ngineered wall framing (90%)

eliver panelized construction or SIPs to the site pre-framed (90%):


Exterior walls
Modular construction

ructural headers are steel or engineered wood (90%)

ECYCLED AND/OR NATURAL CONTENT MATERIALS

ALL LEVELS

se recycled concrete or alternate material as aggregate in foundation

eplace 25% of cement in concrete with fly ash or slag:


Slab and/or foundation walls (100%)
Exterior cladding and trim (75%)

ustainably harvested, FSC certified:


Lumber (50%)
Lumber/millwork: use no tropical wood

se building materials extracted, processed and manufactured 500 miles from site (1 point per product maximum 5 points)

eused, recycled, MDF with no added urea-formaldehyde, local species or FSC certified wood in all:
Cabinet faces
Countertops

xterior cladding and trim (25% recycled content material on 75% area)

sulation (25% recycled content material)

v5 - 2016

EarthCraft Multifamily

50of139

EarthCraft Multifamily New Construction Worksheet


Cork, natural linoleum, sealed concrete or bamboo flooring (20% of total floor area)
Recycled content tiles (30% recycled content material on 100% of tile floor area)
Carpet (50% recycled content material on 50% of all carpeted floor area)
Biodegradable carpet and backing (50% of all carpeted floor area)

ngineered trim:
Interior (80%)
Exterior, including soffit, fascia and trim (75%)

oofing material (50% recycled content material on 90% area)

ut Rehab (project exposing wall cavities or removing exterior cladding) or Adaptive Reuse (for adaptive reuse see addendum
worksheet)

CIENCY TOTAL

ND MOISTURE MANAGEMENT (DU)

TS AND APPLICATIONS

ALL LEVELS

l roof valleys direct water away from walls, dormers, chimneys, etc.

stall drainage plane per manufacturer's specifications

tegrate drainage plane with:


Window and door pan flashing at sills and side flashing
Window and door head/top flashing

ouble layer of building paper or housewrap behind cementitious stucco, stone veneer or synthetic stone veneer on framed
alls

oof gutters discharge water 5' from foundation


Self-sealing bituminous membrane or equivalent at valleys and roof deck penetrations
Step and kick-out flashing at wall/roof and wall/porch intersections, flashing 4 on wall surface and integrated with
wall and roof/deck/porch drainage planes

ontinuous foundation termite flashing (Required if slab edge is insulated)

aintain 2" clearance between wall siding and roof surface

stall air conditioner condensing unit pad

oof drip edge with 1/4" overhang

rain pan for water heaters and washing machines

PLATINUM, OPTIONAL AT GOLD AND CERTIFIED

nclosed crawlspace, if applicable to design

oisture-resistant wallboard in bathrooms

ALL LEVELS

ternative termite treatment with no soil pretreatment

on-toxic pest treatment:


All lumber in contact with foundation (36" above foundation)
All lumber
Mold inhibitor with warranty applied to all lumber

ented rain screen behind exterior cladding

stall termite mesh system

xterior cladding (75% facade) with 30-year warranty

indows, doors and skylights with 25-year warranty

v5 - 2016

EarthCraft Multifamily

51of139

EarthCraft Multifamily New Construction Worksheet

sulate cold water pipes R-2

l entrance doors have overhang 3' depth

oofing warranty:
40-year
50-year

RE MANAGEMENT

ALL LEVELS

ravel bed (57's, no fines) beneath sub-grade slabs, on grade slabs, or raised slabs

00% coverage of 6mil vapor barrier beneath all slabs, in all crawlspaces

undation drain on top of sub-grade footing

atio slabs, walks and driveways sloped 1/4 per 1 away from building for 10 or to the edge of the surface, whichever is
ss
nal site grade sloped 1/2 per 1 away from home for 10 or to the edge of the site, whichever is less

o not install wet or water-damaged building materials

apillary break between foundation and framing at exterior walls

rainage board and damp proofing for below-grade walls

esign for or install additional dehumidification:


Rough-in electrical plumbing for dehumidifier
Install whole-house ENERGY STAR dehumidifier

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

undation drain at outside perimeter edge of footing surrounded with 6" clean gravel and fabric filter

ALL LEVELS

ab and crawlspace vapor barrier 10 mil or reinforced

umidistat or thermidistat used with whole-house variable speed cooling system

apillary break:
Between ground/footing or footing/foundation
Between foundation and framing for all walls

D MOISTURE MANAGEMENT TOTAL

UALITY (IAQ)

STION SAFETY

ALL LEVELS

o unvented combustion fireplaces, appliances, or space heaters

o atmospherically vented water heaters or furnaces

ealed-combustion or electric water heater, must be installed in conditioned space

arbon monoxide detector required if combustion appliances exist (one per bedroom)
POLLUTANT CONTROL

ALL LEVELS

otect all ducts until floor/wall finishing is complete

ter(s) easily accessible for property maintenance to service

ovide rodent and corrosion proof screens with mesh 0.5" for all openings not fully sealed or caulked

l outdoor supply air crosses filter prior to distribution

l interior paints are 100g/L VOC content

o carpet in below grade units

v5 - 2016

EarthCraft Multifamily

52of139

EarthCraft Multifamily New Construction Worksheet

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

ters are MERV 6

PLATINUM, OPTIONAL AT GOLD AND CERTIFIED

ertified low or no VOC materials:


Interior paints
Stains and finishes on wood floors
Sealants and adhesives
Carpet
Carpet pad
Carpet pad adhesive

otect all bath fans until floor/wall finishing is complete

ALL LEVELS

o added urea-formaldehyde:
Insulation
Subfloor
All cabinets, shelves, and countertops

eal all particle board surfaces with water-based sealant

o carpet in all units

o carpet in main living area of all units

rmanent walk-off mats installed at each entry

ALITY TOTAL

MANCE BUILDING ENVELOPE (BE)

ALL LEVELS

CC adopted by jurisdiction plus applicable state amendments

ertified level projects must achieve a confirmed HERS Index 80

old and Platinum level projects must achieve a confirmed HERS Index of of 75

ALL LEVELS

onfirmed HERS Index of 70

ING MEASURES

ALL LEVELS - DESIGN FOR UNIT COMPARTMENTALIZATION

apor barriers installed under slabs and crawls only and not on any vertical surfaces

eal bottom plates to subfloor or foundation for entire unit envelope

ock and seal joists cavities:


Above supporting walls at cantilevered floors
Under attic kneewalls

ock stud cavities at change in ceiling height

stall blocking and baffles in insulated and vented attics

eal penetrations through:


Foundations and exterior wall assemblies
Top and bottom plates
Band and rim joists
Insulated subfloor
Sheathing
Walls and ceilings in attached garages
All ceilings

v5 - 2016

EarthCraft Multifamily

53of139

EarthCraft Multifamily New Construction Worksheet

eal penetrations around:


Shower, sinks, toilets and tub drains
HVAC supply and return boots sealed to subfloor or drywall (floor, walls, or ceilings)
Window and door rough openings
All drywall penetrations (common walls between attached units included)
Exhaust fans to drywall
Attic pull-down stairs, scuttle holes and kneewall doors
Chases

eal seams and gaps in:


Band joist sheathing
Exterior wall sheathing
All seams in SIP's

stall rigid air barriers:


Behind tubs and showers on insulated walls
At attic kneewall on attic-side (including skylight shafts)
At chases in contact with the building envelope (including fireplace chases)
Along staircases on insulated walls
Along porch roofs
At dropped ceiling/soffit
At all band joists above unit separation walls

stall weather-stripping at:


All exterior doors (if not included in door assembly)
Attic kneewall doors, scuttle holes and pull down stairs

l recessed can lights must be air tight, gasketed at all floors and also IC-rated in insulated ceilings; in Climate Zone 4,
sulate exterior surface of fixture to R-10

re rated assemblies that do not use draft block in band areas must comply with Air Tight Drywall approach

nits adjacent to fire walls or CMU walls with an air gap assembly must follow Air Tight Drywall approach

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

eal top plate to drywall at the attic level

ALL LEVELS

omply with Air tight drywall approach (required if band area draft blocking is not used)

ypcrete on all framed floors separating unit envelopes

wo pour application of gypcrete to include areas blocked by drywall

rewalls/party walls that eliminate air gap (UL 370 or equivalent)

o recessed can lights installed

DOOR TEST

ALL LEVELS

r Changes per Hour 5 ACH50

ALL LEVELS

r Changes per Hour 4 ACH50

r Changes per Hour 3 ACH50

ALL LEVELS

v5 - 2016

EarthCraft Multifamily

54of139

EarthCraft Multifamily New Construction Worksheet


Framed R-19
Cantilevered R-30
Podium/Elevated Slab R-19
Exterior walls and band joists R-15
Elevator walls adjacent to dwelling units R-13
Foundation walls R-10 continuous or R-13 cavity
Climate Zone 2/3 R-5 continuous or R-13 cavity
Climate Zone 4 R-10 continuous or R-13 cavity

eilings/Roof:
Vented Flat: Climate Zone 4 R-38
Continuous Roof Deck: Climate Zone 4 R-20
Sloped: Climate Zone 4 R-38
Install wind baffles at eaves in every vented bay, or equivalent air barrier at edge of ceiling
Energy heel trusses or raised top plate
Attic platforms allow for full-depth insulation below

tic kneewall:
Doors R-19
Insulation and attic-side air barrier R-19

tic pull-down/ scuttle hole R-38

hen installing loose-fill attic insulation, card and rulers must be installed

eel framed buildings require thermal break R-7.5

rade II insulation quality at all building envelope locations

ab edge insulation R-10

xterior band areas have interior air barrier meeting required insulation values

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

sulation installation quality (floors, walls and ceilings):


Grade I
Grade II with insulated sheathing R-3 (100%)

orners R-6

eaders R-3

berglass batts are unfaced/friction fit

ALL LEVELS

sulate with foam applied insulation:


Exterior walls including band area
Floor system over crawlspace or basement
Seal and insulate crawlspace walls R-10 continuous
Insulate unfinished basement walls instead of ceiling
Insulate basement walls with continuous insulation
Insulate exterior walls and band joist R-19
Insulate exterior walls and band joist R-20 or R-13 cavity plus R-5 insulated sheathing

ontinuous exterior insulation:

v5 - 2016

EarthCraft Multifamily

55of139

EarthCraft Multifamily New Construction Worksheet

Flat Vented: Climate Zone 4 R-49


Continuous Roof Deck: Climate Zone 4 R-30
Sloped: Climate Zone 4 R-49

tic kneewall insulated R-22

sulate roofline R-30

ALL LEVELS

oor U-factors and SHGC:


U-factor 0.35
SHGC 0.30

indow U-factor and SHGC:


U-factor 0.35
SHGC 0.30

kylight U-factor and SHGC:


U-factor 0.60
SHGC 0.30

FRC certified doors, windows and skylights with label

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

oor U-factor:
Opaque door: U factor 0.21
Door with 50% glass: U-factor 0.27
Door with > 50% glass: U-factor 0.32

indow U-factor and SHGC:


U-factor 0.32
SHGC 0.27

kylight U-factor and SHGC:


U-factor 0.55
SHGC 0.27

ALL LEVELS

indow U-factor and SHGC:


U-factor 0.25
SHGC 0.24

kylight U-factor and SHGC:


U-factor 0.43
SHGC 0.24

lazing facing:
West 2% of floor area
East 3% of floor area

5' overhangs over 80% of south windows

olar shade screens (min all east and west windows)

ertified passive solar design (25% load reduction)

indow area is 15% of conditioned floor area (all units)

v5 - 2016

EarthCraft Multifamily

56of139

EarthCraft Multifamily New Construction Worksheet

ALL LEVELS

stall green roof system:


20% of roof area
40% of roof area
60% or above

NCE BUILDING ENVELOPE TOTAL

ENT SYSTEMS (ES)

AND COOLING EQUIPMENT

ALL LEVELS

ze and select all HVAC equipment in accordance with ACCA Manuals J and S:
Complete load calculation utilizing ACCA Manual J 8th Edition Software or current ASHRAE based software (Trane Trace
or Carrier HAP) and submit to EarthCraft for review prior to issuing construction drawings. Loads must include detailed
inputs.
Based on worst case unit orientation per unit type
Use 2009 ASHRAE Handbook of Fundamentals Climate Design Information for outdoor design temperatures
Indoor temperatures 70 F for heating and 75 for cooling
Base infiltration on project team selected infiltration goal
Use actual area, U-factor and SHGC for windows and doors, actual area and R-values of floors, walls , and ceilings
Base mechanical ventilation on ASHRAE 62.2 or BSC-01 standard
Cooling equipment and/or single-stage heat pump between 95%-125%
Provide OEM data for each unique system type
Internal loads that reflect design and occupancy 2400 Btu/h

programmable thermostat installed for heat pump, include adaptive recovery technology

HRI performance match all indoor/outdoor coils

on-CFC and non-HCFC refrigerant

o electric resistant heat as primary heat source or reheat

eat pump efficiency 8.0 HSPF or equivalent COP

urnace efficiency 90 AFUE

ooling equipment 14 SEER or 11.5 EER

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

eating equipment efficiency:


ENERGY STAR qualified furnace(s) 90 AFUE and within 40% of load calculation
ENERGY STAR qualified heat pump(s) 8.5 HSPF and within 25% of load calculation

erification of proper refrigerant charge with subcooling deviation 3F or superheat deviation 5F

NERGY STAR qualified cooling equipment SEER 14.5

ALL LEVELS

ariable speed blower

round-source heat pump(s) EER 17

NERGY STAR qualified cooling equipment SEER 16

eat pump efficiency 9.0 HSPF

ual-stage compressors

ondenser units are spaced 2 feet apart

v5 - 2016

EarthCraft Multifamily

57of139

EarthCraft Multifamily New Construction Worksheet

arible Refrigerant/Mini-Split system utilized for primary heating and cooling

RK / AIR HANDLER

ALL LEVELS

eal air handlers and duct systems with mastic

ode approved solid connector for all flex-to-flex connections

ully duct all supply and return ducts

uct insulation:
R-6: Ducts in conditioned and interstitial spaces (between floors)
R-8: Ducts in unconditioned space

o ducts in exterior walls or vaulted ceilings and no plenum within 2' of roofline.

cate all air handlers within conditioned space

door coil protected until finished floor installed

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

stall ducts per ACCA Manual D duct design

nimize pressure imbalance within units:


Install jumper ducts, transfer grills, or dedicated return for each room
Measured pressure differential 3pa between bedroom and return

stall rigid duct work or pull all flex ducts with no pinches and support at intervals 5

easure and balance airflow for each duct run (20% of design)

erify supply and return duct static pressure

VAC system and ductwork is dry and clean

PLATINUM, OPTIONAL AT GOLD AND CERTIFIED

cate entire duct system within conditioned space

ALL LEVELS

uct design and installation:


No duct take-offs within 6" of supply plenum cap
Rigid metal supply trunk line
Space all supply duct take-offs 6 apart
Install rigid circular duct as supply plenum

uct insulation in unconditioned spaces R-10

eturn plenum duct take-off free area is 120% of supply plenum duct take-off free area

esign and construct accessible mechanical closets

KAGE TEST RESULTS

ALL LEVELS

st duct leakage based on conditioned floor area (CFA):


Leakage to outside 5%
Total leakage 8%

ALL LEVELS

st duct leakage based on conditioned floor area (CFA):


Leakage to outside 3%
Total leakage 5%

ALL LEVELS

stall exhaust fans in all bathrooms and duct to outside

as kitchen range vented to exterior 100 cfm fan

v5 - 2016

EarthCraft Multifamily

58of139

EarthCraft Multifamily New Construction Worksheet

utside air ventilation strategy complies with ASHRAE 62.2-2007 or BSC-01 and must be conditioned prior to distribution

hen installed to achieve ES 4.1, design and install fresh air intakes:
10' away from exhaust outlets , vehicle idling zones, parking garages
2' above grade
When run to soffit the duct must be extended and affixed through the soffit vent
Fresh air duct may not be run to the roof
Fresh air shutoff may not be controlled by humidistat
Install rigid duct with insulation
All intakes must be ducted to exterior of building

eal seams of all intake and exhaust ducts with mastic

uct clothes dryers to outside

o power roof vents

ack-draft dampers for kitchen and bathroom exhaust

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

installed, ceiling fans must be ENERGY STAR qualified (1/bedroom and 1 in living room)

NERGY STAR bath fans with properly sized ductwork and measured airflow 50 cfm

ectric kitchen range vented to exterior 100 cfm fan

erify outdoor air supply ventilation airflow test within +/- 20% of design values

stall and label accessible ventilation controls, with override controls for continuously operating ventilation fans

upply/exhaust fans rated at 3 sones (intermittent) and 1 sone (continuous)

PLATINUM, OPTIONAL AT GOLD AND CERTIFIED

adon resistant construction:


Passive, radon/soil gas vent system labeled on each floor
Radon test of building prior to occupancy

xhaust fan wired with light in bathroom

uct all exhaust fans with rigid duct

ALL LEVELS

utomatic (timer and/or humidistat) bathroom exhaust fan controls

nergy recovery ventilator

ent storage room to outside

ALL LEVELS

gas, direct vent

eat trap on all storage water heaters

ectric water heaters .93 EF

pe insulation on first 2'

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

gh efficiency water heater Energy Factor (EF):


Storage Gas .67 EF, Electric .95 EF
Tankless: Gas .90 EF

ALL LEVELS

pe of water heater:
Solar domestic (40% annual load based on unit demand)

v5 - 2016

EarthCraft Multifamily

59of139

EarthCraft Multifamily New Construction Worksheet


High efficiency tankless water heater ( .92 EF) with insulated buffer tank
ENERGY STAR qualified heat pump hot water heater

ot water piping insulation R-4 (100%)

G/APPLIANCES

ALL LEVELS

gh-efficacy lighting in 100% of all permenant fixtures

installed, ENERGY STAR dishwasher

installed, ENERGY STAR refrigerator

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

NERGY STAR Advanced Lighting Package

ALL LEVELS

ontrol systems:
Automatic indoor lighting controls
Automatic outdoor lighting controls

xtures and bulbs:


ENERGY STAR qualified compact fluorescent fixtures or LED bulbs (100%)
Ballasted compact fluorescents or LED bulbs at all recessed light fixtures
Compact fluorescent bulbs (90%)

AREA LIGHTING/APPLIANCES

PLATINUM AND GOLD, OPTIONAL AT CERTIFIED

allasted compact fluorescents and/or LED bulbs in all corridor/breezeway and all common spaces

installed, ENERGY STAR qualified clothes washer

installed, high efficiency clothes dryer with moisture sensor

ALL LEVELS

gh Efficiency Exterior Lighting:


Design to Reach IES guidelines: Lighting For Exterior Environments
Achieve 50% reduction based on Advanced Energy Design Guide (ASHRAE/IES)
High efficiency exterior lighting using 100% fluorescent and/or LED bulbs

gh efficiency elevators

NT SYSTEMS TOTAL

ENCY (WE)

WATER USE

ALL LEVELS

eet National Energy Policy Act low flow standards for all fixtures

etect no leaks at any water-using fixture, appliance or equipment

PLATINUM , OPTIONAL AT GOLD AND CERTIFIED

installed, water treatment system NSF certified, 85% efficient

installed, water softeners certified to NSF/ANSI Standard 44

ore 0.5 gal of water between water heater and fixture (not applicable to central systems)

w-flow fixtures (units and common facilities):


WaterSense labeled toilet (1.28 avg. gal/flush)
WaterSense labeled urinal (0.5 gal/flush)
WaterSense lavatory faucet and accessories (1.5 gpm at 60 psi)
WaterSense labeled Showerhead (2.0 gpm)

v5 - 2016

EarthCraft Multifamily

60of139

EarthCraft Multifamily New Construction Worksheet

ALL LEVELS

ilet (1.1 avg. gal/flush)

aterless urinals in common areas

reywater system for toilet flushing

ainwater harvest system for indoor water use

ot water demand 0.13 gal of water between loop and fixture and 2 gal of water in loop between water heater and furthest
xture (not applicable to central systems)

R WATER USE

ALL LEVELS

over all exposed soil with 2"-3" mulch layer

rigation system:
Must have rain sensor shutoff switch
Provide operating manual to property management
Provide irrigation system layout to property management

installed, ornamental water features must recirculate water and serve beneficial use

stall plants to maintain distance 2' from home at maturity

PLATINUM, OPTIONAL AT GOLD AND CERTIFIED

rf 40% of landscaped area


egetate slopes exceeding 4:1

installed, irrigation system is:

(Max 4 points)

Design, install, and audit irrigation system by WaterSense Irrigation Partner with no leaks
Micro-irrigation system (e.g., drip irrigation) includes pressure regulator, filter and flush end assemblies
Distribution uniformity 65% lower quarter
Install sprinklers only on turfgrass, pop-up height 4"
Establish grow-in phase and post landscape seasonal water schedules at irrigation controller

rought-tolerant/native landscaping turf and plants

riscapeTM guidebook given to property management or owner


ALL LEVELS

st and amend soil

rigation: (Max 5 points)


Greywater irrigation system
Rainwater irrigation system
Zone irrigation system for specific water needs in each planting area
Provide weather station or soil moisture sensor on irrigation system

mer on exterior water spigots

D OPERATIONS (EO)

ALL LEVELS

ovide property manager with project-specific owner's manual

ALL LEVELS

cal recycling contact

bel all storm drain or storm inlets to discourage dumping of pollutants

v5 - 2016

EarthCraft Multifamily

61of139

EarthCraft Multifamily New Construction Worksheet

ousehold hazardous waste resources

ONS AND MANAGEMENT

ALL LEVELS

ovide all subcontractors with EarthCraft Multifamily worksheet

ALL LEVELS

operty Maintenance Staff representative attends design review and/or kick off meeting

arket EarthCraft Multifamily program

ovide pre-occupancy briefing for tenant

oject participates in post occupancy project debriefing

nvironmental management and building maintenance guidelines for staff

ndscape maintenance guide for maintenance and management personnel

ARTY PROGRAMS

ALL LEVELS

NERGY STAR Version 3

door airPLUS

ualify for WaterSense

arthCraft Community Certification

arthCraft Light Commercial for Community Center

arthCraft Light Commercial Ready Spaces

uilding America Builders Challenge


OPERATIONS TOTAL

ALL LEVELS

n-site fuel cell or co-generation system

olar, micro-hydro or wind electric system

olar-ready design

olar electric system (10% of project requirements)

00% of stormwater kept on site and used for development operations

ommon areas use solar electric system (80% of demand)

ousing Affordability:
20% total units
50% total units

eveloper contracts for at least 12 months post construction energy monitoring

oject specific innovation points: builder submits specifications for innovative products or design features to EarthCraft prior
construction completion

v5 - 2016

EarthCraft Multifamily

62of139

EarthCraft Multifamily New Construction Worksheet


Points

Planned

Select all that apply:


3

Status

Documentation

Site Plan

1
Select one:
1
2
Select one:
1

Site Plan

2
3

Select One:

Site Plan, Location

2
1
Select One:
3
1
Select One:
2
1
Select One:
2
1
Select One:
2
1
2

Calculation

4
Select one:
2

Calculation

3
4
4
2
1
Select all that apply:
1
1
1

v5 - 2016

EarthCraft Multifamily

63of139

EarthCraft Multifamily New Construction Worksheet


2
1
1
1

Local ordinance

Certificate

Greenspace/Tree survey

E&S plan

Plant list

Phase I

Contact Person

Test data

Photographs

Photographs

Site plan

Site plan

Contract

Photographs

Site plan

1
1
1
2
0

Select all that apply:

Waste mgmt. plan, pick up tickets

2
1
1
2
1
2
0

v5 - 2016

EarthCraft Multifamily

64of139

EarthCraft Multifamily New Construction Worksheet

Select all that apply:

3
2
1
Select one:
2
1
1
1

2
Select all that apply:

2
3
1
Select all that apply:

2
2
2
2
2

Product literature
Select all that apply:

Product literature

Select all that apply:

Product literature

1
1
2
2
1-5

Product literature
Select all that apply:

Product literature

2
2
2

Product literature

Product literature
Select all that apply:

v5 - 2016

Product literature

EarthCraft Multifamily

65of139

EarthCraft Multifamily New Construction Worksheet


2
2
1
2
Select all that apply:

Product literature

1
1
2

Product literature

8
0

All must comply:

All must comply:

2
2
2
Select all that apply:

1
2
1
2
3
2

Warranty

Warranty

v5 - 2016

EarthCraft Multifamily

66of139

EarthCraft Multifamily New Construction Worksheet


1
1
Warranty

Select one:

1
2

Photographs

Photographs

Select one:

Photographs

1
2

Product literature
Select all that apply:

2
1
0

v5 - 2016

Product literature

EarthCraft Multifamily

67of139

EarthCraft Multifamily New Construction Worksheet

Product literature
Product literature

Select all that apply:


1
2
2
1
1
2
1
Select all that apply

Product literature

1
1
2
1
3
1
1
0

All must comply:

All must comply:

v5 - 2016

EarthCraft Multifamily

68of139

EarthCraft Multifamily New Construction Worksheet


All must comply:
-

All must comply:

All must comply:

All must comply:

2
4
1
1
2
2

7
10

All must comply:

v5 - 2016

EarthCraft Multifamily

69of139

EarthCraft Multifamily New Construction Worksheet


-

All must comply:

All must comply:

All must comply:

All must comply:

Select one:

3
2
1
1
1
Select all that apply:
4
2
Select all that apply:
2
1
2
2
3
Select one:

v5 - 2016

EarthCraft Multifamily

70of139

EarthCraft Multifamily New Construction Worksheet


5
7
Select one:
2
2
2
2
4

All must comply:


-

All must comply:

All must comply:

Select all that apply:

2
1
1
Select all that apply:
1
2
Select all that apply:
1
2
Select all that apply:
2
3
Select all that apply:
2
3
Select all that apply:
1
1
1
2
4
2

v5 - 2016

EarthCraft Multifamily

71of139

EarthCraft Multifamily New Construction Worksheet

Select one:
2
3
4
0

All must comply:


Load Calculations

Product literature

AHRI Certificate

Select one:

AHRI match

2
1

Test results

2
2
3
3
2
3
2

v5 - 2016

EarthCraft Multifamily

72of139

EarthCraft Multifamily New Construction Worksheet


6

All must comply:

Manual D
Select all that apply:

2
3

Test results

2
3
2
1
5
Select all that apply:

1
2
1
2
1
2
2

All must comply:

Test results

Select all that apply:


8

Test results

v5 - 2016

Test results

EarthCraft Multifamily

73of139

EarthCraft Multifamily New Construction Worksheet

All must comply:

Product literature

Test results

Test results

Test results

1
1
Select all that apply:
1
1
1
1
2
3
1

Select one:

AHRI Certificate

AHRI Certificate

2
3
Select one:

v5 - 2016

Product literature

EarthCraft Multifamily

74of139

EarthCraft Multifamily New Construction Worksheet


4

AHRI Certificate

4
2

Product Literature

Product Literature

3
Select all that apply:

2
2
Select one:

2
1
1

2
2

Product literature

Product literature
Select all that apply:

2
1
2
2
0

2
2
2

Test results
Select all that apply:

2
1

Product literature

1
2

v5 - 2016

EarthCraft Multifamily

75of139

EarthCraft Multifamily New Construction Worksheet

2
2
4
4
2

Test results

All must comply:

Landscape plan

Landscape plan
Select all that apply:

2
2
2
1
2
1

Plant list

Resource

Test results
Select all that apply:

3
3
2
2
1
0

Copy

Contact

Picture

v5 - 2016

EarthCraft Multifamily

76of139

EarthCraft Multifamily New Construction Worksheet


1

1
1

Signage

2
2
2

Copy

2
2
1
3
2
1
1
0

System design

System design

System design

System design

System design

System design
Select one:

1
2
6

Unit Level Utility Data

TBD

v5 - 2016

EarthCraft Multifamily

77of139

2015 Multifamily Construction


Specifications Sheet

Multifamily Construction Specifications Sh


Certification Level:

Certified

*CHOOSE LEVEL ON COVER SHEET**


0
0
0
0
0

****RED VALUES ARE PROGRAM MIN

INSULATION

Program Minimums

Location
If Exposed or Accessible with Project
Scope

Grade 2 Installation

Exterior Walls

R-15 Grade 2

Floor over Bsmt/Crawl/Garage

R-19 Grade 2

Interior Partition/Party Walls

R-13 Grade 2

Cantilevered Floors

R-19 Grade 2

Adiabatic Ceilings/Floors
Flat Ceilings/Roof Deck
Vaulted or Sloped Ceilings

No Minimum
Vented Flat: R-38
Continuous Roof Deck: R-20

Sloped: Climate Zone 4 R-38

Attic Kneewalls

Insulation and attic-side air barrier R19

Rim/Band Joists

R-15 Grade 2
*Exterior band areas have interior air barrier*

v5 - 2016

EarthCraft Multifamily

78

2015 Multifamily Construction


Specifications Sheet
Poured Bsmt or Crawl Walls Specify whether
int. or ext.

Framed Bsmt Walls


Slab Edge & Under Slab

GLAZING

R-10 continuous
R-10 continuous or R-13 cavity
R-10 Slab Edge

Program Minimum

Main windows

.35 U-Value/.30 SHGC

Door w/ 50% Glass

.35 U-Value/.30 SHGC

Door w/ 50% Glass

.35 U-Value/.30 SHGC

Skylights

.60 U-Value/.30 SHGC

Ornamental Glass Locations

SOLID DOORS

Program Minimum
U-Value

Check type, specify R-Value when available

Front Door

.35 U-Value

Back Door

.35 U-Value

Other

.35 U-Value

v5 - 2016

EarthCraft Multifamily

79

2015 Multifamily Construction


Specifications Sheet
HVAC SYSTEMS

Program Minimum
AFUE/HSPF/SEER

-Air handler location,


Include make & model number

90% AFUE/8.2 HSPF/14 SEER


90% AFUE/8.2 HSPF/14 SEER
90% AFUE/8.2 HSPF/14 SEER

DUCT SYSTEMS
Floor

Location of duct system:


Program Minimums
Conditioned / Unconditioned space

Conditioned/Interstitial Space

Bottom Floor

Conditioned/Interstitial Space

Middle Floor(s)

Unconditioned Space

Top Floor

If no Duct System, is project specifying Mini/Multi-Split system (Highlight one)

Geothermal heat pumps, solar water heating, and PV require separate spec sheet Request from EarthCraft Virginia.

MECHANICAL VENTILATION
Specify Type: (highlight one)
Duct Diameter (in.):

Supply Only

Rate (CFM):

When using ERV/HRV or DOAS, enter specs below:

Sensible Recovery Efficiencies (%):

WATER HEATING
v5 - 2016

Make and model #


EarthCraft Multifamily

80

2015 Multifamily Construction


Specifications Sheet
Make and model #

- Unit Types

ENERGY STAR Appliances

Make & Model number

- List type

Refrigerator
ADA Refrigerator
Dishwasher
ADA Dishwasher
Clothes Washer
(High Efficiency)
Clothes Dyer

Advanced Lighting

% Pin-Based Fluorescent Lighting Used

Interior
Exterior
Parking
Building Orientation*
v5 - 2016

Orientation of front face


EarthCraft Multifamily

81

2015 Multifamily Construction


Specifications Sheet
- Building name or number

Orientation of front face

* If complete site plan is provided, including clearly labeled orientation, completing this table is not necessary.

v5 - 2016

EarthCraft Multifamily

82

2015 Multifamily Construction


Specifications Sheet

Certified
Gold
Platinum

v5 - 2016

EarthCraft Multifamily

83

2015 Multifamily Construction


Specifications Sheet

cations Sheet
0
0
0
ECVA Project Manager:
0

E PROGRAM MINIMUMS****
R-value or Inches of Foam
Cavity

v5 - 2016

Continuous

EarthCraft Multifamily

84

2015 Multifamily Construction


Specifications Sheet

U-Factor

SHGC

Wood, Solid core

Wood Panel

Give Thickness

Give Thickness

v5 - 2016

EarthCraft Multifamily

85

2015 Multifamily Construction


Specifications Sheet
Unit Type 1BR, 2BR, Etc.

AFUE or HSPF

Number of Returns

Programmable Thermostat?

Yes

from EarthCraft Virginia.

AL VENTILATION
Exhaust Only

Hours/Day:

Balanced

Fan Power (watts):

Total Recovery Efficiencies (%):

Efficiency
Factor
v5 - 2016

Program Minimum
Efficiency Factor
EarthCraft Multifamily

86

2015 Multifamily Construction


Specifications Sheet
Efficiency
Factor

Program Minimum
Efficiency Factor
.93 EF Electric
.93 EF Electric
.93 EF Electric

EF, kWh/yr

Program Requirement

- or other specification
ENERGYSTAR Rated
ENERGYSTAR Rated
ENERGYSTAR Rated
ENERGYSTAR Rated
0

% Compact Fluorescent Lighting

v5 - 2016

% LED Lighting

EarthCraft Multifamily

87

2015 Multifamily Construction


Specifications Sheet

v5 - 2016

EarthCraft Multifamily

88

2015 Multifamily Construction


Specifications Sheet

v5 - 2016

EarthCraft Multifamily

89

2015 Multifamily Construction


Specifications Sheet

Insulation Type
Fiberglass, Cellulose, Open-cell
foam, Closed-cell foam

v5 - 2016

EarthCraft Multifamily

90

2015 Multifamily Construction


Specifications Sheet

Metal Polystyrene Core

Metal Polyurethane
Core

Other

Give Thickness

Give Thickness

Give R-Value or UValue

v5 - 2016

EarthCraft Multifamily

91

2015 Multifamily Construction


Specifications Sheet
Capacity
SEER

Output in btu/h or tons


Heating

Insulation R-Value

Cooling

Minimum
R-Value

R-6
R-6
R-8
No

Fuel Type
*If Gas, must be Direct Vent*

v5 - 2016

Capacity Or Tankless
EarthCraft Multifamily

Extra Insulation?

92

2015 Multifamily Construction


Specifications Sheet
Fuel Type

*If Gas, must be Direct Vent*

v5 - 2016

Capacity Or Tankless

EarthCraft Multifamily

Extra Insulation?

93

2015 Multifamily Construction


Specifications Sheet

v5 - 2016

EarthCraft Multifamily

94

2015 Multifamily Construction


Specifications Sheet

v5 - 2016

EarthCraft Multifamily

95

Unit Level Takoffs


0
0
Total # of Units

unit type
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z

v5 - 2016

# of bedrooms

floor area served

EarthCraft Multifamiliy

30% Sampling =

ceiling height

band height

96

Unit Level Takoffs

perimeter

v5 - 2016

volume(cubic ft)
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

sfbe
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

EarthCraft Multifamiliy

97

Unit Level Takoffs

v5 - 2016

EarthCraft Multifamiliy

98

Unit Level Takoffs

1
2
3
4
5

v5 - 2016

EarthCraft Multifamiliy

99

EarthCraft Final Inspection Diagnostics


0
0
0
0
0
0
Certification Level:

Date
0
0
0
ECVA Project Manager:
0
Certified

Diagnostic Testing
General Information
Unit Number
Name of Technician
Date of visit
Indoor Temperature
Outdoor Temperature
Temperature Difference

# of bedrooms

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Floor Area Served

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Ceiling Height

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Band Height

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Perimeter

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Volume

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

SFBE

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

Unit Data
Type

Building Level
Sample set #
Sample subset
Blower Door Test- Single Point Test Data

Blower Door Testing Goal:

ACH50

Pre Test Baseline Reading


Independent Average Baseline
Readings (5 required)
Baseline Reading
Accuracy
Ring

v5 - 2016

EarthCraft Multifamily

100 of 139

EarthCraft Final Inspection Diagnostics


0
0
0
0
0
0
Certification Level:

Date
0
0
0
ECVA Project Manager:
0
Certified

Fan Pressure
Fan Flow (Nominal)
Fan Flow (Corrected)
ELR (CFM50/SFBE)

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

ACH50 (CFM50x60/Volume)

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

8%

CFA or Less

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

PASS/FAIL
BONUS
Total Duct Leakage
Total Duct Leakage Goal:
Ring
Fan Flow
Duct Pressure
Leakage %
PASS/FAIL
BONUS
Leakage to Outside
Leakage To Outside Goal:

5%

CFA or less

Ring
Building Pressure
Fan Flow
Duct Pressure
Leakage %

#N/A

#N/A

PASS/FAIL

v5 - 2016

EarthCraft Multifamily

101 of 139

EarthCraft Final Inspection Diagnostics


0
0
0
0
0
0
Certification Level:

Date
0
0
0
ECVA Project Manager:
0
Certified

BONUS
Pressure Differential Test Data
BR1/main return location
BR2/ main return location
BR3/ main return location
ThrWall; JmpDct; Highlow; other:
identify
Fresh Air Ventilation System
Positive/Negative/Balanced
Flow Rate (CFM)
Run Time
Shutoff control device

v5 - 2016

EarthCraft Multifamily

102 of 139

EarthCraft Final Inspection Diagnostics


0
0
0
0
0
0
Certification Level:
Inspection Notes (ALT + ENTER)

v5 - 2016

Date
0
0
0
ECVA Project Manager:
0
Certified

EarthCraft Multifamily

103 of 139

EarthCraft Final Inspection Diagnostics

Project Manager:

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

v5 - 2016

EarthCraft Multifamily

104 of 139

EarthCraft Final Inspection Diagnostics

Project Manager:

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

#N/A

v5 - 2016

EarthCraft Multifamily

105 of 139

EarthCraft Final Inspection Diagnostics

Project Manager:

v5 - 2016

EarthCraft Multifamily

106 of 139

EarthCraft Final Inspection Diagnostics

Project Manager:

v5 - 2016

EarthCraft Multifamily

107 of 139

EarthCraft Final Inspection Diagnostics

#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A

v5 - 2016

EarthCraft Multifamily

108 of 139

EarthCraft Final Inspection Diagnostics

#N/A
#N/A

#N/A

#N/A

v5 - 2016

EarthCraft Multifamily

109 of 139

EarthCraft Final Inspection Diagnostics

v5 - 2016

EarthCraft Multifamily

110 of 139

EarthCraft Final Inspection Diagnostics

v5 - 2016

EarthCraft Multifamily

111 of 139

Building Component
0
0
0
0
0
0
Unit Information
Unit #

Type

#DIV/0!

#DIV/0!

HVAC Make/Model #
Air Handler Make/Model #
Outdoor Make/Model #
Domestic WH Make/ Model #
DHW Make/Model #
Appliances (Make/Model #)
Dishwasher
Refrigerator
Bath Fans
Lighting Unit Type
# Pin-Based Fixtures
# CFLs
# Total Fixtures
% Total CFL/PIN
Window Specifications
U-Value
SHGC
Glass Door Specifications
U-Value
SHGC
Water Appliances- flow rates
Lavatory
Showerhead
Toilet
Insulation Grade/Values
Exterior Walls
Rim & Band
Party/Common Walls
Ceilings/Roof Decks

v5 - 2016

EarthCraft Multifamily

112 of 139

Building Component
Floors
Knee walls
Cantilevered Floors
Slab edge/under slab
Ductwork (cond. Or uncond.)
Water pipe on exterior walls
Entry Door U-Value
Other

v5 - 2016

EarthCraft Multifamily

113 of 139

Building Component
Date
0
0
0
ECVA Project Manager:
0

v5 - 2016

#DIV/0!

#DIV/0!

#DIV/0!

EarthCraft Multifamily

114 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

115 of 139

Building Component

#DIV/0!

#DIV/0!

#DIV/0!

Toilet

v5 - 2016

EarthCraft Multifamily

116 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

117 of 139

Building Component

v5 - 2016

#DIV/0!

#DIV/0!

#DIV/0!

EarthCraft Multifamily

118 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

119 of 139

Building Component

#DIV/0!

#DIV/0!

#DIV/0!

Toilet

v5 - 2016

EarthCraft Multifamily

120 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

121 of 139

Building Component

v5 - 2016

#DIV/0!

#DIV/0!

#DIV/0!

EarthCraft Multifamily

122 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

123 of 139

Building Component

v5 - 2016

#DIV/0!

#DIV/0!

#DIV/0!

EarthCraft Multifamily

124 of 139

Building Component

v5 - 2016

EarthCraft Multifamily

125 of 139

Photo Verification
Pictures of Minimum Rated Features
Development Signage

Right Elevation

Rear Elevation

v5 - 2016

EarthCraft Multifamily

126of139

Photo Verification
Outdoor Unit Model #

Domestic Hot Water Heater Model #

Refrigerator Model #

Range Hood

v5 - 2016

EarthCraft Multifamily

127of139

Photo Verification
Exterior Lighting

Glass Door Values (Sticker)

Showerhead (GPM)

Exterior Wall Insulation

Party/Common Wall Insulation

v5 - 2016

EarthCraft Multifamily

128of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

129of139

Photo Verification
Slab Edge Insulation

Pipe Insulation

Knee Wall Insulation

v5 - 2016

EarthCraft Multifamily

130of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

131of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

132of139

Photo Verification

Minimum Rated Features


Front Elevation

Left Elevation

Air Handler Model #

v5 - 2016

EarthCraft Multifamily

133of139

Photo Verification
Fresh Air Ventilation

Dishwasher Model #

Bath Fan (Make/Model #)

Interior Lighting

v5 - 2016

EarthCraft Multifamily

134of139

Photo Verification
Window Values (Sticker)

Lavatory Faucet (GPM)

Toilet (GPF)

Rim & Band Insulation

Ceiling/Roof Deck Insulation

v5 - 2016

EarthCraft Multifamily

135of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

136of139

Photo Verification
Duct Insulation

Floor Insulation

Entry Door U-Value/Material/Thickness

v5 - 2016

EarthCraft Multifamily

137of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

138of139

Photo Verification

v5 - 2016

EarthCraft Multifamily

139of139