CALCULATION OF
SEWER MANHOLE AND CATCH BASIN
(LIGTH DUTY)
MARK
DESCRIPTION
BY
CHKD
REVISION
CLIENT
APVD
PROJECT
JOB NO.
DOC NO.
CHKD
MADE
DATE
CONTENTS
1
GENERAL
1.1.
APPLICABLE SPECIFICATION
______________________
1.2.
APPLICABLE CODES
______________________
DESIGN CONDITIONS
2.1.
______________________
2.2.
______________________
2.3.
______________________
2.4.
______________________
2.5.
______________________
OUTLINE OF STRUCTURE
______________________
______________________
______________________
______________________
GENERAL
1. 1.
APPLICABLE SPECIFICATION
1.2.
APPLICABLE CODES
ACI 318M - 11
ACI 350 - 06
DESIGN CONDITIONS
2. 1.
24
* Soil (Dry)
1 =
18
* Water
2 =
10
* Soil (Submerged)
3 =
f'c =
45
f'y =
420
2. 3.
ko =
0.5
2. 4.
1.1
20
2. 2.
Bouyancy
2. 5.
OUTLINE OF STRUCTURE
Manhole and Catch Basin Light Duty
Outline of structure :
t1 =
t2 =
t3 =
200 mm
200 mm
200 mm
0.200 m
0.200 m
0.200 m
=
=
=
=
1600 mm
2700 mm
2000 mm
3100 mm
1.600 m
2.700 m
2.000 m
3.100 m
Grating:
Opening =
Grat.side =
h1 = H1 + t3 =
2900 mm
2.900 m
Grt.wght =
Bouyancy :
Catchbasin weight
Concrete Wt = (2*2*3.1-1.6*1.6*2.7-0.6*0.6*0.2)*24 =
Wt1
Wt2
=
=
139.31
124
1.123
> Bf 1.1
Loading diagram:
t3 =
h1 =
1 =
ko =
200 mm
2900 mm
18 kN/m3
0.5
0.200 m
2.900 m
(Unit weight of Soil)
(Coefficient of Lateral Soil Pressure)
Calculate for Lateral Pressure actin on wall due to Soil and Liquid pressures :
Soil Pressure
Ps = 1 * ko * H = 18 * 0.5 * H
then,
H = t3 =
0.200 m
Ps1 =
1.80 kN/m2
H = h1 =
Ps2 =
2.900
26.10
Calculate for Lateral Pressure actin on wall due to Soil and Liquid pressures :
q 1 = 1.6 * Ps1
=
2.88 kN/m2
q 2 = q3 - q1
=
38.88 kN/m2
q 3 = 1.6 * Ps2
=
41.76 kN/m2
Wall -
Wall is analyze and design as two-way slab with 3 edges fixed and 1 edge free.
Data:
A1 =
H1 =
Ly
Lx
Data:
A1 =
H1 =
q1 =
q2 =
1600 mm
2700 mm
1.600 m
2.700 m
2.88 kN/m2
38.88 kN/m2
ns based on
APVD
DATE
___________________
PAGE
3
___________________
___________________
___________________
___________________
___________________
___________________
___________________
___________________
___________________
12
___________________
21
tructural Concrete
ental Engineering
to be input
kN/m3
kN/m3
kN/m3
kN/m3
N/mm2
N/mm2
kN
0.35 m
0.600 m
0.05 m
0.74 kN/m2
129.98 kN
0.36 kN
8.96 kN
139.31 kN
124 kN
OK
E CATCH BASIN
m
kN/m2
1600 mm
2700 mm
=
=
2700
1600
1.69