Sie sind auf Seite 1von 4

CONSTRUCTION BID FORM

OWNER INFORMATION

CONTRACTOR INFORMATION

Name

Michael Tucker

Company

Fabrikam, Inc.

Address

123 Main St

Name

John Kane

City, State ZIP

Greenville, CO 12345

Address

321 South St

Phone

(888) 555-0111

City, State ZIP

Greenville, CO 12345

Email

michael@proseware.com

Phone

(888) 555-0123

Email

john@fabrikam.com

Completion date

7/14/2013

Project name

Stairway to business

SCOPE OF WORK
Project scope of work goes here. Type in all of the specifications you would like. This is going to be a mock project of building a
large set of stairs. We will use only 2x4 and 2x8 lumber, as well as joist brackets, to construct the frame. Stairs will be cut from
the 2x4 material. No less than 2" screws will be used. Any nails will be no less than 10 penny. Design weight shall hold a
minimum of 500 pounds per step. Steps will be level with that of the house. A running board will be fastened to the house.
Contractor will take care of clean up.

NOT INCLUDED
No rails will be installed. Ground to be prepped by owner. Stairs to be painted by owner.

COMPANY PROPOSAL
We, Fabrikam, Inc., propose the above scope of work, to be completed by 7/14/2011 for the amount of $476.43.

Submitted by (Company Representative)

OWNER ACCEPTANCE

Date

I, Michael Tucker, do accept the above scope of work, proposed to be completed by 7/14/2011 for the amount of $476.43.

Submitted by (home owner or authorized representative)

Date

BID COST SUMMARY


LIST OF MATERIALS AND COSTS
Qty.

Description

Cost

Total

2x8x10 lumber

$6.75

Err:509

20

2x4x10 lumber

$4.97

Err:509

30

Joist brackets

$2.49

Err:509

Box of screws, 2 in

$6.67

Err:509

Box of nails, 10 penny

$3.25

Err:509

Pair of gloves, leather

$7.75

Err:509

Laborer charges

$100.00

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509

Page 3 of 4

Subtotal

Err:508

Tax rate

7.50%

Tax

Err:509

Grand total

Err:509

BREAKDOWN OF MATERIALS AND COSTS


TOTAL

NOTES

Err:508
Err:508
Err:508

Err:508
Err:508

Err:508

Err:508

Err:508

Err:508
Err:508
Err:508

Err:508
Err:508

Err:508

Page 4 of 4

Err:508

Das könnte Ihnen auch gefallen