Scope of works

I.carpentry work(masters bedroom)


A.ceiling design adjustment
B.ledge design for aircon enclosure
C.pocket wall board w/ tv.stand
D.2units door fabricate and install's
E.additional ledge shelves
F.bedroom headboard
G.blind door storage
H.bench w/ upholstery preparation
I.wall stair accent design
J.redesign walk in closet
K.stainless grab rail installation
L.sollflex/granite installation
M.sliding door installation w/pocket cover
____________________
Labor cost=47,200
II.carpentry works(attic extension)
A.cabinet redesign preparation for sliding glass.
B.kitchen cabinet remodel
C.glass block installation
D.additional ledges
E.granite installation
F.cabinet accesories
G.fabricate and install door for kitchen
_________________
Labor cost 19,000
III.MAID QUARTERS
A. Ceiling installation
B.opening for window
C.door installation
D. Fabricate double deck bed
_________________
Labor cost 6,500
Bill of materials
8sht. Plyboard
16sht 3/4 marine plywood
6sht. 1/2 marine plywood
3gal. Stikwel glue
5kg. 2"finishing nails
2kg. 1-1/2 conrete nails
2kg. 1-1/2finishing nails
12pc. 1x3x10ft s4s nz wood
5pc. 2x3x8ft. S4s nz wood
5pc. 2x4x10ft. s4s nz wood
16pc 1x4x8ft. s4s nz wood