WORK INSTRUCTION- Steel

Melting Shop Division

Godawari Power and Ispat Ltd.

Doc. No.:WI-SMS-Crane-00
Revision No:00
Effective Date:03-11-14

TITLE: SOP for Mechanical Maintenance of cranes

Objective: To standardize mechanical maintenance of Crane


Scope 1:
Roles and Responsibilities (Scope 1):
Responsi
ble
Account
able
Consulte
d
Informed

Engineer (Mechanical)
Astt. Manager (Mechanical)
HOD (Sr. Manager/AGM Maintenance)
HOD (Sr. Manager/AGM Maintenance)

Location: Crane Area


Procedure:-

GEAR BOX
1.
2.
3.
4.

Oil level to be maintained at min. level as marked in the gauge


Check pinion and gear teeth for any wear and tear
Check bearing and bearing cover plate.
Check Foundation bolt for tightness

COUPLING
1. Check for sufficient lubrication in between hub and flange.
2. Check coupling bolt for any wear and tear.

WHEEL
1. Check Collar condition of L.T and C.T wheel.
2. Check wheels Bearing condition.
3. Check Block and bearing plate bolt.

WIRE ROPE AND DRUM


1.
2.
3.
4.

Check Condition of wire rope thread.


Check and ensure sufficient lubrication on Wire rope.
Ensure Greasing of bearing block side.
check wire rope clamp for tightness

Brake
Approved By:
G S Bansal Sr VP

Issued By:
G S Bansal Sr VP

WORK INSTRUCTION- Steel


Melting Shop Division

Godawari Power and Ispat Ltd.

Doc. No.:WI-SMS-Crane-00
Revision No:00
Effective Date:03-11-14

TITLE: SOP for Mechanical Maintenance of cranes

1. Check Condition of brake shoe and liner.


2. Check brake assembly condition.

SNATCH BOX
1. Check Condition of pulley.
2. Check Bearing condition and lubrication.

Approved By:
G S Bansal Sr VP

Issued By:
G S Bansal Sr VP