dipper size
1 cubic yard
manhour
oiler
1.5
Site Requirement
B1
total area 10,600sq meter
depth
19ft
driver
1.5
Total
4.5
Site Requirement
total area
depth # 1
depth # 2
as per
BOQ
64660m3 27000
84575.3y335370
1269hrs 530.55
10hrs
10hrs
127days 53days
2
2
63.5days 27days
6.1m
6m
45000
58858
882.9hrs
10hrs
88.3days
2
44days
Block Works
100y3
1.5hrs
1y3
0.015hrs
84575.3y31268.6hrs
1m3
1.31y3
ite Requirement
B2
7500sq meter
19.7
46 tank
D1
D2
Area
H.House
8m
AS per BOQ
38525.76
35000 1966m3
50468
45850 2575y3
752hrs
687.8
38.6
10hrs
10
10
75.2days
68.8 3.9days
2
2
1
38days 35days
4days
63.7
75.6
4815.72
Roof Plan
Length
131600
Width
49200
height
Sub station at roof
Length
17.5
Width
9
height
other constructions
Machine Room 1
Length
8400
Width
5000
height
Machine Room 2
Length
8400
Width
5000
height
Basement plan
RYK KHAADI
Demolition Works
Activity
Concrete slab
Brick Masonry
Units
labor
helper
total
total QTY.
T.Mhrs
1cu yd.
cu ft.
cu yd.
2.5
0.5
130Cft
15
1.35
3
27cft
1.35
cu ft.
0.74
0.74
130Cft
96.2
Construction Work
Tiling Works
Paint works
(internal)
100Sq. Ft
1.1
2.5
3.6
3765
0.55
0.4
1.46
2.41
Primer
Coat
2nd Coat
3rd Coat
11700
136
282
Unit conversions
1
T. Md
# of workers
W.Duration
10.7
15
2 teams
31
10
cu. Y
27
cu. Ft
General requirments
1 Demolition
2 Dewatering
3 Site Grading
4 Piling
5 Excavation
6 Soling
7 Screeding
8 Raft making
9 Retaining wall making
10 Columns for basement
11 beams & lintels
12 Block works
13 surface finishing
14 painting
15 Doors & Windows
16 Floor finishes
17
Excavation estimation
per 100 cubic yard
dipper size
1 cubic yard
.75cubic yard
.5cubic yard
manhour
supervisor
oiler
1.4
1.4
1.5
1.5
2
2
driver
1.4
1.5
2
Total
3.3
4.5
6
xcavation estimation
applicable for 6ft depth
1yard=
1yard=
0.91m
3ft (int.)
1cubic yard=
1cubic yard=
.765m3
27ft3
1m3=
35.32ft3
manhours
Block works / 1000bricks
4" walls
ground upto 5' elev.
ground upto 10' elev.
Mason
Labor
Mortar
(cubic feet)
13.71
13.88
11.21
11.37
18
18
hours
brick size
6"* 12* 8"