Sie sind auf Seite 1von 9

CNS CONSULTANT

197A EAST COAST ROAD


SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +102.603 to EL + 98.153)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
8
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

31.20

kN-m

wl/2

15.60

kN

113.5

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +98.153 to EL + 94.153)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
7.25
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

25.62

kN-m

wl/2

14.14

kN

93.2

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +94.153 to EL + 90.413)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
6.5
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

20.60

kN-m

wl/2

12.68

kN

74.9

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +90.413 to EL + 88.873)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
3.5
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

5.97

kN-m

wl/2

6.83

kN

21.7

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +87.333 to EL + 84.253)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
5.25
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

13.44

kN-m

wl/2

10.24

kN

48.9

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +83.603 to EL + 80.403)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
6.25
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

19.04

kN-m

wl/2

12.19

kN

69.2

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +80.403 to EL + 77.603)


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
5.75
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

16.12

kN-m

wl/2

11.21

kN

58.6

cm3

160.88

kN

3.9

kN/m

275

N/mm2
M/py

Use
Zx

115

cm3

Av

975
0.6 pyAv

mm2

Check for shear Resistance Pv

Date

Page

C 150x75x6.5

OK

CNS CONSULTANT
197A EAST COAST ROAD
SINGAPORE 428901
TEL: 67422032 FAX: 62341839

Design of Temporary Access


Staircase for Shaft A
Calc by

Date

AUNG

7/6/2016

Chck'd by

App'd by

Date

ES LIM

Simple Span Beam Design

(From EL +77.603 to EL +74.94 )


DL

1.00

kN/m2

LL
Span Length
Width (Beam Spacing)

=
=
=

4.00
5
0.5

kN/m2
m
m

Factored Load

Unit load on beam

Span Positive Moment

Reaction

Steel Strength py

Required Zx

=
Use
Zx

Date

Page

1.4DL+1.6 LL

7.8

kN/m2

wl2/8

12.19

kN-m

wl/2

9.75

kN

44.3

cm3

3.9

kN/m

275

N/mm2
M/py

C 150x75x6.5
=

115

cm3

Av
Check for shear Resistance Pv

=
=

975
0.6 pyAv

mm2
=

160.88

kN

OK

Das könnte Ihnen auch gefallen