Sie sind auf Seite 1von 8

DB POWER LIMITED, RAIGARH

2 X 600 MW Power Plant


SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

WORK INSTRUCTIONS
FOR
CHARGING OF GENERATOR
[DB / SOP / GEN]

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

Page 1 of 8

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

Page 2 of 8

Amendment Record
Amendment
Rev
No.

Amendment
Date

Nature of Change

Page
No.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

ACK No.

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

Page 3 of 8

1.0 Purpose:
This Procedure is intended to provide guidance and instructions for carrying out the
procedure for charging and synchronizing of generator.
2.0 Responsibility:
a) All the personnel involved in carrying out /supervising the above activities are
required to ensure implementation of this procedure.
b) In the event of any changes required in the procedure such changes may be
requested with Site Incharge, who would take appropriate action with approval
from respective departmental heads.
3.0 SAFETY AND ENVIRONMENTAL MEASURES/ CHECKS:
1. Work area should be clean & no oil, grease splitting should be there.
2. Safety signs should be marked wherever required.
3. Readiness of fire fighting equipments.
4. Ensure no oil leak at bearings area.
5. All GRP relays are reset. ( 186AI/286A1/186A2/286A2/186B/286B/186C/286C)
6. ALL H 2 Coolers are charged and H2 purity is > 98%.
7. GCB DC power supply is normalized
8. GCB earth switch is open
9. Generator Bus duct Pressurization system is in service & flow < 45 cu mtr
10. Flow of Water through stator winding > 80 M3/hr
11. Stator water Conductivity in main ckt = 2.0, Regen Ckt < 1.2 ms/cm start > 2.5
stop.
12. Stator cooling H2 gas rated pressure is 5 kg/cm2. (For better DP control, after
synchronization pressure should be made 3.5 ksc).
4.0 CHARGING OF GENERATOR:
ACTION

OBSERVATION

REMARKS

1.CHECK all the


generator Parameters
are healthy

-Stator cooling water flow


more than ------- T/Hr.

-UCB indication

- Stator cooling water temp


Less than ------------- C.

-UCB indication

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

File no:

-Cold end hydrogen temp less


than -------------------C.

-UCB indication

-Seal oil pressure at exciter end


-------------- KSC.

-UCB indication

-Seals oil D.P. between


----------KSC.

-UCB indication

-Generator stator water


Specific conductivity is less than
--------------- mho/cm.

-UCB indication.
Alarm: ----mho/cm
Trip: -------mho/cm

-Gen. hydrogen and stator water


coolers are charged and
''Clarified water pressure to
hydrogen &Stator water coolers
low'' alarm is not on.

-Local operation.
Remote function

-Turbine RPM is more than


--------- rpm. Generator isolators
are closed from switchyard.

-UCB & switchyard


operator's
responsibility/ UCB
indication

-Generator excitation control


Is on REMOTE.

-Field breaker does not


close from UCB if
control is on local

-Generator excitation control


is on MANUAL OR AUTO

3. CLOSE the generator


Field breaker.

Page 4 of 8

-UCB indication

-Seal oil pressure at turbine end


---------------- KSC.

2. CHECK before closing


the field breaker before
Synchronisation.

DB / SOP / GEN

-UCB indication.

-AUTO/MANUAL excitation
Controllers are on HOME
Position.

-Associated white lamp


is ON. If not, lower it
down to home position

-Generator field breaker gets


closed & Generator voltage

-Associated red lamp


comes on.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

Page 5 of 8

Increases to 21 KV approx. on
manual /auto excitation control,
Respectively.

4. RAISE generator
excitation manually, to
raise gen. voltage

-Field current and voltage


also increases ----- A & ------ V
respectively

-UCB indication

-Generator voltage comes to


21 KV approx.

-UCB indication.

-Field current and voltage


increase to -------A & ---------V
Respectively.

-UCB indication.

-Generator gas and rotor


winding temperatures start
Increasing.

-Maintain all temps


within LIMITS

Parameters
Cold gas temp
(HI)
Hot gas temp.
(HI)
Rotor winding
temp HI

5. CHECK all the


generator voltages
(phase to phase)

Alar
m
---- C

Trip

---- C

---C

-----C

---C

---C

All the three phases


should read equal voltages

UCB indication

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

Page 6 of 8

6. SWITCH-ON the
Synchroscope to CHECK
mode.

-IN-COMING/RUNNING
voltages and frequencies
start showing on their
Corresponding meters.

-UCB indication &


Operation

- Alternatively
synchroscope is put on
Check mode and auto
synchroniser can be
Switched on.

-Synchroscope needle starts


rotating at a rate
proportional to difference
between the generator and
Grid frequencies.

-If the direction of


rotation is clockwise
the incoming
generator frequency
is higher than the
Grid & vice-versa.

7. ADJUST turbine speed


reference to match
generator freq with the
grid (running).

-Incoming and grid


frequencies should become
equal

-Synchroscope
Indications

-Synchroscope needle slows


down as the frequencies
match

8 ADJUST generator
excitation to match the
gen. voltage with that
of grid.

-Grid and generator


voltages start matching

-Incoming freq. Must


be higher than that of
grid before
synchronising.
-UCB/synchroscope
Meter readings.

-As synchroscope needle comes


to 11'O clock position
(clockwise), the
green CHECK lamp comes on &
the red lamp goes off. At 12' O
clock position the check lamp
goes off and
red lamp comes on again.

-With synchroscope on
check mode the
generator can be
synchronised
(breaker closed) only
When the green lamp
is on.

9 CLOSE the generator


breaker when the
check lamp is green.

-''Generator Breaker'' gets


closed, if all parameters
are matching during the
''close'' command

-If the breaker fails to


close.'' Gen. Breaker
Trip'' alarm comes on.
re-set and try again.

- ''Generator motoring'' alarm


Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

Revision:

Revision Date:

DB / SOP / GEN

File no:

Page 7 of 8

Comes on.
-Synchroscope needle gets
locked in 12'O clock
position

-Synchroscope red
lamp stays "ON"

-Generator line charging


MVAR (approx.-80 MVAR)
Indication comes on.

-Power factor becomes


leading for some
moments and
becomes unity again
depending upon the
gen. Load and
excitation.

9A. INCREASE Starting


Device to 100%

-Starting device comes to


100 %.

10 RAISE speed
reference slightly to
increase Gen load,
immediately after
closing the generator
breaker

-Turbine load increases to


----- MW approximately.

Speed reference can


be operated from
generator desk if the
ATRS selector switch is
on UCB mode.

-motoring'' alarm clears off.

UCB indication

- ''Speed controller'' transfers


to 'Load controller'' after some
time delay.

UCB indication

-Excitation null voltage


Becomes zero.

-UCB indication.

-Automatic voltage regulator


gets transferred to Auto.

-Manual channel
backs the auto
Channel if AVR is on.

11. RAISE excitation auto


set point until the
excitation null voltage
becomes zero and
TRANSFER excitation
to auto

-UCB indication.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation:

DB POWER LIMITED, RAIGARH


2 X 600 MW Power Plant
SOP for CHARGING OF GENERATOR
Issue No:

Issue Date:

12 CHECK all the


generator parameters
are OK and all
phases show equal
currents.

Revision:

Revision Date:

DB / SOP / GEN

File no:

Generator winding temperatures


less than 85C (alarm.)
Generator transformer winding
temp less than ---------C
(alarm.).

Page 8 of 8

UCB indication.

UCB indication.

Rotor winding temp are less than


--------C (alarm).

UCB indication.

Gen. cold gas temp is less than


------------- C (alarm).

UCB recorders.

Hydrogen cooler inlet water


temp is less than --------C (max.)

Local/DAS check

Hydrogen cooler outlet water


temp is less than ----C (max.).
Stator water temp at the inlet of
stator is less than --------C
(max.).

DAS/Local check

DAS/Local check

Stator water outlet temperature


is less than -----C (max.)
UCB/Local check.

Prepared by:

Reviewed by:

Approved by:

Signature:

Signature:

Signature:

Name:

Name:

Name:

Designation:

Designation:

Designation: