WORK INSTRUCTIONS
FOR
CHARGING OF GENERATOR
[DB / SOP / GEN]
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Page 1 of 8
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 2 of 8
Amendment Record
Amendment
Rev
No.
Amendment
Date
Nature of Change
Page
No.
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
ACK No.
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 3 of 8
1.0 Purpose:
This Procedure is intended to provide guidance and instructions for carrying out the
procedure for charging and synchronizing of generator.
2.0 Responsibility:
a) All the personnel involved in carrying out /supervising the above activities are
required to ensure implementation of this procedure.
b) In the event of any changes required in the procedure such changes may be
requested with Site Incharge, who would take appropriate action with approval
from respective departmental heads.
3.0 SAFETY AND ENVIRONMENTAL MEASURES/ CHECKS:
1. Work area should be clean & no oil, grease splitting should be there.
2. Safety signs should be marked wherever required.
3. Readiness of fire fighting equipments.
4. Ensure no oil leak at bearings area.
5. All GRP relays are reset. ( 186AI/286A1/186A2/286A2/186B/286B/186C/286C)
6. ALL H 2 Coolers are charged and H2 purity is > 98%.
7. GCB DC power supply is normalized
8. GCB earth switch is open
9. Generator Bus duct Pressurization system is in service & flow < 45 cu mtr
10. Flow of Water through stator winding > 80 M3/hr
11. Stator water Conductivity in main ckt = 2.0, Regen Ckt < 1.2 ms/cm start > 2.5
stop.
12. Stator cooling H2 gas rated pressure is 5 kg/cm2. (For better DP control, after
synchronization pressure should be made 3.5 ksc).
4.0 CHARGING OF GENERATOR:
ACTION
OBSERVATION
REMARKS
-UCB indication
-UCB indication
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Issue Date:
Revision:
Revision Date:
File no:
-UCB indication
-UCB indication
-UCB indication
-UCB indication.
Alarm: ----mho/cm
Trip: -------mho/cm
-Local operation.
Remote function
Page 4 of 8
-UCB indication
DB / SOP / GEN
-UCB indication.
-AUTO/MANUAL excitation
Controllers are on HOME
Position.
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 5 of 8
Increases to 21 KV approx. on
manual /auto excitation control,
Respectively.
4. RAISE generator
excitation manually, to
raise gen. voltage
-UCB indication
-UCB indication.
-UCB indication.
Parameters
Cold gas temp
(HI)
Hot gas temp.
(HI)
Rotor winding
temp HI
Alar
m
---- C
Trip
---- C
---C
-----C
---C
---C
UCB indication
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 6 of 8
6. SWITCH-ON the
Synchroscope to CHECK
mode.
-IN-COMING/RUNNING
voltages and frequencies
start showing on their
Corresponding meters.
- Alternatively
synchroscope is put on
Check mode and auto
synchroniser can be
Switched on.
-Synchroscope
Indications
8 ADJUST generator
excitation to match the
gen. voltage with that
of grid.
-With synchroscope on
check mode the
generator can be
synchronised
(breaker closed) only
When the green lamp
is on.
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 7 of 8
Comes on.
-Synchroscope needle gets
locked in 12'O clock
position
-Synchroscope red
lamp stays "ON"
10 RAISE speed
reference slightly to
increase Gen load,
immediately after
closing the generator
breaker
UCB indication
UCB indication
-UCB indication.
-Manual channel
backs the auto
Channel if AVR is on.
-UCB indication.
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation:
Issue Date:
Revision:
Revision Date:
DB / SOP / GEN
File no:
Page 8 of 8
UCB indication.
UCB indication.
UCB indication.
UCB recorders.
Local/DAS check
DAS/Local check
DAS/Local check
Prepared by:
Reviewed by:
Approved by:
Signature:
Signature:
Signature:
Name:
Name:
Name:
Designation:
Designation:
Designation: