Beruflich Dokumente
Kultur Dokumente
Client:
Project:
Site address:
Contact number:
Stage/
Frequency
Records
Conform to order
Each
delivery
Storage and
protection
As specified
Each week
Visual
Preliminary
activities
Task completion
Each work
area
Pre-start
Each work
area
Fencing
/
signage/
Protectiv
e
clothing
Each
sequence
Conduit
installation
Cable
installation
Ref
Description
Characteristics
Incoming
materials
inspectio
n
2
3
5
5a
5b
5c
6.
Inspection/test
procedure
Inspection: What/Who
Worker Service
Provider
Customer
Check against
orders
Safe, secure/adequate
protection
Visual
Visual
As per site
specific procedure To authority requirements Checked
Checklist
Specification as
per SWMS
attached
Checked
H (A)
Each
sequence
Checklist
SWMS002
Checklist
Checked
Each
sequence
Checklist
SWMS012
Checklist
Earth test report
Checked
Cable
connections
Each
Sequence
Checklist
SWMS013
Checklist
HV test report
Checked
Pre-handover
activities
Each work
area
Wiring
diagrams/
checklist
Specification,
as attached
Final inspection
W=
Protected from
weather
A witness point provides a party (such as the customer, service provider and regulatory authority) with the opportunity to witness the inspection or test
or aspect of the work, at their discretion.
Witness Point
H=
Hold Point
A hold point defines a point beyond which work may not proceed without the authorisation of a designated service provider or authority. This designated
service provider or authority might be an agency or other customers representative/ authorised person, or a regulatory authority (such as Integral Energy,
Sydney Water, Council and/or WorkCover etc.) representative, or it may be the service provider inspecting its service provider or worker.
S=
Electrical work to AS3000:2007 and Installation and Wiring Rules unless otherwise required.
X=