Sie sind auf Seite 1von 4

Roads

1. Asphalt Wearing Course

ISSUED FOR BID

3. Asphalt Base Course


4. Aggregate Base Course

05/19/16

JOB ORDER/EWO NO.

25-00037-0009

5. Subgrade Material
6. Embankment Fill Material
7. Granular Material
8. Road Markings & Road Studs
9. Traffic Signs with posts

BY/DATE

11. W-beam Guard Rail


12. Guard Rail End Terminals
14. Curbs
15. Concrete
16. Steel Reinforcement Bars
1.5.2

Street Lighting

FS
05/19/16

1. 20m High Mast Pole (mid hinged/motorized)


2. 12m High Pole
3. LED luminaire for 305 Watt and 155 Watt or equivalent wattage to meet the criteria.
4. LED luminaire for under bridge lighting of 105 watt or equivalent wattage to meet the

IA
05/19/16

ENGG. DATE

CERTIFIED/DATE

CONST. AGENCY/DATE OPERATIONS/DATE

13. Impact Attenuator

criteria
5. Cables

4Cx16 mm2 C/XLPE/SWA/PVC

4Cx25 mm2 C/XLPE/SWA/PVC

6. Street Lighting Control Cabinets


7. Duct Banks
8. UPVC/ PVC ducts
9. Manholes/Hand holes

REPORT
PK11- ISSUED FOR BID- MATERIAL LIST
JEC JAZAN EXPRESSWAY INTERCHANGES
JAZAN

DWG. TYPE

DOC
SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

SHT. NO

RXC

VE-075749

OF

JO / EWO:

25-00037-0009

REV. NO.

12
Saudi Aramco 2616 ENG. (09/03)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.

THIS REVISION IS NOT TO BE


USED FOR CONSTRUCTION
UNTIL CERTIFIED AND DATED

1.5.1

Material List

2. Asphalt Intermediate Course

THIS REVISION NO. A


IS COVERED, FOR ALL APPROVAL
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
DRAWING COMPLETION CERTIFICATE NO:

REVISION DESCRIPTION
DATE
REV. NO.

OTHER
REQUIRED (SAUDI ARAMCO)

REVIEW FOR KEY DRAWINGS

1.5

10. Gantry Signs and Cantilever Signs

(DESIGN AGENCY)

DESIGN CERTIFICATION
REVISION VALIDATION

SAUDI ARABIAN OIL COMPANY

1.
2.
3.
4.
5.

25-00037-0009

JOB ORDER/EWO NO.

05/19/16
A

33 KV Switch
33KV Cables.
33 KV/400V, 300KVA substation.
600 V Cables.
KWH Meters

Drainage
1. Inlet structures

BY/DATE
CONST. AGENCY/DATE OPERATIONS/DATE

Concrete

Reinforcement bars, steel

Construction joints

Waterproofing membrane

Coal tar epoxy coats

Polyethylene sheet

Heavy duty grating

2. uPVC pipes

Unplasticized polyvinyl chloride

3. GRP pipes

Glass reinforced plastic

FS
05/19/16

4. Pipe bedding

IA
05/19/16

CERTIFIED/DATE
ENGG. DATE

Power Supply

Granular material compacted under and around of the pipe

Fill material well compacted

Concrete

Blinding concrete

Geotextile fabric filter

5. Grouted Riprap

Rock/stone

Blinding concrete

Polyethylene sheet

Cohesive material

6. Loose Riprap

Rock/stone

Fill material (subgrade)

Cohesive material

7. Outfalls with Grouted riprap

REPORT
PK11- ISSUED FOR BID- MATERIAL LIST
JEC JAZAN EXPRESSWAY INTERCHANGES
JAZAN

DWG. TYPE

DOC
SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

SHT. NO

RXC

VE-075749

10

JO / EWO:

25-00037-0009

OF

REV. NO.

12
Saudi Aramco 2616 ENG. (09/03)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.

THIS REVISION IS NOT TO BE


USED FOR CONSTRUCTION
UNTIL CERTIFIED AND DATED

ISSUED FOR BID

1.5.3

1.5.4

THIS REVISION NO. A


IS COVERED, FOR ALL APPROVAL
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
DRAWING COMPLETION CERTIFICATE NO:

REVISION DESCRIPTION
DATE
REV. NO.

OTHER
REVIEW FOR KEY DRAWINGS

REQUIRED (SAUDI ARAMCO)


(DESIGN AGENCY)

DESIGN CERTIFICATION
REVISION VALIDATION

SAUDI ARABIAN OIL COMPANY

8. Concrete ditches

Concrete

9. Concrete check dams

ISSUED FOR BID

Concrete

05/19/16

JOB ORDER/EWO NO.

25-00037-0009

11. Reinforced concrete culverts

1.5.5

Concrete

Reinforcement bars, steel

Structure
1. Prestress Concrete with formwork

BY/DATE

3. Blinding / screed and Mass concrete


4. Reinforcement

6. Prestressing duct and system


7. Waterproofing membrane
8. Spray applied waterproofing
9. Red sand asphalt
10. Protection board
11. Bituminous paint
FS
05/19/16

CERTIFIED/DATE

CONST. AGENCY/DATE OPERATIONS/DATE

5. Prestressing steel

12. Protective coating


13. Lockable GRP doors for box girder decks and inspection galleries

IA
05/19/16

14. Mechanical bearings


15. Elastomeric bearings
16. Expansion joints

THIS REVISION NO. A


IS COVERED, FOR ALL APPROVAL
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
DRAWING COMPLETION CERTIFICATE NO:

REVISION VALIDATION

17. Backfill Material


18. Perforated pipe
19. Hand rail
20. Wearing surface
21. Stainless steel dowels
22. Galvanized steel cover plate and anchor bolts
23. Bearing dust covers
24. Conduits for lighting
25. Conduits for drainage

REPORT
PK11- ISSUED FOR BID- MATERIAL LIST
JEC JAZAN EXPRESSWAY INTERCHANGES
JAZAN

DWG. TYPE

DOC
SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

SHT. NO

RXC

VE-075749

11

JO / EWO:

25-00037-0009

OF

REV. NO.

12
Saudi Aramco 2616 ENG. (09/03)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.

Grouted riprap protection

10. Basins (natural gravel)

ENGG. DATE

REVIEW FOR KEY DRAWINGS

REQUIRED (SAUDI ARAMCO)


(DESIGN AGENCY)

DESIGN CERTIFICATION

2. Reinforced concrete with formwork

OTHER

REV. NO.

DATE

REVISION DESCRIPTION

THIS REVISION IS NOT TO BE


USED FOR CONSTRUCTION
UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

THIS REVISION NO. A


IS COVERED, FOR ALL APPROVAL
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER
DRAWING COMPLETION CERTIFICATE NO:

REVISION VALIDATION

FS
05/19/16

IA
05/19/16

CONST. AGENCY/DATE OPERATIONS/DATE

BY/DATE

OTHER
05/19/16

DATE

ISSUED FOR BID

REVISION DESCRIPTION

25-00037-0009

JOB ORDER/EWO NO.

REV. NO.

THIS REVISION IS NOT TO BE


USED FOR CONSTRUCTION
UNTIL CERTIFIED AND DATED

26. Water stop bar

27. Compressible filler

28. Joint sealant

29. Butyl rubber membrane

REPORT

PK11- ISSUED FOR BID- MATERIAL LIST

JEC JAZAN EXPRESSWAY INTERCHANGES


JAZAN

DWG. TYPE

DOC

SAUDI ARABIA

PLANT NO.

INDEX

DRAWING NO.

SHT. NO

RXC

VE-075749

12

JO / EWO:

25-00037-0009

OF

REV. NO.

12

Saudi Aramco 2616 ENG. (09/03)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.

CERTIFIED/DATE

REQUIRED (SAUDI ARAMCO)

(DESIGN AGENCY)
ENGG. DATE

REVIEW FOR KEY DRAWINGS

DESIGN CERTIFICATION

SAUDI ARABIAN OIL COMPANY

Das könnte Ihnen auch gefallen