Project Purpose:
To create a game manual for The Titans Revenge in English and French for use by the player as an
introductory and informative reference.

Outline:
A draft manual outline is presented in the Appendix on page 5. This draft outline will evolve as the project
progresses, and is subject to additions, deletions and re-organizations as required.

Budget:
Task
Plan Document
Write Document
First Review Cycle
Final Review Cycle
Translate Document
Publish and Archive Document

Total

Labour

Materials

Contractors

Expenses

$880
$9,570
$3,300
$4,400
$2,200
$4,400

/////
/////
/////
/////
/////
$13,000

/////
/////
/////
/////
$3,450
/////

/////
$1,323
/////
/////
/////
/////

$24,750

$13,000

$3,450

$1,323

Labour:
Based on the outline detailed in Appendix A, the fixed price labour cost is $24,750.
The lead writer`s time will be charged at $60/hour and the Secondary writers time will be charged at
$50/hour.
Additions to the scope of work will be charged at $75/hour.

Materials:
Estimated expenses are:
Printing charge: $1,000
Printing cost: $12,000
Total: $13,000

1
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

Contractors:
The document will be translated into French by Good Speaking Translation Agency. Their fixed price labour
cost is:
$3,450
This expense will be paid directly by Shockwave Games Inc. Any additional translation costs due to additions to
the scope of the work or other changes will be borne by Shockwave Games Inc. according to Good Speakings
regular charge-out rates. PM Technical Writing will not be responsible for any of the translation costs or cost
overruns.

Expenses:
All out-of-pocket expenses will be charged on a cost +10% basis. Estimated travel expenses between
Vancouver and Toronto are:
Airfare: $600
Accommodation: $200 per night x 2 nights
Expenses (food, ground transport): $50 per day x 3 days
Total for travel: $1,150
Carrying Charge: $173
Total: $1,323

Summary:
Labour: $24,750
Materials: $13,000
Contractors: $3,450
Expenses: $1,323
Total: $42,523
The labour cost is a fixed price quotation. Material, contractor and expense costs are estimates only and may
vary from this estimate.
Shockwave Games Inc. will cover the costs of Materials and Contractors.
All costs are quoted in Canadian Dollars.
GST will be added to the above amounts.
Interim invoices will be issued after the document achieves final approval. Progress reports will be issued on a
bi-weekly basis. Payment terms are net 30 days after receipt of invoice.
2
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

Schedule:
//

February
//
//

March
4

April
8
9

10

11

12

May
13

14

Submit Proposal

Finish

Approval to start
Plan

Sign off

Write Document/Travel

Publish

First Review Cycle

Submit

Translate
Final Review Cycle

Start
Plan
Write Document
First Review Cycle
Final Review Cycle
Translate
Publish
Sign off

The following assumptions are inherent in this schedule:

Approval to start the project by March 3rd, 2016

Project will be completed by May 24th, 2016

Stability of documentation scope, requirements and objectives

Availability and stability of source material

Resolution of outstanding technical issues

Timely review of material and the number of reviews

Deviations from any of these assumptions will delay the delivery of the final documentation. PM
Technical Writing cannot be responsible for the duration and timing of activities outside of its direct
control

3
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

Information Sources:
Information will be drawn from the following sources:

The Titans Revenge game software

The Titans Revenge game developers

Shockwave Games Inc. documentation

Public Domain

Any material drawn from The Titans Revenge game developers must be reviewed and approved by them prior
to release. PM Technical Writing cannot be responsible for any modifications or deletions to the proposed
outline arising from this review.
PM Technical Writing personnel require liberal access to The Titans Revenge game software and Shockwave
Games Inc. documentation during the course of document preparation. Images may be taken from this
software as part of the documentation process. Existing documentation will be made available to PM
Technical Writing in electronic or hardcopy form, as appropriate.

Review Process:
The document will be reviewed in two stages:

The First Review will occur formally and involve up to six members of Titans Revenge game
development team. This review will occur at the Shockwave Games Inc. facility in Burnaby, BC.

The Final Review will occur formally and involve up to eight members of the Titans Revenge game
development team. This review will also occur at the Shockwave Games Inc. facility in Burnaby, BC.
Shockwave Games Inc. is responsible for engaging the reviewers and arranging the meeting logistics for both
reviews.
Progress reports will be submitted twice through the project:

The first progress report will be submitted half way through the Write Document phase.

The second progress report will be submitted after the First Review Cycle.

Document Sign-off:
Shockwave Games Inc. will sign off and thereby take responsibility for the accuracy of the documentation.
Specifically, Shockwave Games Inc. will hold PM Technical Writing, its employees and contractors harmless of
any liability and litigation that may arise from the use of the documentation.

4
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

Document Format:
The document will be formatted consistent with other Shockwave Games Inc. game manuals. Documentation
will be created using Microsoft Word. Graphics will consist of materials supplied by Shockwave Games Inc. and
images taken directly from The Titans Revenge game software.

Assumptions:

Specific procedural instructions will be based on The Titans Revenge software. Instructions for other
software or products from Shockwave Games Inc. will not be included

The Titans Revenge software will be available to the project free of charge and a final version of the
product will be supplied to PM Technical Writing personnel

An invoice will be submitted after the document achieved final approval

All costs for document translation will be borne by Shockwave Games Inc.

All costs for document publishing will be borne by Shockwave Games Inc.

Deliverables:
PM Technical Writing will deliver 6000 copies of the manual in each language (English and French). Each copy
will consist of double-sided 600 dpi black and white laser printed paper using 7 x 4 sheets (as required).
Document softcopies (including embedded graphics) will be provided in MS Word (.docx) and Adobe Acrobat
(.pdf) formats. Separate original graphics files will be supplied in Adobe Illustrator (.ai) format.
Shockwave Games Inc. is responsible for binding, index tabs and distribution.

5
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

Appendix
The Titans Revenge Game Manual Outline
1. System Requirements
2. Installing
3. Uninstalling
4. Single Player Mode
4.1.1. Starting a New Game
4.1.2. Loading a Saved Game

5. Local Multiplayer Mode


6. Online Multiplayer Mode

6
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

7. Gameplay
7.1.1. User Interface
7.1.2. Controls
7.1.3. Movement
7.1.3.1.1.
Movement Controls
7.1.4. Manipulating Objects
7.1.5. Fighting
7.1.5.1.1.
7.1.6. Flying

Fighting Controls

7.1.6.1.1.
7.1.7. Inventory

Flying Controls

7.1.8. Items
7.1.9. Exiting the Game
7.1.10. Saving

8. Introduction
8.1.1. Characters
8.1.1.1.1.
8.1.1.1.2.
8.1.1.1.3.

Argoth the Marauder


Branwyn the Berserker
Korgen the Wild

7
Copyright 2016 PM Technical Writing. All Rights Reserved

PM Technical Writing
Document Number 20160223 Proposal Number RFP0496-2

9. Questing
9.1.1. Map
9.1.2. Talking
9.1.3. Collecting Rainbow Gems
9.1.4. status

10. Chapters
10.1.1. The First Steps a Lulu
10.1.2. Dont Eat the Mushrooms
10.1.3. A Hard Days Night in the Black Forest
10.1.4. Beware the Bones of March
10.1.5. Ill Be Back

11. Completing the Game


12. Technical Support
13. Tips and Techniques